Laserfiche WebLink
0^0 <br />REGULAR MEETING MAY 11, 1998 <br />Ra,r <br />77 700 Cool White, 75 Watts $ 2.44 <br />F96T 12/CW/S S <br />78 60 Cool White, 60 Watts $ 3.00 <br />F48T 12/CW/HO <br />79 24 Cool White $ 4.31 <br />F36T 12/CW/HO/S S <br />80 1,200 Cool White (112), 100 Watts $ 2.64 <br />F96T 12/CW/HO/SS <br />81 50 White (112), 110 Watts $ 4.23 <br />F96T 12/W/D3 5/HO/SS <br />87 48 1141 Bulb 120 $ .67 <br />Sylvania # 363770 <br />88 50 2 Foot Ballast $ 7.16 <br />447-LR-TC-P <br />89 100 4 Foot Ballast $ 9.21 <br />R-2540-TP <br />90 150 72" or 96" High Output $21.87 <br />RS-25110-TP <br />91 150 60", 72", or 96" Slim Line $15.50 <br />R-2E75-S-ST <br />92 50 4 Foot Ballast $44.01 <br />VDC - 2540 TP <br />Therefore, Mr. Caldwell made a motion that the recommendation be accepted and the bid be awarded <br />as outlined above. Ms. Roemer seconded the motion which carried. <br />AWARD BID - REMOVAL OF UNDERGROUND STORAGE TANKS - PROJECT NO. 98-34 <br />Mr. Ken Zmudzinski, Environmental Services, advised the Board that on April 27, 1998, bids were <br />received and opened for the above referred to project. After reviewing those bids, Mr. Zmudzinski <br />recommends that the Board award the contract to Metro Environmental Contractors, Inc., I I I I West <br />Dundee Road, Wheeling, Illinois in the amount of $15,472.50. Therefore, Mr. Caldwell made a <br />motion that the recommendation be accepted* and the bid be awarded as outlined above. Ms. Roemer <br />seconded the motion which carried. <br />AWARD QUOTATION - SOUTHEAST NEIGHBORHOOD SITE PREPARATION - PROJECT <br />NO. 98-41-1 <br />Mr. Marco Marian, Planning Department, advised the Board that on May 4, 1998, quotations were <br />received and opened for the above referred to project. After reviewing those quotations, Mr. Mariani <br />recommends that the Board award the contract to Bradberry Brothers, Inc., 20061 West Dice Street, <br />South Bend, Indiana, in the amount of $50,033.00. Therefore, Mr. Littrell made a motion that the <br />recommendation be accepted and the quotation be awarded as outlined above. Ms. Roemer seconded <br />the motion which carried. <br />APPROVE CHANGE ORDER - 1997 SEWER LINING PROGRAM - PROJECT NO. 98-52 <br />Mr. Caldwell advised that Mr. Toy Villa, Public Construction Manager, has submitted Change Order <br />No. 1 on behalf of Insituform Midwest, Inc., Post Office Box 458, Lemont, Illinois indicating that <br />the Contract amount be increased $68,422.00 for a new Contract sum including this Change Order <br />in the amount of $826,165.00. Upon a motion made by Mr. Littrell, seconded by Ms. Roemer and <br />carried, the Change Order was approved. <br />