HomeMy WebLinkAboutAward Bid - Marion Rd Trail Proj No 125-070 - Reith-Riley Construction September 22, 2026 Jacob Kwilasz Rieth-Riley Construction Co., Inc. 25200 State Road 23 South Bend, IN 46614 hgritton@rieth-riley.com RE: Award Bid – Marion St. Trail – Project No. 125-070 Dear Jacob: At its September 22, 2026 meeting, the Board of Public Works awarded the above referenced bid to you in the amount of $313,852. Enclosed please find a signed Bid/Proposal form. Please forward the following documents in one submittal by October 13, 2026 to my attention for Board of Public Works approval at hhorvath@southbendin.gov: 1. One (1) signed Public Works Contract (enclosed) 2. Labor & Material Payment Bond 3. Performance Bond (125% of Bid Amount) 4. Certificate of Insurance naming the City of South Bend as an additional insured 5. Item #4 for all subcontractors that you use Sincerely, /s/Hillary Horvath Hillary Horvath, Clerk BOARD OF PUBLIC WORKS CITY OF SOUTH BEND, INDIANA PUBLIC WORKS CONTRACT This Agreement is made and entered into this 22nd Day of September 2026, by and between Rieth-Riley Construction Co., Inc.., (the “Contractor”), and the Board of Public Works (the "Board”). The Contractor covenants and agrees to make the following improvement, as fully set out in the Request for Quotations, Standard Specifications, Special Provisions, Plans, and Bid Proposals, all of which are set forth as a part of this Contract, for: PROJECT NO. 125-070 DESCRIPTION: MARION ST. TRAIL COMPLETION DATE: SEE SPECIFICATIONS AMOUNT: $313,852 FUNDING: PR-00049413 The unit prices for this improvement were those prices as received and accepted by the Board on the 22nd Day of September 2026. The Contractor further agrees to notify the assigned Engineer when this improvement is completed. This notification shall be in the form of a Project Completion Affidavit, signed by the Contractor. Upon final acceptance of the improvement by the Engineer, the Contractor’s final estimate will be presented to the Board for final Payment with one (1) copy of the Project Completion Affidavit and one (1) copy of a Waiver of Lien. Each of the Parties, by signing below, represents and warrants to the other Party that he/she/it has the authority to bind the named person or entity to this Agreement. BOARD OF PUBLIC WORKS RIETH-RILEY CONSTRUCTION CO., INC. President Member Printed Name Member Member Signature Member Attest: Clerk September 22, 2026 Bryan Slott C&E Excavating, Inc. 2831 Dexter Drive Elkhart, IN 46530 bslott@candeexcavating.com RE: Bid Award – Marion St. Trail – Project No. 125-070 Dear Bryan: At its September 22, 2026, meeting, the Board of Public Works awarded the above referenced bid to Rieth-Riley