INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Hillary Horvath, Clerk
Board of Public Works
FROM: Zak Tebell, Project Engineer
SUBJECT: Agreement for Professional Services – Project No. 124-003
Wastewater SCADA Refresh
DATE: 10/6/2026
The PLC (Programmable Logic Controller, these are the electronic devices that control the lift stations and bridge SCADA to the pumps in the lift stations) contract for the SCADA project is primarily a professional system integration and technical services agreement involving the programming, configuration, testing, commissioning, and optimization of the City's existing and new control systems. The work requires specialized expertise to develop PLC logic, integrate field equipment with the SCADA platform, perform functional testing, and provide startup and operational support. While control hardware will be furnished as part of the implementation, the principal purpose of the contract is the provision of technical services necessary to achieve a fully functional and integrated SCADA system rather than the construction of a public improvement. The deliverables consist of engineering, software development, system configuration, commissioning, training, and ongoing integration support provided by a qualified systems integrator along with the physical installation of the PLCs.
AGREEMENT FOR PROFESSIONAL SERVICES
BY AND BETWEEN THE CITY OF SOUTH BEND, INDIANA
AND AUTOMATION & CONTROL SERVICES, Inc.
THIS AGREEMENT is made effective the 13th day of October 2026 by and between the City
of South Bend, Indiana (the “City”), a municipal corporation organized and operating under the laws of
the State of Indiana, acting by and through its Department of Public Works (the “Department”)
and by Automation and Control Services, Inc., (the "Provider"), and each a “Party” and together the
“Parties”.
NOW THEREFORE, for and in consideration of the mutual covenants and promises
contained herein, the City and Provider hereby agree as follows:
Section 1. Duties of the Provider. The Provider shall provide the professional services (the
“Services”) which are more particularly described at Exhibit A attached hereto and incorporated herein.
If any conflict between this Agreement and Exhibit A exists, the terms of this Agreement shall control.
The Provider certifies that it has sufficient experience and expertise to complete the Services and shall
execute its responsibilities by following and applying the highest professional and technical guidelines
and standards of care for projects of similar design and complexity at all times. Nothing in this
Agreement shall preclude the Provider from performing work for other entities or individuals. However,
the Provider agrees not to engage in any activity that is detrimental to the City’s business interests,
creates a conflict of interest with the City, or otherwise interferes with the Provider’s provision of the
Services. The Provider understands and agrees that it shall not commence any additional work or change
the scope of the Services provided unless authorized in writing by the City. No claim for additional
compensation shall be made by Provider in the absence of prior written approval of the Parties. The
City shall provide all necessary information, details and locations to Provider in a timely manner. Any
changes to this information shall be communicated to Provider at least one (1) week prior to the planned
construction. In the event in which the installation and/or location needs to be rescheduled due to
inclement weather, an alternate station may be selected by the City’s engineering team which allows
station installation progress to proceed.
Provider must adhere to the installation schedule established by the City’s engineering team. Failure to
do so may result in late or reduced payment as the orderly and efficient installation of the
hardware contemplated in the Services is necessary in order to keep the City’s Telemetry Control
System properly functioning during this upgrade.
Section 2. Consideration. In exchange for the Provider’s performance of the Services, and
subject to the terms and conditions of this Agreement, the City will pay the Provider a total sum not to
exceed One Million Four Hundred Forty-Five Thousand Six Hundred Sixty-Four Dollars ($1,445,664)
(the “Contract Amount”). The City will pay the Contract Amount in installments within thirty (30) days
of an undisputed invoice from the Provider (each a “Contract Installment”), as set forth in Exhibit A.
The City will not be required to pay any Contract Installment if the City is not reasonably satisfied with
the Provider’s performance under this Agreement or any material default or material breach of this
Agreement by the Provider exists, as the City may determine in its sole discretion within the duty of
reasonableness, good faith, or fair dealing. The sum of all Contract Installments will not exceed the
Contract Amount, and the Provider will not incur or seek reimbursement for any expenses in excess of
the Contract Amount. The
payment terms as set forth in this paragraph supersede any terms presented by Provider in any supplement
or exhibit to this Agreement.
Section 3. Provider Use of Generative AI. To the extent applicable, Provider must disclose
the extent to which any Generative Artificial Intelligence (“AI”) technology was used in providing the
Services set forth in Exhibit A and which technology was used. Any deliverables or work product created
in part by Generative AI shall be reviewed by a human being prior to submission to the City as finished
work product. Failure to do so, including, but not limited to, correction of any mistakes in work product
caused by Generative AI, shall be considered a performance deficiency pursuant to the terms of this
Agreement. Provider shall not rely solely on Generative AI for any decision making required as part of
the Services. Any disclosure required by this section shall be included in the Provider’s invoice. Providers
shall not input any non-public City information into any Generative AI technology. Generative AI
technology shall not be used to generate images, art, or video. As of the date of this contract, there is no
AI planned for use in completion of this work by the Provider and any plans to do so must be approved in
advance by the City.
Section 4. Work Product; Ownership. The Provider will submit its work product to the City
in accordance with the terms of the Scope of Services. Any and all work product submitted by the Provider
to the City as part of the Provider’s performance of the Services will become the exclusive property of the
City, and the City will have the right to use and reproduce copies of the Provider’s work product as the
City determines in its sole discretion without compensation to the Provider except the compensation
expressly provided for in this Agreement.
Section 5. Term and Renewal Option. This Agreement shall be effective commencing on
the Effective Date and shall end on the date when the Provider has completed the Services, expected to be
no later than May 1, 2027. The Parties agree that this Agreement may be extended by mutual agreement
of the Parties.
Section 6. Assignment; Successors. The Provider shall not assign or subcontract the whole
or any part of this Agreement to any other person or entity without the prior written consent of the City.
