Laserfiche WebLink
REGULAR MEETING <br />v365 <br />NOVEMBER 14, 2005 <br />were removed late last year, it was discovered that the mortar had deteriorated badly. <br />The option chosen was the less expensive of the two means to correct the problem. It <br />was felt that it made no sense to have to cover the problem back up, and then bid another <br />contract to tear out and repair. By such a procedure there would have been more work <br />for the contractor and more expenses for the taxpayer. The means chosen was clearly <br />the most economical for South Bend. Because of the policy of annual inspections in the <br />Sewer Department and the fact that those inspections had not revealed any deficiencies in <br />the mortar, the need for this particular change order was unforeseeable. Given that it is <br />directly in the same street that the work was being done, this change order is related to <br />the scope of the original project. Mr. Bodnar stated that the $45,159.00 expense <br />connected with Change Order No. 2 need to be included in computing the 20% <br />maximum. Without this change order, the total change orders equal $218,855.94 or <br />slightly less than 18.80%, less than the statutory maximum. Additionally submitted was <br />the Project Completion Affidavit indicating this new final cost. Upon a motion made by <br />Mr. Gilot, seconded by Mr. Inks, and carried, the Final Change Order and the Project <br />Completion Affidavit were approved subject to the filing of the appropriate three-year <br />Maintenance Bond. <br />APPROVE FINAL CHANGE ORDER AND PROJECT COMPLETION AFFIDAVIT — <br />CHARLES STREET SEWER AND WATER EXTENSION — REITH RILEY <br />CONSTRUCTION — PROJECT NO. 104-005 (SEWER/WATER WORKS BONDS) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Final Change Order <br />on behalf of Rieth Riley Construction, Post Office Box 1775, South Bend, Indiana, <br />indicating that the contract amount be decreased by $15,740.88 for a new contract sum <br />including this Change Order in the amount of $134,574.12. Additionally submitted was <br />the Project Completion Affidavit indicating this new final cost. Upon a motion made by <br />Mr. Inks, seconded by Mr. Littrell, and carried, the Final Change Order and the Project <br />Completion Affidavit were approved subject to the filing of the appropriate three-year <br />Maintenance Bond. <br />APPROVE FINAL CHANGE ORDER AND PROJECT COMPLETION AFFIDAVIT — <br />DUNHAM STREET MODEL BLOCK — RIETH RILEY CONSTRUCTION — <br />PROJECT NO. 105-019 (CDBG) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Final Change Order <br />on behalf of Rieth Riley Construction, Post Office Box 1775, South Bend, Indiana, <br />indicating that the contract amount be decreased by $2,125.34 for a new contract sum <br />including this Change Order in the amount of $77,871.66. Additionally submitted was <br />the Project Completion Affidavit indicating this new final cost. Upon a motion made by <br />Mr. Inks, seconded by Mr. Littrell, and carried, the Final Change Order and the Project <br />Completion Affidavit were approved subject to the filing of the appropriate three-year <br />Maintenance Bond. <br />APPROVE FINAL CHANGE ORDER AND PROJECT COMPLETION AFFIDAVIT — <br />CONCRETE PAVEMENT REPAIRS — FALL 2005 — SELGE CONSTRUCTION - <br />PROJECT NO. 105-078 (LRSA) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Final Change Order <br />on behalf of Selge Construction, 2833 South 111h Street, Niles, Michigan, indicating that <br />the contract amount be decreased by $1,828.93 for a new contract sum including this <br />Change Order in the amount of $30,631.07. Additionally submitted was the Project <br />Completion Affidavit indicating this new final cost. Upon a motion made by Mr. Inks, <br />seconded by Mr. Littrell, and carried, the Final Change Order and the Project Completion <br />Affidavit were approved subject to the filing of the appropriate three-year Maintenance <br />Bond. <br />APPROVE FINAL CHANGE ORDER AND PROJECT COMPLETION AFFIDAVIT — <br />TAYLOR STREET CURB AND SIDEWALK REPLACEMENT — RAM <br />CONSTRUCTION — PROJECT NO. 105-077 (COIT) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Final Change Order <br />on behalf of Ram Construction, 1057 Denslow, South Bend, Indiana, indicating that the <br />contract amount be decreased by $585.84 for a new contract sum including this Change <br />Order in the amount of $1,758.58. Additionally submitted was the Project Completion <br />Affidavit indicating this new final cost. Upon a motion made by Mr. Inks, seconded by <br />