Laserfiche WebLink
J <br />REGULAR MEETING JUNE 27, 2005 <br />and he supports the CD recommendation to award the project to DLZ. The difference <br />between the quotes from DLZ and QEPI is $6,355. The highest bidder was Wightman <br />Petrie Environmental, Inc. at a price of $15,700. For the reasons states above, CD staff <br />recommends that DLZ be awarded the project for a total amount not to exceed <br />$13,900.00. Therefore, Mr. Inks made a motion that the recommendation be accepted <br />and the bid be awarded as outlined above. Mr. Littrell seconded the motion, which <br />carried. <br />APPROVAL OR REQUEST TO REJECT BIDS — RE -ADVERTISE FOR BIDS — <br />CONCRETE PATCHES FOR UTILITY CUTS — PROJECT NO. 105-059 <br />(SEWER/WATER/SEWER INSURANCE) <br />Mr. Jason Durr, Engineering, requested permission to reject all bids and re -advertise for <br />the receipt of bids for the above referred to project. Upon a motion made by Mr. Gilot, <br />seconded by Mr. Inks and carried, the request was approved. <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS — ONE <br />O MORE OR LESS, 2005 OR NEWER COMBINATION JET RODDER/VACUUM <br />MACHINE WITH CAB AND CHASSIS (2005 VEHICLE CAPITAL BUDGET) <br />In a memorandum to the Board, Mr. Lou Grounds, Equipment Services, requested <br />permission to advertise for the receipt of bids for the above referred to equipment. <br />Therefore, upon a motion made by Mr. Inks, seconded by Mr. Littrell, the above request <br />was approved. <br />APPROVE REQUEST TO _ADVERTISE FOR RECEIPT OF BIDS — SALE OF <br />ABANDONED VEHICLES <br />Ms. Kathy Eli, Department of Code Enforcement, requested permission to advertise for <br />the sale of approximately seventeen (17) abandoned vehicles, which are being stored at <br />Super Auto Salvage Corporation, 3300 South Main Street, South Bend, Indiana. It was <br />noted that all vehicles have been stored more than fifteen (15) days, identification checks <br />had been run for auto theft and the owners and lienholders notified. Upon a motion made <br />by Mr. Inks, seconded by Mr. Littrell and carried, the above request was approved. <br />APPROVE CHANGE ORDER — STUDEBAKER NATIONAL MUSEUM NEW <br />FACILITY — H.G. CHRISTMAN CONSTRUCTION COMPANY — PROJECT NO. <br />103-072 (STUDEBAKER MUSEUM BOARD) <br />Mr. Gilot advised that Mr. Carl Littrell, Engineering, has submitted Change Order No. 5 <br />on behalf of H.G. Christman Construction, 850 Fellows, South Bend, Indiana, indicating <br />that the Contract amount be increased $111,356.00 for a new Contract sum including this <br />Change Order in the amount of $5,419,554.00. Upon a motion made by Mr. Littrell, <br />seconded by Mr. Inks, and carried, the Change Order was approved, subject to the receipt <br />of the funding from the Studebaker Museum Board for the increase. <br />APPROVE FINAL CHANGE ORDER AND PROJECT COMPLETION AFFIDAVIT — <br />LINCOLNWAY WEST STREETSCAPE — L.L. GEANS CONSTRUCTION — <br />PROJECT NO. 104-069 (COIT) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Final Change Order <br />on behalf of L.L. Geans Construction, 1923 Home Street, Mishawaka, Indiana, indicating <br />that the contract amount be decreased by $1,194.57 for a new contract sum including this <br />Change Order in the amount of $76,607.93. Additionally submitted was the Project <br />Completion Affidavit indicating this new final cost. Upon a motion made by Mr. Gilot, <br />seconded by Mr. Inks, and carried, the Final Change Order and the Project Completion <br />Affidavit were approved subject to the filing of the appropriate three-year Maintenance <br />Bond. <br />APPROVE FINAL CHANGE ORDER AND PROJECT COMPLETION AFFIDAVIT — <br />RIVER PARK PARTNERSHIP CENTER PUBLIC WORKS SERVICE AREAS — <br />KASER SPRAKER CONSTRUCTION — PROJECT NO. 105-030 (GENERAL FUND) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Final Change Order <br />on behalf of Kaser Spraker Construction, 25487 West State Road 2, South Bend, Indiana, <br />indicating that the contract amount be decreased by $440.00 for a new contract sum <br />including this Change Order in the amount of $15,896.00. Additionally submitted was <br />the Project Completion Affidavit indicating this new final cost. Upon a motion made by <br />