Laserfiche WebLink
DIVISION B <br />Item <br />No. <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONSTRUCTION ENGINEERING <br />1 <br />LS <br />$65,000.00 <br />$65,000.00 <br />2 <br />CPM SCHEDULE <br />1 <br />LS <br />$500.00 <br />$500.00 <br />3 <br />CPM SCHEDULE, MONTHLY <br />UPDATE <br />12 <br />EA <br />$100.00 <br />$1,200.00 <br />4 <br />MOBILIZATION AND <br />DEMOBILIZATION <br />1 <br />LS <br />$100,000.00 <br />$100,000.00 <br />5 <br />CLEARING RIGHT OF WAY <br />1 <br />LS <br />$55,000.00 <br />$55,000.00 <br />6 <br />TREE REMOVAL, 24 IN. AND <br />SMALLER <br />73 <br />EA <br />$400.00 <br />$29,200.00 <br />7 <br />TREE REMOVAL, GREATER THAN <br />241N. <br />28 <br />EA <br />$500.00 <br />$14,000.00 <br />8 <br />CURB, CONCRETE, REMOVE <br />12,000 <br />LFT <br />$2.00 <br />$24,000.00 <br />9 <br />CONCRETE, REMOVE <br />7,129 <br />SYS <br />$4.00 <br />$28,516.00 <br />10 <br />PAVEMENT REMOVAL <br />16,513 <br />SYS <br />$6.00 <br />$99,078.00 <br />11 <br />PIPE, REMOVE <br />2,823 <br />LFT <br />$6.00 <br />$16,938.00 <br />12 <br />STRUCTURE, REMOVE <br />64 <br />EA <br />$200.00 <br />$12,800.00 <br />13 <br />EXISTING TIMBER RETAINING <br />WALL, REMOVE <br />205 <br />LFT <br />$11.00 <br />$2,255.00 <br />14 <br />COMMON EXCAVATION <br />18,515 <br />CYS <br />$17.00 <br />$314,765.00 <br />15 <br />B-BORROW, UNDISTRIBUTED <br />100 <br />CYS <br />$7.50 <br />$750.00 <br />16 <br />TEMPORARY EROSION AND <br />SEDIMENT CONTROL <br />1 <br />LS <br />$15,000.00 <br />$15,000.00 <br />17 <br />SILT FENCE <br />1,600 <br />LFT <br />$1.75 <br />$2,800.00 <br />18 <br />EROSION CONTROL BLANKET <br />260 <br />SYS <br />$3.84 <br />$998.40 <br />19 <br />NO.2 STONE <br />150 <br />TON <br />$20.00 <br />$3,000.00 <br />20 <br />FLOWABLE BACKFILL, NOW <br />REMOVABLE <br />12 <br />CYS <br />$120.00 <br />$1,440.00 <br />21 <br />COMPACTED AGGREGATE, NO. 53, <br />BASE <br />6,231 <br />TON <br />$17.00 <br />$105,927.00 <br />22 <br />CRUSHED CONCRETE <br />126 <br />TON <br />$27.00 <br />$3,402.00 <br />23 <br />MILLING, ASPHALT, 2.51N <br />1,144 <br />SYS <br />$4.00 <br />$4,576.00 <br />24 <br />HMA SURFACE, TYPE B <br />2,697 <br />TON <br />$67.00 <br />$180,699.00 <br />25 <br />HMA INTERMEDIATE, TYPE B <br />3,726 <br />TON <br />$47.00 <br />$175,122.00 <br />26 <br />HMA BASE, TYPE B <br />5,962 <br />TON <br />$44.00 <br />$262,328.00 <br />27 <br />HMA WEDGE & LEVEL, TYPE B <br />61 <br />TON <br />$75.00 <br />$4,675.00 <br />28 <br />HMA FOR PATCHING <br />62 <br />TONM <br />$4,650.00 <br />29 <br />ASPHALT FOR TACK COAT <br />14 <br />TON <br />$210.00 <br />30 <br />CURB RAMP, CONCRETE, G <br />275 <br />SYS <br />$34,375.00 <br />31 <br />CURB RAMP, CONCRETE, H <br />13 <br />SYS <br />$1,765.00 <br />32 <br />SIDEWALK, CONCRETE, 4 IN. <br />6,956 <br />SYS <br />$208,680.00 <br />33 <br />CURB, CONCRETE <br />13,996 <br />LFT <br />$209,940.00 <br />Bidder's Name <br />Version 5/25/2016 Contractor's Bid for Public Works - 8 CHANGE ORDER NO. 1 <br />