Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />o45ou TN qF� <br />4 � <br />� x <br />U ❑ <br />r ai <br />Project Name Chet Waggoner Court 1965 <br />Project No. 116-005 <br />For Bids Due August 18, 2016 <br />BASE BID <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Construction Engineering <br />1 <br />LS <br />$ 20,000.00 <br />$ 20,000.00 <br />2 <br />CPM Schedule <br />1 <br />LS <br />$ 300.00 <br />$ 300.00 <br />3 <br />CPM Monthly Update <br />4 <br />EA <br />$ 125.00 <br />$ 500.00 <br />4 <br />Mobilization and Demobilization <br />1 <br />LS <br />$ 40,000.00 <br />$ 40,000.00 <br />5 <br />Video Record <br />1 <br />LS <br />$ 5,000.00 <br />$ 5,000.00 <br />6 <br />Utility Allowance <br />5000 <br />DOL <br />$ 1.00 <br />$ 5,000.00 <br />7 <br />Sprinkler Allowance <br />3000 <br />DOL <br />$ 1.00 <br />$ 3,000.00 <br />8 <br />Maintaining Traffic <br />1 <br />LS <br />$ 15,000.00 <br />$ 15,000.00 <br />9 <br />Sidewalk, Concrete, Remove, <br />Undistributed <br />140 <br />SYS <br />$ 10.00 <br />$ 1,400.00 <br />10 <br />Pavement Removal, Undistributed <br />210 <br />SYS <br />$ 10.00 <br />$ 2,100.00 <br />11 <br />HMA for Patching, Type A, Undistributed <br />40 <br />TON <br />$ 200.00 <br />$ 8,000.00 <br />12 <br />Detour Route Marker Assembly, <br />Undistributed <br />5 <br />EA <br />$ 89.00 <br />$ 445.00 <br />13 <br />Road Closure Sign Assembly, Undistributed <br />5 <br />EA <br />$ 75.00 <br />$ 375.00 <br />14 <br />Inspection Hole, Undistributed <br />5 <br />EA <br />$ 1,000.00 <br />$ 5,000.00 <br />15 <br />Structural Backfill, Type 2, Undistributed <br />100 <br />CYS <br />$ 20.00 <br />$ 2,000.00 <br />16 <br />Clearing of Right of Way <br />1 <br />LS <br />$ 5,000.00 <br />$ 5,000.00 <br />17 <br />Curb, Concrete, Remove <br />160 <br />LF <br />$ 15.00 <br />$ 2,400.00 <br />18 <br />Pedestrian Light, Remove and Relocate <br />1 <br />EA <br />$ 1,280.00 <br />$ 1,280.00 <br />19 <br />Pedestrian Light Foundation, Remove <br />1 <br />EA <br />$ 710.00 <br />$ 710.00 <br />20 <br />Excavation, Common <br />3650 <br />CYS <br />$ 15.00 <br />$, 54,750.00 <br />21 <br />Temporary Erosion Control <br />1 <br />LS <br />$ 2,500.00 <br />$ 2,500.00 <br />22 <br />Temporary Silt Fence <br />2110 <br />LF <br />$ 3.50 <br />$ 7,385.00 <br />23 <br />Temporary Inlet Protection <br />14 <br />EA <br />$ 198.00 <br />$ 2,772.00 <br />24 <br />No. 2 Stone <br />100 <br />TON <br />$ 30.00 <br />$ 3,000.00 <br />25 <br />Compacted Aggregate, No. 53, Base <br />1500 <br />TON <br />$ 16.00 <br />$ 24,000.00 <br />26 <br />HMA for Patching, Type A <br />110 <br />TON <br />$ 105.00 <br />$ 11,550.00 <br />27 JHMA <br />Surface, 9.5mm <br />485 <br />TON <br />$ 70.00 <br />$ 33,950.00 <br />Version 7/31/2015 Contractor's Bid for Public Works - 7 <br />