Laserfiche WebLink
REGULAR MEETING DECEMBER 26, 2000 <br />Lemont, Illinois, in the amount of $497,441.28. <br />Mr. Littrell stated that ProForm Pipe Lining Co., Inc. did not provide the information required by the <br />specifications to be attached to Form 96. Specifically, the specifications require submission of <br />previous experience with the same size and type of liners being bid. The specifications also asked the <br />bidders to submit the number of insertions that would be made for each network. ProForm Pipe <br />Lining Co., Inc. was the successful bidder for several bidders in the 1999 Sewer Lining Project. Their <br />performance on small diameter pipe was not satisfactory. The Engineering and sewer maintenance <br />staff recommends that ProForm Pipe Lining Company's bid be considered non -responsive in that <br />insufficient information was provided, though specifically requested, to evaluate the bid. <br />The bid is divisible by network of pipe to be lined. Insituform Technologies USA has offered a <br />discount of 4% if awarded all nine networks. That discounted price is $497,441.28, which is less than <br />the sum of the discounted prices of the low bidders on each network and is also less than every other <br />combination of discounted prices. Therefore, Mr. Gilot made a motion that the recommendation be <br />accepted and the bid be awarded as outlined above. Mr. Inks seconded the motion which carried. <br />AWARD QUOTATION - CARPETING FOR CENTURY CENTER - PROJECT NO. 100-105 <br />Mr. Gene Mikolajewski, Century Center, advised the Board that on December 11, 2000, quotations <br />were received and opened for the above referred to project. After reviewing those quotations, Mr. <br />Mikolajewski recommends that the Board award the contract to the lowest responsive and <br />responsible bidder, Carpet Service Outlet, Inc., 1514 Mishawaka Avenue, South Bend, Indiana, in <br />the amount of $33,443.46. Therefore, Mr. Inks made a motion that the recommendation be accepted <br />and the bid be awarded as outlined above. Mr. Gilot seconded the motion which carried. <br />VOID CONTRACT - DRAPERIES/CENTURY CENTER - PROJECT NO. 100-86 <br />In a letter to the Board, Mr. Michael Bernacchi, Michaelangelos, 3372 Cleveland Road, South Bend, <br />Indiana, requested permission to void the Contract for the above referred to project, as the fabric bid <br />does not meet the required specifications. Gene Mikalajewski, Century Center, concurs with this <br />request. Upon a motion made by Mr. Gilot, seconded by Mr. Inks and carried, the Contract was <br />voided. <br />APPROVE CHANGE ORDER - CLEVELAND ROAD ADDED LANES - KANKAKEE VALLEY <br />CONSTRUCTION COMPANY, INC. - PROJECT NO. 98-87 <br />Mr. Gilot advised that Mr. Toy Villa, Public Construction Manager, has submitted Change Order No. <br />1 on behalf of Kankakee Valley Construction Company, Inc., Post Office Box 1471, LaPorte, Indiana <br />indicating that the Contract amount be increased $32,182.94 for a new Contract sum including this <br />Change Order in the amount of $1,237,351.12. Upon a motion made by Mr. Inks, seconded by Mr. <br />Gilot and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER - HEADWORKS FACILITY - WASTEWATER TREATMENT <br />PLANT - PROJECT NO. 98-26 <br />Mr. Gilot advised that Mr. Jack Dillon, Director, Environmental Services, has submitted Change <br />Order No. 3 on behalf of Superior Construction, 2045 East Dunes Highway, Gary, Indiana, indicating <br />that the Contract amount be increased $9,450.00 for a new Contract sum including this Change Order <br />in the amount of $11,114,481.00. Upon a motion made by Mr. Inks, seconded by Mr. Gilot and <br />carried, the Change Order was approved. <br />APPROVE CHANGE ORDER - MORRIS PERFORMING ARTS CENTER - SLUTSKY-PELTZ <br />PLUMBING - PROJECT NO. 98-25 <br />Mr. Gilot advised that Mr. Toy Villa, Public Construction Manager, has submitted Change Order No. <br />09 on behalf of Slutsky Peltz Plumbing and Heating, 844 South Rush Street, South Bend, Indiana, <br />indicating that the Contract amount be increased $4,100.00 for a new Contract sum including this <br />Change Order in the amount of $1,374,547.50. Upon a motion made by Mr. Inks, seconded by Mr. <br />Gilot and carried, the Change Order was approved. <br />