Version 1/3/2025 Page - 7 Public Works Quote
CITY OF SOUTH BEND, INDIANA
CONTRACTOR’S QUOTE FOR PUBLIC WORK
PROJECT NAME: Row at Ward — Phase 1.1 — Main Homes 1–6 — Framing,
Lumber, Roofing, Windows and Exterior Doors Labor & Materials
– NO ADU
PROJECT NO. 126-051
QUOTES DUE Tuesday, October 13, 2026, at 9:00 A.M. (EDT)
Via email to BPWbids@southbendin.gov
(Must be completed for all quotes. Please type or print)
Date: Firm:
Address:
City/State/Zip: Telephone Number: ( )
Email Address:
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
Abonmarche and KIL Architecture & Planning
and dated for the sum of (enter the Total Quote as shown on the Proposal)
($ )
(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical)
If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any
addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that shown
in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the
itemization of the units shall be shown on a separate attachment.
ACCEPTANCE
The above quote is accepted this day of 20
Subject to the following conditions:
BOARD OF PUBLIC WORKS
President
Members
By
(Signature)
(Printed Name of Person Signing)
10/12/2026
jeffc@carterlumber.com
1400 Markley Drive
574Plymouth/IN/46563
Carter Lumber
Row at Ward Phase 1.1 Main Homes 1-6
10/12/2026
274,875.04$274,875.04
Matt Lombard
261-6618
Jeffrey M Carroll
Version 1/3/2025 Page - 20 Public Works Quote
QUOTE/PROPOSAL
CITY OF SOUTH BEND
PROJECT NAME
Row at Ward — Phase 1.1 — Main Homes 1–6 — Framing,
Lumber, Roofing, Windows and Exterior Doors Labor &
Materials – NO ADU
PROJECT NO. 126-051
QUOTES DUE
Tuesday, October 13, 2026, at 9:00 A.M. (EDT)
Via email to BPWbids@southbendin.gov
Item No. Description Quantity Unit Unit Price Total Amount
1
Complete all structural framing
shown on the plans, including floors,
exterior and interior walls, roofs,
stairs, landings, porches, blocking,
backing, sheathing, and subflooring.
$
2
Furnish and install all required
lumber, engineered wood, trusses,
connectors, anchors, fasteners, and
framing accessories specified in the
plans.
$
3
Furnish and install TAMKO
architectural shingles in the
Weathered Wood/Black colorway,
including compatible underlayment,
ice-and-water protection, starter
materials, ridge materials, vents,
flashing, fasteners, and roofing
accessories.
$
4
Furnish and install all windows
shown on the plans, including
flashing, sealing, anchoring,
insulation, adjustment, and
protection.
$
5
Furnish and install all exterior doors
shown on the plans, including
frames, thresholds,
weatherstripping, glazing, scheduled
hardware, flashing, sealing,
anchoring, and adjustment.
$
Total Amount of Quote $
Firm:
Address:
City/State/Zip: Telephone Number: ( )
Fax Number: ( )
By
(Signature)
(Printed Name of Person Signing)
1
1
1
1
1
92,097.55 92,097.55
97,701.15 97,701.15
10,689.66 10,689.66
$46,588.80 $46,588.80
1
1
1
1
1
$28,797.88
275,875.04
$28,797.88
Carter Lumber
1400 Markley Drive
Plymouth/IN/46563 574-261-6618
574
Jeff Carroll
936-8284
Version 1/3/2025 Page - 17 Public Works Quote
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to
this Affidavit.
CONTRACTOR’S NON-COLLUSION AND NON-DEBARMENT AFFIDAVIT,
CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY
VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE
OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF ___________ )
) SS:
COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that:
1. Contractor has not, nor has any other member, representative, or agent of the firm,
company, corporation or partnership represented by him, entered into any combination, collusion
or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent
any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made
without reference to any other bid and without any agreement, understanding or combination with
any other person in reference to such bidding. Contractor further says that no person or persons,
firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift,
commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its
principals are presently debarred, suspended, proposed for debarment, declared ineligible, or
voluntarily excluded from participation in this transaction by any Federal department or agency;
and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment
activities in Iran.
a. For purposes of this Certification, “Iran” means the government of Iran and any agency or
instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from
time-to-time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time-to-time, a Contractor is
engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty million
dollars ($20,000,000) or more in value in the energy sector of Iran; or
ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty
million dollars ($20,000,000) or more in credit to another person for forty-five (45)
days or more, if that person will (i) use the credit to provides goods and services in
the energy sector in Iran; and (ii) at the time the financial institution extends credit, is
a person identified on list published by the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the Contractor subsequently learns is an unauthorized
Indiana
St.Joseph
Version 1/3/2025 Page - 18 Public Works Quote
alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of
Contractor’s newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3.
