HomeMy WebLinkAboutTitle Sheet Bendix Ph 2 Improvements Proj No 121-047SHEETSofDESIGNATIONCONTRACTSURVEY BOOK 2100022R-441151ELECTRONICOAAATINT
FTRNS
PORTAT I O N NADEPRMENDIINDOTROAD PLANSPROJECT NO. 2100022(2021)(2026)(2046)A.A.D.T.A.A.D.T.D.H.VDIRECTIONAL DISTRIBUTIONTRUCKSDESIGN SPEEDPROJECT DESIGN CRITERIAFUNCTIONAL CLASSIFICATIONRURAL/URBANTERRAINACCESS CONTROL12,778 V.P.D.13,097 V.P.D.14,375 V.P.D.1,438 V.P.H. 48% NB, 52% SB7% D.H.V.DESIGN DATATRAFFIC DATARoad Reconstruction and Road Diet Project Along Bendix DriveFrom Voorde Drive to 0.1 Miles North of Lathrop RoadSections 27, 28, 33, and 34, T-38-N, R-2-E, German andPortage Townships, St. Joseph County, IndianaPROJECT LOCATION SHOWN BYST. JOSEPH COUNTYMAX. GRADE:NET LENGTH:GROSS LENGTH:3.09%LATITUDE 41°42'12" N LONGITUDE 86°17'38" W0.780 MI.0.780 MI.CITY OF SOUTH BENDBENDIX DRIVE - ROAD RECONSTRUCTIONBENDIX DRIVEPRINCIPAL ARTERIALNEW CONSTRUCTION (NON-FREEWAY)URBAN (INTERMEDIATE)LEVELNONE35 M.P.H.APPROVED BY BOARD OF PUBLIC WORKSELIZABETH A. MARADIK, PRESIDENTABIGAIL MAGAS, MEMBERMURRAY L. MILLER, MEMBERCITY ENGINEERING DEPARTMENTABIGAIL MAGAS, P.E., CITY ENGINEERLESLIE BIEK, P.E., ASSISTANT CITY ENGINEERDATEDATEDATEDATEDATEDLZ INDIANA, LLCCERTIFIED BY:DATEREGISTER PROFESSIONAL ENGINEER STATE OF INDIANA NO. 60900360COVERING SIGNAL DESIGNREGISTER PROFESSIONAL LANDSCAPE ARCHITECT STATE OF INDIANA NO. 21000063COVERING LANDSCAPE DESIGNINDIANA DEPARTMENT OF TRANSPORTATIONAPPROVEDFOR LETTING:DATE2100022CONTRACTDESIGNATIONAND CURRENT SUPPLEMENTS THERETO,STANDARD SPECIFICATIONS DATED 2026INDIANA DEPARTMENT OF TRANSPORTATIONTO BE USED WITH THESE PLANSDATEJOSEPH R. MOLNAR, VICE PRESIDENTDATER-44115DLZ INDIANA, LLCBEGIN PROJECTP.O.T.STA. 35+82.00 'PR-B'END PROJECTP.O.T.STA. 77+00.00 'B'A.A.D.T.7% A.A.D.T.HUC: 04050001220789BEGIN CONSTRUCTIONP.O.T.STA. 103+63.55 'S-2-B'END CONSTRUCTIONP.O.T.STA. 105+75.00 'S-2-B'BENDIX DRIVE(2021)(2026)(2046)A.A.D.T.A.A.D.T.D.H.VDIRECTIONAL DISTRIBUTIONTRUCKSDESIGN SPEEDPROJECT DESIGN CRITERIAFUNCTIONAL CLASSIFICATIONRURAL/URBANTERRAINACCESS CONTROL4,181 V.P.D.4,286 V.P.D.4,704 V.P.D.564 V.P.H. 65% EB, 35% WB9% D.H.V.DESIGN DATATRAFFIC DATALATHROP STREETLOCAL AGENCY COLLECTORNEW CONSTRUCTION (NON-FREEWAY)URBAN (INTERMEDIATE)LEVELNONE30 M.P.H.A.A.D.T.9% A.A.D.T.LATHROP STREETT-38-N
R-2-E34332728LOCATION MAPNOT TO SCALELINE EQUATIONP.T. STA 71+22.24 'PR-B' BACK =P.O.T. STA 71+22.22 'B' AHEADAT-GRADE NICTDRAILROAD CROSSINGDOT# 913224VMP# 0001.11P.O.T.STA. 50+93.20 'PR-B'AT-GRADE NICTDRAILROAD CROSSINGDOT# 870378HMP# 0001.8943T-38-N
T-37-N
R-2-ET-37-NDATEREGISTER PROFESSIONAL ENGINEER STATE OF INDIANA NO. 11200672COVERING CIVIL DESIGNDLZ INDIANA, LLCDATEREGISTER PROFESSIONAL ENGINEER STATE OF INDIANA NO. 10100213COVERING GENERAL CIVIL DESIGNDLZ INDIANA, LLCCERTIFIED BY:CERTIFIED BY:CERTIFIED BY:8/31/20268/31/2026
BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM
Date 8/31/2026
Name Leslie Biek, PE Department PW
BPW Date 9/8/2026 Phone Extension 9323
Review and Approval Required Prior to Submittal to Board
Diversity Compliance
and Inclusion Officer Officer Name
BPW Attorney Attorney Name
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach
Required Information
Company or Vendor Name
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Bendix Ph 2 Improvements from Lathrop to Voorde
Project Number 121-047: Des # 2100022; PROJ 338
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description Title Sheet for Bendix Ph 2 from Lathrop to Voorde. This is a federal
aid LPA project administered through INDOT. INDOT will bid the project in March 2027.
For Change Orders Only
Amount of Increase Decrease
$
($ ) Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount: New Completion Date: