HomeMy WebLinkAboutAmendment No 1 to CMc Contract Madison Lifestyle District Proj No 123-074 - FA Wilhelm
March 24, 2026
Mr. Tony Bogard F.A. Wilhelm Construction Co., Inc.
630 E Bronson St., Suite 2 South Bend, IN 46601 TonyBogard@fawilhelm.com
RE: Amendment No. 1 to CMC Contract Madison Lifestyle District
Dear Mr. Bogard:
At its March 24, 2026 meeting, the Board of Public Works approved the above referenced Amendment No. 1 for CMC Contract Madison Lifestyle District in the
amount of $6,839,000. Please find enclosed the agreement. Kindly sign and return it to
hhorvath@southbendin.gov and retain a copy for your records.
Sincerely,
/s/ Hillary Horvath
Hillary Horvath, Clerk
Enclosures HH
Page 1 of 1
INTER-OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING
TO: Hillary Horvath, Clerk Board of Public Works
FROM: Zach Hurst, PE, Sr. Project Engineer
SUBJECT: Amendment No. 1 - Project No. 123-074
Madison Lifestyle District – New Parking Garage – CMc
DATE: 03/17/2026 On March 17, 2026, FA Wilhelm, as the City’s Construction Manager for the new Madison Lifestyle District parking garage, will host a public meeting to open nine (9) bid packages related to early work at the site. The intent of this early work is to get a head start on mobilization to and clearing of the site. The entirety of the Madison Lifestyle District (parking garage, apartments, and hotel) must be complete before the end of 2028 as a requirement for a significant portion of funding from the State of Indiana. The remainder of the bid packages will be procured in July 2026. The overall project estimated
cost for the new parking garage (and podium for the multi-family housing) is $30.5M. The nine bid packages are as follows:
• Temporary Fencing
• Tower Crane & Operator
• Foundations, Columns, and Slab on Grade
• Supply of Rebar
• Installation of Rebar
• Supply of Ready-Mix Concrete
• Elevators
• Site Demolition, Earthwork, and Site Utilities
• Aggregate Piers
FAWILHELM.COM 3914 PROSPECT ST. INDIANAPOLIS, IN 46203 317.359.5411 Page 1 of 1 March 20, 2026 Mr. Zach Hurst, PE Senior Project Engineer City of South Bend City Hall Suite 400 215 South Dr. Martin Luther King Jr. Blvd. South Bend, IN 46601 RE: GMP-1 (Guaranteed Maximum Price) Madison Lifestyle District – Parking Garage Mr. Hurst, Enclosed is our GMP-1 as described in the attached documentation for the Madison Lifestyle District Parking Garage Construction for the City of South in South Bend, IN. Contained within this packet is the GMP in the amount of $6,839,000. Financial Summary: GMP-1 (Bid Event #1) $ 6,839,000 GMP-1 Total $ 6,839,000 Enclosed are the following sections: 1. Bid Recap – Bid Event #1 2. Assumptions & Clarifications 3. General Requirements and General Conditions 4. Subcontractor Bid Analysis 5. Construction Schedule 6. Site Logistics 7. RFI Response Log 8. Document List 9. Project Bid Manual We look forward to discussing this submittal further with the project team. Please do not hesitate to contact us at (317) 538-0868 if you have any questions or comments. Sincerely, Mitch Davison Operations Manager F.A. Wilhelm Construction., Inc.
Madison Lifestyle District - Parking Garage
BID RECAP MASTER
March 20th, 2026
Bid
Event
Bid
Package Bid Package Description Apparent Low Bidder Bid Package Total SD Budget DELTA1
02A Temporary Fence K & K Fence $57,120 $24,000 $33,1201
02B Tower Crane & Operator (anchor stool & footing design only)Maxim Crane $28,248 $28,000 $2481
03A Foundations F.A. Wilhelm $1,697,000 $1,732,000 -$35,0001
03B Rebar - Supply Whitecap $328,749 $188,000 $140,7491
03C Rebar - Installation F.A. Wilhelm $268,400 $180,000 $88,4001
03D Ready Mix Supplier Ozinga $615,106 $390,000 $225,1061
14A Elevators TK Elevator $888,000 $1,050,000 -$162,0001
31A Site Demolition, Earthwork, & Site Utilities Indiana Earth $1,240,200 $1,723,410 -$483,2101
31B Aggregate Piers Pier Foundations $294,271 $372,000 -$77,729
BID PACKAGE SUBTOTAL $5,417,094 $5,687,410 -$270,316
General Conditions $359,100 $359,100 $0
General Requirments $358,894 $358,894 $0
Design & Estimate Contingency 5.00%$0 $320,270 -$320,270
Builders Risk Insurance 0.40%$113,794 $113,794 $0
General Liability Insurance 0.50%$146,396 $146,396 $0
Performance and Payment Bond 0.51%$186,323 $186,323 $0
Construction Management Fee 2.75%$181,399 $197,235 -$15,836
Precon Fee $76,000 $38,000 $38,000
TOTAL $6,839,000 $7,407,423 -$568,422
*BP 14A includes (4) elevators. SD Budget had (3) elevators included.
*BP 31A has an allowance of $100k for sanitary manholes not shown on drawings.
FAWILHELM.COM 3914 PROSPECT ST. INDIANAPOLIS, IN 46203 317.359.5411 Page 1 of 3 March 20, 2026 Project: Madison Lifestyle District Parking Garage – Bid Event #1 GMP Clarifications and Assumptions This document consists of allowances, clarifications, and assumptions that are integral to the Madison Lifestyle District Parking Garage Guaranteed Maximum Price (GMP1) Proposal to provide the City of South Bend with a full and completely accounted for project per the received contractual drawings, specifications, and documents. We are more than willing to discuss or elaborate on any and all of the below at your request: General: 1. Documents captured in this GMP: 1. Drawing Log is attached as an exhibit to GMP Phase 1 proposal. 2. Specifications Log is attached as an exhibit to GMP Phase 1 proposal. 3. Project Bid Manual is attached as an exhibit to GMP Phase 1 proposal. 4. Site Logistics is attached as an exhibit to GMP Phase 1 proposal. 5. Schedule is attached as an exhibit to GMP Phase 1 proposal. 6. RFI Response Log is attached as an exhibit to GMP Phase 1 proposal. 7. General Requirements and General Conditions are attached as an exhibit to GMP Phase 1 proposal. 2. The assumptions and clarifications listed below state conditions that are not clearly identified in the documents. In instances where the assumptions or clarification is in conflict with further design documentations the issue will be resolved according to the Owner/CM and Owner/Architect agreements. 3. GMP excludes any Owner Furnished or Owner Installed items. 4. Owner will pay use charges for sewer, water, and electric power service after substantial completion. Installation, removal, connections or extensions of services as required for construction operations (Temporary Facilities & Controls) shall be provided by Contractor. 5. Includes coordination with the Owner’s Commissioning consultant. 6. Includes preconstruction fee of $76,000. The original preconstruction fee has been doubled due to procurement being phased in two segments. General Exclusions: 1. Subcontractor payment and performance bond alternate. 2. Sales and use tax for permanent materials is excluded. Sales and use tax for non-permanent materials is included in accordance with State Statute. 3. Utility consumption costs (i.e. electric, water, gas, chilled water, steam, etc.), assessment fees, excess facility charges, and installation costs and any furnishing of meters (water, irrigation, steam, gas, etc.). 4. Architectural, engineering, or Legal fees. (only delegated design for specified systems is included).
FAWILHELM.COM 3914 PROSPECT ST. INDIANAPOLIS, IN 46203 317.359.5411 Page 2 of 3 Insurance & Bonding: 1. Construction Contingency – Includes 3% for Construction Contingency as defined in Section 3.2.4 of the Contract. 2. Subcontractor Bonds – Contractor is not employing a subcontractor default insurance program for this project. 3. Builder’s Risk Insurance – Includes a fixed rate of 0.40% for the cost to provide Builder’s Risk Insurance coverage per the policy terms. 4. Liability and Professional Insurance – Includes a fixed cost rate of 0.50% to cover Commercial General Liability and Excess Liability coverage per Section 14.3. 5. Performance and Payment Bond – Includes a fixed rate of 0.50% for the cost to provide a Payment and Performance bond for the entirety of the value of this GMP. 6. Insurance & bond coverage was bound immediately upon execution of the GMP-1 change order therefore, the full amounts indicated on the Bid Recap Master for Builder’s Risk, General Liability, and Performance & Payment bond will be included on the first payment application after execution of this GMP-1. General Requirements: 1. Includes the general requirements as shown in the GC’s and GR’s attachment. Staffing: 1. Staffing is based on projected staffing costs through October 31st, 2026. 2. Project staff will be billed per the rates below: a. Project Manager - $110/HR b. Project Engineer - $70/HR c. Superintendent - $120/HR d. Safety Manager - $100/HR Bid Package 02A – Temporary Fencing 1. Drawing set clarification. Work included through Addendum 4. 2. The apparent lowest responsible and responsive bidder is K & K Fence. Bid Package 02B - Tower Crane & Operator 1. Drawing set clarification. Work included through Addendum 4. 2. The apparent lowest responsible and responsive bidder is Maxim Crane. 3. For purposes of this phase we are only contracting the erected stool and engineering design. 4. The remainder of this work will be contracted in a future bid package. Bid Package 03A - Foundations 1. Drawing set clarification. Work included through Addendum 4. 2. The apparent lowest responsible and responsive bidder is F.A. Wilhelm Construction Co., Inc. Bid Package 03B – Rebar - Supply 1. Drawing set clarification. Work included through Addendum 4. 2. The apparent lowest responsible and responsive bidder is Whitecap Construction.
FAWILHELM.COM 3914 PROSPECT ST. INDIANAPOLIS, IN 46203 317.359.5411 Page 3 of 3 Bid Package 03C – Rebar – Installation 1. Drawing set clarification. Work included through Addendum 4. 2. The apparent lowest responsible and responsive bidder is F.A. Wilhelm Construction Co., Inc. Bid Package 03D - Ready Mix Supply 1. Drawing set clarification. Work included through Addendum 4. 2. The apparent lowest responsible and responsive bidder is Ozinga Ready Mix Concrete, Inc. Bid Package 14A - Elevators 1. Drawing set clarification. Work included through Addendum 4. 2. The apparent lowest responsible and responsive bidder is TK Elevator Corporation. Bid Package 31A - Site Demolition, Earthwork, and Site Utilities 1. Drawing set clarification. Work included through Addendum 4. 2. The apparent lowest responsible and responsive bidder is Indiana Earth, Inc. 3. Includes and allowance of $100,000 for (3) sanitary manhole structures not shown on civil drawings but required. Reference Owners’ Allowance Section below. Bid Package 31B - Aggregate Piers 1. Drawing set clarification. Work included through Addendum 4. 2. The apparent lowest responsible and responsive bidder is Pier Foundations, LLC. Owners Allowances: 1. Drawing set clarification. Work included through Addendum 4. a. An allowance of $100,000 is included for (3) sanitary manhole structures that have not been included in the civil design but required. To be reconciled in Phase 2 GMP.
Project:Madison Lifestyle District - Parking Garage Date:3/20/26 2:48 PMMonths:6Weeks:26Calendar Days:182Work Days:130MATERIAL LABOR SERVICE/SUBCONTRACT LINE ITEM TOTALSCODE # LINE ITEM DESCRIPTION ITEM QUANTITYSERVICE OR LINE ITEMUNITMATERIALUNITLABORUNITSUBCONTRACTUNITTOTALQUANTITY UNIT PRICEDOLLARSPRICEDOLLARSPRICEDOLLARSPRICEDOLLARSGeneral Conditions / Staffing
Project Executive / Ops Manager0%Senior Project Manager 0wks $4,000.00100%Project Manager 26wks $4,400.00$114,400$4,400.00$114,40050%Project Engineer 13wks $2,800.00$36,400$2,800.00$36,4000%MEP Manager 0wks $3,600.000%General Superintendent 0wks $4,800.00100%Superintendent 26wks $4,800.00$124,800$4,800.00$124,80025%Safety Manager / Coordinator 7wks $4,000.00$26,000$4,000.00$26,0000%Quality Manager / Coordinator 0wks $3,200.000%Layout 0wks $500.00 $3,400.00InternAdmin AssistantVP of Preconstruction Services
Preconstruction Manager
Senior EstimatorEstimatorBIM / VDC Engineerea dy/wkScheduling Manager1.0 5 GC Staff Travel and Lodging 130days $150.00$19,500$150.00$19,500Office Trailer(s) 6mo $3,000.00$18,000$3,000.00$18,000Office Trailer Set-up & Tear Down 1ls $8,000.00$8,000$8,000.00$8,000Office Equipment & Supplies 6mo $1,000.00$6,000$1,000.00$6,000Phones / Internet / Computers 6mo $500.00$3,000$500.00$3,000Monthly Power for Trailer(s) 6mo $300.00$1,800$300.00$1,800Drinking Water 6mo $200.00$1,200$200.00$1,200Furniture in Trailer(s)
Plans / Reprographics
Additional Travel / Lodging
General Requirements
Initial Benchmark and Surveying 1ls$10,000.00$10,000$10,000.00$10,000Temporary Fencing & Maintenance IN RECAP$0Temporary Barricades 800lf$30.00$24,000$30.00$24,000Temporary Gravel (Staging / Road) 280tons$80.00$22,400$80.00$22,400Private Locates 1ls$14,000.00$14,000$14,000.00$14,000Potholing 1ls$23,000.00$23,000$23,000.00$23,000Buck HoistHoisting: Tower Crane IN RECAP$0ScaffoldingTemporary Stairs
Street Sweeper 6mo$6,000.00$36,000$6,000.00$36,000General Project Cleaning 6mo $8,000.00$48,000$8,000.00$48,000Final CleaningSafety & Fire Extinguishers 6mo $5,000.00$30,000$5,000.00$30,000Dumpsters 26ea$500.00$13,000$500.00$13,000Temporary Restrooms 6mo $2,500.00$15,000$2,500.00$15,000Temporary Heat During Construction
Temporary Water Hookup 1ea$5,000.00$5,000$5,000.00$5,000Temporary Electrical Hookup 1ea$8,000.00$8,000$8,000.00$8,000Temporary Generator*Electrical Usage During Construction 6mo $600.00$3,600$600.00$3,600*Water Usage During Construction 6mo $300.00$1,800$300.00$1,800Temporary Enclosures/Protection
Temporary Sidewalks
Temporary Signage 1ls $10,000.00$10,000$10,000.00$10,000Traffic Control 1ls$25,000.00$25,000$25,000.00$25,000Gate Security
Construction Camera 1ls$2,500.00$2,500$2,500.00$2,500Dewatering
Procore Project Management 0.075%29,644,936 $$ 0.075%$22,234$0.00$22,234Permits & Fees 1LS $10,000.00$10,000$10,000.00$10,00016 hrs/wkTrucking 416hrs $25.00$10,400$60.00$24,960$85.00$35,360Small ToolsTOTALS $160,534 $374,560 $182,900 $717,994GENERAL CONDITIONS / GENERAL REQUIREMENTSBid Event 01 - Early Foundation and Site GMP - GCs.xlsx/GC's Page 1 of 1 F. A. Wilhelm Construction Co., Inc.
Madison Lifestyle District - Parking GarageSubcontractor Bid Analysis Spreadsheet
Bid Package | 02A Temporary FencingK & K PremiumBASE BID$57,120$79,640Specifications/GeneralBid Package Standard Bid FormsubmittedsubmittedSupplemental Bid FormsubmittedsubmittedForm 96submittedsubmittedSubcontractor Qualification FormsubmittedsubmittedResponsible Bidder ChecklistN/A under $300,000submittedScope VerificationQty1. What is your footage of fence that you included?1520 LF2. Standard 6’ chain link fence?yes3. Driven posts at all gates?yes4. Did you include 2 additional trips to project site?yes5. Removal of fence upon completion of project? yes6. What type of systempanelized7. Do you see any issues with the schedule of timing for your scope? No issues8. Restoration of concrete & asphalt where there will be driven postsyesincludes fence screen with FAW logoDiversityWBE--MBE--VBE--MiscellaneousTOTALS$57,120$79,640$0$0Alternates
Alternate #1 - Payment & Performance Bond $1,123
Madison Lifestyle District - Parking GarageSubcontractor Bid Analysis SpreadsheetBid Package | 02B Tower Crane & OperatorMaximBASE BID$842,953Bid FormsBid Package Standard Bid FormsubmittedSupplemental Bid FormsubmittedForm 96submittedSubcontractor Qualification FormsubmittedResponsible Bidder ChecklistsubmittedSpecifications/GeneralDivision 00Division 01DocumentsDrawings dated 02/16/2026Specifications dated 02/13/2026Project Bid ManualGeneral Scope of WorkSpecific Scope of WorkConstruction ScheduleSite Logistics PlanSubcontract Exhibits 1 - 6Sample Subcontract Aggreement and Wilhelm Terms and ConditionsAddendum 01Addendum 02Addendum 03Addendum 04Scope Verification1. Subcontractor to include a 38-week duration for equipment. 2. Subcontractor to include 1,520 crew hours for operation of the crane.3. Subcontractor to include 380 crew hours of overtime premium.4. Subcontractor to include (1) mobilization and (1) demobilization in base bid.5. Subcontractor to include setup and tear down of tower crane.6. Tower crane shall provide 10,000 lb capacity at the tip.7. Includes all road permits.8. Includes an add for zoning / anti-collision.9. Subcontractor to include 38 weeks of necessary maintenance.10. Subcontractor to include the anchor stool for foundation work.11. Subcontractor to include foundation design.12. Subcontractor to include all the above listed items into a lump sum base bid to be evaluated.Exclusions:1. Subcontractor has excluded all sales tax on permanent in place work due to tax exempt status of Owner. 2. Subcontractor Payment and Performance Bonding.3. Electrical DiversityWBE-MBE-VBE-
Miscellaneous
Do you have included an oiler? Can we provide a deduct
TOTALS $842,953 $0 $0 $0
Alternates
Madison Lifestyle District - Parking GarageSubcontractor Bid Analysis SpreadsheetBid Package | 03A FoundationsF.A. WilhelmScott LisinskiBASE BID$1,697,000Specifications/GeneralBid Package Standard Bid FormsubmittedSupplemental Bid FormsubmittedForm 96submittedSubcontractor Qualification FormsubmittedResponsible Bidder ChecklistsubmittedSpecifications/GeneralDivision 00yesDivision 01yes03 10 00 Concrete Forming and Accessoriesyes03 20 00 Concrete Reinforcing (as applicable)yes03 30 00 Cast-in-Place ConcreteyesGeotechyesDocumentsDrawings dated 02/16/2026yesSpecifications dated 02/13/2026yesProject Bid ManualyesGeneral Scope of WorkyesSpecific Scope of WorkyesConstruction ScheduleyesSite Logistics PlanyesSubcontract Exhibits 1 - 6yesSample Subcontract Agreement and Wilhelm Terms and ConditionsyesAddendum 01yesAddendum 02yesAddendum 03yesAddendum 04yesScope Verification1. Subcontractor shall provide all structural cast-in-place concrete, forming, placing, pumping, finishing, and necessary and related materials to construct all foundations consisting of wall footing, foundation walls, elevator pit walls, platform foundation walls, mat foundations, column footings, etc. for a complete project. See exclusions below. yes2. Work includes accessories and components of the Work including curing compound or proper curing methods, water stop, expansion joints, control joints, sawcut joints, reveals, chamfer strips, hardener, etc. yes3. Includes all formwork, edge forms, block-outs, to complete the project. Formwork drawings must be submitted for review and approval. yes4. All concrete shall be formed.yes5. Subcontractor shall have a full-time non-working superintendent on the job at all times while Subcontractor’s work is being performed. This requirement applies to all work under Subcontractor’s Scope of Work. This superintendent must be present at all Subcontractor coordination meetings and safety meetings held by Contractor each week. Employees of Subcontractor shall be required to attend weekly job site safety meetings. yes6. Subcontractor shall have a full-time Project Manager on the job at all times. yes7. Subcontractor is responsible for overseeing Safety and Quality for this scope of work. yes8. Include a minimum of 8 hours per week for project clean-up. yes9. Includes overtime required to maintain the project schedule. yes10. There will be no increase in cost for the duration of the project. yes
11. Includes all layout for this Work. yes
12. Includes all required equipment, hoisting, cranes, and pumps as
required to complete concrete work.yes
13. All concrete is to be placed via pumps. yes
14. Rubbing, patching, and grouting to achieve proper finish as called for by
the Contract Documents. Review project finish requirements for any
architectural exposed or finished concrete. Include mock-ups for exposed,
finished concrete surfaces for review and approval. yes
15. Install miscellaneous embedded items furnished by others. Define
quantities if not shown for an allowance. yes
16. Casual dewatering is required to complete this scope of work, including
rain events, runoff, minimal ground water, etc. yes
17. Conformance with OSHA safety requirements.yes
18. The subcontractor is responsible for grouting structural steel base
plates.yes
19. Include concrete wash-out basin/dumpsters/area.yes
20. Include winter conditions as required within the attached Project
Schedule. yes
21. Provide all structural excavation and backfill required to complete this
Work. Includes removal of spoils off-site and backfill with approved,
suitable materials. yes
22. The subcontractor has included stone/flowable fill beneath the
foundations as shown in the documents.yes
23. The subcontractor shall include all construction and saw cut control
joints per the documents.yes
24. Subcontractor to provide foundation insulation scope and requirements.yes
25. Subcontractor to provide all damp proofing.yes
26. Subcontractor to include allowance for a concrete foundation for base
of tower crane. Assume 30’x30’x5’. yes
Exclusions:
1. Subcontractor has excluded all sales tax on permanent in place work due
to tax exempt status of Owner. yes
2. Subcontractor Payment and Performance Bonding.yes
Diversity
MBE-WBE-VBE-Miscellaneous
TOTALS $1,697,000 $0 $0 $0 $0 $0
Alternates
Alternate #1 Payment and Performance Bond $8,500
Madison Lifestyle District - Parking GarageSubcontractor Bid Analysis SpreadsheetBid Package | 03B Rebar - SupplyCMCNucorW Construction SupplyWhitecapCircle City RebarMatthew RobertsonBASE BID$297,660$299,000$310,350$328,749$366,168Bid FormsBid Package Standard Bid Formnot receivedSupplemental Bid Formnot receivedForm 96not receivedSubcontractor Qualification FormN/A, Supply onlyResponsible Bidder ChecklistSpecifications/GeneralDivision 00yesDivision 01yes03 10 00 Concrete Forming and Accessories (as applicable)yes03 20 00 Concrete Reinforcingyes03 30 00 Cast-in-Place Concrete (as applicable)yesDocumentsDrawings dated 02/16/2026yesSpecifications dated 02/13/2026yesProject Bid ManualyesGeneral Scope of WorkyesSpecific Scope of WorkyesConstruction ScheduleyesSite Logistics PlanyesSubcontract Exhibits 1 - 6yesSample Subcontract Aggreement and Wilhelm Terms and ConditionsyesAddendum 01yesAddendum 02yesAddendum 03yesAddendum 04yesScope Verification1. Supplier shall provide all fabricated reinforcing steel for the concrete foundation scope including but not limited to the following: mat foundations, column footings, foundation walls, elevator pit walls, platform foundation walls.yes2. Includes dowels extending out of this concrete scope into other concrete and CMU masonry.yes3. Includes a (20) ton fabricated reinforcing steel supply allowance for a tower crane foundation.$26,0004. Includes a (5) ton fabricated reinforcing steel supply allowance.$6,5005. Includes rebar (plain), dowels, other concrete accessories required to install reinforcing.yes6. Includes standees and bar supports.yes7. All reinforcing steel shall be cut, bent, bundled, and tagged.yes8. Includes all detailing, shop drawings, engineering, fabrication and freight to job site.yesEpoxy Bar7-8 tons, isolated to the continual footings and 3 tons in SOG area-$4,000Tons of reinforcing steel222 tons, 7tons is epoxyDBRs-$1,200Exclusions:1. Reinforcing steel for slab on grade, columns, shear walls, garage elevated decks and beams, and elevated podium deck.yes, excluded2. Installation of reinforcing steel.yes, excluded3. Subcontractor has excluded all sales tax on permanent in place work due to tax exempt status of Owner. yes, excluded4. Subcontractor Payment and Performance Bonding.N/ADiversityWBE-MBE-VBE-Miscellaneouslooking into a piece of SOG rebartrench drain, partitions?Sending detailsLead Times:
Submittals 1-2 Weeks
Engineer 1-2 Weeks
Fab 1-2 Weeks
detail 7/S305 confirming
Coupler Counts
TOTALS $324,960 $299,000 $310,350 $328,749 $366,168
Alternates
Madison Lifestyle District - Parking GarageSubcontractor Bid Analysis SpreadsheetBid Package | 03C Rebar - InstallationF.A. WilhelmBASE BID$268,400Specifications/GeneralBid Package Standard Bid FormSupplemental Bid FormForm 96Subcontractor Qualification FormResponsible Bidder ChecklistSpecifications/GeneralDivision 00Division 0103 10 00 Concrete Forming and Accessories (as applicable)03 20 00 Concrete Reinforcing03 30 00 Cast-in-Place Concrete (as applicable)DocumentsDrawings dated 02/16/2026Specifications dated 02/13/2026Project Bid ManualGeneral Scope of WorkSpecific Scope of WorkConstruction ScheduleSite Logistics PlanSubcontract Exhibits 1 - 6Sample Subcontract Aggreement and Wilhelm Terms and ConditionsAddendum 01Addendum 02Addendum 03Addendum 04Scope Verification1. Subcontractor shall install all reinforcing steel for the concrete foundation scope including but not limited to the following: mat foundations, column footings, foundation walls, elevator pit walls, platform foundation walls.2. Includes dowels extending out of this concrete scope into other concrete and CMU masonry.3. Includes a (20) ton reinforcing steel install allowance for a tower crane foundation.4. Includes a (5) ton reinforcing steel install allowance.5. Includes tie wire and other concrete accessories required to install reinforcing.6. Includes installation of standees and bar supports.7. Includes pricing for a 40-hour work week and a 50-hour work week.8. Includes full-time onsite supervision.9. Includes project management.Exclusions:1. Reinforcing steel for slab on grade, columns, shear walls, garage elevated decks and beams, and elevated podium deck.2. Supply of reinforcing steel.3. Subcontractor has excluded all sales tax on permanent in place work due to tax exempt status of Owner. 4. Subcontractor Payment and Performance Bonding.DiversityMiscellaneous
TOTALS $268,400 $0 $0 $0 $0 $0
Alternates
Madison Lifestyle District - Parking GarageSubcontractor Bid Analysis SpreadsheetBid Package | 03D Ready Mix SupplyOzingaBASE BID$867,140Bid FormsBid Package Standard Bid FormSubmitted the scope bid formSupplemental Bid FormForm 96Subcontractor Qualification FormN/A Supply onlyResponsible Bidder ChecklistSpecifications/GeneralDivision 00N/ADivision 01N/A03 10 00 Concrete Forming and Accessories yes03 20 00 Concrete Reinforcing (as applicable)yes03 30 00 Cast-in-Place ConcreteyesDocumentsDrawings dated 02/16/2026yesSpecifications dated 02/13/2026yesProject Bid ManualyesGeneral Scope of Workin reviewSpecific Scope of WorkyesConstruction ScheduleyesSite Logistics PlanyesSubcontract Exhibits 1 - 6in reviewSample Subcontract Aggreement and Wilhelm Terms and Conditionsin reviewAddendum 01yesAddendum 02yesAddendum 03yesAddendum 04yesScope Verification1. Furnish the supply of ready mix on the project for all mat foundations, column footings, foundation walls, elevator pit walls, platform foundation walls.yes2. Includes all admixtures required by specifications and Concrete Mix schedule.yes3. Includes high range on all mixes provided.yes4. Includes admixtures, hot water, trucking, plant labor, testing coordination, and quality control as outlined in the contract documents. yes5. Deliveries shall be coordinated in advance with the Construction Manager and Concrete Trade Contractor. yes6. Supplier agrees and has capacity to supply project as described in contract documents. yes7. Supplier has capacity to support and supply concrete pours in excess of 500 cy per day. yes8. Supplier will maintain a minimum relative yield of 1 for concrete. yes9. All environmental fees are included in unit prices indicated. yes
10. Ready-mix material is not subject to price escalation per the contract schedule. yes
11. Supplier shall provide all submittals, testing data, material data safety yes
12. Information, mix designs, and all other submittal requirements as listed in the yes
specifications.
13. Suppliers contract will be based on unit prices provided on bid form and field verified
quantities of supplied ready-mix. yes
14. Quantities provided are for estimating purposes only.yes
15. Subcontractor to fill out the following ready-mix pricing table, and
admixture/additives table and to submit a lump sum bid for the parking garage based off
forthcoming quantities provided.yes
Exclusions:
1. Subcontractor has excluded all sales tax on permanent in place work due to tax
exempt status of Owner.
includes tax, need
tax exemption
deduction
2. Subcontractor Payment and Performance Bonding.N/A
Diversity---Miscellaneous
TOTALS $867,140 $0
Alternates
Madison Lifestyle District - Parking GarageSubcontractor Bid Analysis SpreadsheetBid Package | 14A ElevatorsTK ElevatorBASE BID$848,000Bid FormsBid Package Standard Bid FormsubmittedSupplemental Bid FormsubmittedForm 96submittedSubcontractor Qualification FormsubmittedResponsible Bidder ChecklistsubmittedSpecifications/GeneralDivision 00yesDivision 01yes14 21 00 Electric Traction ElevatorsyesDocumentsDrawings dated 02/16/2026yes, 2/13 drawingsSpecifications dated 02/13/2026yes, will discussProject Bid ManualyesGeneral Scope of WorkyesSpecific Scope of WorkyesConstruction Scheduleyes, to further discussSite Logistics PlanyesSubcontract Exhibits 1 - 6yesSample Subcontract Aggreement and Wilhelm Terms and ConditionsyesAddendum 01yesAddendum 02yesAddendum 03yesAddendum 04yesScope Verification1. Provide, install, and test new elevators for project.yes2. Includes all signals, wiring, and cabling for a complete installation.yes3. Provide elevator sills as required.yes4. Includes all elevator cab finishes.yes5. All elevators submitted must be able to meet all of the design requirements as specified.yes, see minor clarifications6. Subcontractor shall submit a detailed schedule to be incorporated into the Project Schedule for each individual elevator included in this Subcontract. Schedule to include installation activities, pre-inspection checklist activities, pre-functional and performance testing, commissioning, final testing, project closeout, etc.yes7. All cab sizes are to be in accordance the Contract Documents. Any deviations or alternate sizes or configurations must be approved by the Architect and General Contractor (CM). Subcontractor shall provide all ceiling finishes, cab finishes, and lighting within the elevators as specified.yes, minor height difference, inside clear height is 88"8. Subcontractor shall provide all elevator door frames and vertical guide rail supports as required. Subcontractor to coordinate grouting of sills by others. If required, sill support angles will be provided and installed by others. Final layout drawings are to be provided by Elevator installer. All divider beam/intermediate support steel required by others.yes9. Subcontractor shall verify that all locations and depths of call buttons, indicator lights, etc. will work with corresponding finishes and wall thicknesses as designated in the Contract Documents.yes10. Subcontractor is responsible for verifying all dimensions of elevator shafts, pits, openings, landings, machine rooms, etc. as shown on the Contract Documents are acceptable and will not be required to change to accommodate the work of the subcontract.yes
11. Elevator subcontractor is required to coordinate all work by others in the shaft and
machine room in order to successfully install and operate the elevator per specifications
and Contract Documents. This includes but is not limited to, the responsibility to
coordinate pit receptacles, disconnects, pit lighting locations, sump pit dimensions,
general shaft layout, etc. and scheduling pre-installation and coordination meetings with
the appropriate trades as necessary.
yes, on site 10's
M-Th
12. Subcontractor shall furnish all embeds, inserts, and sleeves through walls to be
installed by others. These inserts shall be furnished in a timely manner as to not delay
the project. Subcontractor shall provide coordination and furnish approved detailed
layout drawings in a timely manner locating all inserts and sleeves being furnished by
the Subcontractor. If these items are not furnished in time, this Subcontractor shall be
responsible for all costs, including but not limited to coring, drilling, anchoring, etc.
associated with installation of elevator components where it is required. yes
13. All support steel (divider beams/intermediate support steel) for guide rail/machine
installation is to be provided and installed by others. Subcontractor shall provide
coordination and furnish approved detailed layout drawings locating all anchor inserts
required for this scope of work. If the Subcontractor does not furnish the anchor inserts,
layout drawings, and coordination at the time the formwork is constructed,
Subcontractor shall assume all costs for the use of an alternate means of anchoring.yes
14. The Subcontractor shall coordinate the installation of hoist beams, divider beams,
misc. steel at each elevator shaft to be furnished and installed by others. Subcontractor
shall verify that the location of beams does not conflict with the elevator layout in a
timely manner. This includes verification of shaft height and run-by/clearance
requirements.yes
15. All electrical wiring required for the operation of the elevators shall be provided by
this Subcontractor, with the exception of power from the source, which will be provided
by the Electrical Subcontractor to the location and with the amperage and voltage
indicated on the Electrical Plans. This Subcontractor shall be responsible for
coordinating temporary power.
no, we don't
provide temp
power, but
permanent
power will be
available
16. Subcontractor shall make provisions within the elevator cabs and equipment to
install card readers and cameras supplied by others within the cabs, including contact
points, programming, etc. Subcontractor should additionally make provisions for any
card readers located in the elevator lobbies required for the installation of this Scope of
Work with the Electrical Subcontractor.
yes, card readers
are not in all
elevators, will
follow up to
review spec, no
provisions for
cameras
17. Subcontractor shall provide elevator mechanics as required to operate platforms
and cabs to facilitate elevator inspections required by the Authority Having Jurisdiction.yes
18. Subcontractor shall provide elevator mechanics to operate platforms and cabs as
required by code for other trades to complete work in the shaft, cab, and lobby
including but not limited to concrete, masonry, electrical, steel, fire caulking, plumbing,
and finishes installation. Unit pricing for this work is listed as an alternate under the
“Subcontractors Work” section in this Subcontract. $ 40,000
19. Subcontract shall provide an accounting breakout for a line item for each individual
elevator for a total of 4 line item breakouts.yes, will provide
20. This Subcontractor is responsible for and shall participate in all tests and inspections
related to the elevators, including fire alarm tests, life safety tests, and inspections at no
additional cost. If re-inspection is required and is not due to the fault of this
Subcontractor, Subcontractor shall be reimbursed.
yes, what is
required by code
21. This Subcontractor shall obtain and pay for all licenses and permits required for the
work of this Subcontract.yes
22. Subcontractor is responsible for providing a safe work environment. This
Subcontractor shall maintain fall protection (initially installed by others) for open
hoistways during the installation of this work, including but not limited to removable
barricades, toeboards, falling debris protection, safety netting, and temporary work
platforms. All equipment, lifts, scaffolding, etc. shall conform to OSHA and site-specific
safety requirements.yes
23. Subcontractor will include rebalancing and final adjustments of the elevator cabs
after the architectural finishes have been installed.yes
24. Subcontractor shall clean hoistways, cars, car enclosures, entrances, operating and
signal fixtures, machine room, machine room equipment, and fire status equipment.yes
25. Subcontractor includes the testing and commissioning of all equipment and systems
installed under the work of this Subcontract. Subcontractor is responsible for taking
corrective action to address any items deemed as non-conforming or non-compliant by
the commissioning agent.
yes if it is the
state inspector
26. Subcontractor shall provide any special tools or parts as required by the Contract
Documents for attic stock. (Stored at Subcontractor’s Indianapolis branch)yes
27. Subcontractor will furnish any inserts or embeds required to be installed in CMU or
concrete walls or slabs. yes
28. Subcontractor to include elevator pit ladder.yes
29. Subcontractor is responsible for all hoisting, rigging and staging of materials and
Work.
yes, ask for a
staging area,
rollable access
within 100ft of
hoistway area,
laydown 30x20
30. Verify requirements and who is providing the hoist beam, machine beams, etc.
yes, by others,
hoistbeam and
safety beam
31. Subcontractor shall perform a pre-inspection check list notifying the Construction
manager of any Work that needs to be completed by other trades. This Work will be
completed prior to this Subcontractor requesting a Temporary or Final State inspection. yes
Exclusions:
1. Subcontractor has excluded all sales tax on permanent in place work due to tax
exempt status of Owner. yes
2. Subcontractor Payment and Performance Bonding.yes
Diversity
Miscellaneous
Plastic laminate on wood (spec) - included in base bid
Rate speed
*150, need to
have 200 and
absorb any cost
implications
Construction Use - # of days/units (not included)not needed
Maintenance Contract? Who has responsibility by Owner
12 month pricing
14-16 Weeks Fabrication
2 Weeks delivery
6-8 Weeks, per unit, 2 crews installation
TOTALS $888,000 $0 $0 $0
Alternates
Alterante #1: Payment and Performance $14,840
MADISON GARAGE - SOUTH BENDSubcontractor Bid Analysis SpreadsheetBid Package | 31A Site Demolition, Earthwork, & Site UtilitiesIndiana EarthRitschardBASE BID$1,100,000$1,927,126Bid FormsBid Package Standard Bid FormyesSupplemental Bid FormyesForm 96yesSubcontractor Qualification FormyesResponsible Bidder ChecklistyesSAM.govUnique ID #Specifications/GeneralDivision 00yesDivision 01yesC003 EarthworkyesC003 DemolitionyesC003 ExecutionyesC003 Storm SeweryesPreliminary Geotechnical Investigation Report by Atlas, August 21, 2024.yesDocumentsDrawings dated 02/16/2026yesSpecifications dated 02/13/2026yesProject Bid ManualyesGeneral Scope of WorkyesSpecific Scope of WorkyesConstruction ScheduleyesSite Logistics PlanyesSubcontract Exhibits 1 - 6yesSample Subcontract Aggreement and Wilhelm Terms and ConditionsyesAddendum 01yesAddendum 02yesAddendum 03yesAddendum 04yesScope Verification1. Subcontractor to provide all labor, materials, and equipment for the mass grading cut & fill inclusive of trenching & backfill for site utility work.yes2. Subcontractor has included multiple mobilizations to site to accomplish all work included in this scope of work package and recognized and includes all construction phasing of the project.yes3. Subcontractor has received and reviewed the preliminary geotechnical report for this site and has incorporated any and all methods required to complete the work.yes, using soils from storm system, and should finish on balanced site4. Installation, maintenance and removal of all erosion and sedimentation control measures for the project inclusive of silt fencing, check dams, concrete washout, stone entrances, inlet protection, sediment basins, filter waddles, stormwater control plan, temporary slope protection including all street cleaning of access streets at site entrances as required. Replace materials as needed and provide required inspections for entire duration of project.yes, In compliance with sheet C5005. Site demolition, saw cutting and removal as shown on drawings, including concrete/asphalt pavements, curbs, sidewalk, signage, stone, wall, concrete bases, wheel stops, overhead electric, plantings, and clear & grub trees, etc. as indicated on site demolition documents. Light poles to be removed, salvaged, and turned over to owner. yes6. Includes legal removal/disposal of all spoils and demolished materials per this scope of work. Subcontractor has included removal of all existing site utilities as shown on the documents inclusive of manholes, catch basins etc.yes, except for fiber/over head electrical - those to be removed by utliity company7. Subcontractor has included the concrete inlet collars.yes8. Includes installation of site entrances, stone entrance areas, wash-off stations, etc.yes9. The subcontractor has included stripping and hauling off existing topsoil. yes10. Subcontractor has included all materials, equipment, and labor for all Site Grading/Drainage inclusive of all mass cut & fill, rough & fine grading for both parking lots and building pad and new detention basins.yes11. Subcontractor has included all layout and staking for all cuts/fills, utilities, rough/fine grading, and concrete curbs & sidewalks.yes, no sidewalks noted12. The subcontractor has included all import borrow and haul off that may be required to achieve a balanced site and intended drainage contours as shown on the documents.to review
13. Stockpile of approved backfill material will be stored on-site in the area designated on
plans.yes
14. Subcontractor has included all final and fine grading of site to +/- 0.10 feet of required
subgrade elevations.yes
15. Maintain the site in a well graded condition to permit water run-off and prevent
demucking.
yes if needed, flat
site
16. Furnish and install stone subbase for all concrete sidewalks, asphalt and concrete
pavement.N/A
17. Include scratching out of subgrade and aggregate base for concrete curbs, both integral
and freestanding.no curbs shown
18. The subcontractor shall include private utility locates.yes
19. Subcontractors shall provide any hydro excavation required to locate existing utilities.yes, if needed
20. Provide fully compacted and approved subgrades for building pads and site hardscapes.yes
21. This subcontractor has included under drain tile, inclusive of all drainage gravel as
required by the documents.N/A
22. The subcontractor has included all dewatering as required.
yes, but no deep
well dewatering
required
23. Temporary shoring for utility and excavation work including support and protection of
existing utilities.
no shoring will be
required, trench
boxes included
24. Include maintenance of traffic for final connections to existing utilities.
yes and patching
road of main
street, remove
and replace curbs
25. All storm water piping, structures, catch basins, drain basins, and end sections inclusive
of all trenching, excavation, backfill, bedding and grouting of structures as required for
proper flow diversion.
structures, pipes,
storm systems,
castings, no end
sections
26. Include storm piping and final connections to site trench drains. Trench drains to be
furnished and installed by others.
includes piping
on C400
27. Subcontractor has included all new water lines as shown on the documents inclusive of
trenching, pipe bedding, piping, tracer wire, caution tape and compacted backfill.
yes water lines on
C400
28. The subcontractor has included all fire hydrants, PIVs’ and water valves connections as
shown or required by City of South Bend.
water valves, but
no fire hydrants
shown
29. Include the stubbing up of the fire protection line up to and including the flange within
the mechanical room.
yes into building,
1' AFF
30. The subcontractor has included all new sanitary sewer lines and sanitary structures as
shown on the documents inclusive of excavation, pipe bedding, piping, tracer wire, caution
tape and compacted backfill.
yes, no sanitary
structures shown
31. Include camera, video and reports for all storm and site utilities yes
32. The subcontractor shall adhere to all CM qualifications and safety orientation
procedures, background checks, E-Verification, drug testing and other defined requirements
identified in the proposal process.yes
33. The subcontractor has included all site utilities inclusive of domestic water, fire water,
sanitary and storm rain leaders as indicated in documents, including final connections at a
point 5’ outside of the building unless noted otherwise.
yes, water to be
inside building
34. The subcontractor has included all fire service and meter vaults.
no meter vaults
shown
35. The subcontractor has included removal of all temporary stone to return to prior
conditions, seeding by others.yes
36. This scope requires verification of all existing invert elevations and tie-in points prior to
starting work. yes
37. Proper care shall be taken to avoid tracking debris, trash, and mud onto public streets
or adjacent properties. Mud or excess dirt on public streets resulting from work operations
shall be cleaned daily. The bidder shall have the necessary equipment and personnel
available onsite during all working hours to handle any emergency cleanup.yes, for this scope
38. Dust control is included for this scope.yes if required
39. Traffic control, permitting, flaggers, barricades, temporary officers, etc. as required for
this scope of work.yes
40. Temporary seeding.yes if needed
41. As-Builts of all installed materials as required by City of South Bend.Yes
(3) sanitary manholes not shown on drawings $100,000
Exclusions:
1. Subcontractor has excluded all sales tax on permanent in place work due to tax exempt
status of Owner. yes
2.Subcontractor Payment and Performance Bonding.yes
$400/load, 68 loads $27,200
Storm tech - MC7200, bottom of stone 7'9"
Diversity
MBE
WBE
VBE
up to 2%
Miscellaneous
Mobilize April 22nd
Establish buidling pad 4 weeks
Alternate #1 13000
TOTALS $1,240,200 $1,927,126 $0 $0 $0 $0
Alternates
Alternate #1 $13,000
Madison Lifestyle District - Parking GarageSubcontractor Bid Analysis SpreadsheetBid Package | 31B Aggregate PiersPier FoundationsGeopierSubsurfaceBASE BID$285,700$334,000$582,400Bid FormsBid Package Standard Bid FormsubmittedSupplemental Bid FormsubmittedForm 96submittedSubcontractor Qualification FormsubmittedResponsible Bidder ChecklistsubmittedSpecifications/GeneralDivision 00yesDivision 01yesSheet S002 Rammed Aggregate Pier System Specificationsyes31 66 13.13 Rammed Aggregate PiersyesPreliminary Geotechnical Investigation Report by Atlas, August 21, 2024.yesDocumentsDrawings dated 02/16/2026yesSpecifications dated 02/13/2026yesProject Bid ManualyesGeneral Scope of WorkyesSpecific Scope of WorkyesConstruction ScheduleyesSite Logistics PlanyesSubcontract Exhibits 1 - 6yesSample Subcontract Aggreement and Wilhelm Terms and ConditionsyesAddendum 01yesAddendum 02yesAddendum 03yesAddendum 04yesScope Verification1. Subcontractor to include all equipment, material, labor, and supervision necessary to design and install aggregate pier system complete, and to perform soil and aggregate pier testing.yes2. Subcontractor to include allowance for additional tower crane base. See Site Logistics Plan provided for reference to location. Size subject to change.yes3. Subcontractor to provide a fully designed system for aggregate piers to meet the specifications required by the building against the conditions from the Geotechnical Report provided. yes4. Design submittal to be signed and sealed by an Indiana Professional Engineer.yes5. Includes the designing, furnishing, installing, monitoring, and testing of the densified aggregate pier foundations to the lines and grades designated on the project foundation plan and as specified herein. yes6. The Aggregate pier designer shall determine the number of piers, diameters, and depth of piers. yes7. The design must rely on subsurface information presented in the project geotechnical report. The information on ground conditions must be assessed to determine its suitability for the specified ground improvement system. yes8. The aggregate piers to be columns of compacted aggregate constructed in a columnar-type configuration to produce an intermediate foundation system for support of foundation loads to achieve the degree of improvement (allowable bearing capacity for maximum allowable settlements).yes9. The piers can be constructed with a down-hole vibratory probe, displacement mandrel system, or a down-hole tamper. yes10. Subcontractor to prep site, and predrill as necessary, for the installation and layout of aggregate piers.yes, prep site - assumes pad is proof rolled, will provided stoned if winter, not needed if summer11. Subcontractor shall be responsible for determining and implementing the systems and criteria necessary to ensure that the specified performance is achieved. yes12. Subcontractor to provide all handling and hauling of spoils generated by this scope of work. no, spoil volume 1000cy, $3500013. Include layout of aggregate piers from benchmarks and control points provided by others.yes
Exclusions:
1. Subcontractor has excluded all sales tax on permanent in place work due
to tax exempt status of Owner. yes
2. Subcontractor Payment and Performance Bonding.yes
SAM.gov confirmed
Diversity
MBE-WBE ~20% $57,000
VBE-Miscellaneous
Post Bid
Safety records
Duration 2-3Weeks
Alternate #1 Payment & Performance Bond 8,571.00$ TOTALS $294,271 $334,000 $582,400 $0 $0 $0
Alternates
$8,571
#Activity IDActivity NameOriginalDurationRemainingDurationStartFinish1Madison Street Lifestyle DistrictMadison Street Lifestyle District72772713-Jan-2617-Nov-282MilestonesMilestones71071005-Feb-2617-Nov-283Design PhaseDesign Phase11311316-Feb-2627-Jul-264DMILE1000100% DD Drawings - Garage, Multifamily, Hotel, Site0016-Feb-265DMILE1010Early Garage Bid Package - Bid Documents Complete0016-Feb-266DMILE1015State Foundation Release - Garage and Podium0020-Mar-267DMILE1030100% CD Drawings - Garage, Multifamily, Hotel, Site0026-Jun-268DMILE1040Garage Bid Package - Bid Documents Complete0013-Jul-269DMILE1050State Design Release - Project Wide0027-Jul-2610Contractural MilestonesContractural Milestones40640605-Feb-2609-Sep-2711CMILE1000Site Available to Construction0005-Feb-26*12CMILE1010Final Garage/Site GMP to City of South Bend0031-Aug-2613CMILE1020Garage/Site - Notice to Proceed to FAW0016-Sep-2614CMILE1030Garage - Substantial Completion0012-Jul-2715CMILE1040Garage - Final Completion0026-Jul-2716CMILE1050Site Final Completion0009-Sep-2717Construction MilestonesConstruction Milestones68168118-Mar-2617-Nov-2818Site MilestonesSite Milestones37737718-Mar-2609-Sep-2719SITEMIL1000Mobilization0018-Mar-2620SITEMIL1010Site Secure and Ready for Construction0014-Apr-2621SITEMIL1020Earthwork Start0029-Apr-2622SITEMIL1030Final Site Completion0009-Sep-2723SITEMIL1040Weather Break 20270005-Apr-27*24Garage/Podium MilestonesGarage/Podium Milestones27527525-Jun-2626-Jul-2725GAMILE1000Garage Foundation Start0025-Jun-2626GAMILE1010Garage Foundation Complete0020-Aug-2627GAMILE1020Start Podium Foundations0021-Aug-2628GAMILE1030Podium Foundations Complete0025-Sep-2629GAMILE1040Start Elevated Garage Structure0012-Oct-2630GAMILE1050Start Podium Structure0012-Oct-2631GAMILE1060Complete Garage Elevated Structure0018-Feb-2732GAMILE1070Podium Structure Complete0015-Dec-2633GAMILE1080Start Enclosures0002-Dec-2634GAMILE1090Complete Enclosures0004-Mar-2735GAMILE1100Start Shafts0023-Nov-2636GAMILE1110Complete Shafts0025-Feb-2737GAMILE1120Building Dry In0025-Mar-2738GAMILE1130Start Punchlist0013-Jul-2739GAMILE1140Complete Punchlist0026-Jul-2740Multifamily MilestonesMultifamily Milestones48148131-Dec-2617-Nov-2841MFMIL1000Start Multifamily Construction0031-Dec-2642MFMIL1010Complete Multifamily Construction0017-Nov-2843Hotel MilestonesHotel Milestones39039016-Dec-2627-Jun-2844HOTMIL1000Start Hotel Construction0016-Dec-26*45HOTMIL1010Complete Hotel Construction0027-Jun-2846Design PhaseDesign Phase13813813-Jan-2627-Jul-2647DES1000Design Development Drawings - Garage, Multifamily, Hotel, Site252513-Jan-2616-Feb-2648DES1010DD Team Review - Garage, Multifamily, Hotel, Site151516-Feb-2606-Mar-2649DES1020Early Release Set for State Foundation Release - Garage/Site0006-Mar-2650DES1025State Early Foundation Release101009-Mar-2620-Mar-2651DES1030Construction Documents - Garage, Multifamily, Hotel, Site797909-Mar-2626-Jun-2652DES1040CD Team Review - Garage, Multifamily, Hotel, Site9929-Jun-2610-Jul-2653DES1050Bid Documents - Garage/Site101029-Jun-2613-Jul-2654DES1060100% Permit Set101029-Jun-2613-Jul-2655DES1070State Design Review Period101014-Jul-2627-Jul-2656PermittingPermitting33733723-Mar-2619-Jul-2757PERMIT0900City of South Bend - Foundation Permit101023-Mar-2603-Apr-2658PERMIT1000City of South Bend - Permitting Review (Garage)303028-Jul-2608-Sep-2659PERMIT1010General Building Permit Obtained (Garage)0008-Sep-2660PERMIT1020Final Inspections (Garage)5513-Jul-2719-Jul-2761PERMIT1030Certificate of Occupancy (Garage)0019-Jul-2762ProcurementProcurement23823803-Feb-2611-Jan-2763Site / Parking GarageSite / Parking Garage23823803-Feb-2611-Jan-2764Early Foundation, Site, Elevator Bid PackagesEarly Foundation, Site, Elevator Bid Packages414103-Feb-2631-Mar-26JanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMar202620272028202917-Nov-28, Madison Street Lifestyle D 17-Nov-28, Milestones27-Jul-26, Design Phase100% DD Drawings - Garage, Multifamily, Hotel, SiteEarly Garage Bid Package - Bid Documents CompleteState Foundation Release - Garage and Podium100% CD Drawings - Garage, Multifamily, Hotel, SiteGarage Bid Package - Bid Documents CompleteState Design Release - Project Wide09-Sep-27, Contractural MilestonesSite Available to ConstructionFinal Garage/Site GMP to City of South BendGarage/Site - Notice to Proceed to FAWGarage - Substantial CompletionGarage - Final CompletionSite Final Completion17-Nov-28, Construction Milestones09-Sep-27, Site MilestonesMobilizationSite Secure and Ready for ConstructionEarthwork StartFinal Site CompletionWeather Break 202726-Jul-27, Garage/Podium MilestonesGarage Foundation StartGarage Foundation CompleteStart Podium FoundationsPodium Foundations CompleteStart Elevated Garage StructureStart Podium StructureComplete Garage Elevated StructurePodium Structure CompleteStart EnclosuresComplete EnclosuresStart ShaftsComplete ShaftsBuilding Dry InStart PunchlistComplete Punchlist17-Nov-28, Multifamily MilestonesStart Multifamily ConstructionComplete Multifamily Construction27-Jun-28, Hotel MilestonesStart Hotel ConstructionComplete Hotel Construction27-Jul-26, Design PhaseDesign Development Drawings - Garage, Multifamily, Hotel, SiteDD Team Review - Garage, Multifamily, Hotel, SiteEarly Release Set for State Foundation Release - Garage/SiteState Early Foundation ReleaseConstruction Documents - Garage, Multifamily, Hotel, SiteCD Team Review - Garage, Multifamily, Hotel, SiteBid Documents - Garage/Site100% Permit SetState Design Review Period19-Jul-27, PermittingCity of South Bend - Foundation PermitCity of South Bend - Permitting Review (Garage)General Building Permit Obtained (Garage)Final Inspections (Garage)Certificate of Occupancy (Garage)11-Jan-27, Procurement11-Jan-27, Site / Parking Garage31-Mar-26, Early Foundation, Site, Elevator Bid PackagesRemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestoneData Date = 13-Jan-26Schedule Printed on 13-Feb-26, at 10:06Page 1 of 4Madison Street Lifestyle DistrictFull Schedule - Standard Layout
#Activity IDActivity NameOriginalDurationRemainingDurationStartFinish65PROCU1000Develope Early Garage Bid Packages101003-Feb-2616-Feb-2666PROCU1010Issue Early Garage Bid Package0016-Feb-26*67PROCU1020Prebid Meeting0017-Feb-26*68PROCU1030Contractor Bidding Period222216-Feb-2617-Mar-2669PROCU1040Early Garage Bid Packages Due0017-Mar-26*70Subcontractor BuyoutSubcontractor Buyout101018-Mar-2631-Mar-2671SBOEGA1000Earthwork Package101018-Mar-2631-Mar-2672SBOEGA1010Foundations Package101018-Mar-2631-Mar-2673SBOEGA1020Elevator Package101018-Mar-2631-Mar-2674Balance of Garage Bid PackagesBalance of Garage Bid Packages454522-Jun-2624-Aug-2675PROCU1050Develope Garage Bid Packages151522-Jun-2613-Jul-2676PROCU1060Issue Garage Bid Packages0014-Jul-2677PROCU1070Contractor Bidding Period202014-Jul-2610-Aug-2678PROCU1080Garage Bid Package Due0010-Aug-2679Subcontractor BuyoutSubcontractor Buyout101011-Aug-2624-Aug-2680SBOGA1000CIP Concrete Package5511-Aug-2617-Aug-2681SBOGA1010Structural Steel Package101011-Aug-2624-Aug-2682SBOGA1020Masonry Package101011-Aug-2624-Aug-2683SBOGA1030Misc Metals Package101011-Aug-2624-Aug-2684SBOGA1040Roofing Package101011-Aug-2624-Aug-2685SBOGA1050General Trades Package101011-Aug-2624-Aug-2686SBOGA1060Painting Package101011-Aug-2624-Aug-2687SBOGA1070Doors / Frames / Hardware Package101011-Aug-2624-Aug-2688SBOGA1080Fire Sprinkler Package5511-Aug-2617-Aug-2689SBOGA1090Mechanical Package5511-Aug-2617-Aug-2690SBOGA1100Electrical Package5511-Aug-2617-Aug-2691Garage SubmittalsGarage Submittals13213201-Apr-2606-Oct-2692SUBMIT1000Foundation Submittals202001-Apr-2628-Apr-2693SUBMIT1010Elevator Submittals303001-Apr-2612-May-2694SUBMIT1020CIP Concrete Elevated Structure Submittals202018-Aug-2615-Sep-2695SUBMIT1030Masonry Submittals202025-Aug-2622-Sep-2696SUBMIT1040Steel Submittals303025-Aug-2606-Oct-2697SUBMIT1050Roofing Submittals202025-Aug-2622-Sep-2698SUBMIT1060Finish Submittals202025-Aug-2622-Sep-2699SUBMIT1070Doors/Frames/Hardware Submittals202025-Aug-2622-Sep-26100SUBMIT1080Mechanical Package Submittals202018-Aug-2615-Sep-26101SUBMIT1090Fire Suppression Shop Drawings303018-Aug-2629-Sep-26102SUBMIT1100Electrical Power Submittals202018-Aug-2615-Sep-26103SUBMIT1110Lighting Submittals202018-Aug-2615-Sep-26104Fabrication and DeliveriesFabrication and Deliveries17717729-Apr-2611-Jan-27105FAB1000Foundation Rebar Fabrication5529-Apr-2605-May-26106FAB1010Elevated Structure Rebar Fabrication101016-Sep-2629-Sep-26107FAB1020Steel Fabrication404007-Oct-2603-Dec-26108FAB1030Elevator Fabrication12012013-May-2630-Oct-26109FAB1040Doors/Frames/Hardware Lead Time606023-Sep-2617-Dec-26110FAB1050Air Handler Lead Time606016-Sep-2610-Dec-26111FAB1060Switchgear/Power Distribution Lead Time808016-Sep-2611-Jan-27112FAB1070Lighting Lead Time404016-Sep-2610-Nov-26113ConstructionConstruction68168118-Mar-2617-Nov-28114Site ConstructionSite Construction37737718-Mar-2609-Sep-27115Site LogisticsSite Logistics24524518-Mar-2604-Mar-27116LOG1000Mobilize to Site5518-Mar-26*25-Mar-26117LOG1010Perform Utility Locates5525-Mar-2601-Apr-26118LOG1020Install Construction Fencing101001-Apr-2614-Apr-26119LOG1030Set Trailers5515-Apr-2621-Apr-26120LOG1040Install SWPPP5522-Apr-2628-Apr-26121LOG1050Set Tower Crane5518-Jun-2625-Jun-26122LOG1060Tower Crane Duration18018018-Jun-2604-Mar-27123LOG1070Remove Tower Crane5526-Feb-2704-Mar-27124Site Clearing / Mass ExcavationSite Clearing / Mass Excavation151529-Apr-2619-May-26125EXC1000Site Clearing, Mass Excavtion, Grading101029-Apr-2612-May-26126EXC1010Establish Building Pad5513-May-2619-May-26127Site FinishesSite Finishes707002-Jun-2709-Sep-27128SITEFIN1000Site Grading / Hardscape Prep151502-Jun-27*22-Jun-27129SITEFIN1010Curbs5523-Jun-2729-Jun-27130SITEFIN1020Concrete Walks, Drives, and Patios151530-Jun-2721-Jul-27JanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMar2026202720282029Develope Early Garage Bid PackagesIssue Early Garage Bid PackagePrebid MeetingContractor Bidding PeriodEarly Garage Bid Packages Due31-Mar-26, Subcontractor BuyoutEarthwork PackageFoundations PackageElevator Package24-Aug-26, Balance of Garage Bid PackagesDevelope Garage Bid PackagesIssue Garage Bid PackagesContractor Bidding PeriodGarage Bid Package Due24-Aug-26, Subcontractor BuyoutCIP Concrete PackageStructural Steel PackageMasonry PackageMisc Metals PackageRoofing PackageGeneral Trades PackagePainting PackageDoors / Frames / Hardware PackageFire Sprinkler PackageMechanical PackageElectrical Package06-Oct-26, Garage SubmittalsFoundation SubmittalsElevator SubmittalsCIP Concrete Elevated Structure SubmittalsMasonry SubmittalsSteel SubmittalsRoofing SubmittalsFinish SubmittalsDoors/Frames/Hardware SubmittalsMechanical Package SubmittalsFire Suppression Shop DrawingsElectrical Power SubmittalsLighting Submittals11-Jan-27, Fabrication and DeliveriesFoundation Rebar FabricationElevated Structure Rebar FabricationSteel FabricationElevator FabricationDoors/Frames/Hardware Lead TimeAir Handler Lead TimeSwitchgear/Power Distribution Lead TimeLighting Lead Time17-Nov-28, Construction09-Sep-27, Site Construction04-Mar-27, Site LogisticsMobilize to SitePerform Utility LocatesInstall Construction FencingSet TrailersInstall SWPPPSet Tower CraneTower Crane DurationRemove Tower Crane19-May-26, Site Clearing / Mass ExcavationSite Clearing, Mass Excavtion, GradingEstablish Building Pad09-Sep-27, Site FinishesSite Grading / Hardscape PrepCurbsConcrete Walks, Drives, and PatiosRemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestoneData Date = 13-Jan-26Schedule Printed on 13-Feb-26, at 10:06Page 2 of 4Madison Street Lifestyle DistrictFull Schedule - Standard Layout
#Activity IDActivity NameOriginalDurationRemainingDurationStartFinish131SITEFIN1030Stone Subbase for Paved Areas5522-Jul-2728-Jul-27132SITEFIN1040Base Course Asphalt5529-Jul-2704-Aug-27133SITEFIN1050Suface Course Asphalt5505-Aug-2711-Aug-27134SITEFIN1060Topsoil101005-Aug-2718-Aug-27135SITEFIN1070Seeding and Sod101019-Aug-2701-Sep-27136SITEFIN1080Landscaping151519-Aug-2709-Sep-27137Site UtilitiesSite Utilities505006-Apr-2715-Jun-27138SITEUT1000Storm Sewer202006-Apr-2703-May-27139SITEUT1010Sanitary Sewer202020-Apr-2717-May-27140SITEUT1020Water Main and Hydrants303004-May-2715-Jun-27141Street/Public Right AwayStreet/Public Right Away333323-Jun-2709-Aug-27142SITEUT1030Close Main Street for Round About Construction1123-Jun-2723-Jun-27143SITEUT1040Demo Intersection3324-Jun-2728-Jun-27144SITEUT1045Storm Sewer5529-Jun-2706-Jul-27145SITEUT1050Prep/Stone Subbgrade3307-Jul-2709-Jul-27146SITEUT1060Curbs/Cross Walks101012-Jul-2723-Jul-27147SITEUT1070Asphalt/Concrete Paving101026-Jul-2706-Aug-27148SITEUT1080Open Main Street to Traffic1109-Aug-2709-Aug-27149Garage / Podium ConstructionGarage / Podium Construction29029020-May-2612-Jul-27150Garage StructureGarage Structure22522520-May-2608-Apr-27151FoundationsFoundations757520-May-2603-Sep-26152FOUND0910Aggregate Piers202020-May-2617-Jun-26153FOUND0990Foundation Excavation101018-Jun-2601-Jul-26154FOUND1000Form, Rebar, and Pour Foundations404025-Jun-2620-Aug-26155FOUND1010Foundation Waterproofing101014-Aug-2627-Aug-26156FOUND1030Foundation Backfill101021-Aug-2603-Sep-26157Slab on GradeSlab on Grade101028-Sep-2609-Oct-26158SOG1000Prep, Reinforce, Pour, and Finish Slab on Grade101028-Sep-2609-Oct-26159Elevated DecksElevated Decks909012-Oct-2618-Feb-27160DECKS1000Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 2151512-Oct-2630-Oct-26161DECKS1010Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 3151502-Nov-2620-Nov-26162DECKS1020Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 4151523-Nov-2615-Dec-26163DECKS1030Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 5151516-Dec-2607-Jan-27164DECKS1040Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 6151508-Jan-2728-Jan-27165DECKS1050Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 7151529-Jan-2718-Feb-27166ShaftsShafts959523-Nov-2608-Apr-27167SHAFTS1000CMU Shafts - Level 1101023-Nov-2608-Dec-26168SHAFTS1010CMU Shafts - Level 2101009-Dec-2622-Dec-26169SHAFTS1020CMU Shafts - Level 3101023-Dec-2607-Jan-27170SHAFTS1030CMU Shafts - Level 4101008-Jan-2721-Jan-27171SHAFTS1040CMU Shafts - Level 5101022-Jan-2704-Feb-27172SHAFTS1050CMU Shafts - Level 6101005-Feb-2718-Feb-27173SHAFTS1060CMU Shafts - Level 7101012-Feb-2725-Feb-27174SHAFTS1070Steel Framed Stairs202026-Feb-2725-Mar-27175SHAFTS1080Pour Stair Treds101026-Mar-2708-Apr-27176Podium ConstructionPodium Construction909007-Aug-2615-Dec-26177PODIUM0900Foundation Excavation101007-Aug-2621-Aug-26178PODIUM1000Form, Rebar, and Pour Foundations252521-Aug-2625-Sep-26179PODIUM1005Foundation Backfill101028-Sep-2609-Oct-26180PODIUM1010Form, Rebar, Pour, Shore, Strip Podium Structure454512-Oct-2615-Dec-26181EnclosureEnclosure808002-Dec-2625-Mar-27182ENCL1000CMU Enclosures - Level 1101002-Dec-2615-Dec-26183ENCL1010CMU Enclosures - Level 2101016-Dec-2630-Dec-26184ENCL1020CMU Enclosures - Level 3101031-Dec-2614-Jan-27185ENCL1030CMU Enclosures - Level 4101015-Jan-2728-Jan-27186ENCL1040CMU Enclosures - Level 5101029-Jan-2711-Feb-27187ENCL1050CMU Enclosures - Level 6101012-Feb-2725-Feb-27188ENCL1060CMU Enclosures - Level 7101019-Feb-2704-Mar-27189ENCL1070Penthouse Framing, Sheathing, and EIFS151505-Mar-2725-Mar-27190ElevatorsElevators404026-Feb-2722-Apr-27191ELEV1000Install Elevators404026-Feb-2722-Apr-27192MechanicalMechanical21521504-Sep-2612-Jul-27193MECH0900Underground Plumbing151504-Sep-2625-Sep-26194MECH1000Mechanical Rough In606009-Dec-2604-Mar-27195MECH1010Plumbing Rough In606028-Sep-2622-Dec-26196MECH1020Air Handling Units202026-Mar-2722-Apr-27JanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMar2026202720282029Stone Subbase for Paved AreasBase Course AsphaltSuface Course AsphaltTopsoilSeeding and SodLandscaping15-Jun-27, Site UtilitiesStorm SewerSanitary SewerWater Main and Hydrants09-Aug-27, Street/Public Right AwayClose Main Street for Round About ConstructionDemo IntersectionStorm SewerPrep/Stone SubbgradeCurbs/Cross WalksAsphalt/Concrete PavingOpen Main Street to Traffic12-Jul-27, Garage / Podium Construction08-Apr-27, Garage Structure03-Sep-26, FoundationsAggregate PiersFoundation ExcavationForm, Rebar, and Pour FoundationsFoundation WaterproofingFoundation Backfill09-Oct-26, Slab on GradePrep, Reinforce, Pour, and Finish Slab on Grade18-Feb-27, Elevated DecksForm, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 2Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 3Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 4Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 5Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 6Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 708-Apr-27, ShaftsCMU Shafts - Level 1CMU Shafts - Level 2CMU Shafts - Level 3CMU Shafts - Level 4CMU Shafts - Level 5CMU Shafts - Level 6CMU Shafts - Level 7Steel Framed StairsPour Stair Treds15-Dec-26, Podium ConstructionFoundation ExcavationForm, Rebar, and Pour FoundationsFoundation BackfillForm, Rebar, Pour, Shore, Strip Podium Structure25-Mar-27, EnclosureCMU Enclosures - Level 1CMU Enclosures - Level 2CMU Enclosures - Level 3CMU Enclosures - Level 4CMU Enclosures - Level 5CMU Enclosures - Level 6CMU Enclosures - Level 7Penthouse Framing, Sheathing, and EIFS22-Apr-27, ElevatorsInstall Elevators12-Jul-27, MechanicalUnderground PlumbingMechanical Rough InPlumbing Rough InAir Handling UnitsRemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestoneData Date = 13-Jan-26Schedule Printed on 13-Feb-26, at 10:06Page 3 of 4Madison Street Lifestyle DistrictFull Schedule - Standard Layout
#Activity IDActivity NameOriginalDurationRemainingDurationStartFinish197MECH1030Test and Balance5506-Jul-2712-Jul-27198ElectricalElectrical18518504-Sep-2628-May-27199ELEC0900Underground Electrical151504-Sep-2625-Sep-26200ELEC1000Electrical Power Entrance and Distribution606012-Jan-2705-Apr-27201ELEC1020Lighting Level 1101014-May-2728-May-27202ELEC1030Lighting Level 2101007-May-2721-May-27203ELEC1040Lighting Level 3101030-Apr-2714-May-27204ELEC1050Lighting Level 4101023-Apr-2707-May-27205ELEC1060Lighting Level 5101016-Apr-2730-Apr-27206ELEC1070Lighting Level 6101009-Apr-2723-Apr-27207ELEC1080Lighting Level 7101002-Apr-2716-Apr-27208Finishes and EquipmentFinishes and Equipment12512515-Jan-2712-Jul-27209FINEQ1000Lobby Finishes - 1st Level151521-Jun-2712-Jul-27210FINEQ1010Painting - 1st Level101015-Jan-2728-Jan-27211FINEQ1020Lobby Finishes - 2nd Level151507-Jun-2725-Jun-27212FINEQ1030Painting - 2nd Level101029-Jan-2711-Feb-27213FINEQ1040Lobby Finishes - 3rd Level151521-May-2711-Jun-27214FINEQ1050Painting - 3rd Level101012-Feb-2725-Feb-27215FINEQ1060Lobby Finishes - 4th Level151507-May-2727-May-27216FINEQ1070Painting - 4th Level101026-Feb-2711-Mar-27217FINEQ1080Lobby Finishes - 5th Level151523-Apr-2713-May-27218FINEQ1090Painting - 5th Level101012-Mar-2725-Mar-27219FINEQ1100Lobby Finishes - 6th Level151509-Apr-2729-Apr-27220FINEQ1110Painting - 6th Level101026-Mar-2708-Apr-27221FINEQ1120Lobby Finishes - 7th Level151526-Mar-2715-Apr-27222FINEQ1130Painting - 7th Level101002-Apr-2715-Apr-27223FINEQ1140Traffic Coating/Striping - Level 75516-Apr-2722-Apr-27224FINEQ1150Traffic Coating/Striping - Level 65523-Apr-2729-Apr-27225FINEQ1160Traffic Coating/Striping - Level 55530-Apr-2706-May-27226FINEQ1170Traffic Coating/Striping - Level 45507-May-2713-May-27227FINEQ1180Traffic Coating/Striping - Level 35514-May-2720-May-27228FINEQ1190Traffic Coating/Striping - Level 25521-May-2727-May-27229FINEQ1200Traffic Coating/Striping - Level 15528-May-2704-Jun-27230FINEQ1210Parking Equipment101007-Jun-2718-Jun-27231Multifamily ConstructionMultifamily Construction58058010-Aug-2617-Nov-28232MFCONST1000CRG Site Mobilization404010-Aug-26*05-Oct-26233MFCONST1050Wood Framed Structure16016001-Feb-27*15-Sep-27234MFCONST1060Exterior Envelope12012016-Aug-2704-Feb-28235MFCONST1070Buildout / Finishes20220207-Feb-2817-Nov-28236Hotel ConstructionHotel Construction39039016-Dec-2627-Jun-28237HOTEL1000Foundations / Slab on Grade / Shafts606016-Dec-2611-Mar-27238HOTEL1010Structure12012005-Mar-2723-Aug-27239HOTEL1020MEP Services and Distribution21621612-Feb-2717-Dec-27240HOTEL1030Exterior Envelope707003-Aug-2709-Nov-27241HOTEL1040Partitions and Ceilings16016013-Jul-2728-Feb-28242HOTEL1050Finishes12012010-Nov-2701-May-28243HOTEL1060MEP Trim Out757518-Jan-2801-May-28244HOTEL1070FF&E606004-Apr-2827-Jun-28JanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMar2026202720282029Test and Balance28-May-27, ElectricalUnderground ElectricalElectrical Power Entrance and DistributionLighting Level 1Lighting Level 2Lighting Level 3Lighting Level 4Lighting Level 5Lighting Level 6Lighting Level 712-Jul-27, Finishes and EquipmentLobby Finishes - 1st LevelPainting - 1st LevelLobby Finishes - 2nd LevelPainting - 2nd LevelLobby Finishes - 3rd LevelPainting - 3rd LevelLobby Finishes - 4th LevelPainting - 4th LevelLobby Finishes - 5th LevelPainting - 5th LevelLobby Finishes - 6th LevelPainting - 6th LevelLobby Finishes - 7th LevelPainting - 7th LevelTraffic Coating/Striping - Level 7Traffic Coating/Striping - Level 6Traffic Coating/Striping - Level 5Traffic Coating/Striping - Level 4Traffic Coating/Striping - Level 3Traffic Coating/Striping - Level 2Traffic Coating/Striping - Level 1Parking Equipment17-Nov-28, Multifamily ConstructionCRG Site MobilizationWood Framed StructureExterior EnvelopeBuildout / Finishes27-Jun-28, Hotel ConstructionFoundations / Slab on Grade / ShaftsStructureMEP Services and DistributionExterior EnvelopePartitions and CeilingsFinishesMEP Trim OutFF&ERemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestoneData Date = 13-Jan-26Schedule Printed on 13-Feb-26, at 10:06Page 4 of 4Madison Street Lifestyle DistrictFull Schedule - Standard Layout
Madison Lifestyle District - Early Garage PackageSite Logistics
Legend / Activities
2-13-2026
6-1/2" ONE-WAY POST-TENSIONEDSLAB, TYP UNO
8" NON-LOAD BEARING
CMU CRASH WALL,
TYPICAL AT PERIMETER
18" THICK 2-WAY POST-TENSIONED CONCRETE SLAB
18" THICK 2-WAY POST-TENSIONED CONCRETE SLAB
18" THICK 2-WAY POST-TENSIONED CONCRETE SLAB
18" THICK 2-WAY POST-
TENSIONED CONCRETE SLAB
POST-TENSIONEDBEAM, TYP
POST-TENSIONEDGIRDERPOST-TENSIONEDGIRDER
6" SOG
CONCRETE COLUMN, TYP
CONCRETE COLUMN
BELOW, TYP
CONCRETE
POUR STRIP
CONCRETE POUR STRIP
RETAINING WALL BELOW
DOWN-TURNED CONCRETE
BEAM, TYPICAL AT PERIMETER
S211 S211 S211
1S212
2S212
1
S213
2S213
6" EXP JT6" EXP JT6" EXP JT6" EXP JT
CONCRETE SHEAR WALL BELOW CONCRETE SHEAR WALL BELOW
CONCRETE SHEAR WALL BELOW
CONCRETE SHEAR
WALL BELOW
CONCRETE SHEAR WALL BELOW
CONCRETE SHEAR
WALL BELOW
CONCRETE SHEAR
WALL BELOW
CONCRETE SHEAR
WALL BELOW
CONCRETE SHEAR
WALL BELOW
CONCRETE SHEAR WALL BELOW
CONCRETE SHEAR WALL BELOW
CONCRETE SHEAR
WALL BELOW
METAL PANSTAIR
METAL PANSTAIR
METAL PANSTAIR
METAL PANSTAIR
EXTENTS OF THICKER 2-WAY POST-TENSIONED CONCRETE SLAB
ELEVATED
FRAMING
SLAB ON
GRADE
EQ EQ
POST-TENSIONED
GIRDER
POST-TENSIONED
GIRDER
SIDEWALKCLOSED
SIDEWALKCLOSED
SIDEWALKCLOSED
SIDEWALKCLOSED
SIDEWALKCLOSED
SIDEWALKCLOSED
T T T
T T T
Construction Fence
Construction Gate
Man Gate
Material Laydown Area
Storage Trailer Area
Dumpsters / Recycling
Construction Trailer (12' x 60')
Tower Crane / Crane Position
Concrete Wash-Out
Erosion Control
Tower Crane 2D Radius
AED (Auto. External Defibrillator)
Temporary ToiletT
RFI #Bid Package Question Answer Response By Addendum
1 BP-03A Wilhelm will do all the concrete work on the first floor of both the parking garage and surrounding
apartments/commercial space and then CRG will take over above podium?
Yes, Wilhelm (CM) is responsible for the concrete work on the first floor of both parking garage and surround
apartments/commercial space, and 1 podium level in addition to the parking garage structure. At this time, only the
foundations for both the garage and apartments/commercial are bidding.
FAW ADD-02
2 BP-03B Should the support of all foundations shown on S101-S101.B be included in our bid on 3/17. Not just
the foundations that are within the parking garage area.
Yes, however, please closely review scope of work sheet. Slab on grade and up is not included in Bid Event #1 and
work associated with this portion is not bidding currently. FAW ADD-02
3 BP-02A
General Scope of Work; Section 5 C: Temp Fence will require closure of sidewalks around project
and W. Madison St. between N. Main St. and N. Michigan St. Per 5C Subcontractor is required to
obtain permits. Is the CM going to have these permits already in place for project?
Yes, Wilhelm (CM) will obtain the sidewalk closure permit as part of the street closure permit. FAW ADD-02
4 BP-02A
Construction Signage: Sidewalk Closed, Construction Entrance Ahead, Construction Entrance, Road
Closed; are these going to be required by us for closures caused by Temp Fence? Or will they be by
CM?Wilhelm (CM) will provide necessary signage and sidewalk closure permits.
FAW
ADD-02
5 BP-02A
02A – Temporary Fencing #4 Driven Posts for all Gates. Two Construction Gates on W. Madison are
on asphalt. This will require us to core drill through asphalt then pound posts. North Construction
gate can be placed in grass area shown. Two-man gates to the South on W. Madison are over
concrete sidewalk, these will require core drilling to remove concrete prior to pounding posts. Per
14W in General Scope Core Drilling will require Authorization by Structural Engineer. We will only
need to core through hard surface, 5”-8” asphalt and 4”-5” sidewalk with Locates, will this be
required?
Note 14W in the general scope of work is intended for structural concrete. Neither road surface or concrete sidewalk
will require review by a structural engineer. FAW ADD-02
6 BP-02A We will be providing panelized Temp fence panels 6’x10’ secured together with panel clamps.
Normally we secure bases with sandbags but have also secured with rebar. Which would CM prefer?FAW does not have a preference. Ultimately, it is the BP 02A contractors responsibility to provide and maintain the
fence. Please provide whichever you would prefer for the application.
FAW
ADD-02
7 BP-02A Is a privacy fence screen required? If yes, solid or with CM Logo?Yes, please provide a solid privacy screen. Color to be selected. FAW ADD-02
8 BP-03A Can you confirm all concrete walls, other than those designated as shear walls, are included in the
foundation package?
Confirmed, all concrete walls, except shear walls, are to be included with the 03A Concrete foundation bid package as
well as the ready-mix supply 03D bid package.FAW ADD-02
9 BP-03A In BP-03A scope of work sheet line item #26 calls for dampproofing, but a list of bid packages lists
waterproofing as its own bid package. Is this to be included in the BP-03A scope of work?
