My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/14/03 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2003
>
07/14/03 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:07:21 PM
Creation date
8/17/2016 10:51:27 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/14/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D223 <br />REGULAR MEETING <br />BID: $867,629.00 <br />Alternate No. 1 $46,169.00 <br />JULY 14, 2003 <br />Upon a motion made by Mr. Littrell, seconded by Mr. Inks and carried, the above bids were referred <br />to the Division of Engineering for review and recommendation. <br />OPENING OF BIDS/AWARD BID - OLIVER BOILER HOUSE WINDOW REPLACEMENT - <br />PROJECT NO. 103-027C <br />This was the date set for receiving and opening of sealed bids for the above referred to project. The <br />Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-County News <br />which were found to be sufficient. The following bids were opened and publicly read: <br />HARMON, INC. <br />3801 South Main Street <br />South Bend, Indiana 46614 <br />Bid was signed by Mr. James Mroz <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $207,666.00 <br />J.W. WERNTZ <br />1002 Kerr Street <br />South Bend, Indiana 46601 <br />Bid was signed by Mr. Patrick Werntz <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $210,000.00 <br />Upon a motion made by Mr. Littrell, seconded by Mr. Inks and carried, the above bids were referred <br />to the Division of Engineering for review and recommendation. After reviewing those bids, Mr. <br />Jason Durr, Engineering, recommends that the Board award the contract to the lowest responsible <br />and responsive bidder, Harmon Inc., in the amount of $210,000.00. Therefore, Mr. Inks made a <br />motion that the recommendation be accepted and the bid be awarded as outlined above. Mr. Littrell <br />seconded the motion which carried. <br />OPENING OF BIDS/AWARD BID - KINYON STREET MODEL BLOCK IMPROVEMENTS - <br />PROJECT NO. 103-002 <br />This was the date set for receiving and opening of sealed bids for the above referred to project. The <br />Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-County News <br />which were found to be sufficient. The following bids were opened and publicly read: <br />RIETH RILEY CONSTRUCTION COMPANY, INC. <br />25200 State Road 23 <br />South Bend, Indiana 46614 <br />Bid was signed by Mr. Todd A. Gosc <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $95,058.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.