Contractor’s documentation of enrollment and participation in the E-Verify Program is included
and attached as part of this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public
contract to certify that the subcontractors do not knowingly employ or contract with an
unauthorized alien, nor retain any employee or contract with a person that the subcontractor
subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is
participating in the E-Verify Program. The Contractor agrees to maintain this certification
throughout the term of the contract with the City of South Bend, and understands that the City
may terminate the contract for default if the Contractor fails to cure a breach of this provision no
later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a
contract by the City of South Bend through its agencies, boards, or commissions shall not
discriminate against any employee or applicant for employment in the performance of a City
contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment,
or any matter directly or indirectly related to contracting or employment because of race, sex,
religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or
due to age or disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or
any combination of the foregoing including, but not limited to, public works contracts awarded
under public bidding laws or other contracts in which public bids are not required by law, the City,
its agencies, boards, or commissions will consider the Contractor’s good faith efforts to obtain
participation by those subcontractors certified by the State of Indiana as a Minority Business
(“MBE”) or as a Women’s Business Enterprise (“WBE”) as a factor in determining the lowest,
responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to an
MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal-eligible
contracts, Contractors are required to either meet both MBE and WBE utilization goals or
demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and
WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that
Contractor from being awarded a City contract for a period of one (1) year from the date of such
determination, and such determination may also be grounds for terminating the contact to which
the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall
be made a part of any contract which it may henceforth enter into with the City of South Bend,
Indiana or any of its agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for
employment in the performance of this contract with privileges of employment, or any matter
directly or indirectly related to employment, because of race, religion, color, sex, gender
expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of
this provision may be regarded as material breach of contract.
Version 1/3/2025 Page - 19 Public Works Quote
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-
8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel
products or foundry products made in the United States on this project if awarded. I understand I
have an affirmative duty to notify the City in my bid that my proposal does not include the use of
steel products or foundry products made in the United States. I understand it is my sole obligation
and responsibility to provide a justification to the City, subject to review and approval, why the
cost of United States made steel or foundry products is unreasonable. Prior to award and upon
submission of bid which does not use steel products or foundry products made in the United States,
the City, through its director of public works, shall make a determination if the price of United
States made steel or foundry is unreasonable. I understand that violations hereunder may result in
forfeiture of contractual payments.
***
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public
works are true and correct.
Dated this day of , 20__
Contractor/Bidder (Firm)
Signature of Contractor/Bidder or Its Agent
Printed Name and Title
Subscribed and sworn to before me this day of , 20
My Commission Expires
Notary Public
County of Residence
October 12 26
Carter Lumber
Jeffrey M Carroll Outside Sales Rep
Version 1/3/2025 Page - 8 Public Works Quote
CITY OF SOUTH BEND
EQUAL EMPLOYMENT OPPORTUNITY CONTRACTING
PROVISIONS DIVERSITY UTILIZATION
It is the policy of the City of South Bend to provide equal employment and business opportunity for
all persons, partnerships, companies, and corporations in accordance with the rules, regulations and
guidelines of the applicable federal, state and local laws. This policy of equal employment and business
opportunity shall apply to every contractor or subcontractor bidding or holding a public contract with the City
of South Bend.
In furtherance of this policy, the following Equal Opportunity Clauses are hereby made a part of every
construction contract entered into by the City of South Bend and all subcontractors entered into pursuant
to any such contract and the bidder hereby certifies that it/he/she will abide by these provisions.
The contractor will not discriminate against any applicant or employee because of race,
color, religion, sex, national origin, or handicap. The contractor will take affirmative action
to ensure that all applicants or employees are treated fairly and equitably. Such action
shall include but not be limited to the following: hiring, up-grading, demotion or transfer,
recruitment, advertising, lay-offs or termination, rates of pay or other forms of compensation
and selection for training including apprenticeship programs.
The contractor shall agree to post in conspicuous places available to employees and
applicants, notices to be provided setting forth the provisions of the Non-Discrimination Clause.
The contractor will, in all solicitations or advertisements for employees placed by or on behalf
of the contractor, state that all qualified applicants will receive consideration for employment
without regard to race, color, religion, sex, or national origin.
The contractor will send to each labor union or representative of workers with which
it/he/she has a bargaining agreement or other contract or understanding, a notice to be
provided, advising the labor union or worker's representatives of the contractor's
commitment under this section, and shall post copies of the notices in conspicuous places
available to applicants and employees.
The contractor will comply with all provisions of Executive Order 11246 (as amended by
11375) and of the rules, regulations and relevant orders of the Department of Labor.
Subpart B -- Contractors' Agreements
Sec. 202. Except in contracts exempted in accordance with Section 204 of this Order, all Government
contracting agencies shall include in every Government contract hereinafter entered into the following
provisions:
"During the performance of this contract, the contractor agrees as follows:"
"(1) The contractor will not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national origin. The contractor will take affirmative
action to ensure that applicants are employed, and that employees are treated equally
during employment, without regard to their race, color, religion, sex or national origin. Such
action will include, but not be limited to the following: employment, upgrading, demotion, or
transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other
forms of compensation; and selection for training, including apprenticeship. The contractor
agrees to post in conspicuous places, available to employees and applicants for
employment, notices to be provided by the contracting officer setting forth the provisions of this
nondiscrimination clause."