Construction Co., Inc. in the amount of $313,852. Thank you for bidding, and we hope you bid with us in the future. Sincerely, /s/Hillary Horvath Hillary Horvath, Clerk September 22, 2026 Mark Osler Indiana Earth, Inc. 10343 McKinley Hwy. Osceola, IN 46561 estimatorindianaearth@yahoo.com RE: Bid Award – Marion St. Trail – Project No. 125-070 Dear Mark: At its September 22, 2026, meeting, the Board of Public Works awarded the above referenced bid to Rieth-Riley Construction Co., Inc. in the amount of $313,852. Thank you for bidding, and we hope you bid with us in the future. Sincerely, /s/Hillary Horvath Hillary Horvath, Clerk September 22, 2026 Lynn Bauer Milestone Contractors, L.P. 24358 State Road 23 South Bend, IN 46614 cmitcham@milestonelp.com RE: Bid Award – Marion St. Trail – Project No. 125-070 Dear Lynn: At its September 22, 2026, meeting, the Board of Public Works awarded the above referenced bid to Rieth-Riley Construction Co., Inc. in the amount of $313,852. Thank you for bidding, and we hope you bid with us in the future. Sincerely, /s/Hillary Horvath Hillary Horvath, Clerk Page 1 of 1 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Hillary Horvath, Clerk Board of Public Works FROM: Caitlin Wyant, Project Engineer SUBJECT: Award Project No. 125-070 Marion Street Trail DATE: September 22, 2026 On September 8, 2026, the Board of Public Works opened and read bids for the above project, which consisted of a base bid. The bidders ranked as follows: Bidder Amount 1. Rieth-Riley Construction $313,852.00 2. C&E Excavating $347,705.00 3. Milestone Contractors LP $348,035.70 4. Indiana Earth $399,327.00 I recommend award of a contract to the lowest responsive / responsible bidder, Rieth-Riley Construction in the amount of $313,852.00. They have expressed their intent to meet MBE and WBE goals for this project. Sufficient funds have been appropriated from River West TIF. Please email with your questions. Enc. Bid Tabulation BID TABULATIONMARION ST TRAILProject No: 125-070 MARION STREET TRAIL BASE BID Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost 1 CONSTRUCTION ENGINEERING 1.00 LS 22,920.00$ 22,920.00$ 11,315.00$ 11,315.00$ 33,000.00$ 33,000.00$ 6,500.00$ 6,500.00$ 6,350.00$ 6,350.00$ 2 MOBILIZATION AND DEMOBILIZATION 1.00 LS 22,920.00$ 22,920.00$ 15,888.00$ 15,888.00$ 21,000.00$ 21,000.00$ 17,000.00$ 17,000.00$ 9,410.00$ 9,410.00$ 3 TREE, 36 IN, REMOVE 1.00 EA 3,000.00$ 3,000.00$ 4,834.00$ 4,834.00$ 4,200.00$ 4,200.00$ 4,000.00$ 4,000.00$ 4,000.00$ 4,000.00$ 4 CLEARING RIGHT OF WAY 1.00 LS 13,752.00$ 13,752.00$ 12,052.50$ 12,052.50$ 15,000.00$ 15,000.00$ 14,000.00$ 14,000.00$ 5,521.00$ 5,521.00$ 5 PAVEMENT REMOVAL 83.00 SYS 100.00$ 8,300.00$ 31.50$ 