Please exclude any waterproofing or dampproofing in BP-03A. Crystalline waterproofing admixture is to be included
in BP-03D ready mix supply where required.FAW ADD-02
10 BP-03D
Is sheet waterproofing required as shown on details such as 9/S304, 7/S305, 3&4/S305, or will it be
a crystalline admixture? The concrete mix schedule references Note 7 that only crystalline admixture
is to be included at elevator locations?Crystalline admixture is acceptable at elevator pit locations. Both are not required.
Structurepoint
ADD-02
11 BP-03A In BP-03A scope of work sheet line item #26 calls for dampproofing, but a list of bid packages lists
waterproofing as its own bid package. Is this to be included in the BP-03A scope of work?Please exclude any waterproofing or dampproofing in BP-03A. FAW ADD-02
12 BP-02B What is the duration required for the Tower Crane for base bid?This is spelled out in the bid package scope of work.FAW ADD-02
13 BP-03D Is the crystalline waterproofing admixture as listed by Note 7 on the Concrete Mix Schedule only
required at elevator pit locations?Confirmed.Structurepoint ADD-02
14 Please confirm that no sheet applied waterproofing is required on this project?Confirmed Structurepoint ADD-02
15 BP-03D What are the cubic yard quantities required to provide in bid for the ready mix supplier bid package
BP-03D.
footings 2,921 cy
footings with xypex 301 cy
foundation walls 297 cy
pit wall with xypex 33 cy
FAW ADD-02
Madison Lifestyle District - Parking Garage - Bid Event 01
16 BP-03B
Note 12 on S101.A & S101.B mentions that all reinforcing at Parking Structure/Ramp Slab on Grade
needs to be Epoxy Coated. I was wondering how far that extends out from the “interior parking
structure” walls and what all needed be included as Epoxy Coated. I wanted to double check if the
note meant everything (Mat Foundations, Perimeter Footings, Spread Footings, Column Dowels,
Foundation Walls, Shear Wall Dowel) or if only a portion of those Requirements across entire project:
• All reinforcement within slab on grades and thickened slabs (re-entrant corner bars, construction joint bars, slab
penetration bars, etc) at parking areas.
• Column dowels and column ties extending 2’-0” above slab on grade and within beam depths at parking areas.
• Wall dowels and vertical reinforcement below grade and at bumper walls at parking areas.
• All reinforcement within post-tensioned slabs (Top and bottom bars, support bars, backup bars, etc) at parking areas.
• Downturned beam top bars and stirrups at parking areas.
• Upturned beam bottom bars and stirrups at parking areas.
• CMU dowels within parking areas.
Epoxy-coated reinforcement is not required outside of the parking area extents. See mark up for the full parking area
extents on the slab on grae level as shown in green.
Structurepoint
ADD-03
CURRENT CONTRACT DRAWINGS - Current Drawings
Drawing No.Drawing Title Revision Drawing Date Received Date Set
Architectural
A421 TOWER 01-ENLARGED STAIR/ELEVATOR 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
A422 TOWER 01-ELEVATOR SECTIONS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
A424 TOWER 02-ENLARGED STAIR/ELEVATOR 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
A425 TOWER 02-ELEVATOR SECTIONS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
A429 TOWER 04-ENLARGED STAIR/ELEVATOR 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
A431 TOWER 04-ELEVATOR SECTIONS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
A910 ELEVATOR CALLOUTS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
Civil
C001 TITLE SHEET 1 03/11/2026 03/11/2026 Bid Event 01 - Addendum 3 (03/11/
26)
C002 MADISON LIFESTYLE DISTRICT - SITE DEMOLITION PACKAGE 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
C003 SPECIFICATIONS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
C100 EXISTING TOPOGRAPHY PLAN 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
C110 DEMOLITION PLAN 1 03/10/2026 03/10/2026 Bid Event 01 - Addendum 2 (03/10/
26)
C300 GRADING PLAN 2 03/11/2026 03/11/2026 Bid Event 01 - Addendum 3 (03/11/
26)
C400 UTILITY PLAN 3 03/11/2026 03/11/2026 Bid Event 01 - Addendum 3 (03/11/
26)
C500 EROSION CONTROL PLAN 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
C510 POLLUTION PREVENTION PLAN 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
C520 EROSION CONTROL DETAILS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
C521 EROSION CONTROL DETAILS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
C600 SITE DETAILS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
F.A. Wilhelm Construction Co.
Printed on Fri Mar 20, 2026 at 06:28 am EDT
Job #: 11303 Madison Street Parking Garage
413 Doctor M.L.K Jr. Blvd
South Bend, Indiana 46601
Page 1 of 3
Drawing No.Drawing Title Revision Drawing Date Received Date Set
Electrical
E100 ELECTRICAL FOUNDATION PLAN 1 03/10/2026 03/10/2026 Bid Event 01 - Addendum 2 (03/10/
26)
Plumbing
P100 PLUMBING UNDERFLOOR PLAN 1 03/10/2026 03/10/2026 Bid Event 01 - Addendum 2 (03/10/
26)
P200 PLUMBING DETAILS 1 03/10/2026 03/10/2026 Bid Event 01 - Addendum 2 (03/10/
26)
Structural
S001 ABBREVIATIONS AND SYMBOLS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
S002 GENERAL NOTES 1 03/10/2026 03/10/2026 Bid Event 01 - Addendum 2 (03/10/
26)
S003 GENERAL NOTES 1 03/10/2026 03/10/2026 Bid Event 01 - Addendum 2 (03/10/
26)
S004 SPECIAL INSPECTION REQUIREMENTS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
S005 LOAD MAPS 1 03/10/2026 03/10/2026 Bid Event 01 - Addendum 2 (03/10/
26)
S006 AXONOMETRICS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
S101 OVERALL FOUNDATION AND SLAB ON GRADE 1 03/10/2026 03/10/2026 Bid Event 01 - Addendum 2 (03/10/
26)
S101.A FOUNDATION AND SLAB ON GRADE PLAN -AREA A 1 03/10/2026 03/10/2026 Bid Event 01 - Addendum 2 (03/10/
26)
S101.B FOUNDATION AND SLAB ON GRADE PLAN -AREA B 1 03/10/2026 03/10/2026 Bid Event 01 - Addendum 2 (03/10/
26)
S201 ENLARGED PLANS 1 03/10/2026 03/10/2026 Bid Event 01 - Addendum 2 (03/10/
26)
S301 FOUNDATION SCHEDULES, SECTIONS AND DETAILS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
S302 FOUNDATION SCHEDULES, SECTIONS AND DETAILS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
S303 FOUNDATION SECTIONS AND DETAILS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
S304 FOUNDATION SECTIONS AND DETAILS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
S305 FOUNDATION SECTIONS AND DETAILS 1 03/10/2026 03/10/2026 Bid Event 01 - Addendum 2 (03/10/
26)
S306 FOUNDATION SECTIONS AND DETAILS 1 03/10/2026 03/10/2026 Bid Event 01 - Addendum 2 (03/10/
26)
S307 FOUNDATION SECTIONS AND DETAILS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
S311 CONCRETE COLUMN SCHEDULES, SECTIONS, AND DETAILS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
F.A. Wilhelm Construction Co.
Printed on Fri Mar 20, 2026 at 06:28 am EDT
Job #: 11303 Madison Street Parking Garage
413 Doctor M.L.K Jr. Blvd
South Bend, Indiana 46601
Page 2 of 3
Drawing No.Drawing Title Revision Drawing Date Received Date Set
16/26)
S321 CONCRETE WALL SCHEDULES, SECTIONS, AND DETAILS 0 02/13/2026 02/16/2026 Bid Event 01 - Bid Set Drawings (02/
16/26)
F.A. Wilhelm Construction Co.
Printed on Fri Mar 20, 2026 at 06:28 am EDT
Job #: 11303 Madison Street Parking Garage
413 Doctor M.L.K Jr. Blvd
South Bend, Indiana 46601
Page 3 of 3
Current Specifications
Number Description Revision Issued Date Received Date Set
00 - Bid Manual
000001 Bid Manual 0 02/16/26 02/16/26 Bid Event 01 - Early Foundation and Site Package
AD1 Addendum 1 0 02/18/26 02/18/26 Bid Event 01 - Addendum 1
AD2 Addendum 2 0 03/10/26 03/10/26 Bid Event 01 - Addendum 2
AD3 Addendum 3 0 03/11/26 03/11/26 Bid Event 01 - Addendum 3
AD4 Addendum 4 0 03/12/26 03/12/26 Bid Event 01 - Addendum 4
03 - Concrete
031000 Concrete Forming and Accessories 0 02/16/26 02/16/26 Bid Event 01 - Early Foundation and Site Package
032000 Concrete Reinforcing 0 02/16/26 02/16/26 Bid Event 01 - Early Foundation and Site Package
033000 Cast-in-Place Concrete 0 02/16/26 02/16/26 Bid Event 01 - Early Foundation and Site Package
14 - Conveying Equipment
142100 Electric Traction Elevators 0 02/16/26 02/16/26 Bid Event 01 - Early Foundation and Site Package
31 - Earthwork
316613 Rammed Aggregate Piers 0 02/16/26 02/16/26 Bid Event 01 - Early Foundation and Site Package
F.A. Wilhelm Construction Co.
Printed on Thu Mar 19, 2026 at 11:16 am EDT
Job #: 11303 Madison Street Parking Garage
413 Doctor M.L.K Jr. Blvd
South Bend, Indiana 46601
Page 1 of 1
Madison District Lifestyle – Parking Garage
South Bend, IN
February 2026
Table of Contents Section 1 – Instructions to Bidders 1. Project Team 2. Notice to Bidders 3. Instructions to Bidders 4. General Scope of Work 5. Bid Package Index Section 2 – Bid Forms 1. Bid Forms (Also available in Building Connected Folder) a. Bid Form Attachment 1 – Bid Package Standard Bid Form b. Bid Form Attachment 2 – Combined Bid Form c. Bid Form Attachment 3 – Supplemental Bid Information d. Bid Form Attachment 4 – Qualification Form e. Bid Form Attachment 5 – Form 96 f. Bid Form Attachment 6 – City of South Bend Responsible Bidder Checklist Section 3 – Bid Package Information 1. Project Summary 2. Bid Package Index 3. General Scope of Work for All Bid Packages 4. Bid Package Scope of Work Descriptions Section 4 – Contract Documents 1. Reference Documents List (Also available in Building Connected Folder) a. Construction Schedule b. Site Logistics Plan
Section 5 – Subcontract Exhibits (Also available in Building Connected Folder) 1. Subcontract Exhibit 1 – Sample Subcontract Agreement and Wilhelm Terms and Conditions 2. Subcontract Exhibit 2 – Sample Purchase Order 3. Subcontract Exhibit 3 – Insurance Requirements 4. Subcontract Exhibit 4 – F.A. Wilhelm’s Excavation Policy 5. Subcontract Exhibit 5 – F.A. Wilhelm’s EEO Statement 6. Subcontract Exhibit 6 – City of South Bend’s EEO Statement 7. Subcontract Exhibit 7 – City of South Bend’s Guidelines for Good Faith Efforts By Contractors in Meeting MWBE Contract Goals
Project Team Project: Madison Lifestyle District – Parking Garage 416 North Main Street South Bend, IN 46601 Owner: City of South Bend 215 S. Dr. Martin Luther King Jr. BLVD South Bend, IN 46601 Construction Manager: F.A. Wilhelm Construction Co., Inc. 3914 Prospect Street, Indianapolis Indiana 630 E. Bronson St., Ste 2, South Bend, Indiana Architect: American Structurepoint, INC 9025 River Road, Suite 200, Indianapolis, IN Civil/Structural Engineer: American Structurepoint, INC 9025 River Road, Suite 200, Indianapolis, IN MEP Engineer: Millie Engineering Group 9711 Valparaiso Drive, Munster, IN 46321 Parking Garage Designer: THA Consulting 550 Township Line Road, Suite 100 Blue Bell, PA 19422
Notice To Bidders Project: Madison Lifestyle District Parking Garage – Bid Event #1 F.A. Wilhelm Construction Company and City of South Bend will receive bids for the Madison Lifestyle District Parking Garage as indicated in the Construction Managers Bidding Manual. The project will include the following list of bid packages. The anticipated construction start date is February 2026 and substantial completion July 2027, with final completion by September 2027. All interested bidders can contact Shari Bernhardt at ShariBernhardt@fawilhelm.com to receive ITB through Building Connected or go to www.fawilhelm.com/bid-board/. See critical dates & times listed below (all local time): Documents Available: February 16th, 2026 Pre-Bid Meeting: February 17th, 2026 @ 2:30 PM at South Bend City Hall Bids Due: March 17th, 2026 @ 2:30 PM Public Bid Opening: March 17th, 2026 @ 2:30 PM BID PACKAGES • BP-02A – Temporary Fencing • BP-02B – Tower Crane & Operator • BP-03A – Cast-in-Place Foundations • BP-03B – Rebar – Supply • BP-03B – Rebar – Installation • BP-03D – Ready Mix Supplier • BP-14A – Elevators • BP-31A – Site Demolition, Earthwork, and Utilities • BP-31B – Aggregate Piers
1: INSTRUCTIONS TO BIDDERS
Madison Lifestyle District – Parking Garage
South Bend, IN
Instructions to Bidders 1. General a. F.A. Wilhelm Construction will receive sealed bids for the Bid Packages included herein on Tuesday. March 17th, 2026, at 2:30 PM EST. Bids will be received via Building Connected. LATE BIDS WILL NOT BE ACCEPTED. b. The Bidding Documents consist of the following: i. Construction Documents ii. Exhibits iii. Forms iv. Addenda, Bulletins, and additional supplemental information c. The Bidding Schedule is as follows: i. Bid Documents Available February 16th, 2026 ii. Prebid Meeting February 17th, 2026 South Bend City Hall (4th floor, RM401) 215 S. Dr. Martin Luther King Jr. Blvd South Bend, IN 46601 iii. Pre-Bid RFIs Due February 27th, 2026 iv. Bids Due March 17th, 2026 1. Bids will be received via Building Connected. 2. Bids can be turned in prior to 2:30 PM on March 17th, 2026. 3. Bids Received via Building Connected will be virtually opened and read out loud. 2. Bids a. Bids shall be submitted on the enclosed Bid Form produced by F.A. Wilhelm Construction and will be subject to all requirements of the Bid Documents. b. By Submitting a Bid, the Bidder Represents that: i. They have visited the site and/or become familiarized with local conditions under which the work shall be performed. ii. The Contract Documents have been reviewed and may not necessarily indicate all the work required for the performance or completion of the work. Contractor shall furnish and install items required for proper completion of the work without adjustments to price. Work shall be structurally sound, of quality construction and Contractor shall be responsible for the inclusion of adequate labor and materials to cover the proper and timely installation of the scope of work described or implied. c. Bidders shall identify personnel, equipment and subcontractors as requested in the Bid Form. d. Bid price shall be firm and not subject to escalation.
e. Bid price shall be valid for sixty (60) days. 3. Bid Submission a. Electronic Submission: i. Bids shall be submitted online via Building Connected under the “Bid Form” tab within the respective Bid Packages. All electronic bid submissions are required to contain all applicable bid forms and documents required by this Instructions to Bidders. ii. Bids Received via Building Connected will be virtually opened and read out loud at 2:30 PM EST on March 17th, 2026. The link to public bid opening is below: Bid Opening Teams Link b. To be considered a responsive bid, each envelope or submittal shall contain the following items: i. Bid Form Attachment 1 – Bid Package Standard Bid Form ii. Bid Form Attachment 2 – Combined Bid Form (if applicable) iii. Bid Form Attachment 3 – Supplemental Information iv. Bid Form Attachment 4 – Sub Qualification Form v. Bid Form Attachment 5 – Form 96 vi. Bid Form Attachment 6 – City of South Bend Responsible Bidder Checklist c. Late bids will not be accepted. All bids are sealed until the public bid opening. d. Bid Submission requirements vary depending on contract values. i. All other bidding requirements as specified in these Instructions to Bidders still apply including but not limited to: State Form 96, Bid Form, Bid Form Attachments, etc. ii. Exceptions: 1. Bid amount less than $300,000 a. Indiana State Form 96 is still required to be filled out. 4. Prequalification of Bidders a. All bidders will be required to complete the FA Wilhelm Subcontractor Qualification Form and the City of South Bend’s Responsible Bidder Checklist with their submission of a bid proposal. b. FA Wilhelm Construction reserves the right to receive and review financial statements during the bidding process and throughout the duration of the project. c. Bidders must be registered with the local Building Department.
5. Access to Bidding Documents a. Access to bidding documents will be provided by FA Wilhelm through the Building Connected website and invited Bidders will be able to access, view, download, and print documents. b. Bidders must contact FA Wilhelm Construction in order to access the bidding documents through the Building Connected project site. c. Contact Shari Bernhardt at ShariBernhardt@fawilhelm.com with inquiries regarding use of the Building Connected Project Site. 6. Bidding Requests for Information (RFI) and Addendum a. Bidders shall promptly notify F.A. Wilhelm Construction in writing of any conflicts, discrepancies, or errors in the bidding documents. All Pre-Bid Request for Information must be sent to ShariBernhardt@FAWilhelm.com. b. All requests for Information and substitution requests must be submitted in writing by February 27th at 2:30 PM. c. Bidders will be notified of responses to Requests for Information collectively via Addendum through the Building Connected website. 7. Sales Tax – (Section 3.6.3 of General Conditions) a. Bidders shall exclude Indiana Gross Retail Sales Tax and Federal Excise Tax on all materials, products or equipment incorporated into the project. b. All other applicable Indiana Gross Retail and Indiana Use Taxes for consumables, materials, supplies and rental equipment shall be included in the bid. 8. Schedule a. Time is of the essence in the execution of the work of this project. Therefore, sufficient labor and materials must be provided at all times to meet the project schedule. Subcontractor shall take whatever steps necessary, including additional manpower, equipment, overtime, shifts, etc. at its sole cost and expense to perform its work in a timeframe and sequence to meet the Project Schedule which is included in the Project Manual. 9. Post-Bid Information a. Post-Bid scope review meetings will be held with bidders to identify the lowest responsible and responsive bidder by F.A. Wilhelm Construction and the Owner. b. Bidders should be prepared to discuss key personnel (both the office and on the jobsite), equipment, materials and schedule for the Project. c. Good Faith Efforts Materials to be submitted in the post bid process. 10. Equal Employment Opportunity
a. Bidders shall comply with F.A. Wilhelm Construction’s EEO Statement. b. Bidders shall comply with City of South Bend’s EEO Statement. 11. Diversity Participation a. The City of South Bend is committed to meeting the following MWVBE goals on this project: i. Women Owned Business Goal – 7% ii. Minority Owned Business Goal – 5% iii. Veteran Owned Business Goal – 3% b. Diverse contractors must be certified with the State of Indiana and must be listed on the IDOA Directory: https://www.in.gov/idoa/mwbe/minority-and-womens-business-enterprises/participation-goals/
2: BID FORMS
Madison Lifestyle District – Parking Garage
South Bend, IN
BID FORM ATTACHMENT 1 – BID PACKAGE STANDARD BID FORM BID FORM – PAGE 1 of 3 1.1 PROJECT: Madison Lifestyle District – Parking Garage 1.2 FROM: Company: _____________________________________________________ Address: _____________________________________________________ Contact: _____________________________________________________ Phone: _____________________________________________________ Email: _____________________________________________________ Date: _____________________________________________________ State License Number (if applicable): ___________________________________ 1.3 Submitted through Bid Form tab in Building Connected. Upload pdf with the following title: “[your company name] – Madison Lifestyle District – Parking Garage - [Bid Package Number]” 1.4 BASE BID Total Bid price for all work, complete, in accordance with the Bidding Documents: Bid Package Name and Number: ______________________________________________________________________ Bid Amount (in words): ______________________________________________________________________ Dollars: $ _________________ 1.5 ALTERNATES (CIRCLE ADD OR DEDUCT WHEN APPLICABLE) 1. Alternate #1: Payment and Performance Bond ADD/DEDUCT: $
BID FORM – PAGE 2 of 3 1.6 DIVERSITY PARTICIPATION Value of diversity participation included in your base bid, in accordance with the Bidding Documents. Companies must be certified with State of Indiana to qualify, please visit: https://www.in.gov/idoa/mwbe/minority-and-womens-business-enterprises/participation-goals/ MBE $____________________ ___________% WBE $____________________ ___________% VBE $____________________ ___________% 1.7 ACKNOWLEDGEMENTS A. Documents and correspondence shall be submitted as indicated within the Bid Documents. B. Construction Manager Reserves the Right to reject any and all Bids at their sole discretion. C. Proposals to remain valid for 60 days from receipt of bid. D. Bidder has included all resources required to comply with the Project Schedule. E. RECEIPT OF ADDENDA Addendum No. _________ Dated ________________ Addendum No. _________ Dated ________________ Addendum No. _________ Dated ________________ Addendum No. _________ Dated ________________ Addendum No. _________ Dated ________________ F. Information to be provided with Bid Proposal: i. Bid Form Attachment 2 – Combined Bid Form (if applicable) ii. Bid Form Attachment 3 – Supplemental Information iii. Bid Form Attachment 4 – Subcontractor Qualification Form iv. Bid Form Attachment 5 – Form 96 v. Bid Form Attachment 6 – City of South Bend’s Responsible Bidder Checklist
BID FORM – PAGE 3 of 3 G. The undersigned, do hereby declare that I/we have carefully examined the Site of the proposed Work, have thoroughly examined the Bid Documents, and do hereby agree to furnish and/or install, as specified in the bid package, all materials, transportation, equipment, labor, supervision, tools and all other items necessary to do all Work in strict accordance with the Bid Documents. Signed By: _______________________________________________________________________________________ (Member of Firm Authorized to Sign Bid) Title: _________________________________________________________________Date: _____________________
BID FORM ATTACHMENT 2 – COMBINED BID FORM PROJECT: Madison Lifestyle District – Parking Garage BIDDER: ___________________________________________ DATE: _________________ All Bidders have the option of offering a combined bid for multiple bid packages. Bid Package Standard Bid Forms must be submitted for all bid packages included in the Combined Bid in addition to the Combined Bid Form. Total Combined Bid price for all work, complete, in accordance with the Bidding Documents: Bid Package Name and Number: __________________________________________ Bid Package Name and Number: __________________________________________ Bid Package Name and Number: __________________________________________ Bid Package Name and Number: __________________________________________ Bid Package Name and Number: __________________________________________ Bid Package Name and Number: __________________________________________ Combined Bid Amount: Dollars $ _________________________________________ A. The undersigned, do hereby declare that I/we have carefully examined the Site of the proposed Work, have thoroughly examined the Bid Documents, and do hereby agree to furnish and/or install, as specified in the bid package, all materials, transportation, equipment, labor, supervision, tools and all other items necessary to do all Work in strict accordance with the Bid Documents. Signed By: _________________________________________________________________ (Member of Firm Authorized to Sign Bid) Title: ____________________________________________Date: _____________________
BID FORM ATTACHMENT 3 – SUPPLEMENTAL INFORMATION PROJECT: Madison Lifestyle District – Parking Garage BIDDER: ___________________________________________ DATE: _____________________ BID PACKAGE: ___________________________________________________________________ Bidder shall include the requested supplemental bid information for all Bid Packages. A. PROPOSED STAFF Name and Title % On-Site __________________________________________ __________________ __________________________________________ __________________ __________________________________________ __________________ __________________________________________ __________________ B. LEAD TIMES & MAJOR EQUIPMENT (individual pieces of equipment over $10,000.00) Equipment and Manufacturer Material Lead Time _______________________________ ________________ ________________ _______________________________ ________________ ________________ _______________________________ ________________ ________________ _______________________________ ________________ ________________ _______________________________ ________________ ________________ _______________________________ ________________ ________________ C. TIERED AND/OR DIVERSE SUBCONTRACTS AND SUPPLIERS Scope of Work Supplier/Sub Value XBE (Y/N) XBE Type
Signed By: ___________________________________________________________________________________ (Member of Firm Authorized to Sign Bid) Title: _________________________________________ Date: _________________________
BID FORM ATTACHMENT 4 – SUB QUALIFICATION FORM
3914 Prospect St. Indianapolis, IN. 46203 (P) 317.359.5411 (F) 317.359.8346 2/1/23 Madison Lifestyle District – Parking Garage Subcontractor/Supplier Qualification Form General Business Information Part 1 Legal Business Name: Date: Street Address: Mailing Address: City: State: Zip: City: State: Zip: Former Business Name (if applicable): Street Address: Mailing Address: City: State: Zip: City: State: Zip: Telephone: Fax: Website Address: Contractor’s License #: State: Expiration: State Sales Tax Registration #: State Unemployment #: Federal ID #: Primary Contact Info Contact Name: Title: Telephone: Location: Email: Secondary Contact Info (If applicable) Contact Name: Title Telephone: Location: Email: Contractor Type ☐General Contractor ☐Sub-Contractor ☐Supplier ☐Other Business Type ☐Corporation ☐ Sole Proprietorship ☐Partnership ☐LLC/LLP ☐Other Union Affiliation Signatory Unions: ☐Yes ☐ No (*) If yes, please list all unions that 1.) 4.) your company is signatory with 2.) 5.) 3.) 6.) Type of Work Construction Divisions & CSI Codes-all that apply ☐Commercial ☐Healthcare ☐Education 1. 2. 3. ☐Industrial ☐Hospitality ☐Other (Specify) 4. 5. Contract Size Area of Operation -Maximum contract amount your company can effectively manage? ($) ☐Metro Indianapolis ☐Indiana ☐Central Indiana -What is the largest dollar volume on a single contract that you have performed over the past 3 years? ($) ☐NE Indiana ☐NW Indiana ☐SE Indiana ☐Illinois -Largest Project completed in the past 3 years? ($) -What percentage of work does your company sub-contract on a typical job? ($) ☐Kentucky ☐Michigan ☐Ohio ☐Nationwide ☐International
3914 Prospect St. Indianapolis, IN. 46203 (P) 317.359.5411 (F) 317.359.8346 2/1/23 Company Certifications (*) ☐MBE ☐WBE ☐DBE ☐VOSB ☐SBE ☐JSEB ☐Other List any other certifications: Certified by: ☐Federal ☐State ☐City ☐DOT ☐Other _______________________________________________________________Expiration: / / _______________________________________________________________ (*) If requested, please provide a copy of current certification with Pre-Qualification form Licenses/Product Certifications (*) State License Numbers City License Number Indiana Department of Administration (IDOA) License Number_________________________ Expiration Date__________________________ Indiana Department of Administration (INDOT) License Number_________________________ Expiration Date__________________________ (*) Please attach current IDOA and/or INDOT Certification City of _______________________________________ License Type: ___________________________ License Number_________________________ Expiration Date__________________________ City of _______________________________________ License Type: ___________________________ License Number_________________________ Expiration Date__________________________ (*) Please attach current City Certification and/or license (*) If requested, please provide any documentation which substantiates licenses. Trade Specific License Trade__________________________________ Trade__________________________________ License Number _________________________ License Number _________________________ (*) If requested, please provide any documentation which substantiates trade licenses. Legal Questionnaire (*) if the answer to any of these questions is ‘yes’-please include details in the spaces provided Part 2 Please list any litigation, pending or resolved, that has been brought against your company within the past 5 years. Please describe the circumstances of the litigation and provide the names of the parties to the litigation: Has your organization ever failed to complete work awarded to it? If yes, explain the circumstances for failing to complete the work. □ Yes ☐ No Comments: Are there any judgments, claims, arbitration, proceedings, or suits pending or outstanding against your organization or its officers? □ Yes ☐ No Comments: Has your organization filed any law suits or requested arbitration with regard to construction contracts within the past 5 years? Please describe the circumstances of the law suits or arbitrations and provide the names of the parties involved: □ Yes ☐ No Comments: Within the past 5 years, has any officer or principle of your organization ever been an officer or principle of another organization when it failed to complete a construction contract? If yes, explain the circumstances for failing to complete the work. □ Yes ☐ No Comments:
3914 Prospect St. Indianapolis, IN. 46203 (P) 317.359.5411 (F) 317.359.8346 2/1/23 Architect or Engineer/ Contractor/Supplier Trade References Part 3 Architect/Engineer Name 1: Company Contact: Address: Phone Number: Comments: Architect/Engineer Name 2: Company Contact: Address: Phone Number: Comments: Contractor Name 1: Company Contact: Address: Phone Number: Comments: Contractor Name 2: Company Contact: Address: Phone Number: Comments: Supplier Name 1: Company Contact: Address: Phone Number: Comments:_________________________________________________________________________________________________________________ Supplier Name 2: Company Contact: Address: Phone Number: Comments: Trade/Professional Associations: list any associations your company participates in Name Member Since Awards/Recognition Comments Safety Questionnaire (*) Part 4 OSHA Year EMR Rate Total Recordable Injury Rate (*TRIR) Lost Time Case Rate (*) OSHA or
IOSHA Citations (#) 2024 2023 2022 2021 OSHA Year Work Related Fatalities (Column G) Number of Lost Restricted Workdays (Column H+I) Number of Medical Treatment Cases (Column J) 2024 2023 2022 2021 Totals
3914 Prospect St. Indianapolis, IN. 46203 (P) 317.359.5411 (F) 317.359.8346 2/1/23 Do you have an OSHA compliant safety program in place? ☐ Yes ☐ No Do you have a designated safety officer at your company? ☐ Yes ☐ No Does this person conduct safety inspections on all job site(s)? ☐ Yes ☐ No Have you implemented a hazardous communication plan(s)? ☐ Yes ☐ No Have you implemented a drug testing program? ☐ Yes ☐ No Do you have a light-duty program? ☐ Yes ☐ No Do you review the safety procedures, and history of any sub-contractor you work with? ☐ Yes ☐ No Do you provide safety training to all employees? ☐ Yes ☐ No Would you allow an audit of your company manuals relating to safety policy/procedure? ☐ Yes ☐ No Please describe the safety training provided to the employees and whether it is provided in-house or through a third party: __________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________ List OSHA or IOSHA citations received in the last 5 years that required fines to be paid. Provide the year, the citation and the amount of the fine: __________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________ (*)If requested, please provide along with this Pre-Qualification form any documentation that substantiates the requested information in the safety questionnaire above. Including but not limited to; OSHA logs, citation records, Worker’s Compensation EMR verification, Safety Programs, Fall Prevention / Protection program, Hoisting & Rigging programs and current PICS certification. (*) To calculate TRIR rate combine columns G, H, J and J from OSHA form 300 x (200,000)/Employee Hours Worked. (*) To calculate Lost Time Case Rate use column H from OSHA form 300 x (200,000)/Employee Hours Worked. Insurance Information (*) Part 5 Insurance Agency: Phone: ( ) Insurance Contact Name: Fax: ( ) Street Address: City: State: Zip: Insurance Plan Insurance Carrier Max Obtainable Coverage ($) Plan Deductible Expiration Worker’s Compensation □ Yes ☐ No ($) General Liability □ Yes ☐ No ($) Excess Liability □ Yes ☐ No ($) Auto Liability □ Yes ☐ No ($) Professional Liability □ Yes ☐ No ($) Other □ Yes ☐ No ($) (*)If requested, please include a copy of your current insurance certifications
3914 Prospect St. Indianapolis, IN. 46203 (P) 317.359.5411 (F) 317.359.8346 2/1/23 Banking/Financial (*) Part 6 Bank Name: Contact Name: Phone: ( ) Line of Credit Amount: ($) Amount Available: ($) Secured: ☐ Yes ☐ No Description of Collateral: Personal Guarantee: □ Yes ☐No What is your current backlog of work? D-U-N-S #: Please provide annual revenue for the past 3 years Year 2024 2023 2022 Revenue ($) ($) ($) -On a separate sheet, list any major construction projects your organization has in progress, giving the name of project, contract amount, and scheduled completion date. -On a separate sheet, list the major projects your organization has completed in the past 5 years. (*)If requested, please provide along with this Pre-Qualification form the last 3 year end audited financial statements (with footnotes), along with the most recent interim financial statement including balance sheets and audited income statements. Bonding/Surety Information (*) Part 7 Agent’s Name: Bonding/Surety Company: Phone: ( ) Bonding Capacity: Total: ($) Per Job: ($) Personal Guarantee: ☐ Yes ☐ No Dollar value of bonded work on hand: ($) (*)If requested, please provide along with this Prequalification form a bondability letter from your surety indicating per job and aggregate bonding capacity and also current available capacity.
3914 Prospect St. Indianapolis, IN. 46203 (P) 317.359.5411 (F) 317.359.8346 2/1/23 Experience Part 8 How many years has your company been in business? _______________ Has your company worked for F.A. Wilhelm Construction Co., Inc. in the last 5 years? ☐ Yes ☐ No (If yes, please indicate below.) Project A __________________________________________ F.A. Wilhelm Construction Co., Inc. Contact ____________________________________ Project B __________________________________________ F.A. Wilhelm Construction Co., Inc. Contact ____________________________________ Project C __________________________________________ F.A. Wilhelm Construction Co., Inc. Contact ____________________________________ Please select the average contract size your office most typically performs for the trade package you intend to bid: ________ $1 - $100,000 ________ $100,000 - $500,000 ________ $500,000 – 1,000,0000 ________ $1,000,000 – 5,000,000 ________ $5,000,000 < • Please describe the training and/or apprentice program that your employees receive to become a competent/skilled craft persons in the trades that you perform. Include the types of classes and training provided and the number of years of the program. If the training is provided by a third party organization, please provide the name of such organization. _________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ • If during the course of the project, you were to fall behind schedule requiring adding competent/trained personnel to recover, what is your source for obtaining these workers and how quickly can they be obtained? ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
3914 Prospect St. Indianapolis, IN. 46203 (P) 317.359.5411 (F) 317.359.8346 2/1/23 Project Details Part 8A Please provide at least five projects of relevant experience for each trade package that your company intends to bid. One project may represent experience in multiple trades. Projects should have been completed within the past 5 years. Project Name: City, State: Scopes of Work: Year Completed: Owner: General Contractor/CM: Project Name: City, State: Scopes of Work: Year Completed: Owner: General Contractor/CM: Project Name: City, State: Scopes of Work: Year Completed: Owner: General Contractor/CM: Project Name: City, State: Scopes of Work: Year Completed: Owner: General Contractor/CM: Project Name: City, State: Scopes of Work: Year Completed: Owner: General Contractor/CM: (*) By authorizing this prequalification form the subcontractor named herein, is agreeing to supply any documentation noted in this prequalification form, at the request of the designated party at F.A. Wilhelm Construction Co., Inc. for the purposes of selecting a subcontractor for this project. Authorization I hereby acknowledge that all of the information provided in this document is true and is not purposefully misleading. Signature: Title: Dates: Company:
BID FORM ATTACHMENT 5 – FORM 96
BID FORM ATTACHMENT 6 – CITY OF SOUTH BEND RESPONSIBLE BIDDER CHECKLIST
Version 5/20/2024 General Conditions - 11
CITY OF SOUTH BEND, INDIANA
CONTRACTOR’S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name Madison Lifestyle District - Parking Garage
Project No. 124-074
For Bids Due
Contractor Name:
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID.
**THIS FORM ONLY APPLIES TO BIDS GREATER THAN $250,000. **
INSTRUCTIONS: If you are a pre-qualified bidder, complete Section I only. If you are not a pre-qualified bidder, complete Section II only. Section II acts as an application for pre-qualification. Submission of Section II will allow the bidder to be considered for pre-qualification for bids with the City of South Bend Department of Public Works. Pre-qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-71 of The Responsible Bidding Ordinance No. 10975-23 (hereinafter, “Responsible Bidding Ordinance”) for a period of twelve (12) months. Thereafter, contractors who are pre-qualified must submit a complete application for continuation of “pre-qualified” standing, on a form provided by the City (“Responsible Bidder Checklist (1) Pre-Qualified Bidders”) within twelve (12) months of obtaining pre-qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre-qualified contractor to submit its complete application for continuation of “pre-qualified” standing within the time prescribed above shall result in automatic removal of the designation, effective immediately following the twelve (12) months of pre-qualified standing. However, the “removed” contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-71 until “pre-qualified” status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder’s current and previous customers regardless of pre-qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-71 of the Responsible Bidding Ordinance no later than the date of the public bid opening.
Version 5/20/2024 General Conditions - 12
POST BID SUBMISSIONS: Post-bid submissions must be submitted in accordance with Section 6-72 of the Responsible Bidding Ordinance. The post-bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
2. Each subcontractor, whose portion of the project is estimated to be at least two-hundred fifty
thousand dollars ($250,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list (“Disclosed Subcontractor(s)”) to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder for projects greater than $250,000 and all subcontractors performing work
greater than $250,000 on a public works project are required to submit certified payroll utilizing the
federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days
after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft
for each employee. Certified payrolls shall be submitted electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre-Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor’s submission and any information obtained by the City through its own independent verification of the information provided by the contractor.
Version 5/20/2024 General Conditions - 13
I. PRE-QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements:
(i) ___ By checking this box, I hereby acknowledge that I am a pre-qualified bidder with
the City of South Bend and that I have met the pre-qualification requirements within
the last twelve (12) months. A copy of my Pre-Qualification verification letter
is attached.
(ii) ___ By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(iii) ___ By checking this box, I hereby acknowledge that apprenticeship and training
programs that I participate in have graduated at least five (5) apprentices in each
of the past five (5) years.
(iv) ___ By checking this box, I hereby acknowledge that all subcontractors performing
work greater than $250,000 also meet the qualifications of the Responsible Bidder
Ordinance.
(b) Attachments:
(i) ___ Indiana Secretary of State’s on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State’s Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) ___ Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
(iii) ___ List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years.
(iv) ___ For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor’s Office of Apprenticeship, or its successor organization. This includes, but may not be limited
to, letters from apprenticeship coordinators detailing the bidder’s association with the program, and the United States Department of Labor Office of Apprenticeship
Certificates of Registration of Apprenticeship Programs for each type of work to be performed on the project.
Version 5/20/2024 General Conditions - 14
II. PRE-QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE-QUALIFIED)
(a) Acknowledgements:
(i) ___ By checking this box, I hereby acknowledge that I am not a pre-qualified bidder
with the City of South Bend.
(ii) ___ By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) ___ By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) ___ By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub-contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(v) ___ By checking this box, I hereby acknowledge that apprenticeship and training
programs that I participate in have graduated at least five (5) apprentices in each
of the past five (5) years.
(vi) ___ By checking this box, I hereby acknowledge that all subcontractors performing
work greater than $250,000 also meet the qualifications of the Responsible Bidder
Ordinance.
(b) Attachments:
(i) ___ Indiana Secretary of State’s on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State’s Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) ___ List identifying all former business names.
(iii) ___ Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis-Bacon and related Acts, within the preceding five (5)
years.