"(2) The contractor will, in all solicitations or advertisements for employees placed by or on
behalf of the contractor, state that all qualified applicants will receive consideration for
employment without regard to race, color, religion, sex or national origin."
Version 1/3/2025 Page - 9 Public Works Quote
"(3) The contractor will send to each labor union or representative of workers with which
it/he/she has a collective bargaining agreement or other contract of understanding, a notice,
to be provided by the agency contracting officer, advising the labor union or workers'
representative of the contractor's commitments under Section 202 of Executive Order No.
11246 of September 24, 1965, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment."
"(4) The contractor will comply with all provisions of Executive Order No. 11246 of September
24, 1965, and of the rules and regulations, and relevant orders of the Secretary of Labor."
"(5) The contractor will furnish all information and reports required by Executive Order No.
11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary
of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by
the contracting agency and the Secretary of Labor for purposes of investigation to ascertain
compliance with such rules, regulations, and orders."
"(6) In the event of the contractor's noncompliance with the nondiscrimination clauses of
this contract or with any of such rules, regulations, or orders, in this contract may be
cancelled, terminated or suspended in whole or in part and the contractor may be declared
ineligible for further Government contracts in accordance with procedures authorized in
Executive Order No. 11246 of September 24, 1965, and such other sanctions may be
imposed and remedies invoked* as provided in Executive Order No 11246 of September
24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided
by law."
"(7) The contractor will include the portion of the sentence immediately preceding paragraph
(1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase
order unless exempted by rules, regulations, or orders of the Secretary of Labor issued
pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such
provisions will be binding upon each subcontractor or vendor. The contractor will take such
action with respect to any subcontract or purchase order as the administering agency may
direct as a means of enforcing such provisions including sanctions for noncompliance:
Provided, however, that in the event a contractor becomes involved in, or is threatened
with, litigation with a subcontractor or vendor as a result of such direction by the
administering agency the contractor may request the United States to enter into such litigation
to protect the interests of the United States."
The applicant further agrees that it will be bound by the above equal opportunity clause with
respect to its own employment practices when it participates in federally assisted
construction work: Provided, that if the applicant so participating is a State or local
government, the above equal opportunity clause is not applicable to any agency,
instrumentality or subdivision of such government which does not participate in work on or
under the contract.
The applicant agrees that it will assist and cooperate actively with the administering
agency and the Secretary of Labor in obtaining the compliance of contractors and
subcontractors with the equal opportunity clause and the rules, regulations, and relevant
orders of the Secretary of Labor, that it will furnish the administering agency and the
Secretary of Labor such information as they may require for the supervision of such
compliance, and that it will otherwise assist the administering agency in the discharge of the
agency's primary responsibility for securing compliance.
The applicant further agrees that it will refrain from entering into any contract or contract
modification subject to Executive Order 11246 of September 24, 1965, with a contractor
debarred from, or who has not demonstrated eligibility for, Government contracts and
federally assisted construction contracts pursuant to the Executive Order and will carry out
such sanctions and penalties for violation of the equal opportunity clause as may be
imposed upon contractors and subcontractors by the administering agency or the Secretary
of Labor pursuant to Part II, Subpart D of the Executive Order. In addition, the applicant
agrees that if it fails or refuses to comply with these undertakings, the administering agency
Version 1/3/2025 Page - 10 Public Works Quote
may take any or all of the following actions: Cancel, terminate, or suspend in whole or in
part this grant (contract, loan, insurance, guarantee); refrain from extending any further
assistance to the applicant under the program with respect to which the failure or refund
occurred until satisfactory assurance of future compliance has been received from such
applicant; and refer the case to the Department of Justice for appropriate legal proceedings.
* Corrected to read "invoked". In the original text the word "involved" was printed in error.
Version 1/3/2025 Page - 11 Public Works Quote
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
The City of South Bend, Indiana has shown its commitment to addressing Minority and Women’s Business
Enterprise (“MWBE”) participation in public contracting through the adoption of the City of South Bend Ordinance
No. 10761-21. Persons, partnerships, corporations, associations, or joint ventures awarded a contract by the City
of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or
applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or
privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion,
color, national origin, ancestry, age or disability that does not affect that person’s ability to perform work.
Minority and Women’s Business Enterprises are described in the Ordinance. A list of MBEs and WBEs (both
certified and non-certified) can be found on the Indiana Department of Administration website:
http://www.in.gov/idoa/. Documentation shall be provided with the bid that states the MBEs and WBEs that will be
contracted, the dollar amount of the work that will be performed by the MBEs and WBEs on the project and the
percentage of the dollar amount as it relates to the total bid amount by using Form MBE-1.0, MBE Utilization Plan,
and Form WBE-1.0, WBE Utilization Plan.
