My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/11/00 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2000
>
12/11/00 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:15:01 PM
Creation date
8/30/2016 12:59:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
12/11/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING DECEMBER 11, 2000 <br />Bid was signed by Mr. Tim Horvath, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Security was submitted <br />BID: $37,900.00 <br />KNAPP ENVIRONMENTAL CONSTRUCTION SERVICES, INC. <br />12875 McKinley Highway <br />Mishawaka, Indiana 46545 <br />Bid was signed by Mr. Doug Knapp, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $68,000.00 <br />INDIANA EARTH, INC. <br />10343 McKinley Highway <br />Osceola, Indiana 46561 <br />Bid was signed by Mr. Mark Osler, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $34,500.00 <br />B&J EXCAVATION, INC. <br />1104 West Donald Street <br />South Bend, Indiana 46613 <br />Bid was signed by Mr. Darnell O'Neal, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $79,600.00 <br />Upon a motion made by Ms. Roemer, seconded by Mr. Inks and carried, the above bids were referred <br />to the Division of Engineering for review and recommendation. After reviewing those bids, Mr. Carl <br />P. Littrell, City Engineer, recommends that the Board award the contract to the lowest responsive <br />and responsible bidder, Warner and Sons in the amount of $33,660.00. Therefore, Ms. Roemer made <br />a motion that the recommendation be accepted and the bid be awarded as outlined above. Mr. Inks <br />seconded the motion which carried. <br />OPENING OF BIDS - DEMOLITION OF STUDEBAKER MUSEUM #69 - 730 UNITED DRIVE <br />-PROJECT NO. 100-87 <br />This was the date set for receiving and opening of sealed bids for the above referred to project. The <br />Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-County News <br />which were found to be sufficient. The following bids were opened and publicly read: <br />R&R EXCAVATING <br />2010 Went Avenue <br />
The URL can be used to link to this page
Your browser does not support the video tag.