(iv) ___ Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) ___ Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (v) ___ For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor’s Office of Apprenticeship, or its successor organization. This includes, but may not be limited to, letters from apprenticeship coordinators detailing the bidder’s association with
Version 5/20/2024 General Conditions - 15
the program, and the United States Department of Labor Office of Apprenticeship Certificates of Registration of Apprenticeship Programs for each type of work to be performed on the project. (vi) ___ Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(vii) ___ Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service “Department of Treasury’s Listing of Approved Sureties” as required in the bid specifications or contract. (viii) ___ Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (ix) ___ List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
Date: ___________________________________________
________________________________________________ (Sign Here)
________________________________________________ (Print Name Here)
________________________________________________
(Name of Company)
________________________________________________ (Address of Company)
________________________________________________
(City)
________________________________________________ (State)
________________________________________________ (Telephone Number)
Version 07/19/2023 Contractor’s Bid for Public Works - 4
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR’S NON-COLLUSION AND NON-DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF ___________ ) ) SS: COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran.
a. For purposes of this Certification, “Iran” means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time-to-time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time-to-time, a Contractor is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Version 07/19/2023 Contractor’s Bid for Public Works - 5
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor’s newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor’s documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender
identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions will consider the Contractor’s good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business (“MBE”) or as a Women’s Business
Enterprise (“WBE”) as a factor in determining the lowest, responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal-eligible contracts,
Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding
of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also
be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 07/19/2023 Contractor’s Bid for Public Works - 6
may result in forfeiture of contractual payments. *** I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct. Dated this day of , 20__
Contractor/Bidder (Firm)
Signature of Contractor/Bidder or Its Agent Printed Name and Title Subscribed and sworn to before me this day of , 20
My Commission Expires Notary Public
County of Residence
Bid Package Index BID PACKAGES (BID EVENT #1) • BP-02A – Temporary Fencing • BP-02B – Tower Crane & Operator • BP-03A – Cast-in-Place Concrete Foundations • BP-03B – Rebar – Supply • BP-03B – Rebar – Installation • BP-03D – Ready Mix Supplier • BP-14A – Elevators • BP-31A – Site Demolition, Earthwork, and Site Utilities • BP-31B – Aggregate Piers
3: BID PACKAGE INFORMATION
Madison Lifestyle District – Parking Garage
South Bend, IN
General Scope of Work Project Summary The project consists of a new parking garage for the Madison Lifestyle District project that will be wrapped by a multi-family residential building and hotel with a podium level on ground floor. The anticipated construction start date is February 2026 and substantial completion July 2027, with final completion by September 2027. General Scope of Work for All Bid Packages 1. All specified mock-ups and samples. 2. The term “provide” shall mean to furnish, deliver and install complete. 3. Contract documents may not necessarily indicate all the work required for the performance or completion of work. Subcontractor shall furnish and install items required for proper completion of work without adjustments to price. Work shall be structurally sound, of quality construction and Subcontractor shall be responsible for the inclusion of adequate labor and materials to cover the proper and timely installation of the items described or implied. 4. This summary should in no way be construed as being all-inclusive. It is issued as a guide to aid in the assignment of work. If conflicts regarding assignment of work exist between the drawings, the specifications, notes or these descriptions, the Bid Category Descriptions shall take precedence. 5. Subcontractor shall be responsible for any trade permits and inspection fees for the assigned Scope of Work. Permits, Fees & Inspections: a. The CM will purchase the General Building Permit. All other permits, utility tap fees and inspection fees must be included in the work scope of the subcontractor requiring them. b. Each subcontractor shall call for, obtain and pay for all inspections as required to facilitate their work and to maintain schedule even if the general building permit was secured by the CM. Each subcontractor shall keep copies of permits, inspections and signatures in the CM’s office. Any associated fee for a failed inspection under the General Building permit purchased by the CM (i.e., structural inspections) will result in a back charge to the associated subcontractor for additional inspection needs. c. Permits for work requiring a shutdown of existing streets and /or sidewalks or impeding public access in any way shall be secured and paid for by subcontractor requiring it and scheduled with the CM in advance. d. Each subcontractor shall coordinate with the CM for scheduling of material testing and inspection services. Any re-testing and/or re-inspection of unacceptable materials or installations shall be paid for by the subcontractor requiring the additional test/inspection. 6. BIM will be utilized on this project for MEP contractors at a minimum and will require participation and coordination.
7. Safety: Reference the F.A. Wilhelm Construction Site Specific Safety Plan (SSSP) prepared for this project. Highlighted safety provisions on this project shall include: a. Subcontractor to demonstrate participation in a safety program that includes an acceptable employee substance abuse program. MICCS is an example of an acceptable safety program that includes a substance abuse policy. Job hazard analysis forms are to be completed daily for each work activity and are to be reviewed and initialized by each crew member working on that activity daily. b. Acknowledgment and representation that if, at any time, the safety of any existing or new construction, utilities, etc., appears to be endangered, Subcontractor shall, at its own expense, take all proper means, including any additional bracing and/or shoring necessary to safeguard and prevent any such movement or settlement, and to support such structures as identified on the documents. Assure Fall Protection at heights of 6 feet or greater, pursuant to the OSHA standards and Wilhelm policies, whichever is more stringent. This includes all steel erection activities. c. Acknowledgment and representation that the use of radios, including headsets, is not permitted (this does not apply to two-way radios for remote communication) Eye protection must be worn by all personnel on the jobsite. d. All jobsite personnel shall wear reflective safety shirts or vests at all times. e. All jobsite personnel shall wear hard hats, work boots/shoes, long pants and shirts with a minimum 4” sleeve as defined by OSHA. f. Attendance by all subcontractor personnel to Wilhelm’s and Owner’s preconstruction safety orientation program prior to beginning work. g. All electrical cords are to be rolled up daily and stored by each Subcontractor. Any cords not rolled up or suspended from the structure at the end of the day will be removed and rolled up by the CM at the subcontractor’s expense. Electrical cords in use in walkways or pathways shall be suspended as to not create a tripping hazard and so that these areas can be broom swept daily. h. Use of platform ladders is required in lieu of standard ladders. i. Roof edge barricades as required to perform your work j. Controlled access zones as required to perform your work. k. Confined Space: Each subcontractor requiring access to confined spaces must present their specific confined space safety plan to the CM prior to beginning confined space work. l. A daily jobsite safety meeting prior to starting work for all workers on the project will be utilized by each subcontractor, attendance by all on-site personnel is mandatory. Project site wide safety meeting will be coordinated as necessary by CM and attendance is also mandatory. m. Asbestos – Removal/abatement of asbestos-containing material should not be included in the base bid for any bid category. If during demolition work any material is encountered that is known to contain or suspected of containing asbestos, immediately stop work associated with the questionable material and notify the CM. n. Construction Fumes, Odors, Dust and Related Hazards – All subcontractors shall take extreme care to prevent the infiltration of toxic, hazardous, carcinogenic, and objectionable fumes and odors into adjacent occupied buildings and existing air intakes. Review with CM all sealers, curing agents, and concrete dust producing activities and other products that will possibly affect air quality. All MSDS pertaining to materials/chemicals used on the site
must be submitted to the CM before bringing the materials/chemicals on site. Smoke Eaters must be used in conjunction with any welding activities. o. Hazardous Material – Transportation, handling, storage, and legal disposal of hazardous and potentially hazardous materials shall be pursuant to all applicable Federal, State, and local requirements. The Construction Manager must immediately be notified of any spill or other mishap involving hazardous materials. p. Reference F.A. Wilhelm’s Excavation Policy. 8. Conduct and Coordination: a. Smoking and the use of any tobacco products, including e-cigarettes and vaping, inside buildings, on the property of the owner or on the construction site is prohibited. These rules apply to adjacent properties including the local residential neighborhood and office complexes. Failure to abide by this policy will result in removal from the project. b. Each subcontractor shall cooperate and coordinate with all other Bid Category Subcontractors for expedient completion of the work of this project. If work is not properly coordinated, the CM will require the subcontractor to remove and relocate work with no additional compensation. c. Initial benchmarks, horizontal and vertical, will be provided by the CM. Each subcontractor shall be responsible for all field measuring, engineering, detailed layout, grade and stakes from benchmark and control points required for proper location and coordination of the work. d. Company signs are prohibited, except as specifically assigned by Contract Documents or approved by the CM. Safety signage is mandatory. 9. Management and Supervision: a. Each subcontractor and sub-subcontractor shall have daily huddle meetings at the beginning of each work shift, at a minimum. The huddle meetings shall review all activities on site and provide an open forum for all participants to review safety hazards and procedures to safely conduct the work. All personnel shall attend each huddle meeting and attendance shall be taken daily. Daily foreman huddle meetings are required for each subcontractor on site. b. Subcontractor shall have full-time supervision on the job at all times while Subcontractor’s work is being performed. This requirement applies to all work under Subcontractor’s Scope of Work. This superintendent must be present at all Subcontractor coordination meetings and safety meetings held by Contractor each week. Employees of Subcontractor shall be required to attend weekly job site safety meetings. c. The CM will be utilizing a web-based information management system, Procore, to facilitate communications among project partners including but not limited to Owners, Architects, Engineers, CM, and Subcontractors. Use of this system is mandatory for all subcontractors. All subcontractors must have an e-mail address and have access to the internet. d. Subcontractor to provide a three (3) week look ahead schedule every week. Subcontractor to review, comment, and/or accept Contractor’s P6 Schedule at every update within seven (7) working days of issuance of the updated P6 Schedule. 10. Protection of Work or Property:
a. Commencement of finishing work (completion of work started by others) by subcontractor shall constitute subcontractor’s approval of substrate surfaces for receiving work. Any resulting failure or development of defects in work in these areas shall be repaired at the expense of subcontractor applying finish material. Discrepancies in the work of others shall be brought to the CM's attention prior to starting subcontractor's work. b. Where new work connects with existing, do all necessary cutting and patching required to make a satisfactory connection with the work to be performed under the Contract Documents to leave the entire work in a finished and workmanlike condition. This requirement shall include all required work where new items connect, fit, or otherwise interface with existing surfaces. Provide all labor and materials to this end, whether or not shown or specified. Verify and match existing conditions. 11. Access to Jobsite/Work Times: a. The jobsite will be open during normal working hours, Monday-Friday 7:00AM-4:30PM EST. Work hours outside of these normal working times will be required due to utility shutdowns, work in occupied spaces, site work, exterior building work, and/or loud or noisy work activities due to adjacent neighbor or owner restrictions. The CM reserves the right to change work hours as necessary. This does not alleviate the subcontractor's responsibility to work overtime as required to maintain the schedule. The CM shall try to accommodate any requests by subcontracts to have the jobsite open at different times/days. b. Each subcontractor shall include off-hours work for work in or near areas that could affect the function of the existing facility, as required to complete the scopes of work. The existing facility will remain fully functional throughout the duration of construction. Construction activities taking place shall be planned to minimize/eliminate any interruptions within the facility. Working in existing spaces shall be completed during non-first shift work hours as required to facilitate the on-going operations of the hospital. All costs to complete this work shall be included in this bidder's base bid. c. Saturdays will be utilized on the project as a make-up workday for any lost time during the normal work week. This includes lost time due to weather impacts. d. Saturdays will also be utilized to maintain the project schedule when work activities or durations have fallen behind schedule. e. If the perimeter of the jobsite is enclosed by construction fencing, any Subcontractor that must relocate the temporary construction fencing shall put it back in place, in the state it was found at the end of each workday. f. Subcontractor shall be prohibited from blocking traffic on any public streets or sidewalks. If blocking of public areas are required, Subcontractor is to coordinate and comply with all local requirements, permits, traffic controls, etc. 12. Parking - Parking on site is not permitted. Subcontractor to make accommodations to transport employees to and from the job site. 13. Storage & Delivery: a. There will be limited space available for on-site construction office trailers. Tool/Storage containers shall only be placed with the prior approval of the CM.
b. The project site is limited on lay down, storage, preparation areas, etc. All subcontractors will be required to deliver material to the project on an “as needed” basis and as discussed and approved with the CM. c. All materials delivered to the site shall be neatly organized (as discussed with the CM) and adequately protected from weather at all times and shall be received and stored at the jobsite in an approved manner as established by the manufacturer, specifications, and CM. All materials to be delivered shall be sized, bundled, or packaged in such a fashion to fit in the building. d. Each subcontractor shall take care to plan their work and storage of materials in a manner that does not overload the structure. e. All construction deliveries and access to the site will be thru the designated construction entrance as directed by the CM. Subcontractors requiring alternate access must review their plan for access with the CM prior to proceeding with work. This subcontractor shall provide any cleaning of streets, de-icing and snow removal of work area, temporary signage, barricades, flagmen, etc. required to conduct their work. f. If any vehicle working under this subcontractor carries mud or dirt on any roadways or pavements, this subcontractor shall clean it immediately. 14. Special Project Conditions: a. A Project Specific QA/QC Plan will be prepared by the CM for this project and distributed to all subcontractors for review and submission of a “scope specific” QAQC plan for their scope of work. b. Subcontractor shall provide their own temporary power and task specific lighting. Basic OSHA required lighting inside the building will be provided by the CM. c. Subcontractors have included all project specific or required mock-up provisions for the project as shown or called out in the Bid Documents. d. CM will provide a portion of total necessary port-o-lets as defined by OSHA guidelines. Trade Contractors will be responsible for additional port-o-lets as necessary. e. Subcontractor shall provide their own drinking water for their workers. A designated lunch area will be established for the job site. No food or drinks other than water will be allowed in other areas of the building or site. f. All utility shutdown requests shall be requested and coordinated with the CM and Owner. g. All subcontractors will be required to acquire an ID Hardhat Sticker during their on-site orientation. h. There will be very minimal, if any, laydown available onsite. All deliveries are to be JIT (just in time) Delivery. All deliveries are to be coordinated so that the items can be offloaded in a timely manner. i. CM will provide one (1) operated lull for everyone’s use during construction. If additional means are required to hoist materials, this must be coordinated with the CM. Any hoisting that requires specialty equipment or cranes will be provided by subcontractor. j. Each subcontractor is responsible for repair of firestopping or other materials integral to the proper and complete installations of another trades work that is required to maintain a fire rating or code compliance that was previously installed. The subcontractor is responsible for the cost for the repair by the Subcontractor who warrants the installation. If more extensive patching is required, this will result in a back charge to the subcontractor creating same.
k. Subcontractors shall examine the conditions under which the work is to be installed and notify the CM in writing of any discrepancies or conditions detrimental to proper performance of the work. This subcontractor is not to proceed until the required corrections are accomplished. However, this requirement does not alleviate a preceding subcontractor from his responsibility to correct deficient work or pay the subsequent subcontractor’s cost of rework. l. In the event of discrepancies in the Contract Documents each subcontractor shall assume the higher quality and greater quantity on bid day and include a list of said discrepancies with their bid. The CM and A/E will determine the correct assignment of work and scope will be adjusted accordingly. Each subcontractor is responsible for the complete review of and coordination with the Bid Categories of all other subcontractors. m. Bidders shall review the documents and note the basis of design with regard to manufacturers. Refer to architectural specification sections for substitution procedures. Bidders using manufacturers other than the basis of design shall be responsible for all costs that may be incurred to accommodate the manufacturer utilized by the bidder. These costs including costs that may be incurred by other trades to accommodate the manufacturer shall be borne by the subcontractor providing the alternative equipment. n. Each subcontractor shall provide any required utility extensions, utility connection/tap fees and/or additional services beyond those shown or specified in order to complete their scope. This subcontractor shall coordinate with the utility companies for verification of underground services prior to beginning work. o. Project specific requirements for utility services needs listed and defined i.e. electrical service, lighting, water, etc. p. This subcontractor shall provide 1 worker per every 10 (or one individual if work crew is less than 10) to serve as a member of the composite cleanup crew directed by the CM. This composite cleanup crew will occur once per week or as required to maintain a clean and safe work environment. q. MEP subcontractors shall include all required and UL Listed firestopping for all their respective MEP through fire rated wall penetrations. r. Each subcontractor is responsible for the entire set of Construction Documents for their complete scope of work. No changes in cost will be considered for work shown on any drawings regardless of discipline where shown (i.e. Electrical connections/requirements shown on plumbing drawing). s. Roofing Penetrations –The roofing subcontractor shall be responsible for cutting/repairing of all roof penetrations required as determined by the MEP documents. This includes cutting, flashing, protecting and maintaining the roofing warranty. All MEP subcontractors shall coordinate with the Roofing subcontractors for final locations of all scope related roofing penetrations. t. Each Subcontractor must coordinate with any and all Owner-Furnished equipment, materials and connections as it relates to your bid item/ package Scope of Work. u. Subcontractor will be required to attend the weekly subcontractor meeting prepared with a weekly work plan for the coming week and a review of the work activities to take place in the next 6-week work period. v. All inserts and sleeves shall be cast-in-place whenever feasible. No sleeve shall be placed through any concrete element unless specifically called for on the structural drawings, approved sleeve submittal or specifically authorized in writing by the structural engineer.
w. Core drilling shall not be permitted unless authorized in writing by the structural engineer. Any and all core drilling will follow the standard protocol assigned by the structural engineer or Construction Manager. x. Joint sealants and caulking is assigned to the respective bid packages. Further definition is found in each bid package and bid item Scope of Work. If not more specifically defined, each Subcontractor is responsible for sealant and caulking as required for components which that Subcontractor is responsible for providing and installing. y. All Subcontractors who have work that incorporates MEP components or associated Architectural components that are tied into the MEP systems shall be required to actively participate in BIM/MEP coordination meetings. These BIM/MEP meetings will be scheduled and run by the CM VDC Coordinator/Subcontractor. Each Subcontractor may be required to provide the appropriate BIM/Revit files to the CM VDC Coordinator for purposes of loading into the BIM model along with other trades to determine and resolve all “clash detections” to the satisfaction of the CM VDC Coordinator. All subcontractors shall be required to produce a final set of as-built documents necessary for project closeout. z. The project will be BIM Coordinated per Exhibit “J” of the schedule “A”. Subcontractors will participate in this coordination to the fullest extent required by the contract documents. aa. Subcontractors will be required to actively participate in the final building commissioning and to complete any required documentation and paperwork.
Madison Lifestyle District Parking Garage 02A – Temporary Fencing The work for this Bid Package specifically includes, but is not limited to, all work as defined in the following Specification Sections: Division 00 Bidding and Contract Requirements Division 01 General Requirements Additionally, this scope of work includes, but is not limited to, the following: 1. Furnish and install the required temporary fence on the project. A site logistics plan has been provided. 2. Coordinate delivery and installation based off schedule to occur prior to construction team mobilization. 3. Fence to be standard 6’ chain link fence. 4. Driven posts are required at all gates. 5. Subcontractor may provide driven post or panelized system at their discretion. 6. Temporary fencing to be in place for the duration of the project. 7. Subcontractor shall include (2) additional trips to the project site for necessary modifications to accommodate the construction sequence. 8. Include removal of temporary fence upon completion of the project. 9. Upon removal of temporary fencing, the subcontractor is responsible for restoration of site finishes, beyond the extents of the project, that are affected by temporary fencing. Work Performed by Others and Excluded: 1. Subcontractor has excluded all sales tax on permanent in place work due to tax exempt status of Owner. 2. Subcontractor Payment and Performance Bonding.
Madison Lifestyle District Parking Garage 02B – Tower Crane The work for this Bid Package specifically includes, but is not limited to, all work as defined in the following Specification Sections: Division 00 Bidding and Contract Requirements Division 01 General Requirements Additionally, this scope of work includes, but is not limited to, the following: 1. Subcontractor to include a 38-week duration for equipment. 2. Subcontractor to include 1,520 crew hours for operation of the crane. 3. Subcontractor to include 380 crew hours of overtime premium. 4. Subcontractor to include (1) mobilization and (1) demobilization in base bid. 5. Subcontractor to include setup and tear down of tower crane. 6. Tower crane shall provide 10,000 lb capacity at the tip. 7. Includes all road permits. 8. Includes an add for zoning / anti-collision. 9. Subcontractor to include 38 weeks of necessary maintenance. 10. Subcontractor to include the anchor stool for foundation work. 11. Subcontractor to include foundation design. 12. Subcontractor to include all the above listed items into a lump sum base bid to be evaluated. Work Performed by Others and Excluded: 1. Subcontractor has excluded all sales tax on permanent in place work due to tax exempt status of Owner. 2. Subcontractor Payment and Performance Bonding. 3. Electrical
Madison Lifestyle District Parking Garage 03A – Cast-in-Place Foundations The work for this Bid Package specifically includes, but is not limited to, all work as defined in the following Specification Sections: Division 00 Bidding and Contract Requirements Division 01 General Requirements Sheet S002 General, Penetrations and Embedded Items, Delegated Design, Shop Drawing Submittals, Product Data Submittals 03 10 00 Concrete Forming and Accessories 03 20 00 Concrete Reinforcing (as applicable) 03 30 00 Cast-in-Place Concrete Preliminary Geotechnical Investigation Report by Atlas, August 21, 2024. Additionally, this scope of work includes, but is not limited to, the following: 1. Subcontractor shall provide all structural cast-in-place concrete, forming, placing, pumping, finishing, and necessary and related materials to construct all foundations consisting of wall footing, foundation walls, elevator pit walls, platform foundation walls, mat foundations, column footings, etc. for a complete project. See exclusions below. 2. Work includes accessories and components of the Work including curing compound or proper curing methods, water stop, expansion joints, control joints, sawcut joints, reveals, chamfer strips, hardener, etc. 3. Includes all formwork, edge forms, block-outs, to complete the project. Formwork drawings must be submitted for review and approval. 4. All concrete shall be formed. 5. Subcontractor shall have a full-time non-working superintendent on the job at all times while Subcontractor’s work is being performed. This requirement applies to all work under Subcontractor’s Scope of Work. This superintendent must be present at all Subcontractor coordination meetings and safety meetings held by Contractor each week. Employees of Subcontractor shall be required to attend weekly job site safety meetings. 6. Subcontractor shall have a full-time Project Manager on the job at all times. 7. Subcontractor is responsible for overseeing Safety and Quality for this scope of work. 8. Include a minimum of 8 hours per week for project clean-up. 9. Includes overtime required to maintain the project schedule. 10. There will be no increase in cost for the duration of the project. 11. Includes all layout for this Work. 12. Includes all required equipment, hoisting, cranes, and pumps as required to complete concrete work.
13. All concrete is to be placed via pumps. 14. Rubbing, patching, and grouting to achieve proper finish as called for by the Contract Documents. Review project finish requirements for any architectural exposed or finished concrete. Include mock-ups for exposed, finished concrete surfaces for review and approval. 15. Install miscellaneous embedded items furnished by others. Define quantities if not shown for an allowance. 16. Casual dewatering is required to complete this scope of work, including rain events, runoff, minimal ground water, etc. 17. Conformance with OSHA safety requirements. 18. The subcontractor is responsible for grouting structural steel base plates. 19. Include concrete wash-out basin/dumpsters/area. 20. Include winter conditions as required within the attached Project Schedule. a. Hot water charges for ready-mix concrete b. Concrete blankets c. Admixtures required for cold weather placement d. Temporary enclosures and heat (including fuel consumption) 21. Include snow removal and haul off for the duration of this scope of work. Subcontractor is responsible for tarping and snow removal. 22. Provide all structural excavation and backfill required to complete this Work. Includes removal of spoils off-site and backfill with approved, suitable materials. 23. The subcontractor has included stone/flowable fill beneath the foundations as shown in the documents. 24. The subcontractor shall include all construction and saw cut control joints per the documents. 25. Subcontractor to provide foundation insulation scope and requirements. 26. Subcontractor to provide all damp proofing. 27. Subcontractor to include allowance for a concrete foundation for base of tower crane. Assume 30’x30’x5’. Work Performed by Others and Excluded: 1. Cast-in-Place concrete for slab on grade, columns, shear walls, garage elevated decks and beams, and elevated podium deck. 2. Subcontractor has excluded all sales tax on permanent in place work due to tax exempt status of Owner. 3. Subcontractor Payment and Performance Bonding.
Madison Lifestyle District Parking Garage 03B – Rebar – Supply The work for this Bid Package specifically includes, but is not limited to, all work as defined in the following Specification Sections: Division 00 Bidding and Contract Requirements Division 01 General Requirements 03 10 00 Concrete Forming and Accessories (as applicable) 03 20 00 Concrete Reinforcing 03 30 00 Cast-in-Place Concrete (as applicable) Additionally, this scope of work includes, but is not limited to, the following: 1. Supplier shall provide all fabricated reinforcing steel for the concrete foundation scope including but not limited to the following: mat foundations, column footings, foundation walls, elevator pit walls, platform foundation walls. 2. Includes dowels extending out of this concrete scope into other concrete and CMU masonry. 3. Includes a (20) ton fabricated reinforcing steel supply allowance for a tower crane foundation. 4. Includes a (5) ton fabricated reinforcing steel supply allowance. 5. Includes rebar (plain), dowels, other concrete accessories required to install reinforcing. 6. Includes standees and bar supports. 7. All reinforcing steel shall be cut, bent, bundled, and tagged. 8. Includes all detailing, shop drawings, engineering, fabrication and freight to job site. Work Performed by Others and Excluded: 1. Reinforcing steel for slab on grade, columns, shear walls, garage elevated decks and beams, and elevated podium deck. 2. Installation of reinforcing steel. 3. Subcontractor has excluded all sales tax on permanent in place work due to tax exempt status of Owner. 4. Subcontractor Payment and Performance Bonding.
Madison Lifestyle District Parking Garage 03C – Rebar - Installation The work for this Bid Package specifically includes, but is not limited to, all work as defined in the following Specification Sections: Division 00 Bidding and Contract Requirements Division 01 General Requirements 03 10 00 Concrete Forming and Accessories (as applicable) 03 20 00 Concrete Reinforcing 03 30 00 Cast-in-Place Concrete (as applicable) Additionally, this scope of work includes, but is not limited to, the following: 1. Subcontractor shall install all reinforcing steel for the concrete foundation scope including but not limited to the following: mat foundations, column footings, foundation walls, elevator pit walls, platform foundation walls. 2. Includes dowels extending out of this concrete scope into other concrete and CMU masonry. 3. Includes a (20) ton reinforcing steel install allowance for a tower crane foundation. 4. Includes a (5) ton reinforcing steel install allowance. 5. Includes tie wire and other concrete accessories required to install reinforcing. 6. Includes installation of standees and bar supports. 7. Includes pricing for a 40-hour work week and a 50-hour work week. 8. Includes full-time onsite supervision. 9. Includes project management. Work Performed by Others and Excluded: 1. Reinforcing steel for slab on grade, columns, shear walls, garage elevated decks and beams, and elevated podium deck. 2. Supply of reinforcing steel. 3. Subcontractor has excluded all sales tax on permanent in place work due to tax exempt status of Owner. 4. Subcontractor Payment and Performance Bonding.
Madison Lifestyle District Parking Garage 03D – Ready Mix Supplier The work for this Bid Package specifically includes, but is not limited to, all work as defined in the following Specification Sections: Division 00 Bidding and Contract Requirements Division 01 General Requirements 03 10 00 Concrete Forming and Accessories 03 20 00 Concrete Reinforcing (as applicable) 03 30 00 Cast-in-Place Concrete Additionally, this scope of work includes, but is not limited to, the following: 1. Furnish the supply of ready mix on the project for all mat foundations, column footings, foundation walls, elevator pit walls, platform foundation walls. 2. Includes all admixtures required by specifications and Concrete Mix schedule. 3. Includes high range on all mixes provided. 4. Includes admixtures, hot water, trucking, plant labor, testing coordination, and quality control as outlined in the contract documents. 5. Deliveries shall be coordinated in advance with the Construction Manager and Concrete Trade Contractor. 6. Supplier agrees and has capacity to supply project as described in contract documents. 7. Supplier has capacity to support and supply concrete pours in excess of 500 cy per day. 8. Supplier will maintain a minimum relative yield of 1 for concrete. 9. All environmental fees are included in unit prices indicated. 10. Ready-mix material is not subject to price escalation per the contract schedule. 11. Supplier shall provide all submittals, testing data, material data safety 12. Information, mix designs, and all other submittal requirements as listed in the specifications. 13. Suppliers contract will be based on unit prices provided on bid form and field verified quantities of supplied ready-mix. 14. Quantities provided are for estimating purposes only. 15. Subcontractor to fill out the following read-mix pricing table, and admixture/additives table and to submit a lump sum bid for the parking garage based off forthcoming quantities provided.
Work Performed by Others and Excluded: 1. Subcontractor has excluded all sales tax on permanent in place work due to tax exempt status of Owner. 2. Subcontractor Payment and Performance Bonding. A. COST BREAKDOWN a. Parking Garage Base Bid $ ___________________ B. READY-MIX PRICING (Per Drawings, Specs, and Concrete Mix Schedule) Mix Type/Description Mix Strength Estimated Quantity Price per Yard Footing and Mat Foundations: Crystalline Waterproofing Admixture (Note 7) 4,500 PSI Forthcoming/cy $ /cy Foundation Walls: These elements must be prevented from freezing and protected from moisture in soil. Crystalline Waterproofing Admixture (Note 7) 5,000 PSI Forthcoming/cy $ /cy Exposed Foundation Walls: Crystalline Waterproofing Admixture (Note 7) 5,000 PSI Forthcoming/cy $ /cy Exterior Stoops, Pads, and Slabs on Grade 5,000 PSI Forthcoming/cy $ /cy Exterior Retaining Walls 5,000 PSI Forthcoming/cy $ /cy Interior Slabs on Grade (6 inches or less): Fiber Additive per SOG Schedule (Where indicated) 4,000 PSI Forthcoming/cy $ /cy Interior Columns 6,000 PSI Forthcoming/cy $ /cy Exterior Exposed Columns and Shear Walls 6,000 PSI Forthcoming/cy $ /cy Interior Core Walls and Shear Walls 6,000 PSI Forthcoming/cy $ /cy Interior PT Beams and Slabs 6,000 PSI Forthcoming/cy $ /cy Exterior Exposed PT Beams and Slabs 6,000 PSI Forthcoming/cy $ /cy
C. CONCRETE ADMIXTURE & ADDITIVES (as applicable) Mix Type/Description Price per Yard MID RANGE WATER REDUCER $ /cy HIGH RANGE WATER REDUCER $ /cy ADDITIONAL BAG OF TYPE 1L CEMENT $ /cy STRAIGHT CEMENT $ /cy TYPE 3 CEMENT REPLACEMENT $ /cy LEAN CONCRETE per CY $ /cy FLOWABLE FILL PER CY $ /cy VMA (VISCOSITY ADMIXTURE) per CY $ /cy ELEMENT 5 INTERNAL CURE $ /cy XYPEX PER CY $ /cy PENETRON PER CY $ /cy FIBER PER DOSE MICRO $ /cy FIBER PER DOSE MACRO $ /cy STEEL FIBER $ /cy 1% CALCIUM CHLORIDE per DOSE $ /cy LOW CHLORIDE ACCELERATOR per DOSE $ /cy NON-CHLORIDE ACCELERATOR per DOSE $ /cy FREEZEGUARD Per Dose $ /cy DCI (DISPLACED CONCRETE INHIBITION) PER GAL $ /cy HIGH EARLY ACCELERATOR $ /cy RETARDING ADMIXTURE 1st DOSE $ /cy RETARDING ADMIXTURE ADDITIONAL DOSE $ /cy WASHOUT BAGS PER LOAD $ /cy ICE per LB $ /cy HEATED AGGERGATE (NOV 1 - MARCH 31) $ /cy
WINTER SERVICE CHARGE (NOV 1-MARCH 31) $ /cy HOLIDAY NON-WORK DAYS $ /cy SUNDAY PREMIUM PER (CY or LOAD) $ /cy SUNDAY PLANT OPENING CHARGE $ /cy HOLIDAY PREMIUM PER LOAD $ /cy SATURDAY DELIVERY PER LOAD $ /cy NIGHT SHIFT PREMIUM CHARGE $ /cy SMALL LOADS (____ CY or LESS) $ /cy LATE DELIVERY AFTER 5PM $ /cy WASHOUT BAGS EACH $ /cy COLOR WASHOUT FEE $ /cy PRICING ESCALATOR $ /cy PRICING JOB END DATE $ /cy
Madison Lifestyle District - Parking Garage 14A - Elevators The work for this Bid Package specifically includes, but is not limited to, all work as defined in the following Specification Sections: Division 00 Bidding and Contract Requirements Division 01 General Requirements 14 21 00 Electric Traction Elevators Additionally, this scope of work includes, but is not limited to, the following: 1. Provide, install, and test new elevators for project. 2. Includes all signals, wiring, and cabling for a complete installation. 3. Provide elevator sills as required. 4. Includes all elevator cab finishes. 5. All elevators submitted must be able to meet all of the design requirements as specified. 6. Subcontractor shall submit a detailed schedule to be incorporated into the Project Schedule for each individual elevator included in this Subcontract. Schedule to include installation activities, pre-inspection checklist activities, pre-functional and performance testing, commissioning, final testing, project closeout, etc. 7. All cab sizes are to be in accordance the Contract Documents. Any deviations or alternate sizes or configurations must be approved by the Architect and General Contractor. Subcontractor shall provide all ceiling finishes, cab finishes, and lighting within the elevators as specified. 8. Subcontractor shall provide all elevator door frames and vertical guide rail supports as required. Subcontractor to coordinate grouting of sills by others. If required, sill support angles will be provided and installed by others. Final layout drawings are to be provided by Elevator installer. All divider beam/intermediate support steel required by others. 9. Subcontractor shall verify that all locations and depths of call buttons, indicator lights, etc. will work with corresponding finishes and wall thicknesses as designated in the Contract Documents. 10. Subcontractor is responsible for verifying all dimensions of elevator shafts, pits, openings, landings, machine rooms, etc. as shown on the Contract Documents are acceptable and will not be required to change to accommodate the work of the subcontract. 11. Elevator subcontractor is required to coordinate all work by others in the shaft and machine room in order to successfully install and operate the elevator per specifications and Contract Documents. This includes but is not limited to, the responsibility to coordinate pit receptacles, disconnects, pit lighting locations, sump pit dimensions,
general shaft layout, etc. and scheduling pre-installation and coordination meetings with the appropriate trades as necessary. 12. Subcontractor shall furnish all embeds, inserts, and sleeves through walls to be installedby others. These inserts shall be furnished in a timely manner as to not delay theproject. Subcontractor shall provide coordination and furnish approved detailed layoutdrawings in a timely manner locating all inserts and sleeves being furnished by the Subcontractor. If these items are not furnished in time, this Subcontractor shall be responsible for all costs, including but not limited to coring, drilling, anchoring, etc. associated with installation of elevator components where it is required. 13. All support steel (divider beams/intermediate support steel) for guide rail/machineinstallation is to be provided and installed by others. Subcontractor shall providecoordination and furnish approved detailed layout drawings locating all anchor inserts required for this scope of work. If the Subcontractor does not furnish the anchor inserts, layout drawings, and coordination at the time the formwork is constructed, Subcontractor shall assume all costs for the use of an alternate means of anchoring. 14. The Subcontractor shall coordinate the installation of hoist beams, divider beams, misc.steel at each elevator shaft to be furnished and installed by others. Subcontractor shallverify that the location of beams does not conflict with the elevator layout in a timely manner. This includes verification of shaft height and run-by/clearance requirements. 15. All electrical wiring required for the operation of the elevators shall be provided by thisSubcontractor, with the exception of power from the source, which will be provided bythe Electrical Subcontractor to the location and with the amperage and voltage indicatedon the Electrical Plans. This Subcontractor shall be responsible for coordinatingtemporary power. 16. Subcontractor shall make provisions within the elevator cabs and equipment to installcard readers and cameras supplied by others within the cabs, including contact points,programming, etc. Subcontractor should additionally make provisions for any cardreaders located in the elevator lobbies required for the installation of this Scope of Workwith the Electrical Subcontractor.17. Subcontractor shall provide elevator mechanics as required to operate platforms andcabs to facilitate elevator inspections required by the Authority Having Jurisdiction.18. Subcontractor shall provide elevator mechanics to operate platforms and cabs asrequired by code for other trades to complete work in the shaft, cab, and lobby includingbut not limited to concrete, masonry, electrical, steel, fire caulking, plumbing, andfinishes installation. Unit pricing for this work is listed as an alternate under the“Subcontractors Work” section in this Subcontract. 19. Subcontract shall provide an accounting breakout for a line item for each individualelevator for a total of 4 line item breakouts.
20. This Subcontractor is responsible for and shall participate in all tests and inspections related to the elevators, including fire alarm tests, life safety tests, and inspections at no additional cost. If re-inspection is required and is not due to the fault of this Subcontractor, Subcontractor shall be reimbursed. 21. This Subcontractor shall obtain and pay for all licenses and permits required for the work of this Subcontract. 22. Subcontractor is responsible for providing a safe work environment. This Subcontractor shall maintain fall protection (initially installed by others) for open hoistways during the installation of this work, including but not limited to removable barricades, toeboards, falling debris protection, safety netting, and temporary work platforms. All equipment, lifts, scaffolding, etc. shall conform to OSHA and site-specific safety requirements. 23. Subcontractor will include rebalancing and final adjustments of the elevator cabs after the architectural finishes have been installed. 24. Subcontractor shall clean hoistways, cars, car enclosures, entrances, operating and signal fixtures, machine room, machine room equipment, and fire status equipment. 25. Subcontractor includes the testing and commissioning of all equipment and systems installed under the work of this Subcontract. Subcontractor is responsible for taking corrective action to address any items deemed as non-conforming or non-compliant by the commissioning agent. 26. Subcontractor shall provide any special tools or parts as required by the Contract Documents for attic stock. (Stored at Subcontractor’s Indianapolis branch) 27. Subcontractor will furnish any inserts or embeds required to be installed in CMU or concrete walls or slabs. 28. Subcontractor to include elevator pit ladder. 29. Subcontractor is responsible for all hoisting, rigging and staging of materials and Work. 30. Verify requirements and who is providing the hoist beam, machine beams, etc. 31. Subcontractor shall perform a pre-inspection check list notifying the Construction manager of any Work that needs to be completed by other trades. This Work will be completed prior to this Subcontractor requesting a Temporary or Final State inspection. Work Performed by Others and Excluded: 1. Subcontractor has excluded all sales tax on permanent in place work due to tax exempt status of Owner. 2. Subcontractor Payment and Performance Bonding.
Madison Lifestyle District Parking Garage 31A – Site Demolition, Earthwork, & Site Utilities The work for this Bid Package specifically includes, but is not limited to, all work as defined in the following Specification Sections: Division 00 Bidding and Contract Requirements Division 01 General Requirements C003 Earthwork C003 Demolition C003 Execution C003 Storm Sewer Preliminary Geotechnical Investigation Report by Atlas, August 21, 2024. Additionally, this scope of work includes, but is not limited to, the following: 1. Subcontractor to provide all labor, materials, and equipment for the mass grading cut & fill inclusive of trenching & backfill for site utility work. 2. Subcontractor has included multiple mobilizations to site to accomplish all work included in this scope of work package and recognized and includes all construction phasing of the project. 3. Subcontractor has received and reviewed the preliminary geotechnical report for this site and has incorporated any and all methods required to complete the work. 4. Installation, maintenance and removal of all erosion and sedimentation control measures for the project inclusive of silt fencing, check dams, concrete washout, stone entrances, inlet protection, sediment basins, filter waddles, stormwater control plan, temporary slope protection including all street cleaning of access streets at site entrances as required. Replace materials as needed and provide required inspections for entire duration of project. 5. Site demolition, saw cutting and removal as shown on drawings, including concrete/asphalt pavements, curbs, sidewalk, signage, stone, wall, concrete bases, wheel stops, overhead electric, plantings, and clear & grub trees, etc. as indicated on site demolition documents. Light poles to be removed, salvaged, and turned over to owner. 6. Includes legal removal/disposal of all spoils and demolished materials per this scope of work. Subcontractor has included removal of all existing site utilities as shown on the documents inclusive of manholes, catch basins etc. 7. Subcontractor has included the concrete inlet collars. 8. Includes installation of site entrances, stone entrance areas, wash-off stations, etc.