The City, its agencies, boards, or commissions requires the Contractor’s good faith efforts to obtain participation by
those Contractors classified as MBEs and WBEs.
Failure to either meet the MBE and WBE goals or to provide evidence of good faith efforts for the bid will
be grounds for rejecting a bid as non-responsive.
Bidders shall demonstrate good faith efforts to have active participation from MWBEs on this Project and supply
written documentation evidencing such efforts by using Forms MBE-2.0, Evidence of Good Faith Efforts and WBE-
2.0, Evidence of Good Faith Efforts and Forms MBE-2.1, MBE Contacted and WBE-2.1, WBE Contacted. Such
documentation shall include, but is not limited to, the following items:
a. A listing of all M/WBEs contacted including: (1) the name and address of the M/WBE; (2) the date of
contact; (3) the type of contact (i.e., phone call, written solicitation, etc.); (4) the nature or type services or
goods requested; and (5) the result of the contact.
b. Written evidence of outreach and copies of email exchanges inviting and receiving bids, quotes or other
responses from M/WBEs or other documentation of efforts to encourage and secure competitive responses
from M/WBE and local businesses to be included in the benefits of building this Project.
c. Written documentation of letters of introduction, invitations to forging majority/minority strategic alliances
for capacity building, including but not limited to, mentoring, extensions of assistance on payroll, insurance,
bonding, line of credit, technical skills or business skills.
d. From time to time, projects will undergo a scope change prior to completion. This scope change will
inevitably impact the Contractor’s usage of MWBE’s and the originally submitted Utilization Plan. It is the
request of the City that when a project scope change occurs, the applicable Contractor shall utilize its best
efforts to contract with M and W Subcontractors in a proportional manner as required by the scope change.
All bidders are actively encouraged to reach out to the M/WBEs in St. Joseph County, Indiana, other Indiana
counties, and Berrien County, Michigan to utilize a good faith effort to forge constructive and lasting business
partnerships.
Notwithstanding the foregoing, the award and performance of all City contracts shall comply with applicable federal,
state, and local laws.
The City reserves the right to request verification of goal implementation throughout the course of the project.
If a goal exists, the winning respondent is contractually obligated to utilize the M/WBE’s firms in a manner consistent with
what was represented in its quote submission to the City. Deviations to the utilization plan must be requested in writing
and approved by the City. The City reserves the right to initiate a change order in the amount equal to the difference in
any subcontractor utilization if the utilization plan change is not approved.
Version 1/3/2025 Page - 12 Public Works Quote
CITY OF SOUTH BEND’S GUIDELINES FOR GOOD FAITH EFFORTS
BY CONTRACTORS IN MEETING MWBE CONTRACT GOALS
Under the City of South Bend’s Minority and Women’s Business Enterprise (MWBE) Inclusion Program Plan (COSB
Inclusion Plan), the City of South Bend (the City) is authorized to set “contract specific” goals to increase MWBE
participation in City contracts and procurements.
MWBE participation goals are set based on availability of MWBE contractors within the City’s geographic market
area identified in the City’s Disparity Study.
For contractors bidding on a construction, services, supplies or equipment contract where goals have been set for
all or parts of the project, below is information relevant to “good faith efforts” to meet the contract goal.
When the City sets a contract goal, that means MWBE’s are in fact available to perform work on the contract.
Project bidders must try diligently to meet the goal. Failure to make a good faith effort may result in
rejection of your bid as non-responsive to the contract.
______________________________________________________________________________
Good faith efforts means actions undertaken by a contractor to achieve a contract goal which, by their scope,
intensity, and appropriateness to the objective, can be reasonably expected to fulfill the Program’s goals (City’s
Inclusion Plan, Section 4.B., No. 21).
___________________________________________________________________
A good faith effort is fully reviewable by the City. Where a contract goal is not met, contractors must provide
as much information as possible to help the City assess the contractor’s good faith efforts to achieve the
goal. Inadequate proof of good faith efforts may result in a finding that the contractor was non-responsive,
causing its bid to be rejected even if it is the lowest.