Provider shall ensure that any assignee or subcontractor will comply with the terms hereof and shall be
responsible for such compliance.
Section 7. Relationship/Independent Contractor. Both Parties, in the performance of this
Agreement, shall act in an individual capacity and not as agents, employees, partners, joint venturers or
associates of one another. The employee(s) or agent(s) of one Party shall not be deemed or construed to
be the employee(s) or agent(s) of the other Party for any purpose whatsoever. Neither Party will assume
liability for any injury (including death) to any person(s), or damage to any property, arising out of the
acts or omissions of the agents, employees or subcontractors of the other Party. This Agreement is strictly
for the benefit of the Parties and not for any third party or person.
Provider is solely responsible for compliance with federal, state and local laws and regulations relating to
taxes and social security payments that may be required to be made in connection with the compensation
provided under this Agreement. The City, however, may file informational returns with the United States
Internal Revenue Service or similar state agency regarding payment made to Provider in accordance with
this Agreement under conditions imposed by federal, state or local laws applicable to such payment. The
City shall provide IRS Form 1099, if applicable.
Section 8. Confidentiality. The Provider acknowledges that information which the City
regards as confidential or proprietary in nature (the “Information”), may come to the knowledge of the
Provider during the Provider’s performance of services. The Provider shall treat the Information as strictly
confidential and agrees that the Provider will not, at any time or in any manner, either directly or indirectly,
(i) use, or allowed to be used, any Information for the Provider’s own benefit or the benefit of any director,
official, employee, or agent or any third party, or (ii) divulge, disclose, or communicate in any manner
any Information to any third party without the written consent of the City. The Provider shall be
responsible for maintaining the confidentiality of any Information in its possession, including taking
appropriate measures to secure said Information against such uses and dissemination and to inform any
person to which he allows to access such information of its confidentiality. Notwithstanding anything to
the contrary contained in this Agreement, the Parties will adhere to their respective obligations under the
Indiana Access to Public Records Act, and nothing herein will be construed to relieve either Party of such
obligations. The confidentiality provisions of this Agreement remain in full force and effect after, and
survive the termination of, the Term of this Agreement.
Section 9. Indemnification; Responsibility for Own Acts. The Provider shall be responsible
for its own acts and omissions and hereby agrees to defend, indemnify, and hold harmless the City, its
officials, members, employees, and agents from any and all claims of any nature which arise from the
performance by the Provider under this Agreement and from all costs and attorney fees in connection
therewith, excepting for claims pertaining to this Agreement that arise out of the negligence or intentional
acts of the City, its officials, members, employees, and agents. The indemnification obligations of the
Parties under this Section shall survive the termination of this Agreement. Furthermore, the Provider shall,
at its expense, conduct criminal background checks with respect to any of its employees, agents,
volunteers, interns, or subcontractors of Provider, prior to entrusting such persons to perform work in
connection with the Services. Such checks shall include convictions involving any violent crimes, sex
crimes, or crimes of dishonesty. Unless the City provides prior written consent, Provider shall refrain
entirely from entrusting persons with materially adverse criminal records to perform work in connection
with the Services.
Section 10. Funding Cancellation and Payments. In accordance with I.C. 6-1.1-18-4,
payments by the City are subject to annual appropriation by its fiscal body. If the City makes a written
determination that funds are not appropriated or otherwise available to support continued performance of
this Agreement, this Agreement shall be cancelled. A determination by the City that funds are not
appropriated or otherwise available to support continuation of the performance shall be final and
conclusive.
Section 11. Termination. This Agreement may be terminated by either Party at any time, in
whole or in part, if a Party determines that such termination is in its best interest. Termination shall be
affected by delivery to the Provider, or the City, as the case may be, of written notice at least thirty (30)
days prior to the termination effective date, specifying the extent to which performance of services will or
must cease. The Provider shall be compensated for satisfactory performance prior to the notice date of
termination but in no case shall total payment made to Provider exceed the original consideration set forth
in the Agreement. The City will not be required to pay any Contract Installment or be otherwise liable for
any cost associated with the Provider’s performance of any Services after the date on which Services are
required to cease pursuant to any Notice of Termination.
Section 12. Counterparts. This Agreement may be executed in counterparts, all of which shall
be deemed originals.
Section 13. Performance. Provider shall strive to ensure that its performance under this
Agreement complies with the expectations identified in the Scope of Services. The City may, at any time,
provide written notice to Provider of any concern regarding Provider’s performance under the Scope of
Services. If any such notice is delivered to Provider, Provider shall take reasonable steps to perform under
the Scope of Services.
Section 14. Remedies for Breach of Contract. The Provider’s failure to complete the Services
in accordance with this Agreement will be considered a material breach. In the event of any breach of
this Agreement by the Provider, the City may suspend all payments to the Provider and may pursue any
and all remedies available at law or in equity. The Provider shall repay to the City any portion of the
Contract Amount expended for matters not within the scope of the Services.
Section 15. Governing Law; Jurisdiction; Compliance with Laws. This Agreement shall be
construed and interpreted according to the laws of the State of Indiana without regard to conflicts of laws
statutes. Any dispute arising under the terms of this Agreement shall be filed in any court of competent
jurisdiction in St. Joseph County, Indiana. The Provider agrees to comply with, and shall cause any
subcontractor hereunder to comply with, all applicable federal, state and local laws, rules, regulations and
ordinances, and all provisions required thereby are hereby incorporated herein by reference. Provider shall
comply with federal, state and local law in its hiring and employment practices and policies for any activity
covered by this Agreement. Further, the City shall not be required to pay for Services that are inconsistent
with or in violation of this Agreement nor for any Services performed in violation of federal, state or local
statute, ordinance, rule or regulation
Section 16. Notices. Any notice required or permitted to be delivered hereunder shall be
deemed to be delivered when deposited in the United States Postal Service, postage prepaid, registered or
certified mail, return receipt requested, addressed to the City or the Provider, as the case may be, at the
address set forth below.
