My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 4 - WWTP Secondary Treatment Improvements Proj No. 114-053 Thieneman
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 4 - WWTP Secondary Treatment Improvements Proj No. 114-053 Thieneman
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:52:17 PM
Creation date
8/11/2016 1:48:31 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/9/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />WWTP SECONDARY TREATMENT IMPROVEMENTS <br />CITY PROJECT NO. 114-053 <br />CHANGE ORDER PROPOSAL <br />Change Order Proposal No.: 114-053-0012-DI(R2) Date: 6/21/16 <br />Submitted in Response to Proposal Request No.: <br />Contract Name and No.: 114-053 South Bend W WTP Secondary Treatment Improvements <br />Contractor: Thieneman Construction, Inc. <br />Subject: Demo and Replace Eight (8) Existing 14" Air Lines with New Foreign Ductile Iron <br />Piping. The use foreign steel materials is prohibited by CO #2, but was specifically requested by <br />Jacob Klosinski, City of South Bend. <br />The following changes to the Contract are proposed: <br />SCOPE OF WORK: (attach and list supporting information as required) <br />1. Item: TCI — See attached Breakdown $156,319 <br />2. Item: Davidson -Finch Painting — Prep/Paint Piping and New Concrete $8,888 <br />3. Item: Indiana Concrete Cutting $16,880 <br />JUSTIFICATION: <br />1. Item: Owner Request <br />CHANGES IN CONTRACT PRICE AND CONTRACT TIMES: <br />We propose that the Contract Price and Contract Times be changed as follows: <br />For Contract Price, when requested by Engineer, attach detailed cost breakdowns for Contractor and <br />Subcontractors, Supplier quotations, and other information required. <br />For the Contract Times, state increase, decrease, or no change to Contract Times for Substantial Completion, <br />readiness for final payment, and Milestones, if any. If increase or decrease, state specific number of days for <br />changes to the Contract Times. <br />Description <br />Amount <br />Contract Times (days) <br />Substantial <br />Final <br />1. Item—TCl/Davidson-Finch/ICC <br />$182,087 <br />56 <br />56 <br />2. Item — Marku : TCI 15% / Subs 5% <br />$24, ?36 <br />0 <br />0 <br />Total This Change Order Proposal <br />$206,823 <br />56 <br />56 <br />Changes to Milestones, if any: <br />The adjustment proposed is the entire adjustment to the Contract to which the proposer believes it <br />is entitled as a result of the proposed change. <br />Change Order Proposal By: Allen Gaarder <br />Signature of Proposer: <br />
The URL can be used to link to this page
Your browser does not support the video tag.