My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Veteran's Memorial Park Twyckenham Sidwalk 125-077 - Rieth-Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - Veteran's Memorial Park Twyckenham Sidwalk 125-077 - Rieth-Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:12:23 PM
Creation date
4/28/2026 2:11:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/27/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA,.«, <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK <br />IaGG <br />PROJECT NAME: Veterans' Memorial Park Twyckenham Drive Sidewalk <br />PROJECT NO. 125-077 <br />QUOTES DUE <br />local time to <br />(Must be completed for all quotes. Please type or print) <br />Date: 04/28/2026 Firm: Rieth-Riley Construction Co., Inc. <br />Address: 25200 State Road 23 <br />City/State/Zip: South Bend, IN 46614 Telephone Number: ( 574-) 288-8321 <br />Email Address: gvanoarvs0).rieth-rilev.com <br />Agent of Bidder (if Applicable): Ruben Alvarado - Sales Manager <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated N/A for the sum of (enter the Total Quote as shown on the Proposal) <br />Two Hundred Eighteen Thousand Five Hundred Eighty -Nine Dollars and Ninety -Five Cents _ ($ 218,589.95 ) <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South BenA If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate Tattat.;VJ--lBY <br />(Signature) <br />Ruben Alvarado - Sales Manager <br />(Printed Name of Person Signing) <br />ACCEPTANCE <br />The above quote is accepted this day of <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />President <br />Members <br />20 <br />Version 9/1/2025 Page - 15 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.