Laserfiche WebLink
194 <br />REGULAR MEETING <br />JUNE 8, 1992 <br />The regular meeting of the Board of Public Works was convened at <br />9:32 a.m. on Monday, June 8, 1992, by Board President John E. <br />Leszczynski, with Mr. Leszczynski and Mr. James R. Caldwell <br />present. Board Member and Attorney Mary H. Mueller was not in <br />attendance. Also present was Assistant City Attorney Jenny Pitts <br />Manier. <br />APPROVE MINUTES OF PREVIOUS MEETING <br />Upon a motion made by Mr. Caldwell, seconded by Mr. Leszczynski <br />and carried, the minutes of the regular meeting of the Board held <br />on June 1, 1992 were approved. <br />AWARD BID - REFURBISHING OF ONE (1) 1983 3-D 1500 G.P.M. DUPLEX <br />CHASSIS PUMPER <br />In a letter to the Board, Fire Chief Luther Taylor advised that <br />he has reviewed the two (2) bids received on June 1, 1992 for the <br />above referred to refurbishing project and recommends that the <br />Board award the bid of Renewed Performance, Inc., P.O. Box 196, <br />Tipton, Indiana, in the amount of $65,453.00 which is the base <br />bid of $61,774.00 plus optional equipment in the amount of <br />$3,679.00. Therefore, Mr. Caldwell made a motion that the <br />recommendation be accepted and the bid be awarded. Mr. <br />Leszczynski seconded the motion which carried. <br />AWARD BID - GRIT CHANNEL REBUILDING - SOUTH BEND WASTEWATER <br />TREATMENT PLANT <br />Mr. Carl P. Littrell, Director, Division of Engineering, informed <br />the Board that he has reviewed the two (2) bids received on June <br />1, 1992 for the above referred to project and recommends that the <br />Board award the low bid of Industrial Installation, Inc., 55587 <br />Currant Road, Mishawaka, Indiana, in the amount of $29,760.00 <br />subject to review by the Division of Environmental Services and <br />availability of funds. Mr. Caldwell made a motion that the <br />recommendation be accepted and the bid be awarded. Mr. <br />Leszczynski seconded the motion which carried. <br />AWARD BID - STUDEBAKER CORRIDOR REDEVELOPMENT AREA - AVANTI <br />BUILDING - ASBESTOS ABATEMENT - (BID PACKAGE #1) <br />Mr. Leszczynski advised that the Board is in receipt of a <br />Memorandum from Mr. Carl P. Littrell, Director, Division of <br />Engineering, recommending that the Board award the low bid of <br />Asbestos Services, Inc., 9028 Hills Road, P.O. Box 141, Baroda, <br />MI, in the amount of $24,337.00, with no additional liability <br />insurance ordered, for the above referred to project. It is <br />noted that bids for this project were opened by the Board on June <br />1, 1992. Mr. Leszczynski made a motion that the recommendation <br />be accepted and the bid be awarded. Mr. Caldwell seconded the <br />motion which carried. <br />AWARD BID - STUDEBAKER CORRIDOR REDEVELOPMENT AREA - BUILDING AT <br />216 WEST GARST STREET (NORTH AMERICAN SIGN COMPANY) <br />- ASBESTOS ABATEMENT - (BID PACKAGE #1) <br />- DEMOLITION (BID PACKAGE #2) <br />Mr. Carl P. Littrell, Director, Division of Engineering, informed <br />the Board that he has reviewed the bids received on June 1, 1992, <br />for the above referred to project and at this time recommends <br />that the Board award the low bid of Speciality Systems of <br />Illinois, Inc., Inc., South Bend Division, 1408 Elwood Avenue, <br />South Bend, Indiana, for asbestos abatement, in the amount of <br />$1,120.00 and that no additional insurance be ordered. Mr. <br />Caldwell made a motion that the recommendation be accepted and <br />the bid be awarded. Mr. Leszczynski seconded the motion which <br />carried. <br />1 <br />1 <br />I� <br />Additionally, Mr. Littrell recommended that the Board award the <br />