044
<br />REGULAR MEETING FEBRUARY 8, 1993
<br />AWARD BID - HI -BAND PORTABLE TWO-WAY RADIOS, VEHICULAR CHARGERS
<br />AND ACCESSORY ITEMS FOR THE SOUTH BEND FIRE DEPARTMENT
<br />Board Attorney and Member Mary H. Mueller noted that on December
<br />14, 1992, the Board opened bids for eighty-five (85), more or
<br />less, highband portable two-way radios and vehicular chargers,
<br />sixty-five (65), more or less, UHF portable two way radios and
<br />vehicular chargers and optional accessory items.
<br />Mrs. Mueller further noted that the Police Department is
<br />reconsidering their needs in regards to radios. However, the
<br />Fire Department at this time recommends that the Board award the
<br />bid submitted by Motorola C&E, Inc., 4109 Winterfield run, Fort
<br />Wayne, Indiana.
<br />Therefore, Mrs. Mueller made a motion that the Board award the
<br />bid of Motorola for the Fire Department needs through December,
<br />1994, subject to the letter submitted by Motorola dated February
<br />1, 1993 which indicates that Motorola shall supply thirty-five
<br />(35) HT1000 units with vehicular charger/mobile adapter
<br />capability four (4) weeks after receipt of a valid factory order
<br />and that the vehicular charger/mobile adapters will be supplied
<br />no later than August 30, 1993. Mr. Leszczynski seconded the
<br />motion which carried.
<br />AWARD BID - INSPECTION AND REPAIR OF PUMP NO. 3 AND APPURTENANCES
<br />DIVISION A: PUMP INSPECTION AND REPAIRS
<br />DIVISION B: RIGHT ANGLE DRIVE INSPECTION AND REPAIRS
<br />(WASTEWATER TREATMENT PLANT)
<br />Mr. Carl P. Littrell, Director, Division of Engineering, advised
<br />the Board that on February 1, 1993, bids were received and opened
<br />for the above referred to project. After reviewing those bids,
<br />Mr. Littrell recommends that the Board award two (2) contracts
<br />for this work. The work is divided into Division A and B and a
<br />different contractor was the low bidder in each division.
<br />Mr. Littrell recommended that the Board award Division A to
<br />Fairbanks Morse Pump Corporation, 3601 Fairbanks Avenue, Kansas
<br />City, Kansas, in the amount of $34,781.00 and Division B to
<br />HydroAire, Inc., 834 West Madison, Chicago, Illinois, in the
<br />amount of $20,683.00..
<br />Therefore, Mrs. Mueller made a motion that the recommendation be
<br />accepted and the bids be awarded as outlined above. Mr.
<br />Leszczynski seconded the motion which carried.
<br />AWARD BID - SCISSORS LIFT AND INSTALLATION - SANITATION
<br />DEPARTMENT GARAGE EXPANSION AND RENOVATION PROJECT
<br />Mr. Leszczynski advised that the Board is in receipt of a
<br />Memorandum from Mr. Carl P. Littrell, Director, Division of
<br />Engineering, indicating that on January 11, 1993, the Board
<br />received two (2) bids for the above project. The bids were one
<br />lump sum price to furnish and install one 75,000 pound truck lift
<br />in the Sanitation Department garage addition now under
<br />construction.
<br />Mr. Littrell noted that SEFAC Lift and Equipment Corporation of
<br />Columbia, Maryland bid $69,000.00. Safetylane Equipment
<br />Corporation of Bloomington, Indiana, bid $79,883.00.
<br />Mr. Littrell recommended that the Board award the contract to
<br />Safetylane Equipment, the higher bidder, because the bid from
<br />SEFAC is not responsive to the requirements of the specifications
<br />for this project. The equipment that SEFAC proposed in their bid
<br />documents, an Omer brand Model Vega 325, falls short of the lift
<br />capacity, dimensional sizes of the lift platform and clearances.
<br />Additionally, the electrical controls for the Vega lift have not
<br />1
<br />1
<br />1
<br />
|