HomeMy WebLinkAboutChange Order No 2 - Center City Place Rehabilitation Proj No 125-022 - Slatile Roofing & Sheet Metal October 13, 2026 Debra Carothers Slatile Roofing & Sheet Metal 1703 South Ironwood Dr. South Bend, IN 46613 Deb.carothers@slatile.com RE: Change Order No. 2 – Center City Place Rehabilitation – Project No. 125-022 Dear Debra: At its October 13, 2026 meeting, the Board of Public Works approved the above referenced Change Order be increased by $61,510, bringing the revised contract amount to $799,486. Enclosed is a copy of the Change Order for your records. Sincerely, /s/Hillary Horvath Hillary Horvath, Clerk Page 1 of 1 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Hillary Horvath, Clerk Board of Public Works FROM: Zach Hurst, PE, Sr. Project Engineer SUBJECT: Change Order No. 2 - Project No. 125-022 Center City TIF Project – Reroof and Elevation Restoration DATE: 10/08/2026 Change Order number 2 for the subject project covers unforeseen costs for roof decking and roof joist replacement, totaling $37,460, as well as scope addition of added metal flashing totaling $24,050. The cumulative percent change for the project after CO#2 is 16.1%. Change Order no. 2 also adds 127 days to the contract completion date to bring the revised completion date to October 31, 2026. The reason for the delay stems from Slatile’s chosen subcontractor, Custom Cast Stone of Chicago, not being able to deliver in a timely manner the custom-fabricated fiber reinforced concrete panels located at the bottom of the building façade, nor the custom stone cast medallions intended to replace similar medallions removed during a prior façade renovation. Despite continued effort from the project inspector, the materials were delivered several months later than anticipated. The delay was beyond Slatile’s control, and thus should not be considered for liquidated damages. CO# DATE 125-022-2 07/10/2026 BILL TO City of South Bend Public Works Engineering 215 S. Dr. MLK Jr. Blvd. Ste. 400 South Bend, IN 46601 Subject: Change Order 2 Requested By: Debra Carothers (Slatile) Time Delay: Yes (127 Days) PROJECT Center City Roof/Facade Rehab PROJECT#: 125-022 229 South Michigan Street South Bend, IN 46601 CONTRACTOR Slatile Debra Carothers 1703 South Ironwood Drive South Bend, IN 46613 Item Structure Repair and Additional Decking Replacement Qty 1 Price/Unit $37,460.00 Total $37,460.00 COR3: Deterioration of wood roof deck that has been replaced in multiple locations and 4 2xl2x20' yellow pine joists on lower east roof area. A roof drawing with approximate locations and dimensions will be exhibit "A". 11 custom built and installed roof joists, 22 missing diagonal supports, and 3/4" COX plywood deck as drawn and specified by Frost Engineering for the upper roof drain and elevator areas. 341sqft beyond 500sqft allowance. Metal Flashing 1 $24,050.00 $24,050.00 COR7: Fabricate and install metal sill flashing for lower windows to cover damaged limestone ledge from prior metal panel installation. ($8,610) Fabricate and install new textured coated, scalloped metal to cover exposed CM Us and imitate a limestone facade, at the top of the wall, where it meets the roof coping metal. This will be done in 4' sections to enhance the limestone look. ($15,440) City of South Bend, Public Works Engineering, Phone: (574) 235-9251 215 S. Dr. MLKJr. Blvd., South Bend, IN 46601 Subtotal Tax: (0%) Total $61,510.00 $0.00 $61,510.00 9/25/2026 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 10/02/2026 Name Zach Hurst Department DPW BPW Date 10/13/2026 Phone Extension 3057 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 2 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Slatile Roofing & Sheet Metal New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Center City Place Rehabilitation Project Number 125-022 Funding Source River West DA TIF Account No. PO-0039101 Amount This change: $61,510; Revised Amount: $799,486 Terms of Contract Purpose/Description Change Order #2 adds unforeseen roof decking repair and a scope addition for metal flashing. Added days are due to subcontractor delays providing the new fiber panels and stone castings. For Change Orders Only Amount of Increase Decrease $ 61,510 ($ ) Previous Amount $ 737,976 Current Percent of Change: Increase Decrease 8.9% ( %) New Amount $ 799,486 Total Percent of Change: Increase Decrease 16.1% ( %) Time Extension Amount: 127 days New Completion Date: 10/31/2026