Provider:
Automation & Control Services, Inc.
2440 Ontario St.
Schererville, IN 46375
Attn: Roger F. Florkiewicz
City:
Department of Public Works
City of South Bend
215 S. Dr. Martin Luther King Jr. Blvd. Suite 400
South Bend, IN 46601
Attn: Zak Tebell
Section 17. Non-Collusion and Acceptance. The undersigned attests, subject to the penalties
for perjury, that it is the Provider, that it has not, nor has any assignee or subcontractor, directly or
indirectly, to the best of its knowledge after due inquiry, entered into or offered to enter into any
combination, collusion or agreement to receive or pay, and that neither he nor any assignee or
subcontractor hereunder has received or paid, any sum of money or other consideration for the execution
of this Agreement other than that which appears upon the fact of this Agreement.
Section 18. E-Verify. The Provider affirms under the penalties of perjury that it does not
knowingly employ any person not legally entitled to work in the United States. The Provider shall enroll
in and verify the work eligibility status of all its newly hired employees, if any, through the E-Verify
program as defined in IC 22-5-1.7-3. The Provider shall not knowingly employ or contract with any person
who is not legally entitled to work in the United States. The Provider shall not retain an employee or
contract with a person that the Provider subsequently learns is not legally entitled to work in the United
States.
The Provider is not required to participate in the E-Verify program should the E-Verify program
cease to exist. Additionally, the Provider is not required to participate if the Provider is self-employed and
does not employ any employees.
The City may terminate for default if the Provider fails to cure a breach of this provision no later
than thirty (30) days after being notified by the City.
Section 19. Minority and Women’s Enterprise Diversity Development. Persons,
partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend
through its agencies, boards, or commissions shall not discriminate against any employee or applicant for
employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or
privileges of employment, or any matter directly or indirectly related to employment because of race, sex,
religion, color, national origin, ancestry, age, or disability that does not affect that person's ability to
perform the work.
Section 20. Non-Discrimination. The City of South Bend is committed to ensuring equality
of opportunity and does not exclude, deny the benefit of, or otherwise subject any person to discrimination
in any City program, service or activity on the basis of race, color, national origin, sex, age, disability, or
any other protected characteristic. The Provider agrees to comply with and to act consistently with this
policy in the performance of the Provider’s duties.
Section 21. Drug-Free Workplace. The Provider hereby agrees to make a good faith effort to
provide and maintain a drug-free workplace. The Provider will give written notice to the City within ten
(10) days after receiving actual notice that the Provider or any assignee or subcontractor has been
convicted of a criminal drug violation occurring in the workplace.
Section 22. Severability. In the event any portion of this Agreement shall be held illegal, void,
or ineffective, the remaining portions hereof shall remain in full force and effect. If any of the terms or
conditions of this Agreement are in conflict with any applicable statute or rule of law, then such terms and
conditions shall be deemed inoperative to the extent that they may conflict therewith and shall be deemed
to be modified to conform to such law.
Section 23. No Waiver. No failure or delay on the part of either Party in exercising any right
under this Agreement will operate as a waiver of, or impair, any such right. No single or partial exercise
of any such right will preclude any other or further exercise thereof or the exercise of any other right. No
waiver of any such right will have effect unless given in a written document signed by the Party waiving
such right. No waiver of any right will be deemed a waiver of any other right hereunder.
Section 24. Force Majeure. The Provider shall not be responsible for any failure or delay in
the performance of any obligation hereunder, if such failure or delay is due to a cause beyond the
Provider’s reasonable control, including, but not limited to acts of God, nature, or government.
Section 25. Entire Agreement; Amendment. This Agreement sets forth the entire agreement
and understanding between the Parties as to the subject matter hereof, and merges and supersedes all prior
discussions, agreements, and understanding of any and every nature between them. This Agreement may
be amended only by separate writing, signed by authorized representatives of both the Provider and the
City.
IN WITNESS WHEREOF, the Parties hereto, through their duly authorized representatives, have
caused this Agreement to be executed as of the day and year first written above. The Parties have read and
understand the foregoing terms of this Agreement and do, by their respective signatures hereby agree to
its terms.
EXHIBIT A
SCOPE OF SERVICES
Provider agrees to the following:
SEE ATTACHED – “City of South Bend PLC Control System Upgrade Exhibit A” document
AUTOMATION & CONTROL SERVICES, INC.
___________________________________________
By:
Roger F. Florkiewicz, President
Automation & Control Services, Inc.
Date: September 29, 2026
CITY OF SOUTH BEND, INDIANA
__________________________________
By:
Date:
AUTOMATION & CONTROL SERVICES, INC.
2440 Ontario St.
Schererville, IN 46375-2700
Tel. - (219) 558-2060 Fax - (219) 558-2063
E-mail – techinfo@PLCexperts.com
September 29, 2026
Zak Tebell
Project Engineer
Department of Public Works
City of South Bend
215 S. Dr. Martin Luther King Jr. Blvd.
Suite 400
South Bend, IN 46601
RE: Telemetry Control System Upgrade Project
Mr. Zak Tebell,
We are pleased to submit our updated quotation for construction and installation related to your Telemetry
Control System Upgrade project. We have used the 100% drawing set provided by Black & Veatch, the
Site Station Location Map with site pictures, and each station’s Scope of Work along with our onsite
discussions and site visit as the basis for our quotation. This revision adds RF filter relocation into the
scope of 4 stations (072-Willowgate, 004-Sunnybrook, 015-Clay Fire, and 061-Cleveland) per request of
the City after the J&K radio installations. We have also included surge protection devices at each station
based on the hardware specification and counts provided by B&V.