9. The subcontractor has included stripping and hauling off existing topsoil. 10. Subcontractor has included all materials, equipment, and labor for all Site Grading/Drainage inclusive of all mass cut & fill, rough & fine grading for both parking lots and building pad and new detention basins. 11. Subcontractor has included all layout and staking for all cuts/fills, utilities, rough/fine grading, and concrete curbs & sidewalks. 12. The subcontractor has included all import borrow and haul off that may be required to achieve a balanced site and intended drainage contours as shown on the documents. 13. Stockpile of approved backfill material will be stored on-site in the area designated on plans. 14. Subcontractor has included all final and fine grading of site to +/- 0.10 feet of required subgrade elevations. 15. Maintain the site in a well graded condition to permit water run-off and prevent demucking. 16. Furnish and install stone subbase for all concrete sidewalks, asphalt and concrete pavement. 17. Include scratching out of subgrade and aggregate base for concrete curbs, both integral and freestanding. 18. The subcontractor shall include private utility locates. 19. Subcontractors shall provide any hydro excavation required to locate existing utilities. 20. Provide fully compacted and approved subgrades for building pads and site hardscapes. 21. This subcontractor has included under drain tile, inclusive of all drainage gravel as required by the documents. 22. The subcontractor has included all dewatering as required. 23. Temporary shoring for utility and excavation work including support and protection of existing utilities. 24. Include maintenance of traffic for final connections to existing utilities. 25. All storm water piping, structures, catch basins, drain basins, and end sections inclusive of all trenching, excavation, backfill, bedding and grouting of structures as required for proper flow diversion. 26. Include storm piping and final connections to site trench drains. Trench drains to be furnished and installed by others. 27. Subcontractor has included all new water lines as shown on the documents inclusive of trenching, pipe bedding, piping, tracer wire, caution tape and compacted backfill. 28. The subcontractor has included all fire hydrants, PIVs’ and water valves connections as shown or required by City of South Bend. 29. Include the stubbing up of the fire protection line up to and including the flange within the mechanical room. 30. The subcontractor has included all new sanitary sewer lines and sanitary structures as shown on the documents inclusive of excavation, pipe bedding, piping, tracer wire, caution tape and compacted backfill. 31. Include camera, video and reports for all storm and site utilities
32. The subcontractor shall adhere to all CM qualifications and safety orientation procedures, background checks, E-Verification, drug testing and other defined requirements identified in the proposal process. 33. The subcontractor has included all site utilities inclusive of domestic water, fire water, sanitary and storm rain leaders as indicated in documents, including final connections at a point 5’ outside of the building unless noted otherwise. 34. The subcontractor has included all fire service and meter vaults. 35. The subcontractor has included removal of all temporary stone to return to prior conditions, seeding by others. 36. This scope requires verification of all existing invert elevations and tie-in points prior to starting work. 37. Proper care shall be taken to avoid tracking debris, trash, and mud onto public streets or adjacent properties. Mud or excess dirt on public streets resulting from work operations shall be cleaned daily. The bidder shall have the necessary equipment and personnel available onsite during all working hours to handle any emergency cleanup. 38. Dust control is included for this scope. 39. Traffic control, permitting, flaggers, barricades, temporary officers, etc. as required for this scope of work. 40. Temporary seeding. 41. As-Builts of all installed materials as required by City of South Bend. Work Performed by Others and Excluded: 1. Subcontractor has excluded all sales tax on permanent in place work due to tax exempt status of Owner. 2. Subcontractor Payment and Performance Bonding. 3. Site Utilities
Madison Lifestyle District Parking Garage 31B – Aggregate Piers The work for this Bid Package specifically includes, but is not limited to, all work as defined in the following Specification Sections: Division 00 Bidding and Contract Requirements Division 01 General Requirements Sheet S002 Rammed Aggregate Pier System Specifications 31 66 13.13 Rammed Aggregate Piers Preliminary Geotechnical Investigation Report by Atlas, August 21, 2024. Additionally, this scope of work includes, but is not limited to, the following: 1. Subcontractor to include all equipment, material, labor, and supervision necessary to design and install aggregate pier system complete, and to perform soil and aggregate pier testing. 2. Subcontractor to include allowance for additional tower crane base. See Site Logistics Plan provided for reference to location. Size subject to change. 3. Subcontractor to provide a fully designed system for aggregate piers to meet the specifications required by the building against the conditions from the Geotechnical Report provided. 4. Design submittal to be signed and sealed by an Indiana Professional Engineer. 5. Includes the designing, furnishing, installing, monitoring, and testing of the densified aggregate pier foundations to the lines and grades designated on the project foundation plan and as specified herein. 6. The Aggregate pier designer shall determine the number of piers, diameters, and depth of piers. 7. The design must rely on subsurface information presented in the project geotechnical report. The information on ground conditions must be assessed to determine its suitability for the specified ground improvement system. 8. The aggregate piers to be columns of compacted aggregate constructed in a columnar-type configuration to produce an intermediate foundation system for support of foundation loads to achieve the degree of improvement (allowable bearing capacity for maximum allowable settlements). 9. The piers can be constructed with a down-hole vibratory probe, displacement mandrel system, or a down-hole tamper. 10. Subcontractor to prep site, and predrill as necessary, for the installation and layout of aggregate piers.
11. Subcontractor shall be responsible for determining and implementing the systems and criteria necessary to ensure that the specified performance is achieved. 12. Subcontractor to provide all handling and hauling of spoils generated by this scope of work. 13. Include layout of aggregate piers from benchmarks and control points provided by others. Work Performed by Others and Excluded: 1. Subcontractor has excluded all sales tax on permanent in place work due to tax exempt status of Owner. 2. Subcontractor Payment and Performance Bonding.
4: CONTRACT DOCUMENTS
Madison Lifestyle District – Parking Garage
South Bend, IN
CONSTRUCTION SCHEDULE
#Activity IDActivity NameOriginalDurationRemainingDurationStartFinish1Madison Street Lifestyle DistrictMadison Street Lifestyle District72772713-Jan-2617-Nov-282MilestonesMilestones71071005-Feb-2617-Nov-283Design PhaseDesign Phase11311316-Feb-2627-Jul-264DMILE1000100% DD Drawings - Garage, Multifamily, Hotel, Site0016-Feb-265DMILE1010Early Garage Bid Package - Bid Documents Complete0016-Feb-266DMILE1015State Foundation Release - Garage and Podium0020-Mar-267DMILE1030100% CD Drawings - Garage, Multifamily, Hotel, Site0026-Jun-268DMILE1040Garage Bid Package - Bid Documents Complete0013-Jul-269DMILE1050State Design Release - Project Wide0027-Jul-2610Contractural MilestonesContractural Milestones40640605-Feb-2609-Sep-2711CMILE1000Site Available to Construction0005-Feb-26*12CMILE1010Final Garage/Site GMP to City of South Bend0031-Aug-2613CMILE1020Garage/Site - Notice to Proceed to FAW0016-Sep-2614CMILE1030Garage - Substantial Completion0012-Jul-2715CMILE1040Garage - Final Completion0026-Jul-2716CMILE1050Site Final Completion0009-Sep-2717Construction MilestonesConstruction Milestones68168118-Mar-2617-Nov-2818Site MilestonesSite Milestones37737718-Mar-2609-Sep-2719SITEMIL1000Mobilization0018-Mar-2620SITEMIL1010Site Secure and Ready for Construction0014-Apr-2621SITEMIL1020Earthwork Start0029-Apr-2622SITEMIL1030Final Site Completion0009-Sep-2723SITEMIL1040Weather Break 20270005-Apr-27*24Garage/Podium MilestonesGarage/Podium Milestones27527525-Jun-2626-Jul-2725GAMILE1000Garage Foundation Start0025-Jun-2626GAMILE1010Garage Foundation Complete0020-Aug-2627GAMILE1020Start Podium Foundations0021-Aug-2628GAMILE1030Podium Foundations Complete0025-Sep-2629GAMILE1040Start Elevated Garage Structure0012-Oct-2630GAMILE1050Start Podium Structure0012-Oct-2631GAMILE1060Complete Garage Elevated Structure0018-Feb-2732GAMILE1070Podium Structure Complete0015-Dec-2633GAMILE1080Start Enclosures0002-Dec-2634GAMILE1090Complete Enclosures0004-Mar-2735GAMILE1100Start Shafts0023-Nov-2636GAMILE1110Complete Shafts0025-Feb-2737GAMILE1120Building Dry In0025-Mar-2738GAMILE1130Start Punchlist0013-Jul-2739GAMILE1140Complete Punchlist0026-Jul-2740Multifamily MilestonesMultifamily Milestones48148131-Dec-2617-Nov-2841MFMIL1000Start Multifamily Construction0031-Dec-2642MFMIL1010Complete Multifamily Construction0017-Nov-2843Hotel MilestonesHotel Milestones39039016-Dec-2627-Jun-2844HOTMIL1000Start Hotel Construction0016-Dec-26*45HOTMIL1010Complete Hotel Construction0027-Jun-2846Design PhaseDesign Phase13813813-Jan-2627-Jul-2647DES1000Design Development Drawings - Garage, Multifamily, Hotel, Site252513-Jan-2616-Feb-2648DES1010DD Team Review - Garage, Multifamily, Hotel, Site151516-Feb-2606-Mar-2649DES1020Early Release Set for State Foundation Release - Garage/Site0006-Mar-2650DES1025State Early Foundation Release101009-Mar-2620-Mar-2651DES1030Construction Documents - Garage, Multifamily, Hotel, Site797909-Mar-2626-Jun-2652DES1040CD Team Review - Garage, Multifamily, Hotel, Site9929-Jun-2610-Jul-2653DES1050Bid Documents - Garage/Site101029-Jun-2613-Jul-2654DES1060100% Permit Set101029-Jun-2613-Jul-2655DES1070State Design Review Period101014-Jul-2627-Jul-2656PermittingPermitting33733723-Mar-2619-Jul-2757PERMIT0900City of South Bend - Foundation Permit101023-Mar-2603-Apr-2658PERMIT1000City of South Bend - Permitting Review (Garage)303028-Jul-2608-Sep-2659PERMIT1010General Building Permit Obtained (Garage)0008-Sep-2660PERMIT1020Final Inspections (Garage)5513-Jul-2719-Jul-2761PERMIT1030Certificate of Occupancy (Garage)0019-Jul-2762ProcurementProcurement23823803-Feb-2611-Jan-2763Site / Parking GarageSite / Parking Garage23823803-Feb-2611-Jan-2764Early Foundation, Site, Elevator Bid PackagesEarly Foundation, Site, Elevator Bid Packages414103-Feb-2631-Mar-26JanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMar202620272028202917-Nov-28, Madison Street Lifestyle D 17-Nov-28, Milestones27-Jul-26, Design Phase100% DD Drawings - Garage, Multifamily, Hotel, SiteEarly Garage Bid Package - Bid Documents CompleteState Foundation Release - Garage and Podium100% CD Drawings - Garage, Multifamily, Hotel, SiteGarage Bid Package - Bid Documents CompleteState Design Release - Project Wide09-Sep-27, Contractural MilestonesSite Available to ConstructionFinal Garage/Site GMP to City of South BendGarage/Site - Notice to Proceed to FAWGarage - Substantial CompletionGarage - Final CompletionSite Final Completion17-Nov-28, Construction Milestones09-Sep-27, Site MilestonesMobilizationSite Secure and Ready for ConstructionEarthwork StartFinal Site CompletionWeather Break 202726-Jul-27, Garage/Podium MilestonesGarage Foundation StartGarage Foundation CompleteStart Podium FoundationsPodium Foundations CompleteStart Elevated Garage StructureStart Podium StructureComplete Garage Elevated StructurePodium Structure CompleteStart EnclosuresComplete EnclosuresStart ShaftsComplete ShaftsBuilding Dry InStart PunchlistComplete Punchlist17-Nov-28, Multifamily MilestonesStart Multifamily ConstructionComplete Multifamily Construction27-Jun-28, Hotel MilestonesStart Hotel ConstructionComplete Hotel Construction27-Jul-26, Design PhaseDesign Development Drawings - Garage, Multifamily, Hotel, SiteDD Team Review - Garage, Multifamily, Hotel, SiteEarly Release Set for State Foundation Release - Garage/SiteState Early Foundation ReleaseConstruction Documents - Garage, Multifamily, Hotel, SiteCD Team Review - Garage, Multifamily, Hotel, SiteBid Documents - Garage/Site100% Permit SetState Design Review Period19-Jul-27, PermittingCity of South Bend - Foundation PermitCity of South Bend - Permitting Review (Garage)General Building Permit Obtained (Garage)Final Inspections (Garage)Certificate of Occupancy (Garage)11-Jan-27, Procurement11-Jan-27, Site / Parking Garage31-Mar-26, Early Foundation, Site, Elevator Bid PackagesRemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestoneData Date = 13-Jan-26Schedule Printed on 13-Feb-26, at 10:06Page 1 of 4Madison Street Lifestyle DistrictFull Schedule - Standard Layout
#Activity IDActivity NameOriginalDurationRemainingDurationStartFinish65PROCU1000Develope Early Garage Bid Packages101003-Feb-2616-Feb-2666PROCU1010Issue Early Garage Bid Package0016-Feb-26*67PROCU1020Prebid Meeting0017-Feb-26*68PROCU1030Contractor Bidding Period222216-Feb-2617-Mar-2669PROCU1040Early Garage Bid Packages Due0017-Mar-26*70Subcontractor BuyoutSubcontractor Buyout101018-Mar-2631-Mar-2671SBOEGA1000Earthwork Package101018-Mar-2631-Mar-2672SBOEGA1010Foundations Package101018-Mar-2631-Mar-2673SBOEGA1020Elevator Package101018-Mar-2631-Mar-2674Balance of Garage Bid PackagesBalance of Garage Bid Packages454522-Jun-2624-Aug-2675PROCU1050Develope Garage Bid Packages151522-Jun-2613-Jul-2676PROCU1060Issue Garage Bid Packages0014-Jul-2677PROCU1070Contractor Bidding Period202014-Jul-2610-Aug-2678PROCU1080Garage Bid Package Due0010-Aug-2679Subcontractor BuyoutSubcontractor Buyout101011-Aug-2624-Aug-2680SBOGA1000CIP Concrete Package5511-Aug-2617-Aug-2681SBOGA1010Structural Steel Package101011-Aug-2624-Aug-2682SBOGA1020Masonry Package101011-Aug-2624-Aug-2683SBOGA1030Misc Metals Package101011-Aug-2624-Aug-2684SBOGA1040Roofing Package101011-Aug-2624-Aug-2685SBOGA1050General Trades Package101011-Aug-2624-Aug-2686SBOGA1060Painting Package101011-Aug-2624-Aug-2687SBOGA1070Doors / Frames / Hardware Package101011-Aug-2624-Aug-2688SBOGA1080Fire Sprinkler Package5511-Aug-2617-Aug-2689SBOGA1090Mechanical Package5511-Aug-2617-Aug-2690SBOGA1100Electrical Package5511-Aug-2617-Aug-2691Garage SubmittalsGarage Submittals13213201-Apr-2606-Oct-2692SUBMIT1000Foundation Submittals202001-Apr-2628-Apr-2693SUBMIT1010Elevator Submittals303001-Apr-2612-May-2694SUBMIT1020CIP Concrete Elevated Structure Submittals202018-Aug-2615-Sep-2695SUBMIT1030Masonry Submittals202025-Aug-2622-Sep-2696SUBMIT1040Steel Submittals303025-Aug-2606-Oct-2697SUBMIT1050Roofing Submittals202025-Aug-2622-Sep-2698SUBMIT1060Finish Submittals202025-Aug-2622-Sep-2699SUBMIT1070Doors/Frames/Hardware Submittals202025-Aug-2622-Sep-26100SUBMIT1080Mechanical Package Submittals202018-Aug-2615-Sep-26101SUBMIT1090Fire Suppression Shop Drawings303018-Aug-2629-Sep-26102SUBMIT1100Electrical Power Submittals202018-Aug-2615-Sep-26103SUBMIT1110Lighting Submittals202018-Aug-2615-Sep-26104Fabrication and DeliveriesFabrication and Deliveries17717729-Apr-2611-Jan-27105FAB1000Foundation Rebar Fabrication5529-Apr-2605-May-26106FAB1010Elevated Structure Rebar Fabrication101016-Sep-2629-Sep-26107FAB1020Steel Fabrication404007-Oct-2603-Dec-26108FAB1030Elevator Fabrication12012013-May-2630-Oct-26109FAB1040Doors/Frames/Hardware Lead Time606023-Sep-2617-Dec-26110FAB1050Air Handler Lead Time606016-Sep-2610-Dec-26111FAB1060Switchgear/Power Distribution Lead Time808016-Sep-2611-Jan-27112FAB1070Lighting Lead Time404016-Sep-2610-Nov-26113ConstructionConstruction68168118-Mar-2617-Nov-28114Site ConstructionSite Construction37737718-Mar-2609-Sep-27115Site LogisticsSite Logistics24524518-Mar-2604-Mar-27116LOG1000Mobilize to Site5518-Mar-26*25-Mar-26117LOG1010Perform Utility Locates5525-Mar-2601-Apr-26118LOG1020Install Construction Fencing101001-Apr-2614-Apr-26119LOG1030Set Trailers5515-Apr-2621-Apr-26120LOG1040Install SWPPP5522-Apr-2628-Apr-26121LOG1050Set Tower Crane5518-Jun-2625-Jun-26122LOG1060Tower Crane Duration18018018-Jun-2604-Mar-27123LOG1070Remove Tower Crane5526-Feb-2704-Mar-27124Site Clearing / Mass ExcavationSite Clearing / Mass Excavation151529-Apr-2619-May-26125EXC1000Site Clearing, Mass Excavtion, Grading101029-Apr-2612-May-26126EXC1010Establish Building Pad5513-May-2619-May-26127Site FinishesSite Finishes707002-Jun-2709-Sep-27128SITEFIN1000Site Grading / Hardscape Prep151502-Jun-27*22-Jun-27129SITEFIN1010Curbs5523-Jun-2729-Jun-27130SITEFIN1020Concrete Walks, Drives, and Patios151530-Jun-2721-Jul-27JanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMar2026202720282029Develope Early Garage Bid PackagesIssue Early Garage Bid PackagePrebid MeetingContractor Bidding PeriodEarly Garage Bid Packages Due31-Mar-26, Subcontractor BuyoutEarthwork PackageFoundations PackageElevator Package24-Aug-26, Balance of Garage Bid PackagesDevelope Garage Bid PackagesIssue Garage Bid PackagesContractor Bidding PeriodGarage Bid Package Due24-Aug-26, Subcontractor BuyoutCIP Concrete PackageStructural Steel PackageMasonry PackageMisc Metals PackageRoofing PackageGeneral Trades PackagePainting PackageDoors / Frames / Hardware PackageFire Sprinkler PackageMechanical PackageElectrical Package06-Oct-26, Garage SubmittalsFoundation SubmittalsElevator SubmittalsCIP Concrete Elevated Structure SubmittalsMasonry SubmittalsSteel SubmittalsRoofing SubmittalsFinish SubmittalsDoors/Frames/Hardware SubmittalsMechanical Package SubmittalsFire Suppression Shop DrawingsElectrical Power SubmittalsLighting Submittals11-Jan-27, Fabrication and DeliveriesFoundation Rebar FabricationElevated Structure Rebar FabricationSteel FabricationElevator FabricationDoors/Frames/Hardware Lead TimeAir Handler Lead TimeSwitchgear/Power Distribution Lead TimeLighting Lead Time17-Nov-28, Construction09-Sep-27, Site Construction04-Mar-27, Site LogisticsMobilize to SitePerform Utility LocatesInstall Construction FencingSet TrailersInstall SWPPPSet Tower CraneTower Crane DurationRemove Tower Crane19-May-26, Site Clearing / Mass ExcavationSite Clearing, Mass Excavtion, GradingEstablish Building Pad09-Sep-27, Site FinishesSite Grading / Hardscape PrepCurbsConcrete Walks, Drives, and PatiosRemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestoneData Date = 13-Jan-26Schedule Printed on 13-Feb-26, at 10:06Page 2 of 4Madison Street Lifestyle DistrictFull Schedule - Standard Layout
#Activity IDActivity NameOriginalDurationRemainingDurationStartFinish131SITEFIN1030Stone Subbase for Paved Areas5522-Jul-2728-Jul-27132SITEFIN1040Base Course Asphalt5529-Jul-2704-Aug-27133SITEFIN1050Suface Course Asphalt5505-Aug-2711-Aug-27134SITEFIN1060Topsoil101005-Aug-2718-Aug-27135SITEFIN1070Seeding and Sod101019-Aug-2701-Sep-27136SITEFIN1080Landscaping151519-Aug-2709-Sep-27137Site UtilitiesSite Utilities505006-Apr-2715-Jun-27138SITEUT1000Storm Sewer202006-Apr-2703-May-27139SITEUT1010Sanitary Sewer202020-Apr-2717-May-27140SITEUT1020Water Main and Hydrants303004-May-2715-Jun-27141Street/Public Right AwayStreet/Public Right Away333323-Jun-2709-Aug-27142SITEUT1030Close Main Street for Round About Construction1123-Jun-2723-Jun-27143SITEUT1040Demo Intersection3324-Jun-2728-Jun-27144SITEUT1045Storm Sewer5529-Jun-2706-Jul-27145SITEUT1050Prep/Stone Subbgrade3307-Jul-2709-Jul-27146SITEUT1060Curbs/Cross Walks101012-Jul-2723-Jul-27147SITEUT1070Asphalt/Concrete Paving101026-Jul-2706-Aug-27148SITEUT1080Open Main Street to Traffic1109-Aug-2709-Aug-27149Garage / Podium ConstructionGarage / Podium Construction29029020-May-2612-Jul-27150Garage StructureGarage Structure22522520-May-2608-Apr-27151FoundationsFoundations757520-May-2603-Sep-26152FOUND0910Aggregate Piers202020-May-2617-Jun-26153FOUND0990Foundation Excavation101018-Jun-2601-Jul-26154FOUND1000Form, Rebar, and Pour Foundations404025-Jun-2620-Aug-26155FOUND1010Foundation Waterproofing101014-Aug-2627-Aug-26156FOUND1030Foundation Backfill101021-Aug-2603-Sep-26157Slab on GradeSlab on Grade101028-Sep-2609-Oct-26158SOG1000Prep, Reinforce, Pour, and Finish Slab on Grade101028-Sep-2609-Oct-26159Elevated DecksElevated Decks909012-Oct-2618-Feb-27160DECKS1000Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 2151512-Oct-2630-Oct-26161DECKS1010Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 3151502-Nov-2620-Nov-26162DECKS1020Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 4151523-Nov-2615-Dec-26163DECKS1030Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 5151516-Dec-2607-Jan-27164DECKS1040Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 6151508-Jan-2728-Jan-27165DECKS1050Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 7151529-Jan-2718-Feb-27166ShaftsShafts959523-Nov-2608-Apr-27167SHAFTS1000CMU Shafts - Level 1101023-Nov-2608-Dec-26168SHAFTS1010CMU Shafts - Level 2101009-Dec-2622-Dec-26169SHAFTS1020CMU Shafts - Level 3101023-Dec-2607-Jan-27170SHAFTS1030CMU Shafts - Level 4101008-Jan-2721-Jan-27171SHAFTS1040CMU Shafts - Level 5101022-Jan-2704-Feb-27172SHAFTS1050CMU Shafts - Level 6101005-Feb-2718-Feb-27173SHAFTS1060CMU Shafts - Level 7101012-Feb-2725-Feb-27174SHAFTS1070Steel Framed Stairs202026-Feb-2725-Mar-27175SHAFTS1080Pour Stair Treds101026-Mar-2708-Apr-27176Podium ConstructionPodium Construction909007-Aug-2615-Dec-26177PODIUM0900Foundation Excavation101007-Aug-2621-Aug-26178PODIUM1000Form, Rebar, and Pour Foundations252521-Aug-2625-Sep-26179PODIUM1005Foundation Backfill101028-Sep-2609-Oct-26180PODIUM1010Form, Rebar, Pour, Shore, Strip Podium Structure454512-Oct-2615-Dec-26181EnclosureEnclosure808002-Dec-2625-Mar-27182ENCL1000CMU Enclosures - Level 1101002-Dec-2615-Dec-26183ENCL1010CMU Enclosures - Level 2101016-Dec-2630-Dec-26184ENCL1020CMU Enclosures - Level 3101031-Dec-2614-Jan-27185ENCL1030CMU Enclosures - Level 4101015-Jan-2728-Jan-27186ENCL1040CMU Enclosures - Level 5101029-Jan-2711-Feb-27187ENCL1050CMU Enclosures - Level 6101012-Feb-2725-Feb-27188ENCL1060CMU Enclosures - Level 7101019-Feb-2704-Mar-27189ENCL1070Penthouse Framing, Sheathing, and EIFS151505-Mar-2725-Mar-27190ElevatorsElevators404026-Feb-2722-Apr-27191ELEV1000Install Elevators404026-Feb-2722-Apr-27192MechanicalMechanical21521504-Sep-2612-Jul-27193MECH0900Underground Plumbing151504-Sep-2625-Sep-26194MECH1000Mechanical Rough In606009-Dec-2604-Mar-27195MECH1010Plumbing Rough In606028-Sep-2622-Dec-26196MECH1020Air Handling Units202026-Mar-2722-Apr-27JanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMar2026202720282029Stone Subbase for Paved AreasBase Course AsphaltSuface Course AsphaltTopsoilSeeding and SodLandscaping15-Jun-27, Site UtilitiesStorm SewerSanitary SewerWater Main and Hydrants09-Aug-27, Street/Public Right AwayClose Main Street for Round About ConstructionDemo IntersectionStorm SewerPrep/Stone SubbgradeCurbs/Cross WalksAsphalt/Concrete PavingOpen Main Street to Traffic12-Jul-27, Garage / Podium Construction08-Apr-27, Garage Structure03-Sep-26, FoundationsAggregate PiersFoundation ExcavationForm, Rebar, and Pour FoundationsFoundation WaterproofingFoundation Backfill09-Oct-26, Slab on GradePrep, Reinforce, Pour, and Finish Slab on Grade18-Feb-27, Elevated DecksForm, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 2Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 3Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 4Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 5Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 6Form, Rebar, Pour, Shore, and Strip - Elevated Deck - Level 708-Apr-27, ShaftsCMU Shafts - Level 1CMU Shafts - Level 2CMU Shafts - Level 3CMU Shafts - Level 4CMU Shafts - Level 5CMU Shafts - Level 6CMU Shafts - Level 7Steel Framed StairsPour Stair Treds15-Dec-26, Podium ConstructionFoundation ExcavationForm, Rebar, and Pour FoundationsFoundation BackfillForm, Rebar, Pour, Shore, Strip Podium Structure25-Mar-27, EnclosureCMU Enclosures - Level 1CMU Enclosures - Level 2CMU Enclosures - Level 3CMU Enclosures - Level 4CMU Enclosures - Level 5CMU Enclosures - Level 6CMU Enclosures - Level 7Penthouse Framing, Sheathing, and EIFS22-Apr-27, ElevatorsInstall Elevators12-Jul-27, MechanicalUnderground PlumbingMechanical Rough InPlumbing Rough InAir Handling UnitsRemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestoneData Date = 13-Jan-26Schedule Printed on 13-Feb-26, at 10:06Page 3 of 4Madison Street Lifestyle DistrictFull Schedule - Standard Layout
#Activity IDActivity NameOriginalDurationRemainingDurationStartFinish197MECH1030Test and Balance5506-Jul-2712-Jul-27198ElectricalElectrical18518504-Sep-2628-May-27199ELEC0900Underground Electrical151504-Sep-2625-Sep-26200ELEC1000Electrical Power Entrance and Distribution606012-Jan-2705-Apr-27201ELEC1020Lighting Level 1101014-May-2728-May-27202ELEC1030Lighting Level 2101007-May-2721-May-27203ELEC1040Lighting Level 3101030-Apr-2714-May-27204ELEC1050Lighting Level 4101023-Apr-2707-May-27205ELEC1060Lighting Level 5101016-Apr-2730-Apr-27206ELEC1070Lighting Level 6101009-Apr-2723-Apr-27207ELEC1080Lighting Level 7101002-Apr-2716-Apr-27208Finishes and EquipmentFinishes and Equipment12512515-Jan-2712-Jul-27209FINEQ1000Lobby Finishes - 1st Level151521-Jun-2712-Jul-27210FINEQ1010Painting - 1st Level101015-Jan-2728-Jan-27211FINEQ1020Lobby Finishes - 2nd Level151507-Jun-2725-Jun-27212FINEQ1030Painting - 2nd Level101029-Jan-2711-Feb-27213FINEQ1040Lobby Finishes - 3rd Level151521-May-2711-Jun-27214FINEQ1050Painting - 3rd Level101012-Feb-2725-Feb-27215FINEQ1060Lobby Finishes - 4th Level151507-May-2727-May-27216FINEQ1070Painting - 4th Level101026-Feb-2711-Mar-27217FINEQ1080Lobby Finishes - 5th Level151523-Apr-2713-May-27218FINEQ1090Painting - 5th Level101012-Mar-2725-Mar-27219FINEQ1100Lobby Finishes - 6th Level151509-Apr-2729-Apr-27220FINEQ1110Painting - 6th Level101026-Mar-2708-Apr-27221FINEQ1120Lobby Finishes - 7th Level151526-Mar-2715-Apr-27222FINEQ1130Painting - 7th Level101002-Apr-2715-Apr-27223FINEQ1140Traffic Coating/Striping - Level 75516-Apr-2722-Apr-27224FINEQ1150Traffic Coating/Striping - Level 65523-Apr-2729-Apr-27225FINEQ1160Traffic Coating/Striping - Level 55530-Apr-2706-May-27226FINEQ1170Traffic Coating/Striping - Level 45507-May-2713-May-27227FINEQ1180Traffic Coating/Striping - Level 35514-May-2720-May-27228FINEQ1190Traffic Coating/Striping - Level 25521-May-2727-May-27229FINEQ1200Traffic Coating/Striping - Level 15528-May-2704-Jun-27230FINEQ1210Parking Equipment101007-Jun-2718-Jun-27231Multifamily ConstructionMultifamily Construction58058010-Aug-2617-Nov-28232MFCONST1000CRG Site Mobilization404010-Aug-26*05-Oct-26233MFCONST1050Wood Framed Structure16016001-Feb-27*15-Sep-27234MFCONST1060Exterior Envelope12012016-Aug-2704-Feb-28235MFCONST1070Buildout / Finishes20220207-Feb-2817-Nov-28236Hotel ConstructionHotel Construction39039016-Dec-2627-Jun-28237HOTEL1000Foundations / Slab on Grade / Shafts606016-Dec-2611-Mar-27238HOTEL1010Structure12012005-Mar-2723-Aug-27239HOTEL1020MEP Services and Distribution21621612-Feb-2717-Dec-27240HOTEL1030Exterior Envelope707003-Aug-2709-Nov-27241HOTEL1040Partitions and Ceilings16016013-Jul-2728-Feb-28242HOTEL1050Finishes12012010-Nov-2701-May-28243HOTEL1060MEP Trim Out757518-Jan-2801-May-28244HOTEL1070FF&E606004-Apr-2827-Jun-28JanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMar2026202720282029Test and Balance28-May-27, ElectricalUnderground ElectricalElectrical Power Entrance and DistributionLighting Level 1Lighting Level 2Lighting Level 3Lighting Level 4Lighting Level 5Lighting Level 6Lighting Level 712-Jul-27, Finishes and EquipmentLobby Finishes - 1st LevelPainting - 1st LevelLobby Finishes - 2nd LevelPainting - 2nd LevelLobby Finishes - 3rd LevelPainting - 3rd LevelLobby Finishes - 4th LevelPainting - 4th LevelLobby Finishes - 5th LevelPainting - 5th LevelLobby Finishes - 6th LevelPainting - 6th LevelLobby Finishes - 7th LevelPainting - 7th LevelTraffic Coating/Striping - Level 7Traffic Coating/Striping - Level 6Traffic Coating/Striping - Level 5Traffic Coating/Striping - Level 4Traffic Coating/Striping - Level 3Traffic Coating/Striping - Level 2Traffic Coating/Striping - Level 1Parking Equipment17-Nov-28, Multifamily ConstructionCRG Site MobilizationWood Framed StructureExterior EnvelopeBuildout / Finishes27-Jun-28, Hotel ConstructionFoundations / Slab on Grade / ShaftsStructureMEP Services and DistributionExterior EnvelopePartitions and CeilingsFinishesMEP Trim OutFF&ERemaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining WorkMilestoneData Date = 13-Jan-26Schedule Printed on 13-Feb-26, at 10:06Page 4 of 4Madison Street Lifestyle DistrictFull Schedule - Standard Layout
SITE LOGISTICS PLAN
Madison Lifestyle District - Early Garage PackageSite Logistics
Legend / Activities
2-13-2026
6-1/2" ONE-WAY POST-TENSIONEDSLAB, TYP UNO
8" NON-LOAD BEARING
CMU CRASH WALL,
TYPICAL AT PERIMETER
18" THICK 2-WAY POST-TENSIONED CONCRETE SLAB
18" THICK 2-WAY POST-TENSIONED CONCRETE SLAB
18" THICK 2-WAY POST-TENSIONED CONCRETE SLAB
18" THICK 2-WAY POST-
TENSIONED CONCRETE SLAB
POST-TENSIONEDBEAM, TYP
POST-TENSIONEDGIRDERPOST-TENSIONEDGIRDER
6" SOG
CONCRETE COLUMN, TYP
CONCRETE COLUMN
BELOW, TYP
CONCRETE
POUR STRIP
CONCRETE POUR STRIP
RETAINING WALL BELOW
DOWN-TURNED CONCRETE
BEAM, TYPICAL AT PERIMETER
S211 S211 S211
1S212
2S212
1
S213
2S213
6" EXP JT6" EXP JT6" EXP JT6" EXP JT
CONCRETE SHEAR WALL BELOW CONCRETE SHEAR WALL BELOW
CONCRETE SHEAR WALL BELOW
CONCRETE SHEAR
WALL BELOW
CONCRETE SHEAR WALL BELOW
CONCRETE SHEAR
WALL BELOW
CONCRETE SHEAR
WALL BELOW
CONCRETE SHEAR
WALL BELOW
CONCRETE SHEAR
WALL BELOW
CONCRETE SHEAR WALL BELOW
CONCRETE SHEAR WALL BELOW
CONCRETE SHEAR
WALL BELOW
METAL PANSTAIR
METAL PANSTAIR
METAL PANSTAIR
METAL PANSTAIR
EXTENTS OF THICKER 2-WAY POST-TENSIONED CONCRETE SLAB
ELEVATED
FRAMING
SLAB ON
GRADE
EQ EQ
POST-TENSIONED
GIRDER
POST-TENSIONED
GIRDER
SIDEWALKCLOSED
SIDEWALKCLOSED
SIDEWALKCLOSED
SIDEWALKCLOSED
SIDEWALKCLOSED
SIDEWALKCLOSED
T T T
T T T
Construction Fence
Construction Gate
Man Gate
Material Laydown Area
Storage Trailer Area
Dumpsters / Recycling
Construction Trailer (12' x 60')
Tower Crane / Crane Position
Concrete Wash-Out
Erosion Control
Tower Crane 2D Radius
AED (Auto. External Defibrillator)
Temporary ToiletT
5: SUBCONTRACT EXHIBITS
Madison Lifestyle District – Parking Garage
South Bend, IN
SUBCONTRACT EXHIBIT 1 – SAMPLE SUBCONTRACT
DocuSign 07.01.22
F. A. WILHELM CONSTRUCTION CO., INC. (“Contractor”)
3914 PROSPECT STREET • P.O. BOX 516 • INDIANAPOLIS, IN 46206
TELEPHONE: (317) 359-5411 • FAX: (317) 359-8346
SUBCONTRACTOR: PROJECT:
ARCHITECT: OWNER:
PRIME CONTRACTOR (if applicable): CONSTRUCTION MANAGER (if applicable):
JOB: COST CODE:
Subcontractor’s Work. Subcontractor shall execute the following portion of the Work described in the Subcontract
Documents, including all labor, materials, tools, equipment, services, taxes, wages, employee benefits, insurance, freight and
other items required to complete such portion of the Work, except to the extent specifically called for in the Subcontract
Documents to be the responsibility of others:
Subcontract Documents. The Subcontract Documents consist of: (1) this Subcontract Agreement and any attachments
hereto or documents referred to herein; (2) the Prime Contract, consisting of the agreement between Contractor and [insert
either - Owner, Prime Contractor or Construction Manager] and the other contract documents incorporated therein, including
conditions of the contract (general, supplementary and other conditions), drawings, specifications, and any addenda thereto,
which are available for review and on file in the office of Contractor located at the above address; (3) Schedule “A” to this
Subcontract Agreement and any documents referred to therein; (4) the attached Project Insurance Requirements; and (5) any
other documents set forth below.
Subcontract Sum. Contractor shall pay Subcontractor for performance of this Subcontract Agreement the Subcontract Sum
of __________________ Dollars ($_________), subject to additions and deductions as provided by written change orders.
Provided, however, that if the Subcontract Sum is to be determined on a unit price, time and material or cost of the Work plus
a fee basis, such shall be established in Schedule “A”.
THE ATTACHED TERMS AND CONDITIONS ARE HEREBY MADE A PART OF THIS SUBCONTRACT AGREEMENT. This
Subcontract Agreement has been entered into as of the date written above. In the event Subcontractor has performed any of
the Work prior to the date of this Subcontract Agreement, pursuant to authorizations to proceed, letters of intent or otherwise,
this Subcontract Agreement shall govern to the same extent as though such Work was performed after the above date.
CONTRACTOR SUBCONTRACTOR
(Signature) (Signature)
(Printed name and title) (Printed name and title)
SA#
DATE:
SUBCONTRACT AGREEMENT
Sample Subcontract Agreement
TERMS AND CONDITIONS
Page 1 of 5 DocuSign 07.01.22
1. Progress payments, less retention of ten percent (10%) unless otherwise stated in Schedule “A”, shall be made to
Subcontractor for Work, satisfactorily performed in accordance with the Subcontract Documents, within ten (10) working
days after Contractor has received payment from Owner or Prime Contractor for Subcontractor’s Work. Receipt of
payment by Contractor for Subcontractor’s Work is a condition precedent to Contractor’s obligation to pay Subcontractor
for that Work. Final payment of the balance due on the Subcontract Sum shall be made to Subcontractor upon the
same conditions stated herein for progress payments. Progress and final payments are also subject to receipt of such
waivers of liens and claims, affidavits, warranties and guarantees as required by the Subcontract Documents or by
Contractor. The Subcontract Sum includes the cost of all labor, materials, tools, equipment, services, taxes, wages,
employee benefits, insurance, freight and all other costs of any kind, and Subcontractor shall be solely responsible for
all federal, state and local excise, sales or use taxes applicable to this Subcontract Agreement, and for any license,
privilege, income or receipts tax imposed on Subcontractor. Subcontractor shall accept any valid sales or use tax
exemption certificates. At Contractor’s sole discretion, Contractor may make payments to Subcontractor by joint check
payable jointly to Subcontractor and its sub-subcontractors, suppliers and/or creditors on the Project.
2. To the extent that the provisions, terms and conditions (whether relating to scope of work, payment, dispute
resolution, project administration, or other obligations or responsibilities) of the Prime Contract apply or relate in whole
or in part to Subcontractor’s Work or the administration of the Project, Subcontractor agrees to be bound to Contractor
by the same provisions, terms and conditions that apply to Contractor and assumes toward Contractor all obligations
and responsibilities that Contractor assumes toward Owner, Prime Contractor, Construction Manager and/or Architect
under the Prime Contract, and agrees to ensure that all of its material suppliers and subcontractors are likewise bound.
Where a provision, term or condition of the Prime Contract, this Subcontract Agreement and/or the Subcontract
Documents are in conflict with one another, the provision, term or condition that imposes the greater obligation or
responsibility on Subcontractor shall govern.
3. To the extent Subcontractor has been properly paid amounts due under this Subcontract Agreement,
Subcontractor agrees to keep the Project, Owner’s funds, real estate and other real and personal property, and any
Project bonds or other surety instruments free and clear of all claims, liens or encumbrances of any kind by or from
Subcontractor, its subcontractors or material suppliers, or from any others claiming through Subcontractor, and
Subcontractor shall secure release of the same.
