Laserfiche WebLink
IUU <br />REGULAR MEETING <br />MARCH 22, 1993 <br />Upon a motion made by Mr. Leszczynski, seconded by Mr. Caldwell <br />and carried, the above bids were referred to the Division of <br />Equipment Services for review and recommendation. <br />OPENING OF BIDS - BLACKTHORN GOLF COURSE MAINTENANCE FACILITY <br />This was the date set for the receiving and opening of bids for <br />the above referred to project. The Clerk tendered proofs of <br />publication of Notice in the South Bend Tribune and the Tri-County <br />News which were found to be sufficient. <br />Board Attorney and Member Mary H. Mueller advised that the bid <br />submitted by Diamond Associates Development Company, Inc., 801 "G" <br />Lane #1-B, Elkhart, Indiana, did not contain a properly signed Bid <br />Bond. Therefore, Mrs. Mueller made a motion that the bid be <br />rejected. Mr. Caldwell seconded the motion which carried. <br />The following bids were opened and read: <br />ZIOLKOWSKI CONSTRUCTION, INC. <br />1005 South Lafayette Boulevard <br />P.O. Box 1106 <br />South Bend, Indiana 46624 <br />Bid was signed by Mr. Ben Ziolkowski, President, Non - <br />Collusion Affidavit was in order, Non -Discrimination <br />Commitment form was completed and a five per cent (5%) Bid <br />Bond was submitted. <br />BID: <br />Base Bid: $233,525.00 <br />Alternate Bid IA: $ 28,383.00 <br />Alternate Bid 1B: $ 3,380.00 <br />Alternate Bid 2: $ 9,160.00 <br />CASTEEL CONSTRUCTION CORPORATION <br />P.O. Box 628 <br />South Bend, Indiana 46624 <br />Bid was signed by Mr. R.V. Casteel, President, Non -Collusion <br />Affidavit was in order, Non -Discrimination Commitment form <br />was completed and a five per cent (5%) Bid Bond was <br />submitted. <br />BID• <br />Base Bid: <br />Alternate Bid 1A: <br />Alternate Bid 1B: <br />Alternate Bid 2: <br />Upon a motion made by <br />and carried, the above <br />Engineering for review <br />$229,000.00 <br />$ 40,000.00 <br />$ 3,300.00 <br />$ 4,500.00 <br />Mr. Leszczynski, seconded by Mrs. Mueller <br />bids were referred to the Division of <br />and recommendation. <br />OPENING OF PROPOSALS - CORPORATE SPONSORSHIP OF ETHNIC FESTIVAL <br />(SOFT DRINKS) <br />It was noted that this was the date set for the submission of <br />Proposals for an exclusive soft drink corporate sponsorship for <br />the 1993 Ethnic Festival. Mr. Leszczynski advised that the Board <br />did receive a letter from Pepsi -Cola General Bottlers of South <br />Bend, Inc., 1330 South High Street, P.O. Box 1596, South Bend, <br />Indiana, declining to submit a Proposal for this sponsorship. No <br />other Proposals were received by the Board. <br />1 <br />1 <br />