HomeMy WebLinkAbout08252026 BPW Meeting Minutes - FinalAGENDA REVIEW SESSION AUGUST 20, 2026 189
The Agenda Review Session of the Board of Public Works was convened at 10:31 a.m. on
August 20, 2026, by Board President Elizabeth A. Maradik, Vice President Joseph Molnar,
and Board Members Murray Miller, Breana Micou, Abigail Magas and Board Attorney
Michael Schmidt present. The Board of Public Works Clerk, Hillary R. Horvath, presented
the Board with a proposed agenda of items presented by the public and by City Staff.
Board members discussed the following item(s) from the agenda.
Caitlyn Wyant, Engineering, shared with the Board item 12A: Coal Line Trail Phase 3 –
Project No. 123-007. She announced that she is requesting signatures from the Board for
the title sheet, but that there is no need to request bids to advertise. This is because INDOT
will be handling the letting process instead of the City.
Jenny Guard, Engineering, shared with the Board item 13F: Amendment No. 2 to
Professional Services Agreement – Hanson Professional Services Inc. – Project No. 126-
010.She clarified that the amount for the amendment had decreased since the deadline to
submit the item to the agenda. Instead of $273,500, the updated amount is $265,200.
Patrick Sherman, Engineering, shared with the Board item 8B: Four Winds Field
Renovation and Expansion – Project 123-046. He clarified that the main project had been
completed and that the change order would cover additional scope that was not originally
included in the project plan. The change of scope includes traffic coating and overhead
canopies that were recommended by the Health Department. Traffic coating was already
included in the project but has been expanded to cover more area. The overhead canopies
were initially included in the project and removed due to the budget but have been
reintroduced in this change order. Mr. Miller expressed concerns that the change in scope
was not advertised and rebid, which Attorney Schmidt explained is not required unless the
change in scope exceeds 20%.
Board Member Mr. Miller expressed concern about the Award Bids and Approve Contracts
section of the agenda, asking for it to be read for the record if each project bidder had
affirmed their respective hiring goals. Upon asking engineers and bidders who were
present virtually, it was confirmed that every project bidder had affirmed that they would
meet goals.
Board Attorney Schmidt asked about the status of 13C: Amendment No. 2 to CMc Contract
–F. A. Wilhelm – Project No. 123-074. Zach Hurst requested that the above-mentioned
project be tabled.
Board Attorney Schmidt shared item 6A: Spec E – PD Upfit Equipment. He reminded the
Board that this item had been tabled at a previous meeting due to the legal department
declaring an unresponsive bidder. The bidder had not provided a bid bond or cashier’s
check, and so the item would be awarded to a different bidder than the original
unresponsive bidder at the following Board of Public Works meeting.
Board Attorney Schmidt shared item 8A: Dylan Dr. Lighting Improvements – Project 119-
047.The item had been previously tabled, but City employees were able to speak with
contractors and revise the change order so that it fell below the 20% change order
threshold. Caitlyn Wyant, Engineering, specified that electricians had found that a conduit
had flooded, causing wiring to fail and lights to malfunction. The change order would cover
the costs of replacing the water-damaged wiring and fixing the lights.
PRIVILEGE OF THE FLOOR
Tiana Batiste-Waddell appeared before the Board to discuss the issue of jimsonweed
growth on the West Side. This issue was also brought before the Board at the August 11,
2026, meeting by Diane Benman. Batiste-Waddell claimed that jimsonweed is highly toxic
to children and families in West Side neighborhoods. She requested information related to
the turf and seed mixtures that sidewalk crews were using, where the turf had been
installed, and what the City was doing to address the issue of the spread of the weed.
REGULAR MEETING AUGUST 25, 2026 190
Batiste-Waddell specifically requested a meeting with Public Works Director Eric Horvath
to discuss current and future steps taken by the City.
ADJOURNMENT
There being no further business to come before the Board, President Maradik adjourned
the meeting at 10:48 a.m.
BOARD OF PUBLIC WORKS
_________________________________
Elizabeth A. Maradik, President
_________________________________
Joseph R. Molnar, Vice President
_________________________________
Murray L. Miller, Member
_________________________________
Breana N. Micou, Member
_________________________________
Abigail E. Magas, Member
REGULAR MEETING AUGUST 25, 2026 The
Regular Meeting of the Board of Public Works was convened at 9:32 a.m. on Tuesday,
August 25, 2026, by Board President Elizabeth A. Maradik in the 4th Floor Public
Meeting Room, Council Chambers of the City Hall Building, 215 S. Martin Luther King Jr.
Blvd., Suite 400., South Bend, Indiana. The meeting was also streamed live to the public
via Microsoft Teams. Acting Board Clerk Candy Bermudez confirmed the presence of
Board President Elizabeth A. Maradik, Vice President Joseph Molnar, and Board
Members Murray Miller, Breana Micou, Abigail Magas and Board Attorney Michael
Schmidt, with a roll call. President Maradik reminded virtual attendees to mute their
microphones and turn off their cameras when not speaking, and to save their questions
and comments for the Privilege of the Floor.
APPROVE MINUTES OF PREVIOUS MEETING
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call,
the minutes for the Agenda Review Session and Regular Meetings of the Board held on
August 6, 2026, and August 11, 2026, were approved.
PUBLIC HEARING – NEW MESSAGE ESTABLISHMENT
President Maradik advised that this was the date set for the Board’s Public
Hearing concerning a license application for Sai Shakti LLC. It was noted
favorable recommendations from city staff. There being no one present wishing to
address the Board concerning this matter, the Public Hearing was closed. Therefore,
upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the
license was approved.
OPENING OF BIDS – WELL IMPROVEMENTS PROJECT – PROJECT NO. 125-033
(PR-00048991)
This was the date set for receiving and opening sealed bids for the above-
mentioned project. The Clerk tendered proof of publication of the Notice in the South
Bend Tribune, which was found to be sufficient. The following bids were opened and
publicly read:
HRP CONSTRUCTION INC.
7775 Old Cleveland Rd., PO Box 266
September 8, 2026
REGULAR MEETING AUGUST 25, 2026 191
South Bend, IN 46624
mattc@hrpconstruction.com
Bid was signed by Matthew D. Cain
Non-Collusion, Non-Discrimination Affidavit Form was completed
Five percent (5%) Bid Bond was submitted
Three (3) MWBE Forms (1.0, 2.0, 2.1) were submitted
Two (2) of Two (2) Addendum Acknowledgements received.
BID:
Base Bid Total $2,239,000
Mandatory Alternate Deduct #1 $17,655
Mandatory Alternate Deduct #2 $25,000
Mandatory Alternate Deduct #3 $13,720
Mandatory Alternate Deduct #4 $271,000
R. YODER CONSTRUCTION, INC.
27453 County Road 150, PO Box 69
Nappanee, IN 46550
brad@ryoderconstruction.com
Bid was signed by Jason Yoder
Non-Collusion, Non-Discrimination Affidavit Form was completed
Five percent (5%) Bid Bond was submitted
Three (3) MWBE Forms (1.0, 2.0, 2.1) were submitted
Two (2) of Two (2) Addendum Acknowledgements received.
BID:
Item 1. Total $1,204,600
Item 2. Total $1,257,800
Mandatory Alternate Deduct #1 $35,000
Mandatory Alternate Deduct #2 $35,000
Mandatory Alternate Deduct #3 $32,300
Mandatory Alternate Deduct #4 $125,000
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the
above bids were referred to Public Works for review and recommendation.
OPENING OF QUOTATIONS – THE POINTE AT RIVERWALK – EXTERIOR DOORS &
SIDIDNG – PROJECT NO. 124-069I (PR-0009668)
President Maradik advised that this was the date set for the receiving and opening of sealed
quotations for the above referenced project. The following quotations were opened and
read:
BIG C LUMBER
50860 Princess Way
Granger, IN 46530
Christian.hurley@bigclumber.com
Quotation was submitted by Christian Hurley
Non-Collusion, Non-Discrimination Affidavit Form was completed.
QUOTE:
Total Quote $99,531.76
ABC SUPPLY CO., INC.
815 Oliver Plow Ct.
South Bend, IN 46601
Christian.hurley@bigclumber.com
Quotation was submitted by Christian Hurley
Non-Collusion, Non-Discrimination Affidavit Form was NOT completed.
REGULAR MEETING AUGUST 25, 2026 192
QUOTE:
Total Quote $90,330.46
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the
above quotations were referred to Public Works and Community Investment for review
and recommendation.
OPENING OF QUOTATIONS – THE POINTE AT RIVERWALK – RAILING MATERIALS –
PROJECT NO. 124-069J (PR-00049672)
President Maradik advised that this was the date set for the receiving and opening of sealed
quotations for the above referenced project. The following quotations were opened and
read:
No Quotes Received
OPENING OF PROPOSALS – BENDIX PHASE 2 IMPROVEMENTS FROM LAHTROP TO
VOORDE – PROJECT NO. 121-047
Leslie Biek, Engineering, advised that this was the date set for the receiving and opening of
sealed proposals for the above-mentioned project. President Maradik stated the Proposals
will be reviewed and scored based on a matrix system, by a team made up of City
representatives. Board Attorney Micheal Schmidt read the names of the following
companies submitting proposals:
ABONMARCHE CONSULTANTS, INC.
TROYER GOUP
LOCHMUELLER
UNITED CONSULTING
AMERICAN STRUCTUREPOINT
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the
above proposals were referred to Public Works for review and recommendation.
APPROVAL OF AGREEMENTS/CONTRACTS/PROPOSALS/ADDENDA
The following agreements/contracts/proposals/addenda were submitted to the Board for
approval:
Type Business Description Amount/
Funding
Motion/
Second
Temporary
Right of Way
Agreement
Appletree
Associates, LP
Temporary Right of Way
for the Construction of
the Bendix Phase 2
Project at 1915 Bendix
$1,350
(PR-
00049428)
Molnar/Miller
Exclusive
Municipal
Sanitary
Sewer
Easement
Waste
Management
of Indiana, LLC
Exclusive Municipal
Sanitary Sewer
Easement for the City’s
Sewer Main Located on
Private Property at
20645 Ireland Rd.
N/A Molnar/Miller
Professional
Services
Agreement
Jones Petrie
Rafinski Corp.
Design Services for
Phase I Improvements at
Rum Village, Project No.
126-054
$145,685
(PR-
00049599)
Molnar/Miller
Release of
Easement
GLC Mid-Bay
LLC
Release of the Non-
Access Easement for Lot
NA Molnar/Miller
REGULAR MEETING AUGUST 25, 2026 193
2 of Portage Prairie
Minor #8, First Replat,
which is no longer
needed, and the
proposed construction
of an approach from
Mayflower Dr., DP26-
043
Amendment
No. 2 to
Professional
Services
Agreement
Hanson
Professional
Services Inc.
Amendment to Advance
the Tri-Day
Development
Infrastructure to 100%,
Project No. 126-010
$272,500
(PO-
0043365)
Molnar/Miller
Contract Department of
Community
Investment
Contract between DCI &
BPW for the
Infrastructure Work to
Support the Western
Ave. Transformation
District, Project No.
125-047
$10,000,000
(Section 108
Loan,
Community
Development
Block Grant)
Molnar/Miller
AWARD BID AND APPROVE CONTRACT – SPEC E – PD UPFIT EQUIPMENT (PR-
00048665)
Kevin Smith, Central Services, advised the Board that on July 28, 2026, bids were received
and opened for the above-referenced project. After reviewing those bids, Mr. Smith
recommended that the Board award the contract to the lowest responsive and responsible
bidder, Move Over Outfitters, in the amount of $306,311.30. Therefore, VP Molnar made
a motion that the recommendation be accepted, and the bid be awarded, and the contract
approved as outlined above. Mr. Miller seconded the motion, which carried by roll call.
AWARD BID AND APPROVE CONTRACT – POTAWATOMI PARK IMPROVEMENTS,
PHASE 2A – PROJECT NO. 125-050A (PR-00049016)
Leslie Biek, Engineering, advised the Board that on August 11, 2026, bids were received
and opened for the above-referenced project. After reviewing those bids, Ms. Biek
recommended that the Board award the contract to the lowest responsive and responsible
bidder, Rieth-Riley Construction Co., Inc., in the amount of $1,491,256.91. Therefore, VP
Molnar made a motion that the recommendation be accepted, and the bid be awarded, and
the contract approved as outlined above. Mr. Miller seconded the motion, which carried by
roll call.
AWARD BID AND APPROVE CONTRACT – 2026 NEIGHBORHOOD SERVICES AND
ENFORCEMENT DEMOLITIONS – PROJECT NO. 126-045 (PR-00048966)
Zach Hurst, Engineering, advised the Board that on August 11, 2026, bids were received
and opened for the above-referenced project. After reviewing those bids, Mr. Hurst
recommended that the Board award the contract to the lowest responsive and responsible
bidder, C&E Excavating, Inc., in the amount of $381,372. Therefore, VP Molnar made a
motion that the recommendation be accepted, and the bid be awarded, and the contract
approved as outlined above. Mr. Miller seconded the motion, which carried by roll call.
AWARD BID AND APPROVE CONTRACT – THE YARD – HILL ST PARKING LOT –
PROJECT NO. 126-020A (PR-00048967)
Caitlin Wyant, Engineering, advised the Board that on August 11, 2026, bids were received
and opened for the above-mentioned project. After reviewing those bids, Ms. Wyant
recommended that the Board award the contract to the lowest responsive and responsible
bidder, Rieth-Riley Construction Co., Inc., in the amount of $229,900. Therefore, VP
Molnar made a motion that the recommendation be accepted, and the bid be awarded, and
the contract approved as outlined above. Mr. Miller seconded the motion, which carried by
roll call.
REGULAR MEETING AUGUST 25, 2026 194
AWARD BID AND APPROVE CONTRACT – WESTERN AVE. TRANSFORMATION
DISTRICT – PROJECT NO. 125-047 (HUD LOAN/RIVE WEST TIF)
Charlotte Brach, Engineering, advised the Board that on July 14, 2026, bids were received
and opened for the above-referenced project. After reviewing those bids, Ms. Brach
recommended that the Board award the contract to the lowest responsive and responsible
bidder, Indiana Earth, Inc., in the amount of $7,791,518 divisions A and B plus Alternate 2.
Therefore, VP Molnar made a motion that the recommendation be accepted, and the bid be
awarded, and the contract approved as outlined above. Mr. Miller seconded the motion,
which carried by roll call.
AWARD QUOTATION AND APPROVE CONTRACT – RUM VILLAGE PHASE I
IMPROVEMENTS – PROJECT NO. 126-054 (PR-00049604)
Patrick Sherman, Engineering, advised the Board that on August 14, 2026, quotations were
received and opened for the above-referenced project. After reviewing those quotations,
Mr. Sherman recommended that the Board award the contract to the lowest responsive
and responsible quoter, Custom Fence Company, in the amount of $4,575. Therefore, VP
Molnar made a motion that the recommendation be accepted, and the quotation be
awarded, and the contract approved as outlined above. Mr. Miller seconded the motion,
which carried by roll call.
APPROVE CHANGE ORDER NO. 2 – DYLAN DR. LIGHTING IMPROVEMENTS –
PROJECT NO. 119-047 (PO-0041225
President Maradik advised that Caitlin Wyant, Engineering has submitted change order
number 2 on behalf of Michiana Contracting, indicating the contract amount be increased
by $17,407 for a new contract sum, including this change order, in the amount of
$372,841.92. Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by
roll call, the change order was approved.
APPROVE CHANGE ORDER NO. 1 – FOUR WINDS FIELD RENOVATION AND
EXPANSION – PROJECT NO. 123-046 (PO-000040361
President Maradik advised that Patrick Sherman, Engineering has submitted change order
number 1 on behalf of Larson-Danielson Construction Company, indicating the contract
amount be increased by $1,566,567.78 and an additional two hundred and ninety-five
(295) for a new contract sum, including this change order, in the amount of $45,132,658.78
with a completion date of January 15, 2027. Upon a motion made by VP Molnar, seconded
by Mr. Miller and carried by roll call, the change order was approved.
APPROVE CHANGE ORDER NO. 1 (FINAL) AND PROJECT COMPLETION AFFIDAVIT –
2025 NEIGHBORHOOD SERVICES & ENFORCEMENT DEMOLITIONS – PROJECT NO.
125-043BR (PO-0042336)
President Maradik advised that Zach Hurst, Engineering, has submitted change order
number 1 (final) on behalf of Indiana Earth, Inc., indicating the contract amount be
decreased by $7,935 for a new contract sum, including this change order, of $69,915. Also
submitted was the project completion affidavit indicating this new final cost of $69,915.
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, change
order number 1 (final) and the project completion affidavit were approved.
APPROVE PROJECT COMPLETION AFFIDAVIT – MARSHALL PARK TENNIS COURT
RESURFACE – PROJECT NO. 125-026A (PO-0042762)
President Maradik advised that Zak Tebell, Engineering, has submitted change order
number 1 (final) on behalf of Arnt Asphalt Sealing Inc., indicating the contract timeline be
extended by an additional eighteen (18) days, with a new completion date of July 7, 2026.
Also submitted was the project completion affidavit indicating a final cost of $49,995.
Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, change
order 1 (final) and the project completion affidavit were approved.
APPROVE PROJECT COMPLETION AFFIDAVIT – PINHOOK PARK INSTALLATION OF
EVSE – PROJECT NO. 125-054 (PO-0041078)
President Maradik advised that Caitlin Wyant, Engineering, has submitted the project
completion affidavit on behalf of Anglin Electric, Inc., for the above-referenced project,
REGULAR MEETING AUGUST 25, 2026 195
indicating a final cost of $33,319. Upon a motion made by VP Molnar, seconded by Mr.
Miller and carried by roll call, the project completion affidavit was approved.
APPROVE PROJECT COMPLETION AFFIDAVIT – RACLIN MURPHY ENCORE CENTER –
PROJECT NO. 123-056 (PO-0032487)
President Maradik advised that Patrick Sherman, Engineering has submitted the project
completion affidavit on behalf of Larson-Danielson Construction Co., Inc., for the above-
referenced project, indicating a final cost of $16,099,214.79. Upon a motion made by VP
Molnar, seconded by Mr. Miller and carried by roll call, the project completion affidavit was
approved.
APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS – SALE OF CITY-
OWNED PROPERTY – 1118 HILL ST.)
In a memorandum to the Board, Erin Michaels, Department of Community Investment,
requested permission to advertise for the receipt of bids for the above-mentioned project.
Therefore, upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll
call, the above request was approved.
APPROVE TITLE SHEET– COAL LINE TRAIL PHASE 3 – PROJECT NO. 123-007
Caitlin Wyant, Engineering, advised that the Title Sheet for the above-referenced project
was being presented at this time for execution. Upon a motion made by VP Molnar,
seconded by Mr. Miller and carried by roll call, the above referenced Title Sheet was
approved and signed.
APPROVAL OF LICENSE AND PERMIT APPLICATIONS
The following license and permit applications were presented for approval:
Applicant Description Date/Time Location Motion
Carried
CN America
250
Hometown
Whistle Stop
Tour
Ratify Street
Closure for
Special Event
August 18,
2026/8:00
a.m. to 12:30
p.m.
Lafayette Blvd.
between Taylor St.
and Main St.
Molnar/Miller
Maleni’s 8th
Birthday
Ratify Street
Closure for
Special Event
August 22,
2026/9:00
a.m. and
10:00 a.m.
Dale St. between
Dayton St. and
Milton St.
Molnar/Miller
Porch-A-
Palooza
Street Closure for
Special Event
August 26,
2026/3:00
p.m. to 10:00
p.m.
Hill St. between
Colfax Ave. and
Washington St.
Molnar/Miller
North
Coquillard
Block Party
Street Closure for
Special Event
September
7, 2026/2:00
p.m. to 8:00
p.m.
Coquillard Dr.
between Rockne
Dr. to Cherry Tree
Ln.
Molnar/Miller
Kaley St.
Block
Birthday
Party
Street Closure for
Special Event
September
12,
2026/9:00
a.m. to 10:00
p.m.
Kaley St between
Dunham St. and
Fisher St.
Molnar/Miller
St. Joseph
County Crop
Walk
Street Closure for
Special Event
September
20,
2026/7:00
a.m. to
5:00p.m.
Brief Crossings at
Intersections
Starting at the
East Bank Trail;
Sample St. Bridge;
Lincoln Way; High
St.; Wenger;
Fellows;
Broadway;
Molnar/Miller
REGULAR MEETING AUGUST 25, 2026 196
Bronson;
Edgewater; Plaza
Park Sidewalk
Women’s
Recovery
Walk
Street Closure for
Special Event
September
26,
2026/9:30
a.m., to 3:00
p.m.
Brief Crossings
Starting at 1402 S.
Michigan St. going
north on Main St.
to Monroe St.
ending at 402 E.
South Street
Molnar/Miller
APPROVAL OF REVOCABLE PERMIT FOR ENCROACHMENT – RIVER PARK
NEIGHBORHOOD ASSOCIATION
President Maradik stated an application for an encroachment and revocable permit has
been received from River Park Neighborhood Association for the purpose of allowing fifty
(50) small metal signs to be placed in the right-of-way around River Park. The
encroachment shall remain in the right of way until the time as the Board of Public Works
of the City of South Bend shall determine that such encroachment is in any way impairing
or interfering with the highway or with the free and same flow of traffic. Upon a motion
made by VP Molnar, seconded by Mr. Miller and carried by roll call, the encroachment and
revocable permit was approved.
APPROVE CONSENTS TO ANNEXATION AND WAIVER OF RIGHTS TO REMONSTRATE
President Maradik stated that the Board is in receipt of the following consents to
annexation and waivers of rights to remonstrate. The consents indicate that in
consideration for permission to tap into public water/sanitary sewer system of the City, to
provide water/sanitary sewer service to the below referenced properties, the applicants
waive and release all rights to remonstrate against or oppose any pending or future
annexations of the properties by the City of South Bend:
A. Ingrid Pierotti, 116 S. Taylor St.
1. 13252 Cleveland Rd.– Water (Key No. 71-03-25-226-004.000-03)
B. Adriana Zamudio, 2913 Mishawaka Ave.
1. 20468 Jewell Ave.– Sewer (Key No. 71-08-35-2023-002.000-001)
Upon a motion by VP Molnar, seconded by Mr. Miller and carried by roll call, the consents
to annexation and waivers of rights to remonstrate were approved as submitted.
RATIFY APPROVAL AND/OR RELEASE CONTRACTOR, EXCAVATION, AND
OCCUPANCY BONDS
The Division of Engineering Permit Department recommended that the following bonds be
ratified pursuant to Resolution 100-2000 and/or released as follows:
Business Bond Type Approved/
Released Effective Date
Fireside Homes, Inc. Contractor Released September 15,
2026
Masten Dirt Works LLC Contractor Released August 25,
2026
Weaver Consultants Group, LLC Excavation Approved August 6, 2026
St. John-Mittelhauser &
Associates, Incorporated
Excavation Released August 25,
2026
Weaver Consultants Group, LLC Occupancy Approved August 6, 2026
Terracon Consultants, Inc. Occupancy Released August 20,
2026
Masten Dirt Works LLC Occupancy Released August 29,
2026
Claudia’s Cleaning Service LLC Occupancy Released August 25,
2026
REGULAR MEETING AUGUST 25, 2026 197
VP Molnar made a motion that the bond’s approval and/or release as outlined above be
ratified. Mr. Miller seconded the motion, which carried by roll call.
RATIFY PREAPPROVED CLAIMS PAYMENTS
VP Molnar stated the Board received notices of the following preapproved claim payments
from the City’s Department of Administration and Finance:
Name Date Amount of Claim
City of South Bend Claims GBLN-0141319 07/28/2026 $4,159,831.70
City of South Bend Claims GBLN-0142481 08/04/2026 $2,138,955.80
City of South Bend Claims GBLN-0142621;
GBLN-01426863; GBLN-0142855
08/11/2026 $6,026,587.94
City of South Bend Claims GBLN-0143367;
GBLN-01472683; GBLN-0143517
08/13/2026 $4,648,373.01
Each claim is fully supported by an invoice; the person receiving the goods or services has
approved the claims; and the claims have been filed with the City Fiscal Officer and certified
for accuracy. Therefore, upon a motion by VP Molnar, seconded by Mr. Miller, and carried
by roll call, the Board ratified the preapproved claims payments.
PRIVILEGE OF THE FLOOR
ADJOURNMENT
There being no further business to come before the Board, President Maradik adjourned
the meeting at 9:54 a.m.
BOARD OF PUBLIC WORKS
_________________________________
Elizabeth A. Maradik, President
_________________________________
Joseph R. Molnar, Vice President
_________________________________
Murray L. Miller, Member
_________________________________
Breana N. Micou, Member
_________________________________
Abigail E. Magas, Member September 8, 2026