My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/25/2005 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2005
>
04/25/2005 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:04:53 PM
Creation date
8/16/2016 9:41:43 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/25/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
01'29 <br />REGULAR MEETING <br />Bid was signed by: Mr. Todd Kulczar <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $238,382.75 <br />APRIL 25, 2005 <br />KANKAKEE VALLEY CONSTRUCTION COMPANY, INC. <br />Post Office Box 1471 <br />LaPorte, Indiana 46352 <br />Bid was signed by: Mr. Robert Nelson <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $205,754.00 <br />PHEND & BROWN, INC. <br />Post Office Box 150 <br />Milford, Indiana 46542 <br />Bid was signed by: Mr. Daniel Brown <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $334,680.00 <br />WALSH & KELLY, INC. <br />24358 State Road 23 <br />South Bend, Indiana 46614 <br />Bid was signed by: Mr. Kevin Kelly <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $264,330.50 <br />SELGE CONSTRUCTION COMPANY INC. <br />2833 South 11 Street <br />Niles, Michigan 49120 <br />Bid was signed by: Mr. John Szuba <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $267,004.00 <br />Upon a motion made by Mr. Littrell, seconded by Mr. Inks, and carried, the above bids <br />were referred to the Division of Engineering for review and recommendation. <br />OPENING OF BIDS <br />- One (1) More or Less, 2005 3/4 Ton Two Wheel Drive Pickup Truck — Code <br />Enforcement <br />- Two (2) More or Less, 2005 3/4 Ton Four Wheel Drive Pickup Truck — T&L/Organic <br />Resources <br />
The URL can be used to link to this page
Your browser does not support the video tag.