ADD ALTERNATE A: JEFFERSON BOULEVARD
<br />Item.
<br />No.
<br />Description
<br />Oty
<br />Unit
<br />Unit Price
<br />Total Amount
<br />Al
<br />CONSTRUCTION ENGINEERING
<br />1
<br />LS
<br />$6,500.00
<br />$6,500.00
<br />A2
<br />MOBILIZATION AND
<br />DEMOBILIZATION
<br />1
<br />LS
<br />$7,500.00
<br />$7,500.00
<br />A3
<br />CLEARING RIGHT OF WAY
<br />1
<br />LS
<br />$5,500.00
<br />$5,500.00
<br />A4
<br />CURB, CONCRETE, REMOVE
<br />2,075
<br />LFT
<br />$2.00
<br />$4,150.00
<br />A5
<br />CONCRETE, REMOVE
<br />590
<br />SYS
<br />$4.00
<br />$2,360.00
<br />A6
<br />PAVEMENT REMOVAL
<br />1,510
<br />SYS
<br />$6.00
<br />$9,060.00
<br />A7
<br />PIPE, REMOVE
<br />445
<br />LFT
<br />$7.00
<br />$3,116.00
<br />A8
<br />STRUCTURE, REMOVE
<br />8
<br />- EA
<br />$225.00
<br />$1,800.00
<br />A9
<br />COMMON EXCAVATION
<br />470
<br />CYS
<br />$22.00
<br />$10,340.00
<br />A10
<br />B-BORROW
<br />310
<br />CYS
<br />$7.50
<br />$2,325.00
<br />All
<br />TEMPORARY EROSION AND
<br />SEDIMENT CONTROL
<br />1
<br />LS
<br />$2,200.00
<br />$2,200.00
<br />Al2
<br />FLOWABLE BACKFILL, NON-
<br />REMOVABLE
<br />2
<br />CYS
<br />$200.00
<br />$400.00
<br />A13
<br />COMPACTED AGGREGATE, NO. 53,
<br />BASE
<br />365
<br />TON
<br />$23.00
<br />$8,395.00
<br />A14
<br />MILLING, ASPHALT, 2.5 IN
<br />6.090
<br />SYS
<br />$2.00
<br />$12,180.00
<br />A15
<br />HMA SURFACE, TYPE B
<br />595
<br />TON
<br />$65.00
<br />$38,675.00
<br />A16
<br />HMA INTERMEDIATE, TYPE B
<br />145
<br />TON
<br />$60.00
<br />$7,250.00
<br />A17
<br />HMA BASE, TYPE B
<br />340
<br />TON
<br />$47.00
<br />$15,980.00
<br />A18
<br />HMA FOR PATCHING
<br />35
<br />TON
<br />$75.00
<br />$2,625.00
<br />A19
<br />HMA WEDGE AND LEVEL, TYPE B
<br />336
<br />TON
<br />$60.00
<br />$20,160.00
<br />A20
<br />ASPHALT FOR TACK COAT
<br />2
<br />TON
<br />$15.00
<br />$30.00
<br />A21
<br />CURB RAMP, CONCRETE, G
<br />90
<br />SYS
<br />$145.00
<br />$13,050.00
<br />A22
<br />SIDEWALK, CONCRETE, 4 IN.
<br />200
<br />SYS
<br />$30.00
<br />$6,000.00
<br />A23
<br />CURB, CONCRETE
<br />485
<br />LFT
<br />$17.00
<br />$8,246.00
<br />A24
<br />CURB, MODIFIED, CONCRETE
<br />1,720
<br />LFT
<br />$21.00
<br />$36,120.00
<br />A25
<br />PCCP FOR APPROACHES, 8 IN.
<br />305
<br />SYS
<br />$55.00
<br />$16,775.00
<br />A26
<br />SODDING
<br />1,090
<br />SYS
<br />$4.52
<br />$4,926.80
<br />A27
<br />PIPE, TYPE 2, CIRCULAR, 12 IN.
<br />80
<br />LFT
<br />$32.00
<br />$2,560.00
<br />A28
<br />ADJUST CASTING TO GRADE
<br />5
<br />LFT
<br />$350.00
<br />$1,750.00
<br />A29
<br />ADJUST VALVE BOX TO GRADE
<br />5
<br />EA
<br />$35.00
<br />$175.00
<br />A30
<br />PIPE PLUG, CONCRETE
<br />8
<br />EA
<br />$385.00
<br />$3,080.00
<br />A31
<br />MANHOLE, J15, MODIFIED
<br />3
<br />EA
<br />$4,750.00
<br />$14,250.00
<br />A32
<br />INLET B-15
<br />1
<br />EA
<br />$4,000.00
<br />$4,000.00
<br />A33
<br />INLET C-15
<br />2
<br />EA
<br />$3,500.00
<br />$7,000.00
<br />A34
<br />INLET, B15, MODIFIED
<br />3
<br />EA
<br />$3,500.00
<br />$10,500.00
<br />A35 INLET,
<br />C15, MODIFIED
<br />1
<br />EA
<br />$3,500.00
<br />$3,500.00
<br />Bidder's Name
<br />Version 5/25/2016 Contractor's Bid for Public Works - 15 CHANGE ORDER NO. 1
<br />
|