Good faith efforts require active, aggressive efforts by the prime contractor to obtain the contract MWBE
participation goal. Mere pro forma efforts are not good faith efforts. To satisfy the good faith efforts test:
x A prime contractor may not reject a MWBE’s bid solely because it is not the lowest bid received from
subcontractors. If the MWBE’s costs are reasonable and not excessive, the MWBE’s quote or bid
presumptively should be accepted on a contract requiring goals even if the MWBE’s bid is not the
lowest one received. However, if an MWBE’s bid or quote is unreasonable or excessive, the prime
contractor may reject the bid on that basis. The contractor has the burden of demonstrating the
excessiveness or unreasonableness of the MWBE’s bid or quote. Because the City must determine
whether a MWBE quote was unreasonable or excessive, Contractors must provide the City with
copies of each MWBE and non MWBE quote submitted to the bidder when a non-MWBE was
selected over an MWBE.
x A contractor may not reject a MWBE as being unqualified without sound reasons based on a thorough
investigation of the MWBE’s capabilities. If a prime contractor rejects a MWBE as unqualified, the
Contractor must provide the City with good reasons for this. The MWBE’s industry standing or
membership in a specific group, organization, political or social affiliation (example: union v. non-union)
is not a basis to reject the MWBE for lack of qualification.
x The ability or desire of a prime contractor to perform the work of the contract with its own organization
team does not relieve the prime contractor of the need to make good faith efforts to use MWBE sub
contractors to meet the contract goal.
Version 1/3/2025 Page - 13 Public Works Quote
EXAMPLE: Total Project Estimate is $500,000. An MWBE goal of 10% is set for a specific part of the project, i.e.,
$50,000. Only one MWBE submits a quote to the prime contractor, and it is $50,000. A non MWBE submits a
quote of $45,000. Rejecting the MWBE bid may not meet the requirement of making a good faith effort to meet the
contract goal because: 1) the MWBE quote is within the goal percentage and dollar amount set for MWBE
participation on the project; 2) selection of the MWBE quote guarantees that the contractor meets the set goal and
that its bid will be deemed responsive; and 3) the difference between the MWBE and non MWBE quotes is not
significant in terms of the overall contract amount (i.e., 1% of total contract).
If the MWBE’s quote is $53,000 and the non-MWBE bid is $50,000, it may yet not be demonstrative of a good faith
effort to reject the MWBE solely because the MWBE’s quote is not the lowest. The excess is not greatly significant
to the total contract cost, and it could reasonably be expected to be made up elsewhere in the contract while
guaranteeing full goal compliance.
The above examples are illustrative only. The City will make a fair and reasonable judgment as to good faith efforts
based on all information and documentation provided by bidders and taking into account the Quality, Quantity, and
Intensity of the efforts made by a contractor to meet the contract goal.
Version 1/3/2025 Page - 14 Public Works Quote
GOOD FAITH EFFORTS MATERIALS TO BE INCLUDED WITH BID
If a contractor’s bid does not meet the goal set for the contract, the contractor must submit evidence of good
faith efforts with its bid so the City can determine whether the contractor is a responsive bidder. If the contractor’s
bid meets the MWBE goal, evidence of good faith effort is not required, but it would be prudent to include some
evidence in case an error was made.The information required of a contractor who has not achieved the contract
goal to show good faith efforts can be found in the South Bend Inclusion Program Plan at Section 8.B.3.d. as follows:
(b) Where the bidder cannot achieve the contract goal, the bidder must provide proof of having made
good faith efforts to meet the goal. In making this determination of whether to issue a goal waiver, the City will
consider, at a minimum, the bidder’s efforts to:
(1) Solicit through all reasonable and available means (e.g., attendance at pre-bid meetings,
advertising and written notices) the interest of all MWBEs in the scopes of work of the contract.
The contractor shall provide interested MWBEs with timely, adequate information about the plans,
specifications, and requirements of the contract to allow such firms to respond to the solicitation.
The bidder must follow up initial solicitations with interested MWBEs.
(2) Select portions of the work to be performed by MWBEs in order to increase the likelihood that
the contract goal will be achieved. This includes, where appropriate, breaking out contract work
items into economically feasible units to facilitate participation, even when the bidder would
otherwise prefer to perform these work items with its own forces. It is the bidder’s responsibility to
make a portion of the work available to MWBEs and to select those portions of the work or
material needs consistent with the availability of such firms to facilitate their participation.
(3) Negotiate in good faith with interested MWBEs. Evidence of such negotiation includes the
names, addresses, and telephone numbers of firms that were contacted; a description of the
information provided regarding the plans and specifications for the work selected for
subcontracting; and why agreements could not be reached. The bidder may not reject MWBEs as
being unqualified without sound reasons based on a thorough investigation of their capabilities.
That there may be some additional costs involved in finding and using MWBEs is not in itself
sufficient reason for a bidder’s failure to meet the contract goal, as long as such costs are
reasonable. The ability or desire of a bidder to perform the work of a Contract with its own
organization does not relieve it of the responsibility to make good faith efforts on all scopes of
work within which subcontracting opportunities are available.
(4) Make efforts to assist interested MWBEs in obtaining bonding, lines of credit, or insurance as
required by the City or the bidder, where appropriate.
(5) Make efforts to assist interested MWBEs in obtaining necessary equipment, supplies,
materials, or related assistance or services, where appropriate.