As before, after our review of the stations, we made the decision to split the quote into a hardware section
and an installation labor section by individual station. This allowed us to define the Bill of Materials we
are providing and our estimates for development and construction of the hardware “kit” needed for each.
There are many different variations and it was easiest and most accurate to detail them individually even
though many were of the same vintage and style. Some require adding a new controller with prewired
I/O done onsite while other locations will need a completely new control panel built and tested in advance
of installation. We have chosen to detail each one of the 60 included stations. It is our hope that this
format assists in planning and prioritizing the individual stations for more efficient installation scheduling
and project management. It should also be helpful if there are budgetary restrictions that would prevent
all of the listed stations from being competed at one time.
For pricing clarity, there are optional costs for the station listed as: 032 – Southfield. This station has an
Option #1 for reusing the existing enclosure and re-mounting the panel components and routing the
wiring through the wireway OR an Option #2 replacement of the PLC Control Enclosure into a new 2 –
door above ground combination PLC and Motor Control Panel. This station has been individually detailed
below.
The other stations do not have any optional items, as they include retrofit panels and onsite I/O wiring
changes. The stations listed as 033A – Inwood/Ironwood and the 081 – Blackthorn are stations which
are quoted with an entirely new Enclosure and Panel and will also include I/O wiring and conduit
additions. These stations have been included in our total standard station cost summary at the end of
this quotation and have also been individually detailed below.
We have included the same itemized approach regarding the installation labor section. We believe this
more accurately captures our expectations of the time needed at each station and will assist with
scheduling and coordination with B&V and the City liaisons. This also provides a framework for
discussing our assumptions about access and timing without including high contingencies for each
station. After completing a review of the station photos and comparing it to the scope needed, there are
some concerns on a few stations about the capability to mount all of the new hardware in the designated
locations. We believe we have addressed this sufficiently to ensure we can complete the component
replacement and wiring for all stations. If needed, some of the tighter footprint stations may require the
use of an additional small enclosure & panel mounted directly to the existing enclosure to house some of
the components. This would be done only on an as needed basis and would be a small additional charge
based on actual needs. This would be done only if required and is still a much lower cost than providing
a larger size completely new panel.
We believe our quotation format reduces the uncertainty and risk while ensuring a successful
implementation for everyone involved. As mentioned above, the hardware selected is standard and
typically used by us in our panel shop. In order to overcome some of the price challenges related to
Tariffs and recent cost increases, we have worked with Rockwell Automation to provide competitive
special pricing with assurances of both price stability and inventory availability for the duration of this
project.
Utilizing our long-term distributors, we have firm control over the material supply aspects of the project.
Direct coordination with our vendors is a key to smooth material delivery and direct control of our labor
allocation helps us control costs. The labor mix will vary depending on the specific skillset required at
each stage of building and installation for each of the stations. We have internally verified our I/O counts
and generated the quote detail based on those specific module counts. We have primarily utilized the
B&V provided bid materials and their resources, Brandon Schulz & Steve Yakimow, for guidance on the
station specifics as they are the specified Engineer and Programmer for this project. We have discussed
some timeline and proposed installation plans utilizing some alternating weeks throughout the project to
best complete the onsite installation work. I believe we have accounted for and included the needed
parts and installation labor to ensure the designed and proper operation of the overall telemetry system.
We have detailed the Station Hardware Kits with a major components bill of materials for each station.
The Hardware portion includes the drawing development, revisions, construction and wiring as needed
for each station, and in-house I/O verification. We will complete setup and testing of the hardware
components before shipment from our facility. Listed below the hardware cost is an associated
installation cost for each station. This includes station materials review, installation scheduling,
component purchasing, drawing verification, component mounting, onsite I/O wiring, verification, and
travel to and from the individual stations.
STATION COST DETAIL
001 – Vaness
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 3 – Allen-Bradley 16-Point AC Input Module
• 2 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Power Block Cover
• 20 – Surge Protection Devices
• Pre-wired PLC I/O Harness for two separated enclosures
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $24,374
• Re-wire Existing Back Panel
• Terminate Harness to Existing Terminal Blocks
• Mount New HMI
• Install 2 x 15’ 1-1/2” Conduit
• Install Surge Protection Devices
Onsite installation cost as described above is $10,606
003 – New London
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 2 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Surge Protection Device
• Pre-Wired PLC I/O Harness
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $14,715
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections (No Terminal Blocks visible in panel photos)
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
004 – Sunnybrook
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 2 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Hoffman SS Filter Enclosure
• 3 – Bulkhead Cable Connectors
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $16,778
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections (No Terminal Blocks visible in panel photos)
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Relocate RF Filter to External Enclosure
• Install Surge Protection Device
Onsite Installation cost as described above is $6,296
005A – East Gate
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 2 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Allen-Bradley 4-Point Analog Output Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $16,255
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Terminal Blocks
• Cut Existing Panel to Match New HMI cutout
• Mount New HMI
• Mount Radios to New Bracket
• Mount New HMI
• Install Surge Protection Device
Onsite Installation cost as described above is $4,653
005B – Creekwood
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Hoffman Backplate
• 2 – 15A Receptacles
• 3 – Allen Bradley Selector Switches, Indicating Lights, Pushbuttons
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $20,003
• Add New Enclosure Backplate
• Disconnect Incoming Power
• Disconnect existing Field I/O
• Terminate Field I/O to new Terminal Blocks
• Mount Radio to reserved location on new backplate
• Install Surge Protection Device
Onsite Installation cost as described above is $3,753
006 – Douglas
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 2 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Allen-Bradley 4-Point Analog Output Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $16,456
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Terminal Blocks
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Verify Radio Placement on Panel
• Install Surge Protection Device
Onsite Installation cost as described above is $4,653
013 – Georgetown
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 2 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $14,091
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Terminal Blocks
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Mount Radio on new Bracket
• Install Surge Protection Device
Onsite Installation cost as described above is $4,653
014A – Farmington
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 2 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Allen-Bradley 4-Point Analog Output Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $16,255
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Terminal Blocks
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Remove Old Serial Radio
• Install Surge Protection Device
Onsite Installation cost as described above is $4,653
014B – Carriage Hills
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Hoffman Backplate
• 2 – 15A Receptacles
• 4 – Ice Cube Relays
• 4 – Allen Bradley Selector Switches, Indicating Lights, Pushbuttons
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $18,576
• Add New Enclosure Backplate
• Disconnect Incoming Power
• Disconnect existing Field I/O
• Terminate Field I/O to new Terminal Blocks
• Mount Radio to reserved location on new backplate
• Install Surge Protection Device
Onsite Installation cost as described above is $3,753
015 – Clay Fire
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 2 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Hoffman SS Filter Enclosure
• 3 – Bulkhead Cable Connectors
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $16,979
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections (No Terminal Blocks visible in panel photos)
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Remove Old Flow Transmitter
• Relocate RF Filter to External Enclosure
• Install Surge Protection Device
Onsite Installation cost as described above is $6,296
017 – Summerhill
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 2 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $15,644
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Raise UPS with Shelf Bracket or Standoff Spacer Plate to Allow Front Panel to Close and Latch
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
020 – Michigan
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 2 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Allen-Bradley 4-Point Analog Output Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $16,429
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections (No Terminal Blocks visible in panel photos)
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
021A – Colfax
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 2 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Allen-Bradley 4-Point Analog Output Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $16,429
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
021B – Monroe
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 2 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $14,742
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections (No Terminal Blocks visible in panel photos)
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Install Surge Protection Device
Onsite Installation cost as described above is $4,653
023 – Rosemary
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• 1 – Hoffman Backplate
• 3 – Ice Cube Relays
• 3 – 15A Receptacles
• 8 – Pushbuttons, Selector Switches, Indicator Lights
• 1 – Thermostat
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $20,283
• Add New Enclosure Backplate
• Disconnect Incoming Power
• Disconnect existing Field I/O
• Terminate Field I/O to new Terminal Blocks
• Install Surge Protection Device
Onsite Installation cost as described above is $3,753
024 – Corby
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 2 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Hoffman Backplate
• 2 – 15A Receptacles
• 1 – Ice Cube Relay
• 2 – Allen Bradley Selector Switch, Indicating Light, Pushbutton
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $20,003
• Add New Enclosure Backplate
• Disconnect Incoming Power
• Disconnect existing Field I/O
• Terminate Field I/O to new Terminal Blocks
• Mount Radio to reserved location on new backplate
• Install Surge Protection Device
Onsite Installation cost as described above is $3,753
030 – New Cleveland
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Hoffman Backplate
• 3 – Ice Cube Relays
• 3 – 15A Receptacles
• 8 – Pushbuttons, Selector Switches, Indicator Lights
• 1 – Thermostat
• 2 – Surge Protection Devices
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $20,517
• Add New Enclosure Backplate
• Disconnect Incoming Power
• Disconnect existing Field I/O
• Terminate Field I/O to new Terminal Blocks
• Install Surge Protection Devices
Onsite Installation cost as described above is $3,753
031 – 27th St
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 2 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $14,265
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
032 – Southfield
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Power Block Cover
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
• 1 – Hoffman Enclosure, Backplate, Swing Panel (Option 2 Only)
• 3 – 15A Receptacles (Option 2 Only)
• 3 – Ice Cube Relays (Option 2 Only)
• 2 – Potentiometers (Option 2 Only)
• 1 – Thermostat (Option 2 Only)
• 2 – Motor Protection Circuit Breakers and Contactors (Option 2 Only)
• 1 – Disconnect (Option 2 Only)
• 1 - Transformer (Option 2 Only)
Hardware Kit cost as described above for Option 1 is $15,556
Hardware Kit cost as described above for Option 2 is $41,254
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Move Radio on New Location
• Add Finger Safe Power Terminal Cover
• Remount Existing Components that are not Correctly Mounted
• Route Wiring Neatly through Duct
• Add New Enclosure (Option 2 Only)
• Disconnect Incoming Power (Option 2 Only)
• Disconnect existing Field I/O (Option 2 Only)
• Terminate Field I/O to new Terminal Blocks (Option 2 Only)
• Install Surge Protection Device
Onsite Installation cost as described above for Option 1 is $8,253
Onsite Installation cost as described above for Option 2 is $12,813
033A – Inwood/Ironwood
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 4 – Allen-Bradley 16-Point AC Input Module
• 2 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Hoffman Enclosure and Backplate
• 2 – 15A Receptacles
• 69 – Surge Protection Devices
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $51,413
• Addition of New Enclosure
• Mount New HMI
• Install 1-1/2” Rigid Conduit
• Install Unistrut Conduit Supports
• Pull Wire Between Enclosures
• Install Surge Protection Devices
Onsite Installation cost as described above is $13,773
038 – Deer Hollow
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 2 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $14,717
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections (No Terminal Blocks visible in panel photos)
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Remove Old Flow Transmitter
• Relocate Radio
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
043 – Renewable
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 2 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 2 – Allen-Bradley 8-Point Analog Input Module
• 1 – Allen-Bradley 4-Point Analog Output Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $17,898
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
046 – Lafayette
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Submersible Level Transmitter to be billed as additional cost once specified by SB PM
• 1 – Hoffman Backplate
• 3 – Ice Cube Relays
• 3 – 15A Receptacles
• 8 – Pushbuttons, Selector Switches, Indicator Lights
• 1 – Thermostat
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $20,510
• Add New Enclosure Backplate
• Disconnect Incoming Power
• Disconnect existing Field I/O
• Terminate Field I/O to new Terminal Blocks
• Install Surge Protection Device
Onsite Installation cost as described above is $3,753
060 – Keller Park
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Hoffman Backplate
• 2 – 15A Receptacles
• 2 – Ice Cube Relays
• 4 – Allen Bradley Selector Switches, Indicating Lights, Pushbuttons
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $19,511
• Add New Enclosure Backplate
• Disconnect Incoming Power
• Disconnect existing Field I/O
• Terminate Field I/O to new Terminal Blocks
• Mount Radio to reserved location on new backplate
• Install Surge Protection Device
Onsite Installation cost as described above is $3,753
061 – Cleveland
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 2 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Allen-Bradley 4-Point Analog Output Module
• 1 – Hoffman SS Filter Enclosure
• 3 – Bulkhead Cable Connectors
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $18,842
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Relocate RF Filter to External Enclosure
• Install Surge Protection Device
Onsite Installation cost as described above is $6,296
065 – Laurel
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Hoffman Backplate
• 3 – Ice Cube Relays
• 2 – 15A Receptacles
• 8 – Pushbuttons, Selector Switches, Indicator Lights
• 1 – Thermostat
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $20,463
• Add New Enclosure Backplate
• Disconnect Incoming Power
• Disconnect existing Field I/O
• Terminate Field I/O to new Terminal Blocks
• Install Surge Protection Device
Onsite Installation cost as described above is $3,753
066 – River Commons
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 2 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Allen-Bradley 4-Point Analog Output Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $16,228
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
067 – Airport
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Hoffman Backplate
• 3 – Ice Cube Relays
• 3 – 15A Receptacles
• 8 – Pushbuttons, Selector Switches, Indicator Lights
• 1 – Thermostat
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $20,510
• Add New Enclosure Backplate
• Disconnect Incoming Power
• Disconnect existing Field I/O
• Terminate Field I/O to new Terminal Blocks
• Install Surge Protection Device
Onsite Installation cost as described above is $3,753
069 – Willows
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 2 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $15,992
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
070 – Fernwood
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 2 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $14,717
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
072 – Willowgate
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 2 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Hoffman SS Filter Enclosure
• 3 – Bulkhead Cable Connectors
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $16,780
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections (No Terminal Blocks visible in panel photos)
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Remove Old Flow Transmitter
• Relocate Radio
• Relocate RF Filter to External Enclosure
• Install Surge Protection Device
Onsite Installation cost as described above is $6,296
073 – Mayflower
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 2 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 2 – Allen-Bradley 8-Point Analog Input Module
• 1 – Allen-Bradley 8-Point Analog Output Module
• 1 – APC 3kVA Uninterruptable Power Supply
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $19,102
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
080 – Blue Heron
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 2 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Power Block Cover
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $14,927
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Remove Old serial Radio
• Secure Fiber Patch Panel
• Install Finger Safe Guard on Incoming Power
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
081 - Blackthorn
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Allen-Bradley PanelView Plus 7 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L320ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 5 – Allen-Bradley 16-Point AC Input Module
• 2 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Allen-Bradley 8-Point Analog Output Module
• 1 – APC 3kVA Uninterruptable Power Supply
• 1 – Hoffman Enclosure and Backplate
• 2 – 15A Receptacles
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $39,391
• Addition of New Enclosure
• Mount New HMI
• Install Rigid Conduit
• Install Conduit Supports
• Re-Wire Float Relays
• Pull Wire Between Enclosures
• Install Surge Protection Device
Onsite Installation cost as described above is $18,333
082 – Sports Complex
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 2 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $15,644
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Raise UPS with Shelf Bracket or Standoff Spacer Plate to Allow Front Panel to Close and Latch
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
084 – West Pointe
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 2 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – APC 3kVA Uninterruptable Power Supply
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $16,562
• Re-Wire Existing Back Panel
• Terminate I/O to Terminal Blocks
• Existing Single Point Connections
• Mount New HMI to Panel on Stand-offs
• Add UPS with Shelf Bracket
• Install Surge Protection Device
Onsite Installation cost as described above is $3,753
085 – Edison
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 3 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $14,687
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Mount Radio on New Bracket Adjacent to Power Supply
• Mount UPS with Shelf Bracket or Standoff Spacer Plate
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
086 – Poppy
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L320ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 6 – Allen-Bradley 16-Point AC Input Module
• 3 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Allen-Bradley 8-Point Analog Output Module
• 1 – Hoffman Backplate
• 2 – 15A Receptacles
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $33,667
• Addition of New Backplate in existing Radio Enclosure
• Terminate I/O Harnesses to Field I/O Terminal Blocks
• Install Rigid Conduit
• Install Conduit Supports
• Re-Wire Float Relays
• Pull Wire Between Enclosures
• Install Surge Protection Device
Onsite Installation cost as described above is $18,333
087 – Geyer Ditch
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 3 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Allen-Bradley 4-Point Analog Output Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $16,851
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Mount Radio on New Bracket Adjacent to Power Supply
• Mount UPS with Shelf Bracket or Standoff Spacer Plate
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
088 - Sage
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L320ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 6 – Allen-Bradley 16-Point AC Input Module
• 3 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Allen-Bradley 8-Point Analog Output Module
• 1 – APC 3kVA Uninterruptable Power Supply
• 1 – Hoffman Backplate
• 2 – 15A Receptacles
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $34,882
• Addition of New Backplate in existing Radio Enclosure
• Terminate I/O Harnesses to Field I/O Terminal Blocks
• Install Rigid Conduit
• Install Conduit Supports
• Re-Wire Float Relays
• Pull Wire Between Enclosures
• Install Surge Protection Device
Onsite Installation cost as described above is $18,333
092 – Ameritech
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 2 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $15,644
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Raise UPS with Shelf Bracket or Standoff Spacer Plate to Allow Front Panel to Close and Latch
• Mount New Fiber Switch and Patch Panel
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
095 – Smilax
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for hardware to City of South Bend staging facility
Hardware Kit cost as described above is $2,654
• Addition of Prosoft Module
• Relocate Radio and PLC
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Install Surge Protection Device
Onsite Installation cost as described above is $2,853
096 – Larrison
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for hardware to City of South Bend staging facility
