My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/30/92 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1992
>
11/30/92 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:21:38 PM
Creation date
9/21/2016 11:09:49 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
11/30/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING NOVEMBER 30. 1992 <br />E <br />The regular meeting of the Board of Public Works was convened at <br />9:33 a.m. on Monday, November 30, 1992, by Board President John <br />E. Leszczynski, with Mr. Leszczynski, Mr. James R. Caldwell and <br />Mrs. Mary H. Mueller present. <br />APPROVE MINUTES OF PREVIOUS MEETING <br />Upon a motion made by Mr. Caldwell, seconded by Mrs. Mueller and <br />carried, the minutes of the regular meeting of the Board held on <br />November 23, 1992, were approved. <br />OPENING OF BIDS - PUMP NO. 3 DRIVE REPLACEMENT - WASTEWATER <br />TREATMENT PLANT <br />This was the date set for receiving and opening of sealed bids <br />for the above referred to project. The Clerk tendered proofs of <br />publication of Notice in the South Bend Tribune and the <br />Tri-County News which were found to be sufficient. The following <br />bids were opened and publicly read: <br />KASER-SPRAKER CONSTRUCTION, INC. <br />25487 West State Road 2 <br />P.O. Box 3605 <br />South Bend, Indiana 46619 <br />Bid was signed by Mr. Gary L. Spraker, President, Non - <br />Collusion Affidavit was in order, Non -Discrimination <br />Commitment form was completed and a five per cent (5%) <br />Bid Bond was submitted. <br />BID: $296,370.00 <br />SHAUM ELECTRIC COMPANY, INC. <br />1125 North Nappanee Street <br />Elkhart, Indiana 46514 <br />Bid was signed by Mr. Gary Shaum, President, Non -Collusion <br />Affidavit was in order, Non -Discrimination Commitment form <br />was completed and a five per cent (5%) Bid Bond was <br />submitted. <br />BID: $246,260.00 <br />BOWEN ENGINEERING CORPORATION <br />P.O. Box 40729 <br />Indianapolis, Indiana 46240 <br />Bid was signed by Mr. R. Jed Holt, <br />Collusion Affidavit was in order, <br />Commitment form was completed and <br />Bid Bond was submitted. <br />BID: $302,800.00 <br />HERRMAN & GOETZ, INC. <br />225 South Lafayette Boulevard <br />South Bend, Indiana 46601 <br />Vice -President, Non - <br />Non -Discrimination <br />a five per cent (5%) <br />Bid was signed by Mr. Thomas J. Herrman, President, Non - <br />Collusion Affidavit was in order and a five per cent (5%) <br />Bid Bond was submitted. <br />BID: $288,116.00 <br />Upon a motion made by Mr. Leszczynski, seconded by Mr. Caldwell <br />and carried, the above bids were referred to the Division of <br />Engineering for review and recommendation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.