28
<br />HMA Intermediate, 19.5 mm
<br />645
<br />TON
<br />$ 52.00
<br />$ 33,540.00
<br />29
<br />HMA Base,25.0 mm
<br />1930
<br />TON
<br />$ 50.00
<br />$ 96,500.00
<br />30
<br />HMA for Sidewalk
<br />14
<br />TON
<br />$ 225.00
<br />$ 3,150.00
<br />31
<br />Curb Ramp, Concrete
<br />19
<br />SYS
<br />$ 175.00
<br />$ 3,325.00
<br />32
<br />Curb and Gutter, Combined
<br />3320
<br />LF
<br />$ 18.00
<br />$ 59,760.00
<br />33
<br />PCCP For Approaches,8"
<br />390
<br />SYS
<br />$ 50.00
<br />$ 19,500.00
<br />34
<br />Mobilization and Demobilization for
<br />Seeding
<br />1
<br />EA
<br />$ 250.00
<br />$ 250.00
<br />35
<br />Seeding and Topsoil
<br />5100
<br />SYS
<br />$ 5.00
<br />$ 25,500.00
<br />36
<br />Storm Sewer Pipe 12"
<br />810
<br />LF
<br />$ 36.00
<br />$ 29,160.00
<br />37
<br />Storm Sewer Pipe 15"
<br />350
<br />LF
<br />$ 38.00
<br />$ 13,300.00
<br />38
<br />Storm Sewer Pipe 18"
<br />250
<br />LF
<br />$ 41.00
<br />$ 10,250.00
<br />39
<br />Storm Sewer Pipe 24"
<br />82
<br />LF
<br />$ 50.00
<br />$ 4,100.00
<br />40
<br />Sanitary Sewer,PVC SDR 35,8 IN
<br />166
<br />LF
<br />$ 33.00
<br />$ 5,478.00
<br />41
<br />Sanitary Sewer,PVC SDR 35,10 IN
<br />1606
<br />LF
<br />$ 35.00
<br />$ 56,210.00
<br />42
<br />Sanitary Manhole
<br />5
<br />EA
<br />$ 2,800.00
<br />$ 14,000.00
<br />43
<br />Catch Basin K10
<br />7
<br />EA
<br />$ 1,700.00
<br />$ 11,900.00
<br />44
<br />Manhole C15
<br />3
<br />EA
<br />$ 2,900.00
<br />$ 8,700.00
<br />45
<br />Riprap Stone
<br />60
<br />TON
<br />$ 50.00
<br />$ 3,000.00
<br />46
<br />Safety Metal End Section, Type 3, 24in
<br />1
<br />EA
<br />$ 600.00
<br />$ 600.00
<br />47
<br />Geotextile Fabric
<br />60
<br />SYS
<br />$ 3.00
<br />$ 180.00
<br />48
<br />Irrigation Repair
<br />260
<br />SYS
<br />$ 15.00
<br />$ 3,900.00
<br />49
<br />Sign Post,Square,Type 2,Reinforced
<br />Anchor Base
<br />19
<br />LF
<br />$ 14.00
<br />$ 266.00
<br />50
<br />Sign, Sheet With Legend 0.080 IN
<br />6.3
<br />SIFT
<br />$ 21.00
<br />$ 132.30
<br />51
<br />Sign, Sheet With Legend 0.100 IN
<br />18
<br />SFT
<br />$ 39.00
<br />$ 702.00
<br />52
<br />Sign, Sheet With Legend 0.125 IN
<br />7.5
<br />SIFT
<br />$ 26.00
<br />$ 195.00
<br />53
<br />Hand hole, Lighting
<br />1
<br />EA
<br />$ 870.00
<br />$ 870.00
<br />54
<br />No.4 Wire
<br />565
<br />LF
<br />$ 7.00
<br />$ 3,955.00
<br />55
<br />Conduit, PVC,Schedule 80,2 IN.
<br />555
<br />LF
<br />$ 7.00
<br />$ 3,885.00
<br />56
<br />Miscellaneous Equipment for Lighting
<br />1
<br />LS
<br />$ 241.00
<br />$ 241.00
<br />57
<br />Light Pole Assembly
<br />1
<br />EA
<br />$ 2,890.00
<br />$ 2,890.00
<br />58
<br />Light Pole Foundation
<br />2
<br />EA
<br />$ 821.00
<br />$ 1,642.00
<br />59
<br />Line, Remove
<br />640
<br />LF
<br />$ 2.00
<br />$ 1,280.00
<br />60 1
<br />Transverse Marking, Liquid Thermoplastic
<br />Traffic Paint, Crosswalk, 6 IN
<br />100
<br />LF
<br />$ 10.00
<br />$ 1,000.00
<br />Version 7/31/2015 Contractor's Bid for Public Works - 8