Hardware Kit cost as described above is $2,654
• Addition of Prosoft Module
• Relocate Radio and PLC
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Install Surge Protection Device
Onsite Installation cost as described above is $2,853
100 – Augustine Lakes
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 2 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – APC 3kVA Uninterruptable Power Supply
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $16,528
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
101 – Calvert Dewater
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $13,696
• Re-Wire Existing Back Panel
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Relocate Radio
• Install Surge Protection Device
Onsite Installation cost as described above is $3,753
102 – Fredrickson Flare
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – APC 3kVA Uninterruptable Power Supply
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $14,560
• Re-Wire Existing Back Panel
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Mount Radio on Backplate
• Install Surge Protection Device
Onsite Installation cost as described above is $3,753
103 – Kensington Gate 1
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Hoffman Backplate
• 1 – 15A Receptacle
• 4 – Ice Cube Relays
• 2 – Allen Bradley Selector Switches, Indicating Lights, Pushbuttons
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $19,501
• Add New Enclosure Backplate
• Disconnect Incoming Power
• Disconnect existing Field I/O
• Terminate Field I/O to new Terminal Blocks
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Mount Radio to reserved location on new backplate
• Install Surge Protection Device
Onsite Installation cost as described above is $3,753
104 – Kensington Gate 2
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Hoffman Backplate
• 1 – 15A Receptacle
• 4 – Ice Cube Relays
• 2 – Allen Bradley Selector Switches, Indicating Lights, Pushbuttons
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $19,501
• Add New Enclosure Backplate
• Disconnect Incoming Power
• Disconnect existing Field I/O
• Terminate Field I/O to new Terminal Blocks
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Mount Radio to reserved location on new backplate
• Install Surge Protection Device
Onsite Installation cost as described above is $3,753
105 – Kensington Gate 3
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Hoffman Backplate
• 1 – 15A Receptacle
• 4 – Ice Cube Relays
• 2 – Allen Bradley Selector Switches, Indicating Lights, Pushbuttons
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $19,501
• Add New Enclosure Backplate
• Disconnect Incoming Power
• Disconnect existing Field I/O
• Terminate Field I/O to new Terminal Blocks
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Mount Radio to reserved location on new backplate
• Install Surge Protection Device
Onsite Installation cost as described above is $3,753
106 – Kensington Gate 4
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 2 – Allen-Bradley 8-Point Analog Input Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $16,231
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Relocate Control Transformer
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
107 – Miami Basin
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $14,561
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
108 – Notre Dame Flowmeter
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Automation Direct 5-port Ethernet Switch
• 1 – Allen-Bradley 10A DC Power Supply
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point DC Input Module
• 1 – Allen-Bradley Serial Module
• 1 – Hoffman Backplate
• 1 – 15A Receptacle
• 4 – Ice Cube Relays
• 2 – Allen Bradley Selector Switches, Indicating Lights, Pushbuttons
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $19,189
• Add New Enclosure Backplate
• Disconnect Incoming Power
• Disconnect existing Field I/O
• Terminate Field I/O to new Terminal Blocks
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Mount Radio to reserved location on new backplate
• Install Surge Protection Device
Onsite Installation cost as described above is $3,753
109 – State Rd 2
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for hardware to City of South Bend staging facility
Hardware Kit cost as described above is $2,654
• Addition of Prosoft Module
• Relocate Radio and PLC
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Install Surge Protection Device
Onsite Installation cost as described above is $2,853
C003 – CSO 003
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Power Block Cover
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $14,588
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Remove Serial Box
• Relocate Transformer
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
C004 – CSO 004
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 2 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Power Block Cover
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $14,744
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Relocate Transformer
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
C014 – CSO 014
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Power Block Cover
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $13,937
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Relocate Transformer
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
C025 – CSO 025
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Power Block Cover
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $13,937
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Relocate Transformer
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
C026 – CSO 026
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Power Block Cover
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $13,937
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Relocate Transformer
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
C027 – CSO 027/028
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 8-Point Analog Input Module
• 1 – Power Block Cover
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $14,588
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Relocate Transformer
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
C044 – CSO 044
• 1 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• 1 – Allen-Bradley Field Potential Distributor Module
• 1 – Allen-Bradley 16-Point AC Input Module
• 1 – Allen-Bradley 16-Point Relay Output Module
• 1 – Allen-Bradley 4-Point Analog Input Module
• 1 – Power Block Cover
• 1 – Surge Protection Device
• Brady Thermal Printed Heat Shrink Wire Labels
• All required Ethernet jumpers, terminal blocks, fused terminal blocks for outputs, fuses, wire,
and wire duct
• UL 508A Panel Construction labor
• SolidWorks Electrical Panel Layout & Wiring Diagrams
• Freight for completed panels to City of South Bend staging facility
Hardware Kit cost as described above is $13,729
• Re-Wire Existing Back Panel
• Cut & Relocate Wireway for PLC Clearance
• Relocate DIN Rail for PLC Mounting
• Terminate I/O to Existing Single Point Connections
• Cut Existing Panel to Match New HMI Cutout
• Mount New HMI
• Relocate Transformer
• Install Surge Protection Device
Onsite Installation cost as described above is $5,553
B&V Spares for Testing & Development
• 2 – Prosoft DNP3 Communications Gateway
• 1 – Automation Direct CM5 HMI
• 1 – Allen-Bradley CompactLogix L306ER PLC processor w/End Cap
• Freight for components to Engineer
Hardware cost as described above is $8,363
It is important to note that after reviewing the initial station I/O counts, the originally specified Allen-
Bradley 5069–L320ER Processor was NOT REQUIRED for the majority of the stations listed. This is
due to the somewhat arbitrary number of I/O cards that Rockwell chose to support with each “level” of
processor. We have now updated the processor for the majority of the stations to the 5069-L306ER
per the 100% drawings. These processors are interchangeable and only 3 stations would require the
original L320ER. The other stations currently have no more than 6 IO cards needed, so the 5069-
L306ER is now listed for these stations. Again, should the need arise to add more IO, a processor
change could be done at that time.
