Laserfiche WebLink
REGULAR MEETING OCTOBER 30, 1995 <br />AWARD QUOTATION - IRELAND/NIICHIGAN STREETS ASPHALT PAVING - PROJECT <br />NO. 95-79 <br />Mr. Carl P. Littrell, Director, Division of Engineering, advised the Board that on October 23, 1995, <br />quotations were received and opened for the above referred to project. After reviewing those <br />quotations, Mr. Littrell recommends that the Board award the contract to Walsh & Kelly, Inc., <br />24358 State Road 23, South Bend, Indiana in the amount of $27,285.00. Therefore, Mrs. Manier <br />made a motion that the recommendation be accepted and the quotation be awarded as outlined <br />above. Mr. Caldwell seconded the motion which carried. <br />APPROVE CONSTRUCTION CONTRACT - SOUTHEAST PARTNERSHIP CENTER SERVICE <br />AREA - SIDEWALK, CURB AND APPROACH REPAIRS - PROJECT NO 95-11 <br />Mr. Leszczynski, advised that in accordance with the bid awarded on October 9, 1995, to Walsh & <br />Kelly, Inc., 24358 State Road 23, South Bend, Indiana, in the amount of $69,887.00 for the above <br />referred to project, a Contract in said amount was being submitted for Board approval. Upon a <br />motion made by Mr. Caldwell, seconded by Mrs. Manier and carried, the Contract was approved <br />and the appropriate Certificate of Insurance, Performance Bond and Labor and Materials Payment <br />Bond as submitted were filed. <br />APPROVE CONSTRUCTION CONTRACT - NEW IRRIGATION SYSTEM - ELBEL GOLF <br />COURSE - PROJECT NO. 95-16 <br />Mr. Leszczynski advised that in accordance with the bid awarded on October 16, 1995, to Wissco <br />Irrigation, Inc., 1820 South Bend Avenue, South Bend, Indiana, in the amount of $583,000.00 for <br />the above referred to project, a Contract in said amount was being submitted for Board approval. <br />Upon a motion made by Mrs. Manier, seconded by Mr. Caldwell and carried, the Contract was <br />approved and the appropriate Certificate of Insurance, Performance Bond and Labor and Materials <br />Payment Bond as submitted were filed. <br />APPROVAL OF AGREEMENT - UTILITY AGREEMENT - OLD DARDEN ROAD BRIDGE <br />Mr. Leszczynski stated that the Board is in receipt of an Agreement between the City of South Bend <br />and the Board of Commissioners of St. Joseph County, Indiana, for sanitary sewers, services and <br />appurtenances located within the project limits of the Old Darden Road Bridge in St. Joseph County, <br />to be located on the bridge or within the adjacent right-of-way in accordance to the drawings as <br />submitted. Therefore, upon a motion made by Mrs. Manier, seconded by Mr. Caldwell and carried, <br />the Agreement was approved and executed. <br />APPROVAL OF AGREEMENT - SOUTIEAST REDEVELOPMENT AREA - STORM SEWER <br />SURVEY AND PLANNING - PROJECT NO 95-93 <br />Mr. Leszczynski stated that the Board is in receipt of an Agreement between the City of South Bend <br />and Cole Associates, 2211 East Jefferson, South Bend, Indiana, for services to design a parkway - <br />type roadway, including storm drainage within the project limits. This roadway will separate and <br />provide access to the Parkview Juvenile Center, under construction, and the new Ivy Tech site, now <br />being designed. This design will be coordinated with the master infrastructure plan, also being <br />developed by Cole Associates. Mr. Leszczynski noted that the Agreement is in the amount of <br />$84,292.00 if all the enumerated services are found to be necessary to complete the study and <br />design(s). Therefore, upon a motion made by Mr. Caldwell, seconded by Mrs. Manier and carried, <br />the Agreement was approved and executed. <br />APPROVAL OF AGREEMENT - SOUTHEAST REDEVELOPMENT AREA - FIELD SURVEY <br />INFRASTRUCTURE AND MASTER PLAN STUDY - ROADWAY AND STORM SEWER <br />DESIGN - PROJECT NO. 95-93 <br />Mr. Leszczynski stated that the Board is in receipt of an Agreement between the City of South Bend <br />and Cole Associates, 2211 East Jefferson, South Bend, Indiana, for services to study and design a <br />storm water management system for the Southeast Redevelopment Area. Further, this study will <br />determine the feasibility of storm sewer separation, re -use and/or replacement of existing combined <br />sewers as storm or sanitary sewers, and design those facilities including roadway replacements as <br />the study may show to be necessary for the trunk lines. The area being studied is from Michigan <br />Street to High Street, Sample Street to Broadway. Mr. Leszczynski noted that the Agreement is in <br />