4. Subcontractor shall commence its Work upon notification by Contractor. Time is of the essence. The schedule of
the Project work, including that of this Subcontract Agreement, shall be prepared by Contractor and may be revised by
Contractor as the Project progresses. Subcontractor shall provide Contractor with any requested scheduling information
relating to Subcontractor’s Work. Subcontractor shall complete its Work in a timely manner and in accordance with
Contractor’s schedule.
5. No changes, amendments or modifications to this Subcontract Agreement shall be effective until and unless
accepted in writing by Contractor. Subcontractor may be ordered in writing by Contractor, without invalidating this
Subcontract Agreement, to make changes in Subcontractor’s Work consisting of additions, deletions or other revisions,
the Subcontract Sum and Contractor’s schedule being adjusted accordingly. Within seven (7) working days of receiving
notice of such change, Subcontractor shall submit to Contractor a quotation covering any addition or deduction to the
Subcontract Sum and any impact to Contractor’s schedule, along with all details and backup necessary to support the
quotation. Unless otherwise directed in writing by Contractor, Subcontractor shall not commence such changed or
revised Work until after Contractor has reviewed and accepted Subcontractor’s quotation, and Contractor and
Subcontractor have signed a written change order setting forth any adjustments to the Subcontract Sum or Contractor’s
schedule. Sample Subcontract Agreement
TERMS AND CONDITIONS
Page 2 of 5 DocuSign 07.01.22
6. Subcontractor agrees that in order for it to make a claim against Contractor for additional cost, extensions of time
or other damages which arise out of any event or occurrence not covered by paragraph no. 5 above, Subcontractor, as
a condition precedent, must give Contractor written notice of such claim within seven (7) working days of the event or
occurrence giving rise to the claim or within the time which Contractor has to make such a claim against the Owner or
Prime Contractor, whichever is shorter, or the claim will be waived. Subcontractor’s sole remedy for the performance
of its Work being delayed or interfered with on account of acts of God, fire or other casualty, or any other cause whether
or not within Contractor’s control, shall be limited to an extension of time to the extent Contractor is granted an extension
from the Owner or Prime Contractor. Furthermore, Subcontractor shall not be entitled to recover any increase in the
Subcontract Sum or damages from Contractor for delay, acceleration or interference, except to the extent Contractor
recovers such sums or damages from Owner, Prime Contractor or other third parties on Subcontractor’s behalf.
7. Subcontractor acknowledges that the Subcontract Sum includes any and all material and/or labor cost escalation
for the duration of the Project and that Subcontractor shall not be entitled to a change order or adjustment to the
Subcontract Sum for any such material and/or labor cost escalation.
8. Should Subcontractor fail to satisfy deficiencies in its performance of this Subcontract Agreement (including but
not limited to failure to maintain Contractor’s schedule) within two (2) working days from receipt of Contractor’s written
notice of such deficiency, then Contractor, without prejudice to any other right or remedy, shall have the right to reserve
or withhold payment, terminate this Subcontract Agreement for default, take possession of all materials and equipment
purchased by Subcontractor for use in the Project, and/or take whatever steps it deems necessary to correct said
deficiencies and charge the cost thereof to Subcontractor, who shall be liable for payment of same, including reasonable
overhead, profit and attorney’s fees. Said notice is not required for Contractor to exercise the remedies under this
paragraph when Subcontractor’s deficiency in performance threatens safety or involves Subcontractor’s failure to keep
the Project site clean as required by paragraph no. 14 below. Furthermore, Contractor may terminate this Subcontract
Agreement for its convenience and without cause upon two (2) working days prior written notice to Subcontractor. If
Subcontractor is terminated upon Contractor’s position that Subcontractor is in default, but it is subsequently determined
that Subcontractor was not in default, then such termination shall be deemed a termination for convenience. If this
Subcontract Agreement is terminated for convenience, then Subcontractor’s recovery shall be limited to the unpaid
value of authorized and approved Work performed by Subcontractor prior to notice of termination, adjusted for amount
and damages, if any, for which Subcontractor is liable or which Contractor is entitled to retain and withhold pursuant to
the terms of this Subcontract Agreement. The payment provided by this paragraph shall constitute Subcontractor’s
exclusive remedy in the event of such termination.
9. Subcontractor shall comply with all applicable federal, state and local laws, orders, rules and regulations, and shall
obtain and provide all notices to authorities, permits, fees, licenses, assessments, inspections and taxes necessary to
complete its Work.
10. Subcontractor shall take the proper precautions in the performance of its Work to protect all persons and property
from being injured by the Work or by the condition of the site, shall comply with any safety measures initiated by
Contractor or set forth in the Subcontract Documents, and shall comply with OSHA and any other applicable Federal,
State or local safety laws, rules, orders or regulations. Notwithstanding anything in this Subcontract Agreement to the
contrary. Subcontractor shall be and shall remain responsible for the safety programs and precautions applicable to its
own Work and shall be and remain responsible to others that may be affected by the Subcontractor’s Work.
Subcontractor shall always be the controlling employer as to the safety of its Work, employees, sub-subcontractor
employees, and any other individual or entity for whom Subcontractor is responsible. If the Contractor is subsequently
determined to have a non-delegable duty of jobsite safety, that duty runs only to the injured party and not to Sample Subcontract Agreement
TERMS AND CONDITIONS
Page 3 of 5 DocuSign 07.01.22
Subcontractor and shall not excuse Subcontractor from its indemnity obligations to the Contractor nor shall
Subcontractor’s insurers be excused from their duties to provide coverage to the Contractor as an additional insured.
11. Subcontractor shall be responsible for all field measurements and layout necessary to perform its Work and shall
be responsible for the accuracy of its Work. Subcontractor shall submit to Contractor shop drawings and samples
required by the Subcontract Documents sufficiently in advance of the time any fabrication or shipment of materials or
other item for Subcontractor’s Work is to occur. Review and/or approval by Contractor, Architect, Prime Contractor,
Construction Manager or Owner of Subcontractor’s submittals shall in no way relieve Subcontractor of its obligation that
its Work conforms with the Subcontract Documents.
12. Subcontractor shall maintain an adequate work crew on site at all times, with sufficient manpower to meet
Contractor’s schedule and with a competent foreman or superintendent continuously present. Subcontractor shall not
permit employment of unfit or unsafe persons or persons not skilled in tasks assigned to them.
13. Organized breaks will not be allowed on the Project.
14. Subcontractor shall continuously maintain and protect the Work from damage and shall daily clean the job site of
any dirt or debris caused by the performance of its Work.
15. Prior to the start of its Work, Subcontractor shall procure and maintain in force, for at least the duration of its Work,
insurance as is called for by the attached Project Insurance Requirements, plus any additional insurance that is required
of Contractor under the Prime Contract. Contractor, Owner, Prime Contractor, Construction Manager and Architect
shall be named as additional insureds on each of the required policies, except for workers compensation. Subcontractor
shall furnish insurance certificates to Contractor verifying the required insurance prior to beginning its Work, but no later
than ten (10) days from the date of this Subcontract Agreement. If any of the foregoing insurance coverages are required
to remain in force after final payment, an additional certificate evidencing continuation of such coverage shall be
submitted with Subcontractor’s final application for payment. This insurance coverage provided by Subcontractor shall
be primary and non-contributory to any other insurance.
16. Subcontractor warrants to Contractor, Owner, Prime Contractor, Construction Manager and Architect that
materials furnished hereunder will be of good quality and new unless otherwise permitted by the Subcontract Documents
and that its Work is free from defects and conforms to the Subcontract Document requirements. Work not conforming
to these requirements may be considered defective. This warranty is in addition to and not a limitation of any other
warranty or remedy provided under the law or the Subcontract Documents. All manufacturer warranties shall be
assigned to Owner and Contractor.
17. If, within one year after the date of substantial completion of the Project or such longer time period as may be
prescribed by the Subcontract Documents, any of the Work is found to be defective, Subcontractor shall promptly correct
the Work at its cost. If Subcontractor fails to correct as required herein, Contractor may correct the Work and recover
the costs of correction and damages, including attorneys' fees, against Subcontractor. Nothing contained in this
paragraph shall be construed to establish a period of limitation with respect to any obligation or responsibility owed by
Subcontractor except the express duty to correct defective Work.
18. To the fullest extent permitted by law, Subcontractor shall indemnify, hold harmless, and defend at its own expense
Contractor, Owner, Prime Contractor, Construction Manager, Architect, and their respective agents, employees and
assigns (herein collectively referred to as “Indemnitees”) from and against any claims, causes of action, damages,
losses and expenses (including litigation costs and attorney’s fees) of any nature whatsoever, including but not limited
to claims for or relating to injury, sickness or disease to any persons (including death), damages to property (including
the lost use thereof and consequential damages therefrom), economic loss, liens or Project delays, which arise out of
or are alleged to arise out of: a) the performance of Subcontractor’s Work; b) the Subcontractor’s breach of this Sample Subcontract Agreement
TERMS AND CONDITIONS
Page 4 of 5 DocuSign 07.01.22
Subcontract Agreement; and/or c) any act or omission of Subcontractor, its subcontractors or material suppliers, anyone
directly or indirectly employed by them or anyone for whose acts they may be liable; regardless of whether or not such
claim, cause of action, damage, loss or expense is contributed to or caused by the negligence, breach of contract or
warranty, strict liability, or any other breach of duty of any Indemnitee; provided, however, that Subcontractor shall not
be obligated to indemnify an Indemnitee for its sole negligence or willful misconduct where such indemnification is
contrary to law, but otherwise it is the intent of the parties that Subcontractor shall indemnify the Indemnitees to the
fullest extent permitted by law.
19. To the extent there are any design services required to be performed by Subcontractor either incidental to
Subcontractor's Work or as a primary design-build undertaking by Subcontractor in respect to the Project, such design
services shall be procured from licensed, independent design professionals retained by the Subcontractor or furnished
by licensed employees of the Subcontractor, or as permitted by the law of the place where the Project is located.
Subcontractor shall be responsible for coordinating its design with the Project Architect, engineers and others providing
design services for the Project. Subcontractor shall prepare, for approval by the Project Architect and engineers,
Construction Documents consisting of drawings, specifications, and other appropriate instruments ("Instruments of
Service") sufficient to set forth in detail the requirements for the construction of the Subcontractor's Work. Subcontractor
shall assist the Owner, Architect, Engineers, and/or Contractor in connection with the filing of documents required for
the approval of government authorities having jurisdiction over the Project. All ownership of or other rights in respect of
the Instruments of Service shall be transferred by Subcontractor to Owner upon request.
20. Subcontractor shall not assign any of its rights or obligations in or under this Subcontract Agreement without prior
written consent of Contractor. Any such assignment, even with consent, shall not in any manner relieve Subcontractor
from any of its obligations under this Subcontract Agreement. Subcontractor shall incorporate the terms of this
Subcontract Agreement, including but not limited to the requirements to provide insurance, by flowing them down into
all contracts with or held by sub-subcontractors or vendors performing any portion of Subcontractor’s Work.
Subcontractor shall not misclassify any of its employees as independent contractors, and any entity performing Work
for Subcontractor on the Project that Subcontractor classifies or treats as an independent contractor must be disclosed
as a sub-subcontractor and meet the requirements set forth in this Subcontract Agreement.
21. Subcontractor shall perform its duties hereunder as an independent contractor and not as an employee of the
Contractor. Neither Subcontractor nor any agent or employee of Subcontractor shall be or shall be deemed an agent or
employee of Contractor. Subcontractor shall pay when due all required employment taxes and income tax withholding,
including all federal, state and local income tax on any monies paid pursuant to this Subcontract Agreement.
Subcontractor shall have no authorization, express or implied, to bind Contractor to any agreements, liability, or
understanding except as expressly set forth in this Subcontract Agreement. Subcontractor shall be solely responsible
for the acts of Subcontractor, its employees, sub-subcontractors, vendors and agents.
22. Subcontractor shall keep full and detailed records and accounts related to this Subcontract Agreement, and shall
exercise such controls, as may be necessary for proper financial management under this Subcontract Agreement and
to substantiate all costs incurred. Contractor and/or the Contractor’s auditors shall, during regular business hours and
upon reasonable notice, be afforded access to, and shall be permitted to audit and copy the Subcontractor’s records
and accounts, including complete documentation supporting accounting entries, payroll, books, job cost reports,
correspondence, instructions, drawings, receipts, subcontracts, proposals, invoices, purchase orders, vouchers,
memoranda, safety records, quality control records, and other data relating to the administration of this Subcontract
Agreement. The Subcontractor shall preserve these records for a period of five years after final payment, or for such
longer period as may be required by law. Sample Subcontract Agreement
TERMS AND CONDITIONS
Page 5 of 5 DocuSign 07.01.22
23. Subcontractor shall abide by all federal, state and local laws and regulations that prohibit discrimination
against qualified individuals based on their status as protected veterans or individuals with disabilities and
shall prohibit discrimination against all individuals based on their race, color, religion, sex, sexual orientation,
gender identity or national origin. Moreover, 41 CFR 60-1.4(a), 60-300.5(a) and 60-741.5(a) require that covered
contractors and subcontractors take affirmative action to employ and advance in employment individuals
without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability or
veteran status.
24. This Subcontract Agreement and the rights and duties of all persons arising from or related to this Subcontract
Agreement shall be governed by the laws of the State of Indiana. Any dispute arising under or related to this Subcontract
Agreement, the performance of Work or provision of any materials pursuant hereto, shall be brought only in state court
in Marion County, State of Indiana, or if federal jurisdiction is available, in the U.S. District Court for the Southern District
of Indiana. The parties to this Subcontractor Agreement agree to: a) participate in mediation; b) accept such venues if
mediation is unsuccessful; c) waive trial by jury in all proceedings; and d) waive, as against each other, any claim or
entitlement to punitive or exemplary damages. In the event of a dispute, Subcontractor shall continue to proceed
diligently with the performance of its Work pending final resolution of the dispute, unless directed otherwise in writing by
Contractor. If Contractor is in a dispute with the Owner, Prime Contractor and/or Construction Manager that involves
Subcontractor’s Work, acts or omissions, then Contractor may elect to join Subcontractor as a party to such dispute and
the dispute resolution and litigation provisions in the Prime Contract would govern if Contractor made such election of
joinder.
25. If any term, provision or part of a provision to this Subcontract Agreement should be invalid or unenforceable under
the governing law, the validity and enforceability of the remaining terms, provisions and parts thereof shall not be
affected, with interpretation and enforcement to occur as if such invalid or unenforceable term, provision or part was
never written.
26. Subcontractor agrees that the subject matter of this Subcontract Agreement is confidential in nature and that
Subcontractor will not provide any third party with any information contained herein without the expressed written
consent of Contractor. However, Subcontractor may disclose confidential information, after seven (7) days’ notice to
Contractor, where disclosure is required by law, including a subpoena or other form of compulsory legal process issued
by a court or governmental entity, or by court or arbitrator(s) order. Subcontractor may also disclose confidential
information to its employees, consultants, sureties, sub-subcontractors, and others who need to know the content of
such information solely and exclusively for the Project and who agree to maintain the confidentiality of such information.
27. The Subcontract Documents, including this Subcontract Agreement, represent the entire integrated agreement
between Subcontractor and Contractor, and supersede all prior negotiations, representations or agreements relating to
Subcontractor’s Work. The failure of Contractor to enforce at any time any provision of this Subcontract Agreement
shall in no way affect the validity of this Subcontract Agreement or any part hereof or the right of Contractor thereafter
to enforce each and every such provision. No waiver of any breach of this Subcontract Agreement shall be held to be
a waiver of any other or subsequent breach.
FPR0019 Rev 1, 07/01/2022 Sample Subcontract Agreement
Date: __/__/__ SCHEDULE “A” for SA#____ FAW JOB #____
Project
1 of 12 FPR0011 Rev 13, 07.01.22
SCHEDULE “A” to Subcontract Agreement No. __________ dated _________________,
between F.A. Wilhelm Construction Company, Inc. (“Contractor”) and
______________________________________ (“Subcontractor”). This Schedule “A” is
hereby made a part of and incorporated into the Subcontract Agreement.
1. Subcontractor’s Work. In addition to the Work described on the face of the Subcontract
Agreement, Subcontractor’s Work includes, but is not limited to, the following specific items:
A. Subcontractor has agreed to a total Subcontract Sum for its Work based on the
following breakdown, which is provided for accounting purposes only:
Base Bid $x,xxx,xxx
Deduct $x,xxx
ADD $x,xxx
Total Contract Value $x,xxx,xxx
Alternates:
B. Specification Sections:
• Section
•
C. General Scope of Work Includes:
1. All specified mock-ups and samples.
D. Specific Scope of Work Includes:
1. All __________ work as shown on or indicated by the Contract Documents.
2.
E. Specific Scope of Work Excludes:
1. Initial Building Permit
2. Subcontract Documents. The Subcontract Documents also include the following:
A. This Schedule “A”.
B. The Prime Contract, consisting of the agreement between Contractor and Owner is entitled
___________________ and dated _______________ and the other contract documents
incorporated therein, including conditions of the contract (general, supplementary and other
conditions), drawings, specifications, and any addenda thereto.
C. The following addenda to the Prime Contract:
D. The following Requests for Information that have been answered prior to the execution of
this Subcontract Agreement:
E. The following attached Exhibits:
• Exhibit “A” - Subcontractor/Supplier Affidavit & Waiver of Liens & Claims.
Subcontractor shall submit this document with each application for payment. Sample Subcontract Agreement
Date: __/__/__ SCHEDULE “A” for SA#____ FAW JOB #____
Project
2 of 12 FPR0011 Rev 13, 07.01.22
• Exhibit “B” - Sub-subcontractors and Suppliers Disclosure Affidavit. Subcontractor
shall submit this document within 10 days of receiving this Subcontract Agreement
and shall update the information on the document with each application for payment.
• Exhibit “C” - Sub-Subcontractor/Supplier Affidavit and Waiver of Liens & Claims.
With each application for payment, Subcontractor shall submit this document for
each person or entity listed on the Sub-subcontractors and Suppliers Disclosure
Affidavit Exhibit “B”.
• Exhibit “D” – Corporate Safety Manual – Section 14: Subcontractor General
Requirements. Exhibit “D” includes the Underground Utility Locating, Directional
Boring and other hidden utility procedures that Subcontractor is required to follow.
• Exhibit “E” – E-Verify Affidavit. Subcontractor shall sign and submit to Contractor.
the attached E-Verify affidavit prior to commencing its Work, and abide by the
representations and obligations set forth therein.
• Exhibit “F” – Subcontract Performance and Payment Bond forms that are acceptable
to Contractor if Subcontractor is required to provide bond(s) on the Project.
• Exhibit “G” - Documents Log. The documents listed in Exhibit “G” are also
incorporated into the Subcontract Agreement by reference as Subcontract
Documents.
• Exhibit “H” - Project Schedule.
• Exhibit “I” – Scaffold/Equipment Agreement. Subcontractor agrees not to use any
scaffold and/or equipment that is owned, leased and/or erected by Contractor
without first obtaining written authorization from Contractor by way of an executed
Contractor’s Scaffold/Equipment Agreement – Exhibit “I”.
• Exhibit “J” - BIM Technical Kickoff Package. [Only to be used for subcontractors
participating in BIM process.}
• Exhibit “K” LEEDs plan
3. Schedule. Subcontractor agrees to the following specific scheduling requirements and milestone
dates:
Subcontractor will perform its Work in accordance with the Project Schedule attached as Exhibit
“H” and titled “PROJECT SCHEDULE XYZ”, data date of xx/xx/xx, schedule printed date of
xx/xx/xx.
In addition, the following schedule items and milestones are included:
• Shop drawings and submittals complete by xx/xx/xx
• Mock-up requirements completed by xx/xx/xx
• Other milestones.
.
A. Subcontractor shall, within ten (10) days after the date of this Subcontract Agreement,
prepare and submit to Contractor for review a detailed schedule, showing the order in which
Subcontractor proposes to carry out all major activities and indicating the dates on which
the several activities representing the complete performance of the Subcontract (including
submittals, procurement of materials, and equipment) will be started and finished. This
schedule shall list the sequence of activities anticipated by Subcontractor and the
anticipated duration of each activity. Subcontractor acknowledges that Subcontractor has Sample Subcontract Agreement
Date: __/__/__ SCHEDULE “A” for SA#____ FAW JOB #____
Project
3 of 12 FPR0011 Rev 13, 07.01.22
scheduled and sequenced its Work on the basis of the Contractor’s schedule and any
milestone and performance requirements established above and by the Subcontract
Documents.
1. Subcontractor acknowledges and understands that in development and updating of
Contractor’s schedule, Subcontractor’s proposed activity sequence and durations may
need to be amended by the Contractor to allow Contractor’s schedule to meet the
performance requirements established by the Subcontract Documents. Should any
aspect of Contractor’s schedule be at variance with the desired sequencing or duration
of Subcontractor’s activities, Subcontractor shall notify Contractor in writing of such
variation within five (5) days of its receipt of Contractor’s schedule. Subcontractor’s
failure to submit its proposed schedule when required or to notify Contractor in writing
of any variation or conflict between Subcontractor’s proposed schedule and Contractor’s
schedule shall preclude Subcontractor from receiving any consideration for an extension
of time to the extent allowed under the Subcontract Agreement. Contractor may require
Subcontractor to prosecute its work in such sequence as Contractor may reasonably
require in order to maintain the progress of other subcontractors and the Contractor’s
schedule.
2. Subcontractor shall prosecute its Work with due diligence, without delay, and will not in
any manner, by delay or otherwise, interfere with the work of the Contractor or any other
subcontractors; and shall manage its Work in a manner that will allow the total Project
to be completed within the Prime Contract specified time.
3. Subcontractor will submit a 3-Week Look-Ahead list of work activities prior to each
weekly Project meeting in a form acceptable to Contractor’s Superintendent.
4. Subcontractor will provide sufficient workforce, equipment, materials, supervision, etc.
to work simultaneously on different floors or areas of the building as required by the
Project Schedule.
4. Project Requirements. The Subcontractor’s Work shall be performed in accordance with the
following Project Requirements:
A. General Requirements:
1. Subcontractor has reviewed and will abide by the section from Contractor’s Corporate
Safety Program entitled “Subcontractor General Requirements” attached as Exhibit “D”.
Prior to commencing its work, Subcontractor shall develop its own Site Specific Safety
Plan (SSSP) identifying the hazards with its Work and how it plans to address the
hazards. Subcontractor’s SSSP is to be kept on site and made available for review by
Contractor upon request. Subcontractor shall update its SSSP as Project circumstances
deem necessary. The jobsite will be drug and alcohol free. As such, Subcontractor
agrees that all employees on the jobsite will be subject to the applicable drug and alcohol
policies, whether Owner, Contractor, union or government required.
2. Subcontractor is responsible to install, maintain and replace temporary railings,
barricades, etc. required as a result of Subcontractor’s Work. If Subcontractor removes
a safety railing or barricade, it is responsible to immediately re-install per the applicable
state and/or federal OSHA requirements.
3. OSHA required temporary lighting will be provided by an electrical contractor.
Subcontractor is to include its own specific lighting beyond the temporary lighting
provided by the electrical contractor. If the lighting provided by the electrical contractor
does not meet the applicable state and/or federal OSHA requirements, it is the
Subcontractor’s responsibility to notify Contractor and to make sure that such is Sample Subcontract Agreement
Date: __/__/__ SCHEDULE “A” for SA#____ FAW JOB #____
Project
4 of 12 FPR0011 Rev 13, 07.01.22
corrected before Subcontractor proceeds with its Work in an area with inadequate
lighting.
4. All general conditions required to perform Subcontractor’s Work are included in the
Subcontract Sum, except for those specifically excluded in Section 1 of this Schedule
“A.” This includes, but is not limited to: ladders, permits, scaffolding, lifting and
accessory devices, drinking water, power supply and distribution, cleaning materials,
wax based sweeping compound, office space, telephones, fax machines, temporary
storage requirements, etc.
5. Subcontractor warrants that it has visited and examined the Project site, and further
warrants that it shall make no claims for additional sums on account of existing site
conditions.
6. Subcontractor shall formalize all questions to Contractor in writing by use of a Request
for Information (“RFI”) form that is set up in the web based construction management
software that is to be used by Subcontractor on the Project as determined by Contractor.
7. Weekly progress meetings will be held at the job site. An authorized, decision making
representative of Subcontractor will be required to attend, as requested, or while working
on site.
8. Subcontractor will submit by 9:00 a.m. the following workday, a report, which states how
many workers were on site the previous day and what tasks they performed on the daily
report form set up in the web based construction management software that is to be
used by Subcontractor on the Project.
9. Existing building and facilities are not to be entered or used unless authorized by
Contractor.
10. If and when ordered in writing by Contractor, Subcontractor shall furnish to Contractor a
payment and performance bond for 100% of the Subcontract Sum. The bond shall be
in a form consistent with Exhibit “F” and from a surety acceptable to Contractor and
shall have a dual-obligee rider naming any parties requested by the Contractor to be a
dual-obligee on the bond. The cost of the bond shall be added to the Subcontract Sum,
unless the bond is otherwise required by the Subcontract Documents.
11. Subcontractor’s access and deliveries to the site must be coordinated 48 hours in
advance of arrival with Contractor’s Superintendent. Failure to do so may result in the
access and/or delivery being prohibited by Contractor’s Superintendent, at their
discretion.
12. Subcontractor is responsible for its own cutting and patching.
13. If parking is not available on site, Subcontractor must provide parking, permits, etc. for
all employees and assume responsibility for all costs.
14. Subcontractor is responsible for obtaining and paying for all project documents,
including drawings and specifications.
15. Subcontractor will not change field supervision without the previous approval from
Contractor.
16. The use of tobacco and the use of electronic cigarettes a/k/a vape are not permitted in
any existing building or building under construction.
17. Subcontractor is responsible for the timely location and placement of all sleeves, box-
outs and embeds to the extent associated with its Work. Failure to provide placement
information in a timely manner for items supplied by Subcontractor, but specifically
identified as being installed by others, shall result in Subcontractor being responsible for
any corrective measurements required. It is the Subcontractor’s responsibility to monitor
the progress of the Work and communicate requirements with the Contractor’s
Superintendent and Project Manager.
18. Subcontractor is responsible to ensure damage to new construction is minimized to the
fullest extent. Subcontractor is responsible to repair all damage that it causes at no Sample Subcontract Agreement
Date: __/__/__ SCHEDULE “A” for SA#____ FAW JOB #____
Project
5 of 12 FPR0011 Rev 13, 07.01.22
additional cost to the Contractor. Subcontractor is responsible to provide protective
coverings for its materials as applicable, whether stored or installed.
19. Subcontractor’s personnel will eat lunch in an area designated by Contractor’s
Superintendent.
20. Personal radios, headsets, any other entertainment listening or viewing devices, etc. are
not permitted on the Project.
21. Subcontractor is responsible for cleaning the job site daily and removing from the
premises any debris caused by the performance of its Work. Subcontractor shall keep
clean the general work area, areas around the trailers, workers shanties, tool sheds,
storage facilities, and workmen’s parking area, and shall remove all papers, luncheon
wrappers, food containers, and garbage continuously. The work area shall be
continuously maintained at a minimum of broom clean. Should Subcontractor fail to
perform such cleanup, or fail to accomplish any corrective work required by the
Contractor, Contractor will provide such cleanup service and such corrective work on
behalf of Subcontractor, and the costs incurred by the Contractor will be charged to
Subcontractor plus 10%.
22. Subcontractor shall make a punchlist for its own Work and complete the listed items
before requesting Contractor, Architect and/or Owner to make up a punchlist.
Subcontractor will complete in a timely manner all punchlist Work items as generated by
Contractor, Architect and/or Owner. Multiple punchlists may be generated on this
Project. Punchlists are complete when the initiating party accepts them as being
complete. The Procore web based construction management software shall be used by
Subcontractor for administering punchlist on this Project, unless otherwise stated herein.
23. Subcontractor is responsible for all firestopping, sealant, acoustical sealant, etc. around
all floor, wall and ceiling penetrations to the extent associated with its Work.
Subcontractor is to monitor and coordinate partition, ceiling and floor construction to
ensure that construction around the penetration is correct and allows for a proper and
acceptable sealing detail.
24. Subcontractor's use of lifts, hoists, and other similar equipment (in connection with Work
to be performed inside buildings and/or facilities) shall be subject to Contractor's
Superintendent’s approval.
25. Subcontractor’s starting of any Work that is to be attached to or supported by the work
of others or existing conditions shall constitute acceptance of such work or conditions,
and Subcontractor warrants that it shall make no claims for additional sums on account
such work of others or existing conditions.
26. Subcontractor, its subcontractors or suppliers, or anyone for whom it is responsible shall
not use or allow on the Project any rigging materials which were made in China. Rigging
materials include but are not necessarily limited to alloy steel chains, wire rope slings,
natural rope slings, synthetic fiber rope slings, synthetic web slings, shackles and hooks.
B. Submittal Requirements:
1. Within ten (10) days of the date of this Subcontract Agreement, Subcontractor will
provide a listing of all material suppliers, vendors and sub-subcontractors that are
required to furnish submittals on the Project, indicating a scope of work or materials to
be supplied and the specification section that submittals will be furnished under. This
list must be satisfactory to the Contractor. Subcontractor must notify the Contractor in
writing with any proposed changes once the list has been submitted. Sample Subcontract Agreement
Date: __/__/__ SCHEDULE “A” for SA#____ FAW JOB #____
Project
6 of 12 FPR0011 Rev 13, 07.01.22
2. All submittals must have an approved submittal stamp signed and dated by the
Subcontractor and will identify the specification section and other specific identification
information.
3. Subcontractor is responsible to confirm and coordinate all dimensions at the job site. If
Subcontractor submittals are returned and require additional work or material beyond
what is required by the Subcontract Documents, Subcontractor shall submit a quotation
to Contractor for these scope revisions in accordance with the Subcontract Documents.
4. A comprehensive submittal schedule, listing proposed submittal dates, manufacturer
lead times, and anticipated critical components, shall be sent to Contractor within fifteen
(15) days of the date of this Subcontract Agreement. Upon review and acceptance of
the submittal schedule, Subcontractor shall furnish a detailed delivery schedule for all
materials used on the Project.
5. Subcontractor shall use the web based construction management software that is to be
used by Subcontractor for submittals on this Project. Subcontractor shall provide
samples as required by the Subcontract Documents.
6. Subcontractor shall not be relieved of responsibility for any deviation from the
requirements of the Subcontract Documents by Architect, Owner or Contractor’s
acceptance of shop drawings, product data, samples, and submittals as required by
Subcontract Documents, unless Subcontractor has specifically informed Contractor in
writing of such deviation at the time of submission and the Owner and Contractor have
given written approvals to the specific deviation.
7. Shop drawings and product data that are incomplete or are not in compliance with the
Subcontract Documents shall not be submitted.
8. Any deviations from the Subcontract Documents must be proposed as a change to the
Subcontract Agreement and approved as a change order before procurement. All
changes and proposed changes to the Subcontract Documents are to be noted on the
cover letter of the shop drawings and/or product data during the submittal process.
9. Data sheets, brochures and/or transmittals being submitted must include the
specification section and a reference number.
10. When general catalog or data sheets are submitted, they must be specifically marked
with items only relevant to this Project. Details not relevant to the Project shall be
deleted or marked out. If these are submitted without clearly indicating which materials
or details are applicable, they will be returned without review.
11. Mechanical, Electrical, Plumbing and/or Fire Protection (collectively “MEPFP”)
subcontractors are required to be involved in the overall Building Information Modeling
(“BIM”) and MEPFP coordination processes and participate in the related meetings. If
Subcontractor has any MEPFP Work, then Subcontractor is required to meet or
exceed all guidelines and technical requirements required by the Subcontract
Documents Project and/or as detailed in the Contractor’s BIM Technical Kickoff
Package. Subcontractor understands that the BIM coordination process and
respective models created to support it shall accurately reflect the Subcontractor’s
entire scope of work and planned installation(s).
C. Billing Requirements:
1. Subcontractor’s monthly billing shall be submitted on the AIA form G702 by the [??] day
of each month, along with its completed Subcontractor/Supplier Affidavit and Waiver of
Liens and Claims, its completed Sub-Subcontractors and Suppliers Disclosure Affidavit
and a Sub-Subcontractor/Supplier Affidavit and Waiver of Liens & Claims for each
person or entity listed on the Sub-subcontractors and Suppliers Disclosure Affidavit. A
pencil copy must be submitted five (5) days prior for review by Contractor’s Project Sample Subcontract Agreement
Date: __/__/__ SCHEDULE “A” for SA#____ FAW JOB #____
Project
7 of 12 FPR0011 Rev 13, 07.01.22
Manager. Upon approval of the pencil copy by Contractor’s Project Manager,
Subcontractor shall submit final copies to apinvoice@fawilhelm.com.
2. All applications for payment must indicate the percentage of Work completed through
the billing date, and a percentage of approved change order Work completed through
the billing date.
3. All applications for payment MUST reflect retainage of ten percent (10%) to be withheld.
4. All extra work tickets must be signed for by Contractor’s Superintendent, approved by
Contractor’s Project Manager, and included in a change order prior to inclusion with any
billing.
5. Subcontractor cannot include off-site storage of materials on pay applications unless
approved by Architect and Owner prior to submission of the applicable pay application.
6. Subcontractor’s invoices shall not exceed the current Subcontract Sum.
7. Subcontractor does hereby sell, transfer, assign and convey to Contractor the goods,
materials, parts, supplies, equipment, and accessions required by the Subcontract
Documents (collectively, the “Goods”) and located at the Subcontractor’s premises or
the Subcontractor’s suppliers’ premises, manufactured or in the process of manufacture
for delivery to, or for use on or in connection with the construction of the Project. In the
event that any of the Goods are in the process of manufacture, Subcontractor expressly
intends to sell, transfer, assign and convey the same in their completed state, as well as
in the form and state the Goods possess at the time of execution of this Subcontract
Agreement. It is the express intention of the parties that (i) by their identification in the
Subcontract Documents, Contractor acquires a special property to and insurable interest
in the Goods, (ii) title to the Goods passes to Contractor upon execution of this
Subcontract Agreement, subject to rejection, refusal to receive or retain the Goods or a
justified revocation of acceptance of the Goods by Contractor. Subcontractor
represents, warrants and covenants to Contractor that Subcontractor (i) is the lawful
owner of the Goods, (ii) has good right to sell the Goods to Contractor, and (iii) warrants
and will defend the Contractor’s rights to the Goods as against any and all claims and
demands of Subcontractor’s creditors or other third parties. The foregoing
representations, warranties and covenants shall survive the execution of this
Subcontract Agreement. For so long as Subcontractor maintains possession or control
of the Goods, Subcontractor will provide safe and proper storage of the Goods on its
own premises or such other premises as the Goods may be located from time to time.
Subcontractor shall not move the Goods or Subcontractor’s place of business, unless it
first provides Contractor thirty (30) days advance written notice. Subcontractor will
physically separate and segregate the Goods by means of ropes or other barriers, or as
otherwise may be directed by Contractor, from all other items of inventory and will cause
to be placed conspicuously and securely on the Goods a sign or signs in a form
satisfactory to Contractor, which identifies the Goods as the property of Contractor and
as intended for use on or in connection with the Project.
Notwithstanding the foregoing, and in addition to all of Contractor’s other rights in
connection with the Goods available to Contractor by law or contract, Subcontractor
hereby grants to Contractor, to the fullest extent it is capable of doing so, a security
interest in and to the Goods, now existing or hereinafter acquired, to secure
Subcontractor’s performance of its obligations under this Subcontract Agreement, and
any other agreement entered into by the parties. Subcontractor acknowledges that this
Subcontract Agreement shall constitute a Security Agreement for the security interest
granted hereby in accordance with the provisions of the Uniform Commercial Code.
Subcontractor hereby irrevocably nominates, constitutes, appoints and designates
Contractor as its attorney-in-fact with the rights, but not the obligation, to make, execute,
file and deliver any and all other documents or papers, including, without limitation, any Sample Subcontract Agreement
Date: __/__/__ SCHEDULE “A” for SA#____ FAW JOB #____
Project
8 of 12 FPR0011 Rev 13, 07.01.22
financing statements or security agreements deemed necessary and proper by
Contractor in order to give full effect not only to the intent and meaning of the sale,
transfer, conveyance and assignment contemplated herein, but also to the full protection
intended to be herein given to Contractor under all other provisions of this Subcontract
Agreement and the other agreements entered into between the parties and applicable
law. Subcontractor hereby ratifies and confirms all acts and actions taken and done by
Contractor as attorney-in-fact. This provision is in addition to any other rights and
remedies, common and equitable, available to Contractor under this Subcontract
Agreement.
D. Closeout Requirements:
1. Subcontractor shall provide manufacturer’s field services, service engineering, written
warranties, operation and maintenance manuals, training, orientations and
demonstrations, as required in the Subcontract Documents, and as applicable for all
Work contained in this Subcontract Agreement.
2. Prior to Contractor accepting a billing for Work in excess of 25% complete,
Subcontractor must have completed and submitted a list of closeout documents,
including the status of those documents. Prior to Contractor accepting a billing in excess
of 75% complete, Subcontractor must have submitted all appropriate closeout
documentation. Contractor may withhold progress billings until all closeout documents
are received and approved. Prior to Contractor releasing the final retention,
Subcontractor shall provide a record copy of all shop drawings and submittals fully
corrected with field modifications and revisions for the Project, along with any attic stock
that is required to be provided by the Subcontract Documents. Subcontractor shall
provide as-built drawings on bluelines and CAD files.
5. Change Order Administration. Quotations for changed or revised work submitted pursuant to
Paragraph No. 5 of the Terms and Conditions on the back of the Subcontract Agreement shall
follow one or more of the following methods of calculation, at the option of Contractor:
a) Cost plus a fee or time and material (may include a not to exceed amount)
b) Lump sum
c) Unit prices contained in this Schedule “A” (if any)
Change quotations shall set forth any addition or deduction to the Subcontract Sum and any
impact to Contractor’s schedule, along with all details and backup that Contractor, Owner,
Prime Contractor, Architect and/or Construction Manager may deem necessary to support the
quotation. The administration of any claims for additional cost or additional time shall meet
the requirements of the Subcontract Documents, including the Prime Contract.
a) Cost Plus or Time and Material. If Work is to be performed on a cost plus or time and
material basis, tickets indicating manpower, material, equipment and tools are to be submitted
each day for the Contractor’s Superintendent’s signature. Costs associated with the change
are to be summarized and submitted to the Project Manager at regular intervals not to exceed
30 days. Failure to have tickets signed or to issue cost summaries within 30 days will result
in the claim for such costs being waived. Any fees or mark-ups shall be those established in
the Subcontract Documents, including the Prime Contract. Provided, however, that if such
fees and mark-ups are not established in the Subcontract Documents, they shall be agreed
upon in writing prior to the commencement of the Work. Sample Subcontract Agreement
Date: __/__/__ SCHEDULE “A” for SA#____ FAW JOB #____
Project
9 of 12 FPR0011 Rev 13, 07.01.22
Costs. In case of cost plus compensation, costs shall be limited to: cost of materials, including
cost of delivery and taxes; cost of labor in the field, including social security, unemployment
and medical insurance, and employment benefits; bond premiums; and rental value of power
tools and equipment at rates not to exceed those contained in the Associated Equipment
Distributors Construction Equipment Rental Rates, Current Edition as of the date of the
Subcontract Agreement.
Overhead and profit for cost plus compensation shall include: wages of superintendents,
project managers, project engineers, non-working foremen, timekeepers, watchmen and
clerks; hand tools; incidentals; general office expense; warranty expense; and all other
expenses not included in “costs” as defined above.
The following percentages for overhead and profit, as appropriate, are to be added to
approved costs:
O.H.& PROFIT
a) To Subcontractor on work not performed by its own forces. 5%
b) To Subcontractor for work performed by its own forces. 10%
b) Lump Sum. When a lump sum price for the addition or deletion of any Work is requested
from the Subcontractor, Subcontractor shall submit a lump sum quotation with an itemized
breakdown of all increases or decreases in the costs of Subcontractor and its sub-
subcontractors and material suppliers, in the following detail: a) material quantity and unit cost;
b) labor costs, broken down per item of Work, including man-hours, payroll taxes and
insurance; c) construction equipment; d) sales tax; e) delivery charges; f) overhead; and g)
profit.
d) Unit Prices. Any unit prices accepted as part of the Subcontract Agreement or
incorporated into the Subcontract Agreement by change order are not to be considered
or interpreted as prior approval to proceed with changes to Subcontractor’s Work. All
such changes shall be governed by Paragraph No. 5 on the back of the Subcontract
Agreement.
6. Insurance Requirements. Subcontractor will provide the following minimum insurance
requirements for the Project plus any additional insurance that is required of Contractor under the
Prime Contract. A copy of an approved insurance certificate must be on file with the Contractor,
at the main office location, prior to the commencement of work on the Project. Submit insurance
certificate to inscerts@fawilhelm.com.
A. Required Insurance Coverages:
1. Commercial General Liability
✓ Occurrence Form
✓ Aggregate per Project Endorsement Sample Subcontract Agreement
Date: __/__/__ SCHEDULE “A” for SA#____ FAW JOB #____
Project
10 of 12 FPR0011 Rev 13, 07.01.22
✓ Subcontractor’s Products / Completed Operations coverage shall be continued for
one year after completion of its work or for such period otherwise provided by the
Subcontract Documents, whichever is longer.
✓ Contractual Liability
✓ No exclusion for Explosion, Collapse & Underground (XCU)
✓ No exclusion for liability assumed in an insured contract
2. Automobile Liability (Business)
✓ Including Hired and Non-Owned Auto liability coverage
✓ Contractual Liability
✓ No exclusion for liability assumed in an insured contract
3. Worker’s Compensation/Employer’s Liability
✓ Statutory as required by the State where the project is located
4. Excess Liability
✓ Umbrella Form – follow form coverage on all liability policies
B. Minimum Limits of Insurance Required:
1. Commercial General Liability
a. General Aggregate (other than Products / Completed Operations) $2,000,000
b. Products / Completed Operations Aggregate $2,000,000
c. Bodily Injury and Property Damage (each occurrence) $1,000,000
d. Personal & Advertising Injury (any person or organization) $1,000,000
e. Fire Damage (any one fire) $ 50,000
f. Medical Expenses (any one person) $ 5,000
2. Automobile Liability (Business)
a. Combined Single Limit Per Accident or Loss – Bodily Injury
& Property Damage $1,000,000
3. Worker’s Compensation/Employer’s Liability
a. Bodily Injury by Accident – Each Accident $ 500,000
b. Bodily Injury by Disease – Policy Limit $1,000,000
c. Bodily Injury by Disease – Each Employee $ 500,000
4. Excess Liability
a. Each Occurrence $5,000,000
C. Additional Insured(s) - applies to all insurance coverage, except Worker’s Compensation
and Employer’s Liability. The following shall be named as Additional Insured(s), including
coverage for ongoing and completed operations, on Subcontractor’s policies:
F.A. Wilhelm Construction Co., Inc. AND Wilhelm Construction, Inc. and their respective
affiliates, subsidiaries, officers, directors, employees and representatives.
D. In the event the Subcontractor has or obtains coverage in amounts in excess of those
minimum limits outlined above during the period that coverage is required under the
Subcontract Agreement, those organizations listed above as Additional Insureds shall also
be named as Additional Insureds for such excess amounts. The amounts of insurance
(including endorsements thereto) carried in compliance with these insurance requirements
are not to be construed as either a limitation or satisfaction of the Subcontractor’s liability.
E. Subcontractor waives any and all claims against those organizations listed above as
Additional Insureds and their respective insurers for damages caused by any occurrence or
peril covered by the insurance required by the Subcontract Documents (waiver of
subrogation/waiver of right of recovery).
Sample Subcontract Agreement
Date: __/__/__ SCHEDULE “A” for SA#____ FAW JOB #____
Project
11 of 12 FPR0011 Rev 13, 07.01.22
F. Subcontractor and its insurance carrier shall give Contractor at least thirty (30) days written
notice prior to cancellation, non-renewal and/or any material change of any required
coverage.
G. If any portion of the Subcontractor’s Work involves project design, architectural services,
engineering services or other consulting services, soil boring or reporting of results of same
or site surveying or reporting of results of same, professional liability coverage (errors and
omissions) with minimum limits of $1,000,000 per claim and $3,000,000 general aggregate
and maximum deductible of $25,000 shall be required. It shall also be required that this
professional liability policy, and any replacement policy, have a retroactive date no later than
the date of this subcontract and that the coverage be continued for a minimum of five years
after final completion.
The insurance coverage provided by Subcontractor under this Subcontract Agreement shall
be primary and non-contributory to any other insurance. Sample Subcontract Agreement
EXHIBIT “A”
1 of 1 FPR0011 Rev 13, 07.01.22
SUBCONTRACTOR/SUPPLIER
AFFIDAVIT & WAIVER OF LIENS & CLAIMS
Partial ( ) Final ( )
We, the undersigned, having been employed by F. A. Wilhelm Construction Co., Inc. (“Contractor”)
to furnish labor, services, equipment and/or materials for construction work on the Project known as
Project constructed on real estate located in the County of County in the State of Project State, hereby
warrant that the Contractor, any surety bond instrument or surety, any Project owner(s), any Project
funds, and the Project real estate and the improvements thereon cannot be made subject to any valid
claim, lien or encumbrance by anyone who furnished labor, services, equipment or materials to the
undersigned for use in the Project, and the undersigned hereby waive and release any and all claims,
liens and encumbrances of whatsoever kind or nature against the Contractor, any surety bond instrument
or surety, any Project owner(s), any Project funds, and the Project real estate and improvements thereon
for any labor, services, equipment or materials furnished through _____________________, ______.
The above waiver and release are given in order to induce payment in the Amount Due of
$______________ and upon receipt by the undersigned of the Amount Due, the above waiver and
release become valid, enforceable and of full effect. Upon attachment of the cancelled check and the
legal description of the Project, this release may be recorded by the owner(s) or mortgage holder(s) of
the Project.
Notwithstanding the foregoing, the undersigned does hereby unconditionally waive and release any and
all claims, liens and encumbrance of whatsoever kind or nature against the Contractor, any surety bond
instrument or surety, any Project owner(s), any Project funds, and the Project real estate and any
improvements thereon with respect to monies due the undersigned for previous payment requests in the
total sum of $_____________________, the receipt and sufficiency of which is hereby acknowledged by
the undersigned.
Given under our hand and seal this
_____ day of ____________________, ______
__________________________________________
Company
By: __________________________________________
Authorized Representative of Company
STATE OF: )
COUNTY OF: )
Subscribed and sworn to before me this ______ day of ____________________, 20__.
__________________________________________
Notary Public:
My Commission Expires:
County of Residence:
Sample Subcontract Agreement
EXHIBIT “B”
1 of 1 FPR0011 Rev 13, 07.01.22
Sample Subcontract Agreement
EXHIBIT “C”
1 of 1 FPR0011 Rev 13, 07.01.22
SUB-SUBCONTRACTOR/SUPPLIER
AFFIDAVIT & WAIVER OF LIENS & CLAIMS
Partial ( ) Final ( )
We, the undersigned, having been employed by Insert FAW’s 1st tier Sub that owes the money to
furnish labor, services, equipment and/or materials for construction work on the Project known as Project
constructed on real estate located in the County of County in the State of Project State, hereby warrant
that F.A. Wilhelm Construction Co., Inc. (“Contractor”), any surety bond instrument or surety, any
Project owner(s), any Project funds, and the Project real estate and the improvements thereon cannot be
made subject to any valid claim, lien or encumbrance by anyone who furnished labor, services, equipment
or materials to the undersigned for use in the Project, and the undersigned hereby waive and release any
and all claims, liens and encumbrances of whatsoever kind or nature against the Contractor, any surety
bond instrument or surety, any Project owner(s), any Project funds, and the Project real estate and
improvements thereon for any labor, services, equipment or materials furnished through ____________,
______.
The above waiver and release are given in order to induce payment in the Amount Due of
$______________ and upon receipt by the undersigned of the Amount Due, the above waiver and
release become valid, enforceable and of full effect. Upon attachment of the cancelled check and the
legal description of the Project, this release may be recorded by the owner(s) or mortgage holder(s) of
the Project.
Notwithstanding the foregoing, the undersigned does hereby unconditionally waive and release any and
all claims, liens and encumbrance of whatsoever kind or nature against the Contractor, any surety bond
instrument or surety, any Project owner(s), any Project funds, and the Project real estate and any
improvements thereon with respect to monies due the undersigned for previous payment requests in the
total sum of $_____________________, the receipt and sufficiency of which is hereby acknowledged by
the undersigned.
Given under our hand and seal this
_____ day of ____________________, ______
__________________________________________
Company
By: __________________________________________
Authorized Representative of Company
STATE OF: )
COUNTY OF: )
Subscribed and sworn to before me this ______ day of ____________________, 20__.
__________________________________________
Notary Public:
My Commission Expires:
County of Residence Sample Subcontract Agreement
EXHIBIT “D”
CORPORATE
SAFETY MANUAL
SECTION: 14
REVISION
NUMBER: 10
REVISION DATE: 04.29.22
SUBJECT:
SUBCONTRACTOR GENERAL REQUIREMENTS
1 of 5 FPR0011 Rev 13, 07.01.22
Section 14: Subcontractor General Requirements
POLICY
The subcontractor’s safety program shall, at a minimum, contain the following:
1. The subcontractor will provide Wilhelm a copy of the list of all chemicals that are specific
for the jobsite. MSDS sheets are to be kept in the subcontractor’s trailer.
2. Each subcontractor will prepare a Site Specific Safety Plan (“SSSP”) prior to the
commencement of the subcontractor’s work, and shall update the SSSP as project
circumstances deem necessary. The Subcontractor’s SSSP shall identify the hazards with
Subcontractor’s work and how it plans to address the hazards. The SSSP shall be kept at
the job site and made available to Contractor for review upon request. The SSSP shall
include a Silica Exposure Control Plan that covers all forms of silica exposure created by
Subcontractor’s Work. With respect to drywall work, the plan shall provide that all drywall
sanding will be performed with the use of dust collection systems and/or the wet sanding
method.
3. Each subcontractor will designate an on-site safety representative.
4. The safety representative of each subcontractor will be responsible for the implementation
of the subcontractor’s safety program. The subcontractor’s safety representative shall:
A. Attend every project safety meeting.
B. Inspect the project for safety hazards related to the subcontractor’s work and for
exposure to the employees of the subcontractor and its sub-subcontractors.
C. Follow up on correction of safety hazards.
D. Report any discovered safety hazards to the Wilhelm Superintendent that are left
uncorrected, regardless of who is responsible for the hazard.
E. Monitor the subcontractor’s “Tool Box” meetings.
F. Promote “safety awareness” in all subcontractor tradesmen and supervision and
maintain communications between the two regarding safety.
G. Make sure that the subcontractor has adequate safety equipment on the jobsite
as necessary to perform the various portions of its work.
5. Subcontractors are responsible for compliance with the applicable state and/or federal
OSHA requirements and any site specific safety requirements. At a minimum, this entails
indoctrinating their on-the-job representatives with a working knowledge of the state
and/or federal OSHA requirements, making sure they have a copy of the safety code Part
1926 on the job and directing them to remain in full compliance with OSHA at all times.
They are further responsible for their firm’s representation at all project safety meetings. Sample Subcontract Agreement
EXHIBIT “D”
CORPORATE
SAFETY MANUAL
SECTION: 14
REVISION
NUMBER: 10
REVISION DATE: 04.29.22
SUBJECT:
SUBCONTRACTOR GENERAL REQUIREMENTS
2 of 5 FPR0011 Rev 13, 07.01.22
6. All subcontractor supervisors and foremen are responsible to plan and accomplish their
work with due regard for the safety of all individuals (including the public) on, or adjacent
to, the jobsite. They will be expected to eliminate all foreseeable accident hazards when
planning the work under their control. Supervisors and foremen will ensure that weekly
“Tool Box” meetings are held to implement and further develop the subcontractor’s safety
program. It is expected that they will observe and correct any accident-producing
practices of the crew before injuries occur. If an accident does occur, they will investigate
to determine the cause and take the required corrective action to prevent similar
accidents. All accidents shall be reported immediately on the “Field Report of
Injury/Illness of Employee” form and copied to the Wilhelm Superintendent.
7. All subcontractor supervisors, foremen and workmen are required to observe all local,
state and federal safety regulations. They shall use the safety devices provided for their
own protection and should never render ineffective any safety device which is in use on
the project. They shall report all discovered safety hazards to the subcontractor’s on-site
safety representative.
8. If an accident occurs, the subcontractor involved will take the following action:
A. Administer first aid and see to the immediate needs of the injured.
B. Notify the Wilhelm Superintendent as soon as practicable of the accident, its
location, who was involved, what the injured was doing and the known extent of
the injuries.
C. No later than 24 hours after the accident, the subcontractor will submit a copy of
its accident report to the Wilhelm Superintendent.
9. Underground Utility Locating Process
A. Purpose:
Wilhelm has established the following procedures to prevent damaging
underground utility lines. These mandatory procedures, for below grade work, are
the minimum standards to be followed prior to and throughout the project by all
subcontractors. These procedures are not optional, they are mandatory. Shortcuts
to these procedures are unacceptable.
B. Procedure:
• No work shall begin until underground locate calls have been made and
completed. The subcontractor needing the locate done will begin the locate
process by calling 811 (the utility locate service) and requesting both a “joint
meet” and a “locate”. This process normally requires two (2) phone calls to
811, the first call is to setup the meeting and the second call is to schedule the Sample Subcontract Agreement
EXHIBIT “D”
CORPORATE
SAFETY MANUAL
SECTION: 14
REVISION
NUMBER: 10
REVISION DATE: 04.29.22
SUBJECT:
SUBCONTRACTOR GENERAL REQUIREMENTS
3 of 5 FPR0011 Rev 13, 07.01.22
actual locate. Prior to the joint meet and subsequent locates, mark out the
boundaries where the locate is to be performed. The superintendent for the
subcontractor requesting the locate will stay with the locate team throughout
both the joint meet and the locate process.
• Calls to the 811 utility locate service should be initiated at least three (3)
business days prior to planning to dig. The locate service will want location
information such as the address and township where the below grade work
will occur. The 811 utility locate service will provide a ticket or dig number at
the time of the initial call. Wilhelm requires utility locates for active
construction sites to be refreshed at least every two (2) weeks or at any time
the lines are not clearly visible, until the work is completed. Each time you call
in for a refresh, you will be given a new ticket number. It is important that all
subcontractors obtain their own locate ticket. Whoever puts a bucket in
the ground must have their own locate ticket.
• The subcontractor planning to dig must also engage an independent locate
company such as Bloodhound, Pinpoint or another private utility locating
service to come to the site to locate and mark all known private utilities. The
most recent site utility drawings need to be provided to the locate company.
Prior to digging, the subcontractor must meet with the Wilhelm
Superintendent.
• All subcontractors on the project are to provide Wilhelm with updated as-built
information daily for all site utilities being installed during the course of the
project, whether it is a permanent or temporary installation. The as-built
information is to include coordinates and elevation. Structures, pull or junction
boxes, risers, valves etc., are to be included in this information. Piping, duct
banks, direct bury cabling should be documented at intervals not to exceed
50’. The subcontractor digging shall provide the information on a daily basis to
all excavation personnel, site work foremen, layout engineers, spotters and
operators that are doing the work in the ground.
• All subcontractors will install color coded tracer tape (with embedded wire) on
the top side of the pipe for all water, gas, chemical, electric, fiber and sanitary
forced mains that do not come with tracer capability (such as steel pipe, or a
line with tracer wire already embedded). All subcontractors are to install the
proper color coded warning tape at 18 inches below grade at all utility lines
installed for a project. This procedure is to be followed whether for a
permanent or a temporary utility.
• The pothole method using hydro excavating equipment (“pothole method”)
shall be used for location of all gas, electric, water lines, sanitary lines, fiber
optics and any other data communication lines. Storm lines may be located by Sample Subcontract Agreement
EXHIBIT “D”
CORPORATE
SAFETY MANUAL
SECTION: 14
REVISION
NUMBER: 10
REVISION DATE: 04.29.22
SUBJECT:
SUBCONTRACTOR GENERAL REQUIREMENTS
4 of 5 FPR0011 Rev 13, 07.01.22
means of careful machine excavation and use of a probe rod until located. The
same marking process as described above will be utilized. The depths will be
recorded; vertical markers will be installed in the potholed location and
backfilled; the bottom of these markers should be a minimum of 1’ above the
utility line, and approximately 2’-4’ above grade. Markers will be painted or
taped the color of the utility they represent and the depth below grade at that
location will be marked with permanent marker. Markers are to be placed no
further than 50’ apart.
• If after potholing and taking elevations of a live utility line below a proposed
excavation and the utility is determined to be less than 2’ below proposed
subgrade of the excavation, the subcontractor digging shall expose the entire
line within the confines of the proposed excavation prior to any excavation
beginning.
• If the excavation is going to cross a live utility that was originally potholed and
determined to be greater than 2’ below the proposed excavation but falls within
the range of 2’ to 4’ below subgrade, potholing will need to occur at 10’
intervals wherever the utility is crossed to verify consistency of the depth of
the utility.
• When a live utility line is determined to be less than 2’ from the side of a
proposed excavation, you must pothole the utility line at 10’ intervals for the
entire length of the excavation to verify its location prior to any excavation
beginning.
• Once excavation has begun, the subcontractor doing the work shall have a full-
time spotter watching the excavation and the operator will dig with extreme
caution, anticipating the possibility of a branch or tee coming off the line.
• If a subcontractor strikes an underground utility, they are to call the Wilhelm
Superintendent immediately.
10. Directional Boring. If a subcontractor or one of its sub-subcontractors need to run a
directional boring, it must first submit its written project specific boring plan and procedures
to Wilhelm and go over them in detail with the Wilhelm Superintendent before mobilizing to
the site and beginning the boring process. The boring plan must include set back calculations
and diagrams, and a cut section diagram(s) of the bore path(s) which includes boring machine
location, existing utilities (type, depth and location), and bore path with distance from existing
utilities.
Sample Subcontract Agreement
EXHIBIT “D”
CORPORATE
SAFETY MANUAL
SECTION: 14
REVISION
NUMBER: 10
REVISION DATE: 04.29.22
SUBJECT:
SUBCONTRACTOR GENERAL REQUIREMENTS
5 of 5 FPR0011 Rev 13, 07.01.22
11. WALL, FLOOR, AND CEILING MODIFICATION PROCEDURE - Below are the steps to
be taken for any wall, floor, or ceiling modifications. This includes, but is not limited to
demolition, cutting, coring, and grinding:
• Subcontractor is to identify proposed wall, floor, or ceiling shown on drawings that
are to be modified.
• Wall, floor, or ceiling is to be inspected by the subcontractor’s superintendent.
• All interested parties must be aware of not only utilities running through the
structure, but Post tension (PT) and Pre-stressed cables as well. Utility indicators are
conduits protruding through the concrete in the area, and receptacle and switch
boxes. Post Tension (PT) indicators are grouted cavities located on the edge of both
Slab on Grade (SOG) and elevated concrete decks.
• All concrete walls, floors, and Ceilings must be scanned with a concrete scanner prior
to any concrete modifications/cutting.
• When a concrete scanning company arrives onsite, the technician shall be provided
with PT Drawings of the proposed area/s that are to be modified as well as any as
built drawings. This includes tendon, uniform, and banded cable drawings if they are
warranted for this work.
• A company representative from Wilhelm and the subcontractor need to accompany
the scanning technician as they scan the area(s) that are to be modified.
• If the concrete scanning company’s findings are not conclusive, then the
subcontractor’s quality manager and Wilhelm’s quality manager are to be brought in
to visit the site for a second opinion.
• If utility lines are indicated in the floor or wall, each line must be identified as such
and labeled where they originate and end. This can be written on the wall and/or an
as built.
• If these lines have been identified and are determined to be in conflict with the
proposed modification, the responsible subcontractor shall look into changing the
location of the sawcut or core
• Proper lock out tag out (LOTO) procedures are to be met when deenergizing and
removing electrical circuits and/or any stored energy. Proper Lock out tag out
(LOTO) procedures are to be met when removing locks from circuits/lines that were
shut off during this work. All parties are to be notified prior to circuits being turned
on. Sample Subcontract Agreement
EXHIBIT “E”
1 of 1 FPR0011 Rev 13, 07.01.22
E-Verify Affidavit – Subcontractors of F.A. Wilhelm Construction Co., Inc.
Subcontractor, acting through its authorized agent, and being first duly sworn, deposes,
verifies, and affirms under the penalties for perjury that:
(a) Subcontractor shall enroll in the E-Verify Program conducted through the Illegal
Immigration Reform and Immigration Responsibility Act of 1996, as amended, operated by the U.S.
Dept. of Homeland Security (“E-Verify Program”) and shall verify the work eligibility status of its
employees in compliance with the E-Verify Program and/or any applicable law, except if the E-Verify
Program no longer exists;
(b) Subcontractor does not knowingly employ an unauthorized alien;
(c) Subcontractor does not either knowingly employ or contract with an unauthorized alien or
retain an employee or contract with a person that the Subcontractor later learns is an unauthorized
alien; and
(d) Subcontractor shall obtain written certification from any and all sub-subcontractors
providing any services under the Subcontract Agreement that said sub-subcontractors do not either
knowingly employ or contract with an unauthorized alien and are enrolled in the E-Verify Program,
except if the E-Verify Program no longer exists.
I (we) affirm, under the penalties for perjury, that the foregoing representations are true.
(Subcontractor):
By (Written Signature):
(Printed Name):
(Title):
Sample Subcontract Agreement
EXHIBIT “F”
1 of 6 FPR0011 Rev 13, 07.01.22
SUBCONTRACT
PERFORMANCE
BOND
Bond No.:
KNOW ALL BY THESE PRESENTS: That [name of subcontractor], a [state] corporation, as Principal,
hereinafter called Principal, and [name of surety], a [state] corporation, as Surety, hereinafter called
Surety, are held and firmly bound unto F.A. Wilhelm Construction Company, Inc. with its address at
3914 Prospect Street, Indianapolis, IN 46203, as Obligee, hereinafter called Obligee, in the amount
of U.S. Dollars ($ ) (the “Penal Sum”), for the payment whereof Principal and Surety bind
themselves, their heirs, executors, administrators, successors and assigns, jointly and severally,
firmly by these presents.
WHEREAS, Principal has by written agreement dated entered into a subcontract number
with Obligee for the performance of subcontract work , including warranty obligations,
in accordance with drawings and specifications for the construction of the project (hereinafter
"the Project"), which subcontract is by reference made a part hereof, and is hereinafter referred to as
the “Subcontract”.
A. NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION are such that, if Principal shall
promptly and faithfully perform said Subcontract, then this obligation shall be null and void;
otherwise it shall remain in full force and effect, subject to the following conditions: (i) Principal is
in default under the Subcontract; and (ii) Principal has been declared by Obligee to be in default
under the Subcontract; and (iii) the Obligee has performed its obligations under the Subcontract.
Upon the occurrence of each of the above conditions, Surety shall have 30 days (“Investigatory
Period”) from the last event to occur of the following: (a) receipt of the written notice of default; (b)
the date access to the Project site is provided to Surety; or (c) the date the information and
documentation in Obligee’s or its agent’s possession and requested by Surety is received by the
Surety, which information and documentation must be requested by Surety within 10 days of its
receipt of Obligee’s written notice of default, to:
(1) Notify Obligee that it has elected to complete the Subcontract through independent
contractor(s) retained by Surety and thereafter commence such performance with reasonable
promptness. In such event, that portion of the Balance of the Subcontract Price as may be
required to complete the Subcontract or remedy the default and to reimburse the Surety for
its expenditures shall be paid to the Surety at the times and in the manner as said sums would
have been payable to Principal had there been no default under the Subcontract; or
(2) Notify the Obligee that it has elected to arrange for a subcontract between Obligee and a
replacement subcontractor reasonably acceptable to Obligee guaranteed by subcontract
performance and payment bonds provided by the replacement subcontractor in the amount
of the replacement subcontract. In such event, Surety shall pay Obligee the difference
between the cost of the replacement subcontractor and the amount that would have been
payable to the Principal had there been no default under the Subcontract. Such payments
may be in a lump sum (in the case of a lump sum subcontract) or periodically as incurred by
Obligee; or
(3) Request that Obligee complete the Subcontract. In such event, Surety shall pay Obligee the
difference between the reasonable cost of a replacement subcontractor and the amount that
would have been payable to the Principal had there been no default under the Subcontract;
or
(4) Arrange to provide financial and/or other assistance to the Principal (“Financing”) to assist the
Principal with completion of the Subcontract. In the event Obligee has formally terminated Sample Subcontract Agreement
EXHIBIT “F”
2 of 6 FPR0011 Rev 13, 07.01.22
Principal’s right to proceed under the Subcontract, this option shall be subject to Obligee’s
concurrence, which shall not be unreasonably withheld. The Obligee shall pay the Balance of
the Subcontract Price as directed by the Surety. In the event Surety provides Financing,
Surety, in its sole discretion, may upon written notice to Obligee cease providing such
Financing at any time, in which event Surety shall immediately make a further election without
a further Investigatory Period under this paragraph A; or
(5) Deny liability and notify the Obligee, citing the reasons therefor; or
(6) After investigation, determine the amount for which it may be liable to the Obligee and, as
soon as practicable after the amount is determined, make payment to the Obligee.
B. After Obligee has provided Surety with written notice of the Principal’s default, and during the
Investigatory Period and any subsequent period before the commencement of work under
paragraph A, subparagraphs 1 or 2, Obligee may take action pursuant to its Subcontract rights to
mitigate the damages caused by the Principal’s default. To the extent that Obligee performs
obligations under the Subcontract during this period (the “Mitigation Work”) Obligee shall be
entitled to deduct the Cost of the Mitigation Work from the Balance of the Subcontract Price. To
the extent the Balance of the Subcontract Price is exhausted, and Surety elects to proceed under
paragraph A, subparagraphs 1, 2, 3 or 4, Surety shall reimburse Obligee for the difference
between the Balance of the Subcontract Price and the Cost of the Mitigation Work incurred and
paid by Obligee.
C. If Surety proceeds under paragraph A, subparagraphs 1, 2, 3, 4 or 6, Surety may additionally
advise in its notice of its election to Obligee that the Obligee’s claim is disputed as to liability
and/or amount and Surety is proceeding under a reservation of all rights and defenses. In that
event, Surety shall make all payments otherwise called for under this Bond. However, in the event
it is determined that Surety is not liable, in whole or in part, under this Bond and Surety expended
monies in excess of the funds paid by Obligee to Surety, then Surety shall be entitled to recover
the excess from Obligee.
D. The Surety’s aggregate liability is limited to the Penal Sum of this Bond, regardless of whether
the liability arises from the actions or failure to act of Principal or Surety. All amounts expended
by the Surety under paragraphs A and/or B and/or C of this Bond, in excess of funds paid by
Obligee to Surety, shall be credited against the Penal Sum. However, in the event it is determined
that Surety expended monies in excess of the Penal Sum of this Bond, then Surety shall be
entitled to recover the excess from Obligee. The Penal Sum of this Bond shall automatically be
increased or decreased by the amount of any change order, provided the change order(s) do not,
either singly or in the aggregate, exceed 10% of the original Subcontract amount. Should any
change order singly or in the aggregate exceed 10% of the original Subcontract amount, Surety’s
written consent must be obtained by Obligee in order to increase the penal sum.
E. Definitions:
(1) The term “Balance of the Subcontract Price,” as used in this Bond, shall mean the total
amount payable by Obligee to Principal under the Subcontract and any amendments
thereto, less the amounts heretofore properly paid by Obligee under the Subcontract.
(2) The term “Cost of the Mitigation Work” means the cost actually incurred by Obligee in
proper performance of work under the Subcontract, including remedying defects in the
work of the Principal. Such costs shall be at rates and hours not higher than the standard
customarily incurred at the place of the Project except with the prior written consent of the
Surety. Obligee’s overhead (both field and home office) as well as profit shall be included
in the Cost of the Mitigation Work at a markup of 15% to the actual labor, material, Sample Subcontract Agreement
EXHIBIT “F”
3 of 6 FPR0011 Rev 13, 07.01.22
equipment, and subcontractor costs incurred and paid for by Obligee. Obligee shall not
apply markup to the cost of any subcontractor that is affiliated with Obligee.
F. Notwithstanding any provision in this Bond and any document incorporated herein to the contrary,
any proceeding, legal or equitable, under this Bond must be instituted in a court of competent
jurisdiction in the location in which the work or part of the work is located and shall be instituted
within two years after a declaration of default or within two years after the Principal ceased working
or within two years after the Surety refuses or fails to perform its obligations under this Bond,
whichever occurs first. If the provisions of this paragraph are void or prohibited by law, the
minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall
be applicable.
G. No right of action shall accrue on this Bond to or for the use of any person or corporation other
than the Obligee named herein or the heirs, executors, administrators or successors of the
Obligee.
H. Any notice given or any demand made under this Bond shall be given in writing and may be provided
to the following email address or given by any method of delivery that provides evidence or
confirmation of receipt, including personal delivery, express courier (such as Federal Express), and
prepaid certified or registered mail with return receipt requested. The Surety’s address for notice is
.
I. The Surety shall not be liable to the Obligee or others for obligations of the Principal that are
unrelated to the Subcontract work, and the Balance of the Subcontract Price shall not be reduced
or set off on account of any such unrelated obligations.
J. The Surety hereby waives notice of change, including changes of time, to the Subcontract,
purchase orders or other obligations.
Signed this day of , .
(Principal)
By:
(Surety)
By:
, Attorney-in-Fact
Sample Subcontract Agreement
EXHIBIT “F”
4 of 6 FPR0011 Rev 13, 07.01.22
SUBCONTRACTOR
PAYMENT BOND
Bond No.:
KNOW ALL BY THESE PRESENTS, That we, (subcontractor's name), called the Principal, and
(surety's name), a (state) corporation, called the Surety, are held and firmly bound unto F.A. Wilhelm
Construction Company, Inc. with its address at 3914 Prospect Street, Indianapolis, IN 46203,
hereinafter called the Obligee, in the sum of U.S. Dollars ($ ) (the “Penal Sum”), for the
payment whereof said Principal and Surety bind themselves, their heirs, executors, administrators,
successors and assigns, jointly and severally, as provided herein.
WHEREAS, the Principal has entered into a subcontract numbered with the Obligee, dated
, for project ("Subcontract").
NOW, THEREFORE, the conditions of this obligation are such that if the Principal shall promptly make
payment to all Claimants as hereinafter defined for all labor and material used, consumed or
incorporated in the performance of the construction work to be performed under the Subcontract, then
this obligation shall be void; otherwise to remain in full force and effect, subject, however, to the
following conditions:
1. A Claimant is defined as one other than the Obligee having a contract with the Principal
or with a direct subcontractor of the Principal to supply labor and/or materials and such labor and/or
materials are actually used, consumed or incorporated in the performance of the construction work
under the Subcontract.
2. The above-named Principal and Surety hereby jointly and severally agree with the
Obligee that every Claimant as herein defined who has not been paid in full before the expiration of a
period of ninety (90) days after the date on which the last of such Claimant’s work or labor was done
or performed or materials were furnished by such Claimant, may bring suit on this bond, prosecute
the suit to final judgment for the amount due under Claimant’s contract for the labor and/or materials
supplied by the Claimant which were used, consumed or incorporated in the performance of the work,
and have execution thereon; provided, however, that a Claimant having a direct contractual
relationship with a direct subcontractor of the Principal shall have a right of action on this bond only if
said Claimant notifies the Principal and Surety in writing of its claim within ninety (90) days from the
date on which said Claimant did or performed the last labor and/or materials for which the claim is
made. Such notice shall be served by mailing the same by registered mail or certified mail, postage
prepaid, in and envelope addressed to the Principal and Surety, at any place where an office is
regularly maintained for the transaction of business, or served in any manner in which legal process
may be served in the state in which the project is located, save that such service need not be made
by a public officer.
3. No suit or action or arbitration shall be commenced hereunder by any Claimant:
a. After the expiration of the earlier of: (1) one year after the day on which the
Claimant last supplied the labor and/or materials for which the claim is made; or (2) the
limitation period set forth in the public works bond statutes, if any, in the location where
the construction work is being performed. Any limitation contained in this bond which
is prohibited by any law controlling in the state where the suit is filed shall be deemed
to be amended so as to be equal to the minimum period of limitation permitted by the
law of that state, and said period of limitation shall be deemed to have accrued and shall Sample Subcontract Agreement
EXHIBIT “F”
5 of 6 FPR0011 Rev 13, 07.01.22
commence to run on the day the Claimant last supplied the labor and/or materials for
which the claim is made; and
b. Other than in a state court of competent jurisdiction in the county or other political subdivision
of the state in which the project, or any part thereof, is situated, or in the United States District
Court for the district in which the project, or any part thereof, is situated, and not elsewhere.
The Obligee shall not be liable for the payment of any costs or expenses of any such suit
action or arbitration.
4. The Penal Sum of this bond shall be reduced by and to the extent of any payment or
payments made in good faith hereunder. The Surety's liability hereunder is limited, singly, or in the
aggregate, to the Penal Sum of the bond set forth herein.
Signed this day of , 20 .
(Principal)
By:
(Surety)
By:
, Attorney-in-Fact
Sample Subcontract Agreement
EXHIBIT “F”
6 of 6 FPR0011 Rev 13, 07.01.22
DUAL OBLIGEE
RIDER
To be attached to and form a part of Performance/Payment Bond No. ,
executed concurrently with this rider, it is agreed that:
Surety, and
, Principal,
for valuable consideration, hereby agree that the Bond executed in favor of
, Obligee,
in connection with a contract for:
which bond and contract are made a part of hereof by reference, shall now include as an additional
Obligee:
in its capacity as for the aforementioned project.
The Surety shall not be liable under this bond to the Obligees, or either of them, unless the
said Obligees, or either of them, shall make payments to the Principal or to the Surety, in case
the Surety arranges for the completion of the contract upon default of the Principal, strictly in
accordance with the terms of said contract as to payments, and shall perform all the other
obligations to be performed under said contract at the time and in the manner therein set forth.
In no event shall the Surety be liable in the aggregate to both Obligees for more than the penal
sum of its Performance Bond, nor shall it be liable except for a single payment for each single
breach or default. At the Surety’s election, any payment due to either Obligee may be made
by its check issued jointly to both.
WITNESS the following signatures and seals thisday of , .
By:
, Attorney-in-Fact
Attest: (Principal)
By:
S-5344 (12-99 Sample Subcontract Agreement
EXHIBIT “G”
1 of 1 FPR0011 Rev 13, 07.01.22
Documents Log
Sample Subcontract Agreement
EXHIBIT “H”
1 of 1 FPR0011 Rev 13, 07.01.22
Project Schedule
Sample Subcontract Agreement
EXHIBIT “I”
1 of 3 FPR0011 Rev 13, 07.01.22
SCAFFOLD/EQUIPMENT AGREEMENT
F.A. Wilhelm Construction Co., Inc. (“Wilhelm”)
3914 Prospect Street;
Indianapolis, Indiana 46203
(317) 359-5411 FAX: (317) 359-8346
LICENSEE: PROJECT:
OWNER: ARCHITECT:
JOB # COST CODE: DATE:
WHEREAS, Wilhelm has made available certain scaffolding and/or equipment (hereinafter “Scaffold/Equipment”) which
has been erected or furnished (and/or rented/leased) at the Project, and is described as follows:
WHEREAS, Licensee wishes to use the above described scaffold/equipment in order to perform its work at the Project.
NOW, THEREFORE, Wilhelm and Licensee acknowledge and agree as follows:
1. Use of Scaffold/Equipment. Licensee may use the above-described scaffold/equipment on the Project for the
following purposes:
2. Additional Compensation (if applicable). In addition to the other good and valuable consideration provided by
Licensee as set forth herein, Licensee shall provide the following compensation to Wilhelm:
3. Acknowledgment of Scaffold/Equipment Condition. Licensee hereby confirms that a qualified representative of
Licensee has inspected the scaffold/equipment, and warrants that the scaffold/equipment is in safe and satisfactory
condition for use by Licensee’s employees.
4. Qualified Use of Scaffold/Equipment. Licensee hereby confirms and is responsible that all users of scaffold/
equipment shall have the appropriate training and/or awareness to operate and/or use said scaffold/equipment in
accordance with all applicable regulations. Licensee is responsible for ensuring all users are trained and qualified as
necessary prior to use.
TERMS & CONDITIONS OF THIS SCAFFOLD/EQUIPMENT AGREEMENT ARE CONTINUED ON THE FOLLOWING
PAGES.
This Scaffold/Equipment Agreement entered into as of the date written above.
WILHELM LICENSEE
(Signature) (Signature)
(Printed name and title) (Printed name and title) Sample Subcontract Agreement
EXHIBIT “I”
2 of 3 FPR0011 Rev 13, 07.01.22
5. Inspection and Repair. Prior to each use of the scaffold/equipment by the employees of Licensee, a qualified
representative of Licensee shall make a complete inspection of the scaffold/equipment. If said inspection reveals
any defects or dangerous conditions, said information shall be communicated to the management of Wilhelm in
writing. Licensee shall cause any defective scaffold/equipment to be repaired before it is used by any person,
including Licensee’s employees. Licensee shall provide the management of Wilhelm with written notice of any repairs
made upon the scaffold/equipment. If Licensee cannot safely repair the scaffold/equipment or if said repairs cannot
be made by a qualified worker in a proper and workmanlike manner, Licensee shall immediately cease to use the
scaffold/equipment and shall immediately provide the management of Wilhelm with written notice of the condition of
the scaffold/equipment.
6. Alterations and Modifications. Other than repairs of defects or dangerous conditions as required by Paragraph
No. 5, Licensee shall not make any alterations or modifications to the scaffold/equipment without first obtaining written
authorization from the management of Wilhelm. Unless otherwise directed in writing by the management of Wilhelm,
Licensee, upon completing its use of the scaffold/equipment and before turning the scaffold/equipment back over to
Wilhelm, shall: a) remove any alterations or modifications made pursuant to this paragraph; b) return the scaffold/
equipment to the same condition and configuration that it was in as of the date this Scaffold/Equipment Agreement
was entered into; and c) have a qualified representative inspect the scaffold/equipment and warrant that it is in safe
and satisfactory condition for the continued use by Wilhelm.
7. Safety. Licensee shall take the proper precautions to protect all persons and property from being injured by
Licensee’s use of the scaffold/equipment or the condition of the scaffold/equipment, shall comply with any safety
measures initiated by Wilhelm, and shall comply with OSHA and any other applicable Federal, State or local safety
laws, rules, orders or regulations.
8. Use of Scaffold/Equipment by Others. Licensee shall not allow any person other than its own employees to use
the scaffold/equipment without written authorization from Wilhelm’s management. If Licensee is aware of people
trespassing upon the scaffold/equipment, Licensee shall immediately notify Wilhelm’s management of the
trespassing.
9. Insurance Coverage. Prior to its use of the scaffold/equipment, Licensee shall procure and maintain in force the
insurance that is called for by the Subcontract Agreement between Wilhelm and Licensee on the above referenced
Project.
