My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Main and Colfax Parking Garage Entrance and Exit Adjustment - American Structurepoint
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Main and Colfax Parking Garage Entrance and Exit Adjustment - American Structurepoint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 10:00:47 AM
Creation date
8/30/2016 2:06:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/23/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The second option would be based on a more extensive effort requiring changes with a greater <br />amount of the garage being affected by the required changes. Both options will require the <br />same scope as described below, though to lesser or greater degrees of effort. <br />a) Prepare floor plans and specification for the purpose of open bidding of the project <br />b) Submit bid documents to the Client for review <br />c) Meet with the Client to review their comments <br />d) Incorporate comments into the bid documents <br />e) Submit to the State of Indiana DHS for Design Release should physical alterations be <br />required to the concrete slab (Cost for plan review not included in the fee below) <br />F. Bidding and Construction <br />1. Attend one pre -bid meeting <br />2. Respond to RFI <br />3. Produce Addenda as required <br />4. Attend one pre -construction meeting <br />5. Make up to two site visits to review that work is in accordance to design intent <br />6. Make one site visit for final punch list <br />SCHEDULE <br />The following is a proposed schedule based upon our understanding of the engineering work required. <br />Notice to Proceed <br />Record Drawings 1 week from signed contract <br />Owner Approval 1 week <br />Options Development 3 weeks <br />Owner Approval 1 week <br />Plans and Specification (based upon which option is selected) 3-5 weeks <br />Owner Approval <br />Bidding <br />1 week <br />4 weeks <br />The following lump -sum fees are based on the scope and schedule outlined above. <br />Fee for both projects concurrently <br />Architectural Record Drawings..................................................................... $5,300.00 <br />Options Development....................................................................................$7,200.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.