2,614.50$ 40.00$ 3,320.00$ 34.50$ 2,863.50$ 20.80$ 1,726.40$ 6 CURB, CONCRETE, REMOVE 480.00 LFT 30.00$ 14,400.00$ 8.50$ 4,080.00$ 17.00$ 8,160.00$ 10.00$ 4,800.00$ 18.00$ 8,640.00$ 7 CURB AND GUTTER, REMOVE 19.00 LFT 50.00$ 950.00$ 21.00$ 399.00$ 55.00$ 1,045.00$ 26.00$ 494.00$ 45.45$ 863.55$ 8 SIDEWALK CONCRETE, REMOVE 95.00 SYS 50.00$ 4,750.00$ 25.00$ 2,375.00$ 50.00$ 4,750.00$ 22.50$ 2,137.50$ 36.35$ 3,453.25$ 9 FIRE HYDRANT ASSEMBLY, REMOVE 1.00 EA 1,200.00$ 1,200.00$ 1,421.50$ 1,421.50$ 4,900.00$ 4,900.00$ 3,500.00$ 3,500.00$ 3,050.00$ 3,050.00$ 10 EXCAVATION, COMMON 260.00 CYS 90.00$ 23,400.00$ 59.00$ 15,340.00$ 52.00$ 13,520.00$ 98.00$ 25,480.00$ 108.80$ 28,288.00$ 11 BORROW 335.00 CYS 45.00$ 15,075.00$ 79.50$ 26,632.50$ 58.00$ 19,430.00$ 118.00$ 39,530.00$ 72.30$ 24,220.50$ 12 STORMWATER MANAGEMENT BUDGET 2500.00 DOL 1.00$ 2,500.00$ 1.00$ 2,500.00$ 1.00$ 2,500.00$ 1.00$ 2,500.00$ 1.00$ 2,500.00$ 13 STORMWATER MANAGEMENT IMPLEMENTATION 1.00 LS 6,120.00$ 6,120.00$ 1,362.50$ 1,362.50$ 3,100.00$ 3,100.00$ 2,400.00$ 2,400.00$ 2,400.00$ 2,400.00$ 14 COMPACTED AGGREGATE, NO. 53 109.00 CYS 150.00$ 16,350.00$ 104.50$ 11,390.50$ 95.00$ 10,355.00$ 135.00$ 14,715.00$ 181.40$ 19,772.60$ 15 MILLING, ASPHALT, 1 1/2 IN 11.00 SYS 50.00$ 550.00$ 100.00$ 1,100.00$ 100.00$ 1,100.00$ 87.00$ 957.00$ 94.55$ 1,040.05$ 16 MILLING, PROFILE 1660.00 SYS 50.00$ 83,000.00$ 7.50$ 12,450.00$ 11.50$ 19,090.00$ 10.10$ 16,766.00$ 7.15$ 11,869.00$ 17 HMA SURFACE, TYPE C 138.00 TON 150.00$ 20,700.00$ 155.00$ 21,390.00$ 175.50$ 24,219.00$ 158.00$ 21,804.00$ 146.65$ 20,237.70$ 18 HMA INTERMEDIATE, TYPE C 183.00 TON 150.00$ 27,450.00$ 135.00$ 24,705.00$ 151.00$ 27,633.00$ 135.00$ 24,705.00$ 128.25$ 23,469.75$ 19 ASPHALT FOR TACK COAT 0.60 TON 1,000.00$ 600.00$ 1.67$ 1.00$ 1,900.00$ 1,140.00$ 1,500.00$ 900.00$ 1.00$ 0.60$ 20 SIDEWALK, CONCRETE, 4 IN 8.00 SYS 100.00$ 800.00$ 181.00$ 1,448.00$ 415.00$ 3,320.00$ 350.00$ 2,800.00$ 340.75$ 2,726.00$ 21 SIDEWALK, CONCRETE, 6 IN 489.00 SYS 125.00$ 61,125.00$ 146.00$ 71,394.00$ 106.00$ 51,834.00$ 80.00$ 39,120.00$ 75.05$ 36,699.45$ 22 CURB RAMP, CONCRETE 22.00 SYS 250.00$ 5,500.00$ 188.50$ 4,147.00$ 280.00$ 6,160.00$ 244.00$ 5,368.00$ 210.20$ 4,624.40$ 23 DETECTABLE WARNING SURFACES 4.00 SYS 400.00$ 1,600.00$ 116.00$ 464.00$ 225.00$ 900.00$ 200.00$ 800.00$ 214.75$ 859.00$ 24 CURB, CONCRETE 39.00 LFT 90.00$ 3,510.00$ 72.50$ 2,827.50$ 95.00$ 3,705.00$ 58.00$ 2,262.00$ 71.70$ 2,796.30$ 25 CURB AND GUTTER, CONCRETE 500.00 LFT 100.00$ 50,000.00$ 38.00$ 19,000.00$ 50.00$ 25,000.00$ 33.00$ 16,500.00$ 48.45$ 24,225.00$ 26 PCCP FOR APPROACHES, 6 IN 165.00 SYS 180.00$ 29,700.00$ 93.00$ 15,345.00$ 130.00$ 21,450.00$ 100.00$ 16,500.00$ 82.50$ 13,612.50$ 27 TOPSOIL 88.00 CYS 150.00$ 13,200.00$ 110.50$ 9,724.00$ 150.00$ 13,200.00$ 115.00$ 10,120.00$ 75.00$ 6,600.00$ 28 SODDING, NURSERY 786.00 SYS 50.00$ 39,300.00$ 18.50$ 14,541.00$ 23.50$ 18,471.00$ 17.60$ 13,833.60$ 14.85$ 11,672.10$ 29 PLANT, DECIDUOUS TREE, SINGLE STEM, OVER 2 IN TO 2.5 IN 6.00 EA 750.00$ 4,500.00$ 972.00$ 5,832.00$ 1,100.00$ 6,600.00$ 915.00$ 5,490.00$ 915.00$ 5,490.00$ 30 CASTING, MANHOLE, ADJUST TO GRADE 6.00 EA 800.00$ 4,800.00$ 1,902.50$ 11,415.00$ 820.00$ 4,920.00$ 1,500.00$ 9,000.00$ 980.00$ 5,880.00$ 31 FIRE HYDRANT ASSEMBLY, INSTALL 1.00 EA 13,000.00$ 13,000.00$ 1,202.50$ 1,202.50$ 5,000.00$ 5,000.00$ 7,500.00$ 7,500.00$ 4,604.85$ 4,604.85$ 32 MAINTAINING TRAFFIC 1.00 LS 25,000.00$ 25,000.00$ 13,753.00$ 13,753.00$ 14,000.00$ 14,000.00$ 10,000.00$ 10,000.00$ 13,164.60$ 13,164.60$ 33 SIGN POST, SQUARE TYPE 1 REINFORCED ANCHOR BASE 46.00 LFT 20.00$ 920.00$ 32.00$ 1,472.00$ 30.00$ 1,380.00$ 18.90$ 869.40$ 22.40$ 1,030.40$ 34 SIGN, SHEET, AND SUPPORTS, REMOVE 5.00 EA 100.00$ 500.00$ 150.00$ 750.00$ 240.00$ 1,200.00$ 200.00$ 1,000.00$ 200.00$ 1,000.00$ 35 SIGN, SHEET, WITH LEGEND, 0.080 IN 33.00 SFT 20.00$ 660.00$ 36.00$ 1,188.00$ 45.00$ 1,485.00$ 29.60$ 976.80$ 36.70$ 1,211.10$ 36 SIGN GROUND MOUNTED RESET 1.00 EA 300.00$ 300.00$ 259.00$ 259.00$ 400.00$ 400.00$ 300.00$ 300.00$ 300.00$ 300.00$ 37 TRANSVERSE MARKING, THERMOPLASTIC, CROSSWALK LINE, WHITE, 24 IN 42.00 LFT 15.00$ 630.00$ 26.00$ 1,092.00$ 20.00$ 840.00$ 12.95$ 543.90$ 12.95$ 543.90$ TOTAL 542,982.00$ 347,705.00$ 397,327.00$ 348,035.70$ 313,852.00$ I hereby certify that the above truly and accurately represents bids received for this project on SEPTEMBER 8, 2026 CAITLIN WYANT, PROJECT ENGINEER * CELLS HIGHLIGHTED YELLOW INDICATE ERRORS IN BID BY THE CONTRACTOR MILESTONE RIETH-RILEYEngineer's Estimate INDIANA EARTHC&E EXCAVATING S:\Public Works\Projects\Projects by Year\2025 Projects\125-070 Marion Street Trail\1 - Admin\1 - BPW Documents\2026.09.22 Bid Tabulation & Review - 125-070 Award Bids BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 09/08/2026 Name: Caitlin Wyant, EI Department of Public Works – Engineering Division BPW Date: 09/22/2026 Phone Extension: 7483 Required Prior to Submittal to Board BPW Attorney X Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Rieth-Riley Construction New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Marion St Trail Project Number 125-070 Funding Source River West TIF Account No. PR #49413 Amount $313,852.00 Terms of Contract Special Contract Provisions Purpose/Description Award bid for a construction of a new trail connector from Michigan/Marion RAB to new Marion Pedestrian Bridge to Rieth-Riley For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: