DIVISION B
<br />Item
<br />No.
<br />Description
<br />Qty
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />CONSTRUCTION ENGINEERING
<br />1
<br />LS
<br />$65,000.00
<br />$65,000.00
<br />2
<br />CPM SCHEDULE
<br />1
<br />LS
<br />$500.00
<br />$500.00
<br />3
<br />CPM SCHEDULE, MONTHLY
<br />UPDATE
<br />12
<br />EA
<br />$100.00
<br />$1,200.00
<br />4
<br />MOBILIZATION AND
<br />DEMOBILIZATION
<br />1
<br />LS
<br />$100,000.00
<br />$100,000.00
<br />5
<br />CLEARING RIGHT OF WAY
<br />1
<br />LS
<br />$55,000.00
<br />$55,000.00
<br />6
<br />TREE REMOVAL, 24 IN. AND
<br />SMALLER
<br />73
<br />EA
<br />$400.00
<br />$29,200.00
<br />7
<br />TREE REMOVAL, GREATER THAN
<br />241N.
<br />28
<br />EA
<br />$500.00
<br />$14,000.00
<br />8
<br />CURB, CONCRETE, REMOVE
<br />12,000
<br />LFT
<br />$2.00
<br />$24,000.00
<br />9
<br />CONCRETE, REMOVE
<br />7,129
<br />SYS
<br />$4.00
<br />$28,516.00
<br />10
<br />PAVEMENT REMOVAL
<br />16,513
<br />SYS
<br />$6.00
<br />$99,078.00
<br />11
<br />PIPE, REMOVE
<br />2,823
<br />LFT
<br />$6.00
<br />$16,938.00
<br />12
<br />STRUCTURE, REMOVE
<br />64
<br />EA
<br />$200.00
<br />$12,800.00
<br />13
<br />EXISTING TIMBER RETAINING
<br />WALL, REMOVE
<br />205
<br />LFT
<br />$11.00
<br />$2,255.00
<br />14
<br />COMMON EXCAVATION
<br />18,515
<br />CYS
<br />$17.00
<br />$314,765.00
<br />15
<br />B-BORROW, UNDISTRIBUTED
<br />100
<br />CYS
<br />$7.50
<br />$750.00
<br />16
<br />TEMPORARY EROSION AND
<br />SEDIMENT CONTROL
<br />1
<br />LS
<br />$15,000.00
<br />$15,000.00
<br />17
<br />SILT FENCE
<br />1,600
<br />LFT
<br />$1.75
<br />$2,800.00
<br />18
<br />EROSION CONTROL BLANKET
<br />260
<br />SYS
<br />$3.84
<br />$998.40
<br />19
<br />NO.2 STONE
<br />150
<br />TON
<br />$20.00
<br />$3,000.00
<br />20
<br />FLOWABLE BACKFILL, NOW
<br />REMOVABLE
<br />12
<br />CYS
<br />$120.00
<br />$1,440.00
<br />21
<br />COMPACTED AGGREGATE, NO. 53,
<br />BASE
<br />6,231
<br />TON
<br />$17.00
<br />$105,927.00
<br />22
<br />CRUSHED CONCRETE
<br />126
<br />TON
<br />$27.00
<br />$3,402.00
<br />23
<br />MILLING, ASPHALT, 2.51N
<br />1,144
<br />SYS
<br />$4.00
<br />$4,576.00
<br />24
<br />HMA SURFACE, TYPE B
<br />2,697
<br />TON
<br />$67.00
<br />$180,699.00
<br />25
<br />HMA INTERMEDIATE, TYPE B
<br />3,726
<br />TON
<br />$47.00
<br />$175,122.00
<br />26
<br />HMA BASE, TYPE B
<br />5,962
<br />TON
<br />$44.00
<br />$262,328.00
<br />27
<br />HMA WEDGE & LEVEL, TYPE B
<br />61
<br />TON
<br />$75.00
<br />$4,675.00
<br />28
<br />HMA FOR PATCHING
<br />62
<br />TONM
<br />$4,650.00
<br />29
<br />ASPHALT FOR TACK COAT
<br />14
<br />TON
<br />$210.00
<br />30
<br />CURB RAMP, CONCRETE, G
<br />275
<br />SYS
<br />$34,375.00
<br />31
<br />CURB RAMP, CONCRETE, H
<br />13
<br />SYS
<br />$1,765.00
<br />32
<br />SIDEWALK, CONCRETE, 4 IN.
<br />6,956
<br />SYS
<br />$208,680.00
<br />33
<br />CURB, CONCRETE
<br />13,996
<br />LFT
<br />$209,940.00
<br />Bidder's Name
<br />Version 5/25/2016 Contractor's Bid for Public Works - 8 CHANGE ORDER NO. 1
<br />
|