PLEASE NOTE: We have included RF filter relocation at the 4 stations specified above. In the future, if
there are additional stations that require a separate enclosure for an RF filter, we have provided a
universal per-station cost of $3,357 to include this add-on.
We have also included surge protection devices at each station for total panel protection and for circuit
protection between panels. We have added one panel surge protector at every station. In addition, we
have added circuit protectors at 3 stations based on locations and device counts provided by B&V.
These stations include 001-Vaness, 030-New Cleveland, and 033A-Inwood/Ironwood. We have not
included additional circuit protectors at any other station besides these three.
We have excluded the following from this proposal:
• New Utility (Power, Air, Water, or Hydraulics) connections to any equipment
• Concrete Pad Installation
• Instrumentation (Flow, Level, Pressure transmitters, etc.)
• Costs associated with Undisclosed, Incorrect, or incomplete information in the project bid
information
• PLC or HMI Programming
• Radio Configuration
• Hourly Labor Increase for station installations occurring beyond February 1, 2027. Labor Cost
for installations completed after this date will be adjusted for the stations remaining to be built
and installed. This amount is historically between three and nine dollars per hour. We prefer
this method to avoid a contingency for all stations at this time.
• Supplier related cost increases for components purchased beyond March 31, 2027 when many
of the negotiated rates included in our current pricing are set to expire.
Project Cost Summary
59 Standard Stations w/ B&V Development Parts
Standard Station Hardware Kit Cost $ 1,050,785.00
Standard Station Installation Cost $ 340,812.00
Total Standard Station Project Cost $ 1,391,597.00
1 Southfield Station Option
New Enclosure Hardware Cost $ 41,254.00
New Enclosure Installation Cost $ 12,813.00
New Enclosure Station Cost $ 54,067.00
Total Project Cost w/Southfield Option $ 1,445,664.00
NOTE: The order of installation and completion is not sequential as indicated by the station
numbers listed above. The City will provide notice of the sequence of panel construction
initiation and onsite installation via the City’s designated Project Manager. The installation will
be coordinated upon completion of the control panel “kit” for each station, confirmation of
completion of the related PLC programs, availability of the Parties required to complete the
installation work, and weather-related conditions.
Our standard payment terms are as follows for the Station Hardware Component Kits:
• 50% of hardware kit cost per station due NET 30 upon approval of provided detailed panel
layout & wiring diagrams for each station final Bill of Materials of each Station’s Hardware Kit as
defined above.
• 50% due NET 30 upon ACS completion of FAT at ACS Facility per station and hardware
shipment from our facility to the designated delivery location per station.
Our standard payment terms are as follows for Installation:
• Balance due NET 30 upon completion of installation and City acceptance of the completed
station and receipt of as-built drawings per station.
I look forward to working again with you on this project. If you should have any questions, please
contact me at (219) 558-2060, ext. 225.
Sincerely,
Roger F. Florkiewicz
Sr. Project Engr. & Operations Mgr.
AUTOMATION & CONTROL SERVICES, INC.
Permits and Fees, if necessary, will be the responsibility of the Customer. Underwriter's Laboratories inspection and listing of any control panel is an additional expense. UL
listing will be defined as a line item in the estimate detail of this document if it is to be provided for a specific control panel. This estimate applies only to the job described
above and is based solely upon the information provided to Automation & Control Services, Inc. via Bid Specification, Request for Quotation, and/or preliminary onsite visit.
This estimate does not include additional materials or labor required to successfully complete the project if due to incorrect or incomplete disclosure by the Customer, unless
these contingencies are specifically stated in the estimate detail section. Physical construction of this job will not commence until an approved Purchase Order has been issued by an Authorized Representative of the Customer. Special Shipping, Handling, and/or Freight charges are not included unless specified. The Customer is responsible for all reasonable collection fees and any associated legal expenses related to collection of past due balances owed to Automation & Control Services, Inc., its material suppliers, and/or sub-contractors. The Customer is also responsible for payment of a 1-1/2% monthly finance charge on any unpaid balances beyond the terms established on the original Purchase Order, typically NET 30. If invoices associated with this quotation are paid with a credit card; a 3% Convenience Fee will be added only to the portion
charged to a credit card. This estimate is valid for thirty days and may be revoked by Automation & Control Services, Inc. at any time.
BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM
Date: 10/6/2026
Name: Zak Tebell Department of Public Works – Engineering Division
BPW Date: 10/13/2026 Phone Extension: 9358
Required Prior to Submittal to Board
BPW Attorney X Attorney Name
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, Traffic Control Resolution
Other: Ease./Encroach
Required Information
Company or Vendor Name Automation & Control Services, Inc.
New Vendor Yes If Yes, Approved by Purchasing No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name Wastewater SCADA Update
Project Number 124-003
Funding Source PR-00050457 Account No. 642-06-602-509-442003--PROJ00000515
Amount $1,445,664.00
Terms of Contract Service Agreement
Special Contract Provisions N/A
Purpose/Description Agreement includes procurement of hardware kits for all sewer lift stations and associated installation.
For Change Orders Only
Amount of Increase Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date: