My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/01/94 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1994
>
08/01/94 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:23:16 PM
Creation date
9/13/2016 10:01:28 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
8/1/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ME <br />REGULAR MEETING <br />AUGUST 1, 1994 <br />ZIOLKOWSKI CONSTRUCTION, INC. <br />P.O. Box 1106 <br />South Bend, Indiana 46624 <br />Quotation was signed by Mr. Ben Ziolkowski, President. <br />QUOTATION: $21,280.05 <br />MARVIN A. CRAYTON CONSTRUCTION COMPANY, INC. <br />305 South Lake Street <br />South Bend, Indiana 46619 <br />Quotation was signed by Mr. Marvin A. Crayton, President. <br />QUOTATION: $19,427.98 <br />Upon a motion made by Mr. Leszczynski, seconded by Mrs. Manier and <br />carried, the Quotations received were referred to the Division of <br />Engineering for immediate review and recommendation. <br />Mr. Carl P. Littrell, Director,_Division of Engineering, informed <br />members of the Board that he has reviewed the three (3) Quotations <br />received and recommends that the Board award the Quotation <br />submitted by Marvin A. Crayton Construction Company, Inc. Mr. <br />Littrell noted that the bid of Marvin A. Crayton contained errors <br />in computation but was still the low Quotation submitted in the <br />amount of $19,287.23 <br />Therefore, Mrs. Manier made a motion that the Quotation of Marvin <br />A. Crayton, in the amount of $19,287.23, be awarded. Mr. Caldwell <br />seconded the motion which carried. <br />- ASBESTOS ABATEMENT - 216 E. KEASEY & 225 <br />E. PENNSYLVANIA - SOUTHEAST REDEVELOPMENT AREA SITE CLEARANCE <br />PHASE I - STRUCTURE REMOVAL PACKAGE I <br />It was noted that this was the date set for the submission of <br />Quotations for the above referred to project. Work to be <br />performed shall include furnishing all labor, services, insurance <br />and equipment to abate asbestos contained in exterior siding on <br />the structures located at 216 East Keasey Street and 225 East <br />Pennsylvania Avenue. The following Quotation was opened and read: <br />SPECIALTY SYSTEMS OF SOUTH BEND, INC. <br />1408 Elwood Avenue <br />South Bend, Indiana 46628 <br />Quotation was signed by Mr. Joe W. Taylor, President. <br />QUOTATION: $11,817.00 <br />Mr. Leszczynski made a motion that this Quotation be referred to <br />the Division of Engineering for review and recommendation. Mr. <br />Caldwell seconded the motion which carried. <br />OPENING OF QUOTATIONS - LEVEL CONTROLS MODIFICATION I/N KOTE LIFT <br />STATIONS NO. 1 THOUGH NO. 4 <br />This was the date set for the receiving and opening of sealed <br />Quotations for the above referred to project. The project will <br />include the removal of the existing bubbler level control system <br />and replacement with a new pressure transducer control system. <br />The following Quotations were opened and read: <br />FLOW -TECHNICS, INC. <br />593 North William Street <br />Thorton, Illinois 60476 <br />Quotation was submitted by Mr. Royce E. Hamende, Jr. <br />1 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.