Materials that should be submitted to support a contractor’s good faith efforts include:
x Copies of advertisements, notices, or solicitations from contractor to MWBE’s-- to include date and
time of issuance;
x A list of all locations where advertisements or notices to MWBE’s were placed or solicitations sent;
x Copies of communication between contractor and MWBE’s in response to contractor’s
advertisements, notices, or solicitations;
x Proof of contractor’s break-out of contract items into units feasible for performance by WMBE’s;
x Proof of communications between the contractor and MWBE regarding negotiations for
agreements, and why agreement could not be reached, as stated more specifically in above
Subsection (b) (3);
x Proof of bids or quotes from MWBE’s and those from non MWBE’s when non MWBE’s bid or quote
is used;
x Proof of efforts made by contractor to assist MWBE to participate in contract, where appropriate;
and
x Any other information tending to show that Contractor made active, aggressive efforts to meet the
MWBE participation goal but despite good faith efforts was unable to do so.
Version 1/3/2025 Page - 15 Public Works Quote
CITY OF SOUTH BEND, INDIANA
CONTRACTOR’S BID FOR PUBLIC WORK
MWBE CHECKLIST
Project Name
Row at Ward — Phase 1.1 — Main Homes 1–6 — Framing,
Lumber, Roofing, Windows and Exterior Doors Labor & Materials
– NO ADU
Project No. 126-051
For Bids Due Tuesday, October 13, 2026, at 9:00 A.M. (EDT)
Via email to BPWbids@southbendin.gov
Contractor Name:
The City seeks to promote equal opportunity for minority and women-owned businesses, including small local
businesses, and to encourage utilization of such businesses in City contracting and procurement.
THIS FORM MUST BE SUBMITTED WITH YOUR BID IF THE BID IS AT OR ABOVE $150,000.
**THIS FORM ONLY APPLIES TO BIDS GREATER THAN $150,000. **
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder
in Section 14.5 of the City of South Bend, Indiana Code of Ordinances and the Minority and Women Business
Program Plan.
INSTRUCTIONS:
If you intend to comply with the stipulated MBE and WBE participation goals, complete Section I only.
If you are unwilling to affirm in writing your intent to comply with the stipulated MBE and WBE participation
goals, complete Section II and complete forms MBE-2.0, WBE-2.0, MBE-2.1, and WBE-2.1.
I. MWBE CHECKLIST FOR INTENT TO MEET STIPULATED MBE AND WBE PARTICIPATION
a) ___ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental
information, additional verification of any information provided by me.
b) ___ By checking this box, I hereby acknowledge that I will meet or exceed the stipulated MBE and WBE
participation goals of this contract.
c) ___ By checking this box, I agree to comply with all tracking and reporting, including
online tracking software for MWBE participation.
d) ___ By checking this box, I understand that a failure to meet the contractual obligations
for MWBE participation shall be a breach of contract. I understand that the City
shall impose a penalty against the Contractor in the amount of the difference
between the stipulated MBE and WBE goals and the actual amount paid to MBE
and WBE subcontractors.
II. MWBE CHECKLIST FOR GOOD FAITH EFFORTS GOAL WAIVER
a) ___ By checking this box, I hereby acknowledge that the City reserves the right to request
supplemental information or additional verification of any information provided by me.
b) ___ By checking this box, I affirm I have made good faith efforts to seek opportunities to meet
the stipulated MBE and WBE participation goals. I affirm I have made reasonable efforts (e.g.,
attendance at pre-bid meetings, advertising, and written notices) to solicit MWBEs in the scopes of
work of the contract.
i.___ I have completed the Evidence of Good Faith Efforts Forms [MBE-2.0 and WBE-2.0] and
MWBE Contacted Forms [MBE-2.1 and WBE-2.1] and submit these forms as part of my
bid.
Carter Lumber
Version 1/3/2025 Page - 16 Public Works Quote
ii.___ I affirm that if awarded the bid, I will exhibit post-award good faith efforts, examples of which
include emailing and calling MWBEs to solicit quotes, advertising subcontracting work in
newspapers and online, and meeting with the Office of Diversity Inclusion to identify
opportunities for MWBE utilization throughout the course of the project.
c) ___ By checking this box, I hereby acknowledge that the determination of whether a bidder has
made good faith efforts and should be granted a goal waiver will be made by the MWBE Program
Administrator, in consultation with the City's Legal Department and Department of Public Works.
d) ___ By checking this box, I agree to comply with all tracking and reporting, including online tracking
software for MWBE participation, even if a goal waiver is granted.
Date: ___________________________________________
________________________________________________
(Sign Here)
________________________________________________
(Print Name Here)
________________________________________________
(Name of Company)
________________________________________________
(Address of Company)
________________________________________________
(City)
________________________________________________
(State)
________________________________________________
(Telephone Number)
10/12/2026
Carter Lumber
1400 Markley Drive
Plymouth
Indiana
574-261-6618
Jeffrey M Carroll
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
Version 1/3/2025 Page - 21 Public Works Quote
If you are unwilling to affirm in writing your intent to comply with the stipulated MBE participation
goals and wish to propose adjusted goals, complete this form and Section II of the MWBE Checklist.
