My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 4 - WWTP Secondary Treatment Improvements Proj No. 114-053 Thieneman
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 4 - WWTP Secondary Treatment Improvements Proj No. 114-053 Thieneman
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:52:17 PM
Creation date
8/11/2016 1:48:31 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/9/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I.JCDC <br />IN4�N[[Pt IiNYI COMRatI <br />OOLVMLNiS COCA AIi[I$[ <br />Change Order No. 4 <br />Date of Issuance: July 29,2016 Effective Date: <br />Owner: City of South Bend Owner's Contract No.: 114-053 <br />Contractor: Thieneman Construction Contractor's Project No.: <br />Engineer: Arcadis US Engineer's Project No.: 03029034.0000 <br />Project: Secondary Treatment Improvements Contract Name: <br />The Contract is modified as follows upon execution of this Change Order: <br />Description: Incorporation of Contractor's COPS: <br />COP 12-DI-R2 —Air Header Pipe Replacement........................................................................... <br />$206,823.00 <br />COP 14 —Groundwater Pump Level Sensors.................................................................................. <br />$3,091.00 <br />COP15 — RFI 81 Costs...................................................................................................................... <br />$3,167.00 <br />COP 16-R1— Fiber Optic Additional Work................................................................................... <br />$118,631.00 <br />COP 17 — Lower Dewatering Wells................................................................................................ <br />$26,685.00 <br />COP 20 — Nitrification Pipe Demo................................................................................................... <br />$1,492.00 <br />COP 21— Remove 4 Pipes From Aeration....................................................................................... <br />$3,108.00 <br />COP22 — Concrete Baffle Wall...................................................................................................... <br />$10,713.00 <br />COP 29-R1— Clarifier Pressure Reducing Valves........................................................................... <br />$22,406.00 <br />COP 30— Mixed Liquor Valve Replacement................................................................................ <br />$210,660.00 <br />Attachments: Contractor's Change Order Proposals <br />CHANGE IN CONTRACT PRICE <br />CHANGE IN CONTRACT TIMES <br />Original Contract Price: <br />Original Contract Times: <br />Substantial Completion: July 26, 2017 <br />$ 11,885,000 00 <br />Ready for Final Payment: August 25, 2017 <br />dates <br />Increase from previously approved Change Orders: <br />No Change from previously approved Change Orders: <br />Substantial Completion: 0 <br />$ 101,221.75 <br />Ready for Final Payment: 0 <br />days <br />Contract Price prior to this Change Order: <br />Contract Times prior to this Change Order: <br />Substantial Completion: July 26, 2017 <br />$ 11,986 221.75 <br />Ready for Final Payment: August 25, 2017 <br />dates <br />Increase of this Change Order: <br />Increase of this Change Order: <br />Substantial Completion: 21 <br />$ 606,776.00 <br />Ready for Final Payment: 21 <br />days <br />Contract Price incorporating this Change Order: <br />Contract Times with all approved Change Orders: <br />Substantial Completion: August 16, 2017 <br />$ 12,592,997.75 <br />Ready for Final Payment: September 15, 2017 <br />dates <br />E DMMEND D: ACCEPTED: <br />By: By: t e�n ' By: <br />Engineer (if required) V Owner (Authorized Signature) <br />Title: 4jr r_ Title ASSISTAriTCll4 0461J4F.4L Title <br />Date: _ ej ZZZ Date <br />08-o5-Zolfo Date <br />AGGEP - <br />Contractor(Aut orized Signature <br />�PPA m 2Vt ZrY4'Y <br />g y�(—ZI1/Cr <br />EJCDC' C-941, Change Order. <br />Prepared and published 2013 by the Engineers Joint Contract Documents Committee. <br />Pace 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.