Laserfiche WebLink
"0 <br />REGULAR MEETING <br />OCTOBER 31; 1994 <br />Upon a motion made by Mr. Caldwell, seconded by Mrs. Manier and carried, the above bids were <br />referred to the Department of Code Enforcement for review and recommendation. <br />OPENING OF BIDS - COLLEGE FOOTBALL HALL OF FAME - SYNTHETIC SURFACES <br />REBID AND PAINTING AND FINISHING <br />This was the date set for receiving and opening of sealed bids for the above referred to project. The <br />Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-County News <br />which were found to be sufficient. The following bids were opened and publicly read: <br />KIEFER SPECIALTY FLOORING, INC. <br />1700 Kiefer Drive <br />Zion, Illinois 60099 <br />Bid was signed by Mr. Daniel D. Kehoe, Regional Sales Manager <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $155,600.00 <br />Note: $136,666 for Exterior Plaza Synthetic Surface only <br />$ 18,934 for Interior Synthetic Surface <br />Exterior Plaza Surface - Mondo Super x $60.57 per yard <br />Interior Surfaces - Controlled products are Medallion 1000PC <br />@ $23.167 per yard <br />PANGERE CORPORATION <br />4050 W. 4th Avenue <br />Gary, Indiana 46406 <br />Bid was signed by Mr. Nicholas J. Pangere, Vice-President/Secretary <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $224,312.00 <br />Breakout Cost for Tunnel Work $5,536.00 <br />INTERIOR FINISHES. INC. <br />1616 W. Third Street <br />Osceola, Indiana 46561 <br />Bid was signed by Mr. Alfred R. Vicsik, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $222, 165.00 <br />Alternates for Exterior Surfacing PI <br />Alternate #1 Amount to be deducted from base bid to furnish and install polypropylene <br />turf style athletic surfacing on the plaza $131,025.00 <br />Alternate #2 Amount to be deducted from base bid to furnish and install polypropylene <br />turf style athletic surfacing on the plaza $123,575.00 <br />Alternate #3 NO BID <br />Alternates for Interior Athletic Surfacine <br />