My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 2 - East Bank Sewer Separation Phase 5 Div B - Proj No 114-062B - Walsh&Kelly
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 2 - East Bank Sewer Separation Phase 5 Div B - Proj No 114-062B - Walsh&Kelly
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:50:42 PM
Creation date
8/30/2016 1:49:23 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/23/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
172 <br />PIPE, TYPE 2, CIRCULAR, 15 IN., <br />23 <br />LFT <br />$54.80 <br />$1,260.40 <br />WATERGRADE <br />C01-1 <br />DETERMINE ELEVATIONS OF <br />LATERALS ON FRANCES <br />1 <br />EA <br />$14,400.00 <br />$14,400.00 <br />C01-2 <br />LOWER INSTALL ELEVATION OF <br />1 <br />EA <br />$27,000.00 <br />$27,000.00 <br />STORM SEWER STR30A TO STR30 <br />TOTAL BASE BID (SUM ITEMS 1-172) $4,677,228.64 <br />Total Base Bid <br />A <br />$4,772,918.64 <br />Bidder Credit <br />(Choose 1) <br />None (Enter $0) <br />B <br />-$10,000.00 <br />o <br />Local (Enter Least of 3 /o or $30,000) <br />Regional (Enter Least of 1% or $10,000) <br />Workforce Credit <br />(Choose 1) <br />None (Enter $0) <br />C <br />-$10,000.00 <br />o <br />Local (Enter Least of 2 /o or $20,000) <br />Regional (Enter Least of 1 % or $10,000) <br />Total Base Bid Including Credits (A-B-C) <br />$4,752,918.64 <br />Bidder's Name <br />Version 5/25/2016 Contractor's Bid for Public Works - 14 CHANGE ORDER NO. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.