Project Number: 126-051 Date:
Project Name:
Row at Ward — Phase 1.1 — Main Homes 1–6 — Framing, Lumber,
Roofing, Windows and Exterior Doors Labor & Materials – NO ADU
Bidder:
Contact Person: Telephone:
Address:
City: State: Zip:
Email:
To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goal set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBE LIST(S): The bidder reviewed 1) the City of South Bend’s Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non-certified) found
at: http://www.in.gov/idoa/.
GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend’s Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration’s certified list of
Indiana Minority and Women Business Enterprises, found on their website
(http://www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by MBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate MBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
means the interest of all MBEs in the scopes of work of the contract.
I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform
MBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed MBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform MBEs of subcontracting opportunities and allowed
sufficient time for MWBEs to participate effectively.
I affirm that I followed up on initial solicitations with interested MBEs.
I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding,
lines of credit, or insurance as required by the City or the bidder, where appropriate.
10/12/2026
Carter Lumber
Jeff Carroll 574-261-6618
1400 Markley Drive
Plymouth Indiana 46563
jeffc@carterlumber.com
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
Version 1/3/2025 Page - 22 Public Works Quote
I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary
equipment, supplies, materials, or related assistances or services, where appropriate.
I affirm that I did not reject any MBEs as unqualified without sound business reasons based
on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
Version 1/3/2025 Page - 23 Public Works Quote
If you are unwilling to affirm in writing your intent to comply with the stipulated MBE participation
goals and wish to propose adjusted goals, complete this form and Section II of the MWBE Checklist.
Project Number: Date:
Project Name:
Bidder:
Contact Person: Telephone:
Address:
City: State: Zip:
Email:
To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
WBE LIST(S): The bidder reviewed 1) the City of South Bend’s Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non-certified) found
at: http://www.in.gov/idoa/.
GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend’s Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration’s certified list of
Indiana Minority and Women Business Enterprises, found on their website
(http://www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by WBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate MWBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
means the interest of all WBEs in the scopes of work of the contract.
I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform
WBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed WBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform WBEs of subcontracting opportunities and allowed
sufficient time for WBEs to participate effectively.
I affirm that I followed up on initial solicitations with interested WBEs.
I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding,
lines of credit, or insurance as required by the City or the bidder, where appropriate.
10/12/2026
jeffc@carterlumber.com
Indiana
Carter Lumber
574-261-6618Jeff Carroll
1400 Markley Drive
Plymouth 46563
126-051
Row at Ward Phase 1.1 Main Homes 1-6
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
Version 1/3/2025 Page - 24 Public Works Quote
I affirm that I have made good faith efforts to assist interested WBEs in obtaining
necessary equipment, supplies, materials, or related assistances or services, where
appropriate.
I affirm that I did not reject any WBEs as unqualified without sound business reasons
based on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the WBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.1
MBE CONTACTED
Version 1/3/2025 Page - 25 Public Works Quote
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact MBEs. It is the bidder’s sole responsibility to verify whether any listed
minority or woman business meets the MBE qualifications. Attach additional pages if necessary.
PAGE_______OF________
Project Number: 126-051 MBE Participation Goal
Project Name:
Row at Ward — Phase 1.1 — Main Homes 1–6 — Framing, Lumber, Roofing,
Windows and Exterior Doors Labor & Materials – NO ADU
Bidder:
By:
(Signature) (Title) (Date)
MBE Firm
Owner or Contact at MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM:
MBE Firm
Owner or Contact at MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM:
1 2
0.60%
Carter Lumber
Outside Sales Rep 10/12/2026
JBL Signal and Lighting
Tanner Liebovitz
574-229-8163 TannerL@JBL-2.com
Entire Scope Of Work
Outside their scope of work
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-2.1
WBE CONTACTED
Version 1/3/2025 Page - 26 Public Works Quote
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact WBEs. It is the bidder’s sole responsibility to verify whether any listed
minority or woman business meets the WBE qualifications. Attach additional pages if necessary.
