BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name EAST BANK SEWER SEPARATION, PHASE 5
<br />Project No. 114.062
<br />For Bids Due AUGUST 25, 2015
<br />DIVISION A
<br />Item
<br />No.
<br />Descri tion
<br />P
<br />City
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />CONSTRUCTION ENGINEERING
<br />1
<br />LS
<br />$8,500.00
<br />$8,500.00
<br />MOBILIZATION AND
<br />2
<br />DEMOBILIZATION
<br />1
<br />LS
<br />$6,500.00
<br />$6,500.00
<br />3
<br />CLEARING RIGHT OF WAY
<br />1
<br />LS
<br />$6,500.00
<br />$6,500.00
<br />TREE REMOVAL, 24 IN. AND
<br />4
<br />SMALLER
<br />6
<br />EA
<br />$650.00
<br />$3,900.00
<br />5
<br />HYDROMULCH
<br />1,020
<br />SYS
<br />$2.00
<br />$2,040.00
<br />6
<br />PLANT, WHITE PINE, 72 IN. TO 96
<br />6
<br />EA
<br />$485.00
<br />$2,910.00
<br />TEMPORARY EROSION AND
<br />7
<br />SEDIMENT CONTROL
<br />1
<br />LS
<br />$2,500.00
<br />$2,500.00
<br />8
<br />PIPE, TYPE 2, CIRCULAR, 12 IN.
<br />18
<br />LFT
<br />$50.00
<br />$900.00
<br />9
<br />TEMPORARY PIPE CONNECTION,
<br />18 IN.
<br />27
<br />LFT
<br />$150.00
<br />$4,050.00
<br />10
<br />PIPE, TYPE 2, CIRCULAR, 36 IN.
<br />324
<br />LFT
<br />$60.00
<br />$19,440.00
<br />11
<br />PIPE, TYPE 2, CIRCULAR, 48 IN.
<br />10
<br />LFT
<br />$135.00
<br />$1,350.00
<br />12
<br />48 IN. PIPE PLUG, TEMPORARY
<br />1
<br />LS
<br />$1,000.00
<br />$1,000.00
<br />13
<br />MANHOLE, K4, MODIFIED
<br />1
<br />EA
<br />$6,000.00
<br />$6,000.00
<br />14
<br />MANHOLE, L4, MODIFIED
<br />1
<br />EA
<br />$12,000.00
<br />$12,000.00
<br />MANHOLE, L4, MODIFIED WITH
<br />15
<br />BAFFLE AND 3 FT. SUMP
<br />1
<br />EA
<br />$13,000.00
<br />$13,000.00
<br />16
<br />MAINTAINING TRAFFIC
<br />1
<br />LS
<br />$4,500.00
<br />$4,500.00
<br />SIGN AND POST, REMOVE AND
<br />17
<br />RESET
<br />6
<br />EA
<br />$100.00
<br />$600.00
<br />TOTAL BID, DIVISION A (SUM ITEMS 1.17) $95,690.00