Laserfiche WebLink
0025 <br />REGULAR MEETING FEBRUARY 11, 2002 <br />8 <br />PONTIAC GT <br />1987 <br />1G2PG1194HP223792 <br />$ 22.00 <br />10 <br />CHEVY BLAZER <br />1992 <br />1GNCT18Z2N0129515 <br />$ 76.50 <br />11 <br />DODGE SHADOW <br />1993 <br />AB3X028DXPN551533 <br />$156.50 <br />12 <br />FIAT CONVERTIBLE <br />1980 <br />124CS000167329 <br />$ 26.50 <br />Upon a motion made by Mr. Littrell, seconded by Mr. Gilot and carried, the above bid was referred <br />to Code Enforcement for review and recommendation. <br />AWARD BID - ANTI -ICING AND DE-ICING MATERIALS <br />Mr. Sam Hensley, Street Commissioner, advised the Board that on January 28, 2002, bids were <br />received and opened for the above referred to materials. After reviewing those bids, Mr. Hensley <br />recommends that the Board award the contract to Great Lakes Chloride, Post Office Box 233, <br />Laketon, Indiana, in the amount not to exceed $64,950.00, as follows: <br />Calcium Chloride 50,000 Gallons $0.498 Pick Up $24,900.00 <br />$0.498 Delivered $24,900.00 <br />Liquid Armor 50,000 Gallons $0.801 Pick Up $40,050.00 <br />Calcium Chloride $0.801 Delivered $40,050.00 <br />TOTAL $64,950.00 <br />It was noted that Syntech Products, 520 East Woodruff, Toledo, Ohio, did not provide all the <br />information pertaining to the bid specifications. Syntech Products does not give adequate <br />information on the liquid storage tanks, overhead liquid dispensing system, and tank fill dispensing <br />systems. They did not address bid specifications in the "Miscellaneous Section". Bid specifications <br />required 32% concentration by weight for magnesium chloride, and Syntech could only provide 30%. <br />In addition, their pick-up point is Poneto, Indiana, which is south of Fort Wayne. Bid specifications <br />require additional storage in St. Joseph, Elkhart, LaPorte or Marshall counties. Therefore, Mr. Gilot <br />made a motion that the recommendation be accepted and the bid be awarded as outlined above. Mr. <br />Littrell seconded the motion which carried. <br />AWARD PROPOSAL - CENTURY CENTER ENERGY EFFICIENCY CONTRACTING <br />Mr. Carl P. Littrell, City Engineer, advised the Board that on January 14, 2002, proposals were <br />received and opened for the above referred to project. After reviewing those proposals, Mr. Littrell <br />recommends that the Board award the Contract to Johnson Controls,1255 North Senate, Indianapolis, <br />Indiana. Therefore, Mr. Gilot made a motion that the recommendation be accepted and the proposal <br />be awarded as outlined above. Mr. Littrell seconded the motion which carried. <br />APPROVE FINAL CHANGE ORDER - WESTERN/WAYNE STREET IMPROVEMENTS - <br />BROOKS CONSTRUCTION, INC. -PROJECT NO. 101-002 <br />Mr. Gilot advised that Mr. Darrell Baker, Project Engineer has submitted the Final Change Order <br />indicating that the contract amount be increased by $190,437.83 for a new contract sum including <br />this Change Order in the amount of $2,129,101.32. Mr. Baker stated that this Change Order consists <br />of a new Line item 184 and an overall increase in the original line item proposal. Line Item 184 <br />consists of a "Parking Bump Out" for Ehningers Florist. The original plans did not show new <br />parking spaces being installed in front of the business ($32,429.41). All other items were completed <br />substantially as planned with the exception of the following items which had a major increase due <br />to unforeseen roadway condition. Full depth reconstruction of Wayne Street was needed after the <br />milling operation began exposing existing street pavers. This resulted in an increase on asphalt line <br />items No. 23 ($70,378.50) and No. 26 ($56,363.50). The line item No. 17 for borrow increased <br />when the original sub -grade material was unsuitable and required new borrow material to be hauled <br />in along the roadway widening of Jefferson Wayne Street ($40,448.40). The overall 29.46% increase <br />consists of various add-ons that were not a part of the original contract. <br />The Change Order exceeded 20% of the original contract price as a result of two unforeseensite <br />conditions (the underground vault and borrow problem. Without these two changes, the change <br />orders would be well under the 20%. The cost to cure the impacts were not included in the plans and <br />1 <br />1 <br />1 <br />