0286
<br />REGULAR MEETING
<br />AUGUST 11, 2003
<br />Total
<br />$74,461.00 ea
<br />$148,922.00
<br />Wise International
<br />Single Axle Dump Trucks w/snow equip.
<br />$76,927.56 ea (2 units)
<br />$153,855.12
<br />Option -AC & Fr Plow
<br />$ 5,888.00 ea
<br />$ 11,776.00
<br />Subtotal
<br />$82,815.56 ea
<br />$165,631.12
<br />Trade-in's
<br />($14000,00)
<br />($14,000.00)
<br />Total
<br />$75,815.56 ea
<br />$151,631.12
<br />Hill Truck Sales
<br />Single Axle Dump Trucks w/snow equip.
<br />$77,970.00 ea (2 units)
<br />$155,940.00
<br />Option -AC & Fr Plow
<br />$ 5,860.00 ea
<br />$ 11,720.00
<br />Subtotal
<br />$83,830.00 ea
<br />$167,660.00
<br />Trade-in's
<br />($16,000.00)
<br />($ 16,000.00)
<br />Total
<br />$75,830.00 ea
<br />$151,660.00
<br />Therefore, Mr. Gilot made a motion that the recommendation be accepted and the bid be awarded
<br />as outlined above. Mr. Inks seconded the motion which carried.
<br />AWARD BID - ONE (1) NEW AERIAL TOWER TRUCK - UTILITY TRUCK EOUIPMENT -
<br />TRAFFIC AND LIGHTING
<br />Mr. Matthew Chlebowski, Director, Central Services, advised the Board that on July 14, 2003, bids
<br />were received and opened for the above referred to equipment. After reviewing those bids, Mr.
<br />Chlebowski recommends that the Board award the contract to the lowest responsive and responsible
<br />bidder, Utility Truck Equipment, Inc., 23893 U.S. 33 South, Circleville, Ohio, in the amount of
<br />$87,363.00. Therefore, Mr. Gilot made a motion that the recommendation be accepted and the bid
<br />be awarded as outlined above. Mr. Inks seconded the motion which carried.
<br />AWARD BID - ONE (1) STAR SCREENER - SOLID WASTE
<br />Mr. Matthew Chlebowski, Director, Central Services, advised the Board that on July 14, 2003, bids
<br />were received and opened for the above referred to equipment. After reviewing those bids, Mr.
<br />Chlebowski recommends that the Board award the contract to the lowest responsive and responsible
<br />bidder, Erin Systems, Inc., 37 Evergreen Drive, Portlane, Maine, in the amount of $211,990.00.
<br />Therefore, Mr. Inks made a motion that the recommendation be accepted and the bid be awarded as
<br />outlined above. Mr. Littrell seconded the motion which carried.
<br />AWARD BID - ONE (1) ICE RESURFACER - PARK DEPARTMENT
<br />Mr. Matthew Chlebowski, Director, Central Services, advised the Board that on July 14, 2003, bids
<br />were received and opened for the above referred to equipment. After reviewing those bids, Mr.
<br />Chlebowski recommends that the Board award the contract to the lowest responsive and responsible
<br />bidder, Charles R. Mueller & Sons, Inc., 21500 Gratiot, Eastpointe, Michigan, in the amount of
<br />$68,060.00. It was noted that no responsive bids were received in the bid process, and Central
<br />Services solicited for quotations for this equipment. Therefore, Mr. Gilot made a motion that the
<br />recommendation be accepted and the bid be awarded as outlined above. Mr. Inks seconded the
<br />motion which carried.
<br />AWARD BID - TWO (2) 33 YARD SIDE LOADING REFUSE TRUCKS - SOLID WASTE
<br />Mr. Matthew Chlebowski, Director, Central Services, advised the Board that on July 14, 2003, bids
<br />were received and opened for the above referred to equipment. After reviewing those bids, Mr.
<br />Chlebowski recommends that the Board award the contract to the lowest responsive and responsible
<br />bidder, Best Equipment, 2804 North Catherwood, Indianapolis, Indiana, in the amount of
<br />$247,576.00. Therefore, Mr. Gilot made a motion that the recommendation be accepted and the bid
<br />be awarded as outlined above. Mr. Littrell seconded the motion which carried.
<br />AWARD QUOTATION - ONE (1) FOUR WHEEL DRIVE TRACTOR WITH BLOWER - PARK
<br />DEPARTMENT
<br />Mr. Matthew Chlebowski, Director, Central Services, advised the Board that on July 14, 2003, bids
<br />were received and opened for the above referred to equipment. As no responsive bids were received,
<br />Central Services solicited for Quotations. After reviewing those quotations, Mr. Chlebowski
<br />recommends that the Board award the contract to the lowest responsive and responsible bidder,
<br />
|