PAGE_______OF________
Project Number: 126-051 WBE Participation Goal
Project Name:
Row at Ward — Phase 1.1 — Main Homes 1–6 — Framing, Lumber, Roofing,
Windows and Exterior Doors Labor & Materials – NO ADU
Bidder:
By:
(Signature) (Title) (Date)
WBE Firm
Owner or Contact at WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE WBE FIRM:
WBE Firm
Owner or Contact at WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE WBE FIRM:
1 2
2.10%
Carter Lumber
Outside Sales Rep 10/12/2026
N/A http://www.in.gov/idoa/
N/A
site visited N/A
N/A
Visited website looking for someone to obtain this cope of work
No one able to perform this scope of work
Date: 10/1/2026
To: All Planholders
From Hillary Horvath, Clerk, Board of Public Works
Subject Addendum Number: 01
Project Name:
Row at Ward – Phase 1.1 – Main Homes 1-6
Framing, Lumber, Roofing, Windows and Exterior Doors Labor &
Materials – NO ADU
Project No.: 126-051
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received:
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
quote package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR QUOTE.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company:
Authorized Signature:
Date:
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
215 S DR. MARTIN LUTHER KING JR. BLVD
SUITE 400
SOUTH BEND, INDIANA 46601-1830
PHONE 574/ 235-9251
FAX 574/ 235-9171
TDD 574/ 235-5567
10/1/2026
Carter Lumber
10/12/2026
Addendum 01
To the Contract Documents and Project Specifications for the
Row at Ward – Phase 1.1 – Main Homes 1-6
Framing, Lumber, Roofing, Windows and Exterior Doors Labor & Materials – NO ADU
South Bend, IN
October 1, 2026
To: All holders of the contract documents for the above project.
The items in this Addendum are to become a part of the original documents as if included
therein. The remainder of the original contract document is to remain in its entirety.
This Addendum modifies the Contract Documents and Specifications as follows:
Part 1 – General Clarifications
Part 2 – Scope
PART 1 – GENERAL CLARIFICATIONS
1. Revisions to the Scope of Work based on questions / feedback.
PART 2 – SCOPE
1. Quote Deadline updated to October 13, 2026.
DIVISION 4 — TIF SUBMISSION SCOPE
FRAMING, ROOFING, WINDOWS AND EXTERIOR DOORS
Project The Row at Ward — Phase 1.1
Project No. / Location 126-051 — 906 Portage Avenue, South Bend, Indiana 46616
Included Structures Main Homes 1–6 and all associated Phase 1.1 ADUs shown in the incorporated drawings
Quote Deadline October 13, 2026, 9:00 A.M. EDT — BPWbids@southbendin.gov
Working Completion May 1, 2027, subject to City approval
CONTROLLING DOCUMENTS City procurement documents, this Division Scope, issued addenda, incorporated Row at Ward drawings and
approved submittals. The drawings control exact products, dimensions, measurements, quantities, locations, colors, finishes, accessories and
schedules.
SCOPE OF WORK
•Provide structural framing, framing materials, complete shingle roofing, windows and exterior doors for Phase 1.1 Main Homes 1–6 and allassociated Phase 1.1 ADUs.
•Complete floors, walls, roofs, stairs, landings, porches, blocking, backing, sheathing, subflooring, trusses, engineered wood, connectors,
anchors and fasteners shown in the drawings.
•Furnish and install the complete drawing-specified TAMKO architectural-shingle roofing system, including deck preparation, underlayment,
ice-and-water protection, flashing, starter, field and ridge shingles, ventilation and accessories.
•Furnish and install the drawing-specified Andersen windows with required anchorage, shimming, flashing, air/water sealing, insulation,hardware, screens and accessories.
•Furnish and install exterior doors, frames, thresholds, weatherstripping, glazing, scheduled hardware, flashing, sealing, anchorage and
insulation shown in the drawings.
QUALITY, COORDINATION AND TURNOVER
•The drawings control framing sizes and grades and all roofing, window and door products, models, sizes, measurements, locations,
finishes, colors, glazing, hardware and schedules.
•Verify foundations, anchors, bearing surfaces and openings before work. Coordinate blocking, penetrations and enclosure transitions withplumbing, later MEP and siding trades.
•Maintain temporary bracing and weather protection; obtain framing inspections and provide a structurally complete, weather-tight turnover.
•Correct leaks, water-entry defects, damaged components, operating deficiencies and incomplete seals before turnover; provide warranties
and closeout records.
EXCLUSIONS / BOUNDARIES
•LP SmartSide materials are furnished under Division 2. Siding, trim and soffit installation is excluded from this Division.
•Later mechanical, electrical, above-slab plumbing, insulation, drywall and interior finishes are excluded unless added in writing.
COMPLETE RESPONSIBILITY: Unless expressly excluded, the bidder shall include supervision, labor, materials, equipment, tools, delivery, protection,
coordination, testing, cleanup and closeout necessary for a complete division scope.
Project 126-051 | 9/3/2026 Division 4 TIF Submission Scope Attachment Page 1 of 1
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 09/25/2026
Name: Jenny Guard Department of Public Works – Engineering Division
BPW Date: 10/13/2026 Phone Extension: 9805
Required Prior to Submittal to Board
BPW Attorney Attorney Name
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
Other: Ease./Encroach
Required Information
Company or Vendor Name
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name Row at Ward
Project Number 126-051
Funding Source TIF – River West
Account No. PR/ PO #
Amount $
Terms of Contract
Special Contract Provisions
Purpose/Description Quote opening for framing, lumber, roofing, windows, & exterior doors for
the Row at Ward development. Once a contractor has been selected a
contract will be drafted and approved by the BPW at a later date.
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date: