014
<br />REGULAR MEETING MAY 9, 2005
<br />1a
<br />HMA Surface No. 11 Limestone'
<br />2,000
<br />TON
<br />$30.000
<br />$60,000.00
<br />1b
<br />HMA Surface No. 11 Limestone MAC
<br />10 or MAC 20 with SBS
<br />1,000
<br />TON
<br />$31.00
<br />$31,000.00
<br />1c
<br />HMA Surface No. 11 Limestone MAC
<br />HD with SBS
<br />500
<br />TON
<br />$32.00
<br />$16,000.00
<br />1d
<br />HMA Surface No. 9 Limestone .
<br />500
<br />TON
<br />$30.00
<br />$15,000.00
<br />le
<br />HMA Surface No. 9 Slag
<br />500
<br />TON
<br />$31.75
<br />$15,875.00
<br />1f
<br />HMA Surface No. 11 Slag
<br />15,000
<br />TON
<br />$31.75
<br />$476,250.00
<br />lq
<br />HMA Surface No. 11 Slag MAC 10 or
<br />MAC 20 with SBS
<br />10,000
<br />TON
<br />$32.75
<br />$327,500.00
<br />1 h
<br />HMA Surface No. 11 Slag MAC HD
<br />with SBS
<br />5,000
<br />TON
<br />$33.75
<br />$168,750.00
<br />1 i
<br />HMA Binder No. 8 or 9
<br />2,000
<br />TON
<br />$27.00
<br />$54,000.00
<br />1'
<br />HMA Binder No. 8 or 9 MAC 10 or
<br />MAC 20 with SBS
<br />1,000
<br />TON
<br />$27.50
<br />$27,500.00
<br />1k
<br />HMA Binder No. 8 or 9 MAC HD with
<br />SBS
<br />500
<br />TON
<br />$28.00
<br />$14,000.00
<br />11
<br />HMA Binder No. 8 or 9 Limestone or
<br />Slag
<br />2,000
<br />TON
<br />$28.75
<br />$57,500.00
<br />1 m
<br />HMA Binder No. 8 or 9 Limestone or
<br />Slag MAC 10 or MAC 20 with SBS
<br />1,000
<br />TON
<br />$29.25
<br />$29,250.00
<br />1n
<br />HMA Binder No. 8 or 9 Limestone or
<br />Slag MAC HD with SBS
<br />500
<br />TON
<br />$29.75
<br />$14,875.00
<br />10
<br />HMA Binder No. 11
<br />2,000
<br />TON
<br />$28.00
<br />$56,000.00
<br />1 p
<br />HMA Binder No. 11 MAC 10 or MAC
<br />20 with SBS
<br />1,000
<br />TON
<br />$29.00
<br />$29,000.00
<br />1 q
<br />HMA Binder No. 11 MAC HD with
<br />SBS
<br />500
<br />TON
<br />$30.00
<br />$15,000.00
<br />1 r
<br />HMA Binder No. 11 Limestone or
<br />Slag
<br />4,000
<br />TON
<br />$29.75
<br />$119,000.00
<br />1s
<br />HMA Binder No. 11 Limestone or
<br />Slag MAC 10 or MAC 20 with SBS
<br />2,000
<br />TON
<br />$30.75
<br />$61,500.00
<br />1t
<br />HMA Binder No. 11 Limestone or
<br />Slag MAC HD with SBS
<br />1,000
<br />TON
<br />$31.75
<br />$31,750.00
<br />lu
<br />HMA Base No. 5D
<br />6,000
<br />TON
<br />$27.00
<br />$162,000.00
<br />1v
<br />HMA Base No. 5D MAC 10 or MAC
<br />20 with SBS
<br />1,000
<br />TON
<br />$27.50
<br />$27,500.00
<br />1w
<br />HMA Base No. 5D MAC HD with SBS
<br />1,000
<br />TON
<br />$28.00
<br />$28,000.00
<br />1x
<br />HMA Base No. 5D Limestone or Slag
<br />6,000
<br />TON
<br />$28.75
<br />$172,500.00
<br />Ily
<br />HMA Base No. 5D Limestone or Slag
<br />I MAC 10 or MAC 20 with SBS
<br />1,000
<br />TON
<br />$29.25
<br />$29,250.00
<br />1z
<br />HMA Base No. 5d Limestone or Slag
<br />MAC HD with SBS
<br />1,000
<br />TON
<br />$30.50
<br />$30,500.00
<br />1aa
<br />Bituminous Patch, WS
<br />300
<br />TON
<br />$38.00
<br />$11,400.00
<br />1bb
<br />Bituminous Patch, Material Special
<br />I AE-300P
<br />600
<br />TON
<br />$40.00
<br />$24,000.00
<br />Total Amount of Base Bid (1a
<br />through 1bb)
<br />RIETH RILEY CONSTRUCTION
<br />25200State Road 23
<br />South Bend, Indiana 46614
<br />Bid was signed by: Mr. Christopher Weinkauf
<br />Non -Collusion Affidavit was in order
<br />Non -Discrimination commitment form was completed
<br />Ten percent (10%) Bid Bond was submitted
<br />$2,104,900.00
<br />11
<br />
|