My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/25/93 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1993
>
10/25/93 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:29:42 PM
Creation date
9/20/2016 10:54:41 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/25/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
410 <br />REGULAR MEETING <br />OPENING OF QUOTATIONS <br />OCTOBER 25, 1993 <br />AWARD - SIDEWALK AND CURB REPLACEMENT <br />CENTRAL BUSINESS DISTRICT AND EAST BANK <br />It was noted that this was the date set for the receiving and <br />opening of sealed Quotations for curb and sidewalk replacements <br />in the Central Business District in the 400 block of West Wayne <br />Street and in the East Bank Area in the 100 block of South Hill <br />Street. The following Quotations were opened and read: <br />PHIL ALBERT CONCRETE <br />50106 Bittersweet Trail <br />Granger, Indiana <br />Quotation was signed by <br />QUOTATION: $12,234.00 <br />Mr. Phil Albert, Owner. <br />KASER-SPRAKER CONSTRUCTION INC. <br />25487 West State Road 2 <br />South Bend, Indiana <br />Quotation was signed by Mr. Gary L. Spraker, President. <br />QUOTATION: $11,746.00 <br />NORTHERN INDIANA CONSTRUCTION COMPANY <br />P.O. Box 1333 <br />Mishawaka, Indiana <br />Quotation was signed by Mr. David Walorski, President. <br />QUOTATION: $7,412.05 <br />Upon a motion made by Mr. Leszczynski, seconded by Mr. Caldwell <br />and carried, the above Quotations were referred to the Division of <br />Engineering for immediate review in order that an award could be <br />made at this meeting. <br />Following that review, Mr. Carl P. Littrell, Director, Division of <br />Engineering, recommended that the Board award the low Quotation <br />submitted by Northern Indiana Construction Company, in the amount <br />of $7,412.05, for this project. Mr. Leszczynski made a motion <br />that this recommendation be accepted and the Quotation be awarded. <br />Mrs. Manier seconded the motion which carried. <br />OPENING OF QUOTATIONS - STATE THEATER STORM SEWER REPAIR <br />Mr. Leszczynski noted that this was the date set for the receipt <br />of opening of sealed Quotations for storm sewer repair at the <br />State Theater Building. The following Quotations were opened and <br />read: <br />HRP CONSTRUCTION <br />P.O. Box 266 <br />South Bend, Indiana 46624-0266 <br />Quotation was signed by Ms. Peggy S. Biggs. <br />QUOTATION: $2,800.00 <br />HERRMAN & GOETZ, INC. <br />225 South Lafayette Boulevard <br />South Bend, Indiana 46601 <br />Quotation was signed by Mr. Douglas D. Wagley. <br />QUOTATION: $1,795.00 <br />1 <br />1 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.