My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/21/94 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1994
>
02/21/94 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:27:35 PM
Creation date
9/8/2016 1:15:27 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
2/21/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
099 <br />I] <br />REGULAR MEETING FEBRUARY 21, 1994 <br />HRP CONSTRUCTION, INC. <br />P.O. Box 266 <br />South Bend, Indiana 46624-0266 <br />Bid was signed by Mr. Paul J. Fallon, General Manager, Non - <br />Collusion Affidavit was in order, Non -Discrimination <br />Commitment form was completed and a five ten per cent (5a) <br />Bid Bond was submitted. <br />BID: <br />Division B: $ 188,904.00 <br />Division A: $ 718,095.90 <br />Total Division A & B $ 906,999.90 <br />RITSCHARD BROTHERS, INC. <br />1204 West Sample Street <br />South Bend, Indiana 46619 <br />Bid was signed by Mr. Carmelo Ritschard, President, Non - <br />Collusion Affidavit was in order, Non -Discrimination <br />Commitment form was completed and a five ten per cent (50) <br />Bid Bond was submitted. <br />BID: <br />Division B: $ 133,656.50 <br />Division A: $ 672,038.12 <br />Total Division A & B $ 805,694.62 <br />Upon a motion made by Mr. Leszczynski, seconded by Mr. Caldwell <br />and carried, the above bids were referred to the Division of <br />Engineering for review and recommendation. <br />OPENING AND AWARD - QUOTATIONS - TUNNEL DEMOLITION AND FILLING - <br />STEPHENSON MILLS APARTMENTS SITE DEVELOPMENT <br />It was noted that this was the date set for the receiving and <br />opening of sealed Quotations for the above referred to project. <br />It was further noted that this project involves the demolition of <br />a cast in place reinforced concrete loading dock, excavation and <br />demolition of a reinforced concrete tunnel roof, partial <br />demolition of tunnel walls, and backfill of the tunnel space. The <br />following Quotations were opened and read: <br />RITSCHARD BROTHERS, INC. <br />1204 West Sample Street <br />South Bend, Indiana 46625 <br />Quotation was signed by Mr. Carmelo Ritschard, President. <br />QUOTATION: $ 9,450.00 <br />WARNER AND SONS, INC. <br />P.O. Box 87 <br />Elkhart, Indiana 46515 <br />Quotation was signed by Mr. Jack Warner, President. <br />QUOTATION: $ 7,765.00 <br />LA FREE EXCAVATING INC. <br />11252 West 3rd Street <br />Osceola, Indiana 46561 <br />Quotation was signed by Mr. Richard LaFree, President. <br />QUOTATION: $11,480.00 <br />Based on the recommendation of Mr. Carl P. Littrell, Director, <br />Division of Engineering, Mr. Leszczynski made a motion that the <br />Quotation submitted by Warner and Sons, Inc., in the amount of <br />$7,765.00 be awarded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.