10. Release. Licensee does hereby UNCONDITIONALLY RELEASE AND FOREVER DISCHARGE Wilhelm, Owner,
Architect, and their respective officers, directors, agents, employees, legal representatives, subsidiaries,
predecessors, successors and assigns (hereinafter collectively referred to as “Released Parties”) from any and all
claims, causes of action or demands for damages, losses, costs, attorney fees, expenses or consequential damages
of any nature whatsoever which arise out of, are related to or connected with the condition of the scaffold/equipment
or the use of scaffold/equipment by Licensee.
11. Indemnification. To the fullest extent permitted by law, Licensee shall indemnify, hold harmless, and defend at its
own expense the Released Parties from and against any and all claims, causes of action, demands, damages, losses
and expenses (including litigation costs and attorney’s fees) of any nature whatsoever, including but not limited to
claims for or relating to injury, sickness or disease to any persons (including death), damages to property (including
the lost use thereof and consequential damages therefrom) or economic loss, which arise out of, are alleged to arise
out of, are related to or connected with: a) the condition or use of the scaffold/equipment during the time period when
Licensee uses or has the right to use the scaffold/equipment; b) the Licensee’s breach of this Scaffold/Equipment
Agreement; and/or c) any act or omission of Licensee, its subcontractors or material suppliers, anyone directly or
indirectly employed by them or anyone for whose acts they may be liable; regardless of whether or not such claim,
cause of action, damage, loss or expense is contributed to or caused by the negligence, breach of contract or
warranty, strict liability, or any other breach of duty of any Released Party; provided, however, that Licensee shall
not be obligated to indemnify a Released Party for its sole negligence or willful misconduct where such
indemnification is contrary to law, but otherwise it is the intent of the parties that Licensee shall indemnify the
Released Parties to the fullest extent permitted by law.
12. Governing Law. This Scaffold/Equipment Agreement and the rights and duties of all persons arising from or related
to this Scaffold/Equipment Agreement shall be governed by the laws of the State of Indiana. Any dispute arising
under or related to this Scaffold/Equipment Agreement, shall be brought only in state court in Marion County, State
of Indiana, or if federal jurisdiction is available, in the U.S. District Court for the Southern District of Indiana. The
parties to this Scaffold/Equipment Agreement agree to: a) participate in mediation; b) accept such venues if mediation
is unsuccessful; c) waive trial by jury in all proceedings; and d) to waive, as against each other, any claim or
entitlement to punitive or exemplary damages.
Sample Subcontract Agreement
EXHIBIT “I”
3 of 3 FPR0011 Rev 13, 07.01.22
13. Severability. If any term, provision or part of a provision to this Scaffold/Equipment Agreement should be invalid or
unenforceable under the governing law, the validity and enforceability of the remaining terms, provisions and parts
thereof shall not be affected, with interpretation and enforcement to occur as if such invalid or unenforceable term,
provision or part was never written.
14. Entire Agreement. This Scaffold/Equipment Agreement represents the entire integrated agreement between
Licensee and Contractor, and supersedes all prior negotiations, representations or agreements relating to Licensee’s
use of the scaffold/equipment. Sample Subcontract Agreement
EXHIBIT “J”
BIM Technical Kickoff Package
1 of 11 FPR0011 Rev 13, 07.01.22
OVERVIEW
These guidelines are prepared to serve as a basic standard and to be used in developing a consistent plan
for coordination, collision detection, and information exchange. Before setting this plan, F.A. Wilhelm has
captured the collective VDC goals and uses on the project. There are many ways to use VDC through design,
construction, and facility management. We have worked to define what is critical to the owner.
The collective goals and uses for this project are:
• (fill this area in with any project-specific goals, challenges, focal points, owner concerns, etc.)
• Planning
• Coordination
• Quality
• Efficiency
• Lessons Learned
It is important to understand that this is a collaborative, iterative process and that each model upload
represents a snapshot of your work at the time it is uploaded. The expectation is that you will make consistent
progress as required to support the project schedule and to deliver a quality, coordinated installation to the
owner.
1. SOFTWARE
Software being used by teams for coordination is listed below. Any object enablers required to view your
model files must be uploaded to the project Box site; more details regarding the Box site can be found in
section 5 of this document.
COMPANY SOFTWARE FUNCTION VERSION
Construction Manager Revit / AutoCAD Modeling 2020
F.A. Wilhelm Construction Navisworks Manage
Box
Coordination
Model & File Collaboration
2020
Box Drive
Mechanical / Plumbing Revit / AutoCAD MEP Modeling 20XX
Trade Contractor Navisworks Manage
Box
Model Coordination
Model & File Collaboration
20XX
Box Drive
Electrical Revit / AutoCAD MEP Modeling 20XX
Trade Contractor Navisworks Manage
Box
Model Coordination
Model & File Collaboration
20XX
Box Drive
Fire Protection Revit / AutoCAD / HydraCAD Modeling 20XX
Trade Contractor Navisworks Manage
Box
Model Coordination
Model & File Collaboration
20XX
Box Drive
Structural Steel Tekla Structures / SDS/2 Modeling 20XX
Trade Contractor Navisworks Manage
Box
Model Coordination
Model & File Collaboration
20XX
Box Drive
(Specialty / Other / Misc.) Revit / AutoCAD MEP Modeling 20XX
Trade Contractor Navisworks Manage
Box
Model Coordination
Model & File Collaboration
20XX
Box Drive
Sample Subcontract Agreement
EXHIBIT “J”
BIM Technical Kickoff Package
2 of 11 FPR0011 Rev 13, 07.01.22
2. MODEL SCOPE OVERVIEW
Please include the following scope and level of detail in the model files. This is just a quick look at model
scope and detail. As a general assumption and guideline, “if you install it, model it”. If it is not shown in the
model and creates field coordination issues, you will be responsible for moving it in the field at no additional
cost. Specific questions can be addressed later along with requirements of contracts.
All conduits/piping in runs of 2 or more need to be modeled regardless of size.
DISCIPLINE MODEL EXAMPLES INCLUDE BUT ARE NOT LIMITED TO:
Mechanical Equipment Major Equipment Pads Space Constraints
Low Pressure Duct Medium Pressure Duct Diffusers
VAV Boxes Mechanical Piping Hangers or Supports
Valves Valve Handles Firestop Sleeves (XYZ)
Electrical Equipment Major Equipment Pads Lighting Fixtures
Cable Trays Hangers or Supports Bus Duct
Panel Boards Duct Banks Space Constraints
Junction Boxes Branch & Feeder Conduit Firestop Sleeves (XYZ)
Plumbing Equipment Fixtures Main Lines
Vents Hangers or Supports HW and CW Line
Sanitary Lines Space Constraints Firestop Sleeves (XYZ)
Fire Protection Sprinkler Mains Sprinkler Branches FP Pumps/Equipment
Panels/Boxes Sprinkler Head Drops Space Constraints
Inspector’s Tests Hangers or Supports Firestop Sleeves (XYZ)
SPACE CONSTRAINTS
Space Constraints are areas that equipment, MEP/FP systems, architecture and structural components need
for maintenance, installation, or access. Space constraints must be modeled, where applicable, by all
disciplines.
The example below shows a VAV box with a space constraint for maintenance. This is typically drawn in 2D,
but for added coordination, the space is extruded into a 3D element. Place these elements on different layers
(or via alternate designation) from other items for use within coordination software. Collision checks with
these areas are highlighted as issues if other systems are passing through them. These items can be turned
off for plotting.
2D View of a VAV and its Space Constraint Clearance Zone for Maintenance Purposes
Sample Subcontract Agreement
EXHIBIT “J”
BIM Technical Kickoff Package
3 of 11 FPR0011 Rev 13, 07.01.22
3. VDC TEAM ROLES
Throughout the coordination process, various team members will act in several roles. Below are definitions of
these roles and a chart showing who will be filling each of those roles.
BIM COORDINATION LEAD
During coordination F.A. Wilhelm or a Trade Contractor will assume the role of BIM Coordination Lead. By
taking on this role this party will be responsible for:
• Running clash detection in accordance with F.A. Wilhelm’s guidelines and best practices.
• Running a weekly clash review meeting with other Trade Contractors to discuss and resolve all
clashes identified by the Coordination Lead.
TRADE BIM COORDINATORS
Trade BIM Coordinators are responsible for updating models of their scope of work throughout the
coordination process and uploading those model changes at least once per week. It is expected that Trade
BIM Coordinators are reaching-out to one another individually (outside of our regularly scheduled group
meetings) to actively coordinate throughout each week.
FAW VDC SUPPORT
FAW VDC Support associates are VDC specialists who will participate in all aspects of VDC on a project.
Specifically regarding coordination their responsibilities include:
• Organizing coordination startup.
• Assisting the Coordination Lead and Trade BIM Coordinators with technical issues that may impact
the coordination process (e.g. model alignment issues, model conversion problems, etc.).
• Providing oversight for the BIM Coordination process and assistance to ensure that coordination
proceeds according to our standards for quality and excellence.
FAW PROJECT ENGINEERS (PE)
FAW PEs are responsible for management of the Trade Contractors. Specifically regarding coordination, their
responsibilities include:
• Review and submission of RFIs.
• Review and submission of shop drawings.
ROLE ORGANIZATION PERSON (CONTACT INFORMATION
LOCATED IN SECTION 11)
BIM Coordination Lead TBD Contractor Contact
Trade BIM Coordinators TBD Trade Contractor Contact
TBD Trade Contractor Contact
TBD Trade Contractor Contact
TBD Trade Contractor Contact
TBD Trade Contractor Contact
FAW VDC Support F.A. Wilhelm Office Support Contact Name
FAW PE F.A. Wilhelm PE Contact (Mechanical / Plumbing)
FAW PE F.A. Wilhelm PE Contact (Electrical)
FAW PE F.A. Wilhelm PE Contact (Fire Protection)
Sample Subcontract Agreement
EXHIBIT “J”
BIM Technical Kickoff Package
4 of 11 FPR0011 Rev 13, 07.01.22
4. BIM COORDINATION SERVICE & QUALITY WALKS REQUIRED
Weekly coordination meetings are held to review and resolve coordination issues. Meeting time will be
coordinated with the field meeting schedule.
Initial test model upload is performed by all team members prior to starting the weekly cycle. Objectives are:
1. Team members upload latest model information to Box; file formats and naming convention can be
found in section 8 of this document.
2. Confirm model geometry is accurately shown in Navisworks.
3. Geometry is correctly aligned in the X, Y, and Z planes.
a. To verify correct alignment upfront, each model’s initial upload is required to include at least 2
grid intersection references represented with both 2D and 3D geometry; these references can
be deleted after alignment is verified and the respective Trade Contractor feels comfortable
with their model alignment going forward.
Weekly coordination cycle includes:
COORDINATION LEAD
CL1. Trades merge their models for review within Box and Navisworks. The BIM Coordination Lead runs
clash detection and organizes clashes into groups for review at the Clash Resolution Meeting.
TRADE CONTRACTORS
TC1. Weekly (at minimum) uploading of model files to Box.
TC2. Trades model and continue updating and adding to their existing shop models.
BOTH TEAMS
BT1. Clash Resolution Meeting: the purpose of this meeting is for the BIM Coordination Lead and Trade
BIM Coordinators to review and collaborate on resolutions to all clashes found in that week’s clash detection.
If necessary to meet the schedule, multiple Clash Resolution Meetings may be held per week.
EXTENDED TEAM
ET1. BIM MEP Coordination Meeting: the purpose of this meeting is to review major issues, issues that
require RFIs, the coordination schedule, and other items the trades will need to continue the coordination
process. These meetings are to include an extended team of attendees, such as Superintendents, Project
Managers, and the Design Team; Design Team involvement will vary week-by-week.
ET2. Virtual Quality Walk meetings take place after an area is considered to be coordinated/clash-free by
the BIM coordination team. Superintendents, Project Managers, and the Trade BIM Coordinators are required
to be in attendance for this final review of the area before moving into shop drawings and fabrication;
additionally, the Design Team and Owner will be invited to attend. These meetings will commonly be held
during the same scheduled time as the typical weekly BIM MEP Coordination Meeting.
WEEKLY COORDINATION CYCLE TASKS MON. TUES. WED. THURS. FRI.
TC1. File Upload Deadline Noon
CL1. Model Compilation / Clash Detection
BT1. Clash Resolution Meeting
TC2. Trade Team Modeling and Updates
ET1. BIM MEP Coordination Meeting
ET2. Virtual Quality Walk (Final Visual Review)
Typical Weekly Cycle Example (Project-Specific Weekly Cycle to be Set by Project Team)
Sample Subcontract Agreement
EXHIBIT “J”
BIM Technical Kickoff Package
5 of 11 FPR0011 Rev 13, 07.01.22
5. BOX SITE LOCATION
All project files are to be uploaded to the designated Box site. Access to the Box site will be provided to the
active participants in the coordination process. If additional team members desire access, please contact your
FAW VDC support associate to provide them with contact information and permission levels they will require.
6. BOX SITE FOLDER STRUCTURE & BOX DRIVE FEATURE
Individual trade models are to be uploaded to their corresponding folder(s); standard BIM coordination folder
structure is shown below.
BOX SITE FOLDER STRUCTURE OVERVIEW
00 Live Federated Model
Master NWF & Trade-Specific
Linked NWC Folders Within
storage location where our working version of our composite model file (also
referred to as Federated Model) will be located as well as individual trade-
specific folders that house each respective linked model file
01 Weekly NWD Archive storage location where our published versions of our composite model file
will be stored (for ease of sharing and general reference)
02 Reference serves as a general file depository and exchange location; files located in
this section should not be actively linked to the Live Federated Model
03 Trade Contractor
Working Folders
serves as a storage location where each respective trade contractor may
store their working files if they wish to utilize Box’s platform and features
Interface of Box Site Folder Structure on Box.com 00 Live Federated Model Section of Box Site Folder Structure
02 Reference Section of Box Site Folder Structure Sample Subcontract Agreement
EXHIBIT “J”
BIM Technical Kickoff Package
6 of 11 FPR0011 Rev 13, 07.01.22
BOX DRIVE SETUP INSTRUCTIONS & OPTIONAL BOX FEATURES
1. Download and install Box Drive: https://www.box.com/resources/downloads/drive
a. Box Drive allows users to view the Box site and all its contents in a Windows Explorer folder
view.
(For current Box Sync users, click here for information on Box Drive vs. Box Sync.)
2. By default, Box Drive will not automatically download or sync
any folders to your computer; as you open files or require other
files as external references (such as NWCs that make up a
NWF file or XREFs used/linked within a DWG file), it will
download and cache them on your local hard drive.
a. If you would like a particular folder to always download
the latest subfolders/files within that folder, you can simply right-click on the respective folder
and select the option to “Make Available Offline”.
i. Once this feature has been enabled on a particular folder, you can right-click on the
same folder and select “Make Available Online Only” if you no longer wish to have
it synced.
3. Setup preferred email notification settings (default and overrides for specific Box sites can be
modified):
IMPORTANT NOTES RELATING TO THE BOX DRIVE FEATURE & FUNCTIONALITY
1. If you delete a folder from your Box Drive folder, it will assume you want to delete that entire folder
and all of its contents/subfolders from the Box site without warning.
2. If you delete individual files from your Box Drive folder, it will assume you want to delete them from
the Box site without warning.
Sample Subcontract Agreement
EXHIBIT “J”
BIM Technical Kickoff Package
7 of 11 FPR0011 Rev 13, 07.01.22
Interface of Box Site Folder Structure When Utilizing Box Drive 00 Live Federated Model Folder of Box Site When Utilizing Box
Drive
02 Reference Folder of Box Site When Utilizing Box Drive
Sample Subcontract Agreement
EXHIBIT “J”
BIM Technical Kickoff Package
8 of 11 FPR0011 Rev 13, 07.01.22
7. DRAWING / MODELING / EXPORTING STANDARDS
A list of best practices and/or lessons learned when drawing, modeling, or exporting particular objects and
files.
• NWC Exports: When Exporting Level-Based Models, Utilize the Floor Plans’ “View Range” in
Conjunction With the “Orient to View” Function/Technique in Order to Cut Each Level-Based
Model Precisely at Essentially Top of Slab/Floor Elevations in the Z-Direction; If Required to Cut Each
Floor into Separate Areas, a Square Crop Box Can Be Used in the Floor Plan Being Utilized for
“Orient to View” in Order to Crop Information in the X/Y-Directions (Ask Your BIM Lead Coordinator
Unaware of this Method)
• NWC Exports: Hide “Revit Links” in NWC Export Views or Make Sure “Convert linked Revit files”
Checkbox in Not Selected/Checked in “Navisworks settings…” (Button Found at Bottom of NWC
File Naming Dialog Box During NWC Export Process)
• NWC Exports: Hide “Imported Categories” in NWC Export Views or Make Sure “Convert linked
CAD formats” Checkbox is Not Selected/Checked in “Navisworks settings…” (Button Found at
Bottom of NWC File Naming Dialog Box During NWC Export Process)
• Clearance Zones: Ensure Clearance Zones Are Assigned a Separate Material From Their
Respective Equipment (Name Their Material “Clearance” So All Clearances Can Be Easily
Selected En Masse)
• NWC Exports: Remove/Hide Miscellaneous Items Drawn Off to the Sides of Models (aka, “Model
Junk”)
• NWC Exports: Unless Notified Otherwise By BIM Lead Coordinator, Export NWCs Per Shared
Coordinates in “Navisworks settings…” (Button Found at Bottom of NWC File Naming Dialog Box
During NWC Export Process)
8. FILE NAMING AND FORMAT
Model files are to conform to the standards below before being uploaded to the designated Box site.
FILE FORMAT
The minimum expectation is a 2020 3D NWC / IFC and a 3D native file (RVT / DWG / etc.) are to be
provided.
FILE NAMING
ESND Plumbing HFI Gravity L02 B .nwc
PROJECT NAME DISCIPLINE COMPANY SUB-DISCIPLINE LEVEL AREA FILE TYPE
Reference Files Required Required Required As Needed Required Project Specific
DATE PROJECT NAME DISCIPLINE COMPANY SUB-DISCIPLINE LEVEL AREA
YYMMDD ESND Architecture FAW Steel L00 A
Structure AE (varies) Precast L01 B
Duct TC (varies) Power L01M C
Hydronic Lighting L02 D
Process Equipment L03
Electrical Gravity L04
Plumbing Pressure ROOF
Fire Protection Gridlines (etc.)
Annotations Room Tags
(etc.) (etc.) Sample Subcontract Agreement
EXHIBIT “J”
BIM Technical Kickoff Package
9 of 11 FPR0011 Rev 13, 07.01.22
Diagram of File Naming Convention Sample Subcontract Agreement
EXHIBIT “J”
BIM Technical Kickoff Package
10 of 11 FPR0011 Rev 13, 07.01.22
9. FILE ORIENTATION IN THE XYZ
All models produced by Trade Contractors and F.A. Wilhelm that are uploaded to Box will need to be located
to match the agreed upon alignment for this project. A 2D CAD reference file with the project grid lines located
in the appropriate coordinate system is available on the Box site. The expectation is that each modeler will
begin modeling by referencing this CAD file, origin to origin.
Design team models that have NWC exports into the merged model will be aligned in Navisworks via the
”Units and Transform” function; these transform values will be defined for the team and posted to the Box site.
All trade contractor drawings are required to have the designated gridline intersection at the X and Y
coordinates below. The designated gridline corresponds to plan north, not true north.
The XY-alignment as well as the Z-elevation to be used for this project’s coordination models are defined as:
AXIS DIMENSION REFERENCE GRID/LEVEL
X 0’ A
Y 0’ 1
Z 0’ / Sea Level L01 FFE
Note: Reference “Coordination Grid” File in 2D
CAD Backgrounds Section of Box Site
XYZ Drawing Location
10. LAYERING
If using a DWG-based modeling software, internal format for layer names can remain the same with exception
to major equipment. Please separate each major piece of equipment onto its own respective layer; the
minimum expectation would be that any piece of equipment that is given a unique identifier on the contract
documents is assigned to its own layer.
Please send layering list with brief layer description to the F.A. Wilhelm VDC support contact at the end of this
document.
Examples: Layer Name: SA-BOH-AHU
Layer Description: Supply Air - Back of House - AHU
Layer Name: AHU-03
Layer Description: Air Handling Unit Identified as AHU-03 on Contract Documents
If using Revit, use either the Comments parameter or a custom Project Parameter to label equipment
per its respective unique identifier on the contract documents.
Sample Subcontract Agreement
EXHIBIT “J”
BIM Technical Kickoff Package
11 of 11 FPR0011 Rev 13, 07.01.22
11. CONTACT INFORMATION
The contact information below uses all of the team members involved with the BIM / MEP coordination effort.
A. MAIN MODELING CONTACTS
COMPANY NAME TITLE ROLE PHONE / EMAIL
Mechanical /
Plumbing TC
Person Title HVAC Modeler &
Coordinator
(###) ###-#### (O/M)
email@company.com
Mechanical /
Plumbing TC
Person Title Plumbing
Modeler &
Coordinator
(###) ###-#### (O/M)
email@company.com
Electrical TC Person Title Electrical
Modeler &
Coordinator
(###) ###-#### (O/M)
email@company.com
Fire Protection
TC
Person Title Fire Protection
Modeler &
Coordinator
(###) ###-#### (O/M)
email@company.com
(Specialty / Other
/ Misc. TC)
Person Title Role (###) ###-#### (O/M)
email@company.com
Main Modeling Contact List
B. BIM COORDINATION CONTACTS
COMPANY NAME TITLE ROLE PHONE / EMAIL
Coordination
Lead GC/TC
Person Title Coordination Lead (###) ###-#### (O/M)
email@company.com
F.A. Wilhelm Person Title VDC Support (###) ###-#### (O/M)
email@fawilhelm.com
F.A. Wilhelm Person Title PE (###) ###-#### (O/M)
email@fawilhelm.com
F.A. Wilhelm Person Title Project Manager (###) ###-#### (O/M)
email@fawilhelm.com
F.A. Wilhelm Person Title Superintendent (###) ###-#### (O/M)
email@fawilhelm.com
Mechanical /
Plumbing TC
Person Title Project Manager (###) ###-#### (O/M)
email@company.com
Mechanical /
Plumbing TC
Person Title Superintendent (###) ###-#### (O/M)
email@company.com
Electrical TC Person Title Project Manager (###) ###-#### (O/M)
email@company.com
Electrical TC Person Title Superintendent (###) ###-#### (O/M)
email@company.com
Fire Protection
TC
Person Title Project Manager (###) ###-#### (O/M)
email@company.com
Fire Protection
TC
Person Title Superintendent (###) ###-#### (O/M)
email@company.com
(Specialty / Other
/ Misc. TC)
Person Title Role (###) ###-#### (O/M)
email@company.com
BIM Coordination Contact Sample Subcontract Agreement
SUBCONTRACT EXHIBIT 2 – SAMPLE PURCHASE ORDER
“Date” RE: #20250072 IU Launch Accelerator for Biosciences [Insert Person’s Name from Viewpoint] Attached for your company’s signature is Purchase Order #_____-____ dated _______________. An authorized representative from your firm is to sign this Purchase Order via DocuSign. Please note a current - job specific - Certificate of Insurance is required to be on file prior to delivery of materials. Submit Certificate of Insurance to inscerts@fawilhelm.com. If you have any questions, please contact this office at the listed address below. Sincerely, “Name” “Title” cc: FAW PM Accounting Insurance
DocuSign 07.01.22 F. A. WILHELM CONSTRUCTION CO., INC. (“Contractor”) 3914 PROSPECT STREET • P.O. BOX 516 • INDIANAPOLIS, IN 46206 TELEPHONE: (317) 359-5411 • FAX: (317) 359-8346 SUPPLIER: PROJECT: #20250072 IU LAUNCH ACCELERATOR FOR BIOSCIENCES ARCHITECT: OWNER: INDIANA UNIVERSITY PRIME CONTRACTOR (if applicable) : CONSTRUCTION MANAGER (if applicable): F.A. Wilhelm Construction Co. Inc. JOB: 11313 COST CODE: Sales and/or Use taxes for location of the Project: Included Excluded Delivery tickets and invoices must list PO No. and cost code. Supplier’s Work. Supplier shall furnish all goods, materials, labor, tools, equipment, services, taxes, wages, employee benefits, insurance, freight and other items required to provide the following to the Project (F.O.B. jobsite) in strict accordance with the Purchase Order Documents: Purchase Order Documents. The Purchase Order Documents consist of: (1) this Purchase Order and any attachments hereto or documents referred to herein; (2) the Prime Contract, consisting of the agreement between Contractor and [insert either - Owner, Prime Contractor or Construction Manager] and the other contract documents incorporated therein, including conditions of the contract (general, supplementary and other conditions), drawings, specifications, and any addenda thereto, which are available for review and on file in the office of Contractor located at the above address; (3) Schedule “A” to this Purchase Order and any documents referred to therein; (4) the attached Project Insurance Requirements; and (5) any other documents set forth below. Purchase Order Sum. Contractor shall pay Supplier for performance of this Purchase Order the Purchase Order Sum of _______________ Dollars ($____________), subject to additions and deductions as provided by written change orders. Provided, however, that if the Purchase Order Sum is to be determined on a unit price, time and material or cost of the Work plus a fee basis, such shall be established in Schedule “A”. THE ATTACHED TERMS AND CONDITIONS ARE HEREBY MADE A PART OF THIS PURCHASE ORDER. Acceptance is limited to the terms and conditions set forth in the Purchase Order Documents. Contractor objects to and rejects any additional or different terms and conditions proposed by supplier. This Purchase Order entered into as of the date written above. CONTRACTOR SUPPLIER (Signature) (Signature) PO# Date: PURCHASE ORDER
TERMS AND CONDITIONS Page 1 of 5 DocuSign 07.01.22 (Printed name and title) (Printed name and title) 1. Supplier’s written acceptance or commencement of any performance or service under this Purchase Order shall constitute Supplier’s acceptance of the terms and conditions set forth in the Purchase Order Documents. Contractor objects to and rejects all terms and conditions proposed by Supplier which are different from or in addition to the terms and conditions contained in the Purchase Order Documents and such terms shall not become a part of this Purchase Order. If this Purchase Order is deemed to be an acceptance of a prior offer by Supplier, such acceptance is conditional on Supplier’s assent to all additional or different terms and conditions contained in the Purchase Order Documents. The terms and conditions contained in the Purchase Order Documents cannot be changed in any manner except by a Contractor initiated change order pursuant to Paragraph No. 15 below. 2. Unless otherwise noted on the face of this Purchase Order or in Schedule ‘A’, payment shall be made to Supplier monthly from funds received by Contractor from Owner or Prime Contractor for Supplier’s Work on the following schedule: progress payments in the amount of ninety percent (90%) of the value of goods, materials and services delivered to the job site as determined by Contractor and approved by Owner and Prime Contractor. Final payment of the balance due on the Purchase Order Sum shall be made to Supplier within ten (10) working days after receipt by Contractor of final payment from Owner or Prime Contractor for Supplier’s Work. These payments are subject to receipt of such backup, delivery tickets signed by Contractor’s Project Superintendent, waivers of liens and claims, affidavits, warranties and guarantees as required by the Purchase Order Documents or by Contractor. The Purchase Order Sum includes the cost of all goods, materials, labor, tools, equipment, services, insurance, freight and all other costs of any kind, and Supplier shall be solely responsible for all federal, state and local excise, sales or use taxes applicable to this Purchase Order, and for any license, privilege, income or receipts tax imposed on Supplier. Supplier shall accept any valid sales or use tax exemption certificates. At Contractor’s sole discretion, Contractor may make payments to Supplier by joint check payable jointly to Supplier and its suppliers, subcontractors and/or creditors on the Project. 3. The risk of loss, damage, spoilage and deterioration, and all other risks, shall not pass to Contractor until on or after the scheduled delivery date and after Contractor, Owner, Prime Contractor, Construction Manager and Architect have actually inspected and accepted the goods and materials at the location designated for delivery by Contractor. Any rejected goods or materials may be returned at Supplier’s expense, including any transportation and other charges and expenses paid by Contractor in connection therewith; no replacement of rejected goods and materials may be made without Contractor’s prior written consent. 4. To the extent that the terms and conditions of the Prime Contract apply or relate to Supplier’s Work, Supplier agrees to be bound to Contractor by the same terms and conditions which apply to Contractor and assumes toward Contractor all obligations and responsibilities which Contractor assumes toward Owner, Prime Contractor, Construction Manager and/or Architect under the Prime Contract, and agrees to ensure that all of its material suppliers and subcontractors are likewise bound. Where a provision, term or condition of the Prime Contract, this Purchase Order and/or the Purchase Order Documents are in conflict with one another, the provision, term or condition that imposes the greater obligation or responsibility on Supplier shall govern. 5. Supplier may not assign, delegate or subcontract any of its rights, interests or obligations in or under this Purchase Order without Contractor’s prior written consent. Notwithstanding Contractor’s consent to any such assignment, delegation or subcontracting, Supplier shall not be relieved of any of its obligations pursuant to this Purchase Order, except as otherwise expressly and specifically agreed to in writing by a Contractor initiated changed order pursuant to Paragraph No. 15 below.
TERMS AND CONDITIONS Page 2 of 5 DocuSign 07.01.22 6. Supplier shall provide all goods, materials and services required by this Purchase Order on the delivery date set forth on the face of this Purchase Order, unless a separate delivery and/or work schedule is attached to this Purchase Order. Time is of the essence. The delivery and/or work schedule may be revised by Contractor as the Project progresses. Supplier shall provide Contractor with any requested scheduling information of Supplier’s Work. Any goods or materials delivered in advance of the scheduled delivery date shall, at Contractor’s option, be returned to Supplier or stored by Contractor, at Supplier’s cost and risk. 7. To the extent Supplier has been properly paid amounts due under this Purchase Order, Supplier agrees to keep Owner’s funds and property free and clear of all liens, claims or encumbrances of any kind of Supplier, its subcontractors or suppliers, or from any others claiming through Supplier. 8. Supplier shall comply with all applicable federal, state and local laws, orders, rules and regulations, and shall obtain and provide all notices to authorities, permits, fees, licenses, assessments, inspections and taxes necessary to complete its Work. 9. Supplier shall take the proper precautions in the performance of its Work to protect all persons and property from being injured by the Work or by the condition of the site, shall comply with any safety measures initiated by Contractor or set forth in the Purchase Order Documents, and shall comply with OSHA and any other applicable federal, state or local safety laws, rules, orders or regulations. 10. Supplier shall be responsible for all field measurements and layout necessary to perform its Work, and shall be responsible for the accuracy of its Work. Supplier shall submit to Contractor shop drawings and samples required by the Purchase Order Documents sufficiently in advance of the time any fabrication or shipment of materials, goods or other item for Supplier’s Work is to occur. Review and/or approval by Contractor, Architect, Prime Contractor, Construction Manager or Owner of Supplier’s submittals shall in no way relieve Supplier from conforming with the Purchase Order Documents. 11. Supplier warrants that neither the manufacture nor the sale nor use of the goods and materials to be sold will infringe on any United States or foreign patent, trademark, service mark, copyright, trade secret, trade name or other intellectual property right of any third party. 12. Supplier warrants that all goods and materials provided pursuant to this Purchase Order will be new, unless otherwise specified in the Purchase Order Documents, and will be of merchantable quality and fit for the purposes intended by Contractor, Architect, Prime Contractor, Construction Manager and/or Owner. Supplier also warrants the goods, materials and services provided pursuant to this Purchase Order against all deficiencies and defects in design, manufacturing, materials and/or workmanship for a period of one (1) year from the date of substantial completion of the Project or for such period otherwise provided by the Purchase Order Documents, whichever is longer, and agrees to satisfy the same without cost to Owner, Prime Contractor, Construction Manager or Contractor. These warranties shall survive inspection, acceptance and payment, shall run to Contractor, Owner, Prime Contractor and their respective successors and assigns, and shall be in addition to and not in limitation of any other warranty (including manufacturer warranties), right or remedy provided by law, the Purchase Order Documents or any other means. All manufacturer warranties shall be assigned to Owner and Contractor. 13. Prior to the start of its Work, Supplier shall procure and maintain in force, for at least the duration of its Work, insurance as is called for by the attached “Insurance Requirements,” plus any additional insurance that is required of Contractor under the Prime Contract. Contractor, Owner, Prime Contractor, Construction Manager and Architect shall be named as additional insureds on each of the required policies, except for workers compensation. Supplier shall furnish insurance certificates to Contractor verifying the required insurance prior to beginning its Work, but no later than
TERMS AND CONDITIONS Page 3 of 5 DocuSign 07.01.22 ten (10) calendar days from the date of this Purchase Order. If any of the foregoing insurance coverages are required to remain in force after final payment, an additional certificate evidencing continuation of such coverage shall be submitted with Supplier’s final application for payment. 14. To the fullest extent permitted by law, Supplier shall indemnify, hold harmless, and defend at its own expense Contractor, Owner, Prime Contractor, Construction Manager, Architect, and their respective agents, employees and assigns (herein collectively referred to as “indemnities”) from and against any claims, causes of action, damages, losses and expenses (including litigation costs and attorney’s fees) of any nature whatsoever, including but not limited to claims for or relating to injury, sickness or disease to any persons (including death), damages to property (including the lost use thereof and consequential damages therefrom), economic loss, liens, Project delays or intellectual property rights, which arise out of or are alleged to arise out of: a) the performance of Supplier’s Work; b) the condition of the goods and/or materials provided pursuant to this Purchase Order; c) the Supplier’s breach of this Purchase Order; and/or d) any act or omission of Supplier, its subcontractors or material suppliers, anyone directly or indirectly employed by them or anyone for whose acts they may be liable; regardless of whether or not such claim, cause of action, damage, loss or expense is contributed to or caused by the negligence, breach of contract or warranty, strict liability, or any other breach of duty of any indemnitee; provided, however, that Supplier shall not be obligated to indemnify an indemnitee for its sole negligence or willful misconduct where such indemnification is contrary to law, but otherwise it is the intent of the parties that Supplier shall indemnify the indemnities to the fullest extent permitted by law. 15. Supplier may be ordered in writing by Contractor, without invalidating this Purchase Order, to make changes in Supplier’s Work consisting of additions, deletions or other revisions, the Purchase Order Sum and Contractor’s schedule being adjusted accordingly. Within seven (7) working days of receiving notice of such change, Supplier shall submit to Contractor a quotation covering any addition or deduction to the Purchase Order Sum and any impact to Contractor’s schedule, along with all details and backup necessary to support the quotation. Unless otherwise directed in writing by Contractor, Supplier shall not commence such changed or revised work until after Contractor has reviewed and approved Supplier’s quotation, and Contractor and Supplier have signed a written change order setting forth any adjustments to the Purchase Order Sum or Contractor’s schedule. 16. Supplier agrees that in order for it to make a claim against Contractor for extensions of time or allowable damages which arise out of any event or occurrence not covered by Paragraph No. 15 above, Supplier, as a condition precedent, must give Contractor written notice of such claim within seven (7) working days of the event or occurrence giving rise to the claim or within the time which Contractor has to make such a claim against the Owner or Prime Contractor, whichever is shorter, or the claim will be waived. In no event shall Contractor be liable to Supplier for anticipated profits, business interruption or incidental or consequential damages. Contractor’s liability to Supplier for any claim arising out of or relating to this Purchase Order shall be limited to the price allocable to the goods or services or unit thereof which gives rise to the claim. 17. Supplier acknowledges that the Purchase Order Sum includes any and all material and/or labor cost escalation for the duration of the Project and that Supplier shall not be entitled to a change order or adjustment to the Purchase Order Sum for any such material and/or labor cost escalation. 18. To the extent there are any design services required to be performed by Supplier either incidental to Supplier's construction services or as a primary undertaking by Supplier in respect of the Project, such design services shall be procured from licensed, independent design professionals retained by the Supplier or furnished by licensed employees of the Supplier, or as permitted by the law of the place where the Project is located. Supplier shall be responsible for coordinating its design with the Project Architect, engineers and others providing design services for the Project.
TERMS AND CONDITIONS Page 4 of 5 DocuSign 07.01.22 Supplier shall prepare, for approval by the Project Architect and engineers, Construction Documents consisting of drawings, specifications, and other appropriate instruments ("Instruments of Service") sufficient to set forth in detail the requirements for the construction of Supplier’s Work. Supplier shall assist the Owner, Architect, Engineers, or Contractor in connection with the filing of documents required for the approval of government authorities having jurisdiction over the Project. All ownership of or other rights in respect of the Instruments of Service shall be transferred by Supplier to Owner upon request. 19. Should Supplier fail to satisfy deficiencies in its performance of this Purchase Order (including but not limited to failure to maintain Contractor’s schedule) within two (2) working days from receipt of Contractor’s written notice of such deficiency, then Contractor, without prejudice to any other right or remedy, shall have the right to: a. terminate this Purchase Order and reject all further deliveries of goods, materials or services; b. reserve or withhold payment to Supplier and retain or take possession of the goods, materials and services provided, stored, manufactured and/or fabricated until Supplier cures and completes this order; and/or c. take whatever steps Contractor deems necessary to correct said deficiencies and charge the cost thereof (including the cost of removing and repairing other work and improvements as necessary to correct the deficiencies) to Supplier, who shall be liable for payment of the same, including reasonable overhead, profit and attorney’s fees. Said notice is not required for Contractor to exercise the remedies under this paragraph when Supplier’s deficiency in performance threatens safety. 20. Contractor may terminate, without notice, all or any part of this Purchase Order, without liability to Contractor, if Supplier becomes insolvent, makes an assignment for the benefit of creditors, is the subject of a proceeding for the appointment of a receiver or trustee, or files a voluntary petition in bankruptcy or is the subject of an involuntary petition in bankruptcy. 21. Labor disputes, fires, acts of God, public enemy, earthquakes, floods, accidents or other causes beyond Contractor’s control shall constitute grounds for suspension of shipment without penalty or cost to Contractor. 22. Supplier shall abide by all federal, state and local laws and regulations that prohibit discrimination against qualified individuals based on their status as protected veterans or individuals with disabilities and shall prohibit discrimination against all individuals based on their race, color, religion, sex, sexual orientation, gender identity or national origin. Moreover, 41 CFR 60-1.4(a), 60-300.5(a) and 60-741.5(a) require that covered suppliers, contractors and subcontractors take affirmative action to employ and advance in employment individuals without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability or veteran status. 23. This Purchase Order and the rights and duties of all persons arising from or related to this Purchase Order shall be governed by the laws of the State of Indiana. Any dispute arising under or related to this Purchase Order, the performance of Work or provision of any materials or goods pursuant hereto, shall be brought only in state court in Marion County, State of Indiana, or if federal jurisdiction is available, in the U.S. District Court for the Southern District of Indiana. The parties to this Purchase Order agree to: a) participate in mediation; b) accept such venues if mediation is unsuccessful; c) waive trial by jury in all proceedings; and d) waive, as against each other, any claim or entitlement to punitive or exemplary damages. If Contractor is in a dispute with the Owner, Prime Contractor and/or Construction Manager that involves Supplier’s Work, acts or omissions, then Contractor may elect to join Supplier as a party to such dispute and the dispute resolution and litigation provisions in the Prime Contract would govern if Contractor made such election of joinder.
TERMS AND CONDITIONS Page 5 of 5 DocuSign 07.01.22 24. Supplier agrees that the subject matter of this Purchase Order is confidential in nature and that Supplier will not provide any third party with any information contained herein without the expressed written consent of Contractor. However, Supplier may disclose confidential information, after seven (7) days’ notice to Contractor, where disclosure is required by law, including a subpoena or other form of compulsory legal process issued by a court or governmental entity, or by court or arbitrator(s) order. Supplier may also disclose confidential information to its employees, consultants, sureties, sub-subcontractors, and others who need to know the content of such information solely and exclusively for the Project and who agree to maintain the confidentiality of such information. 25. If any term, provision or part of a provision to this Purchase Order should be invalid or unenforceable under the governing law, the validity and enforceability of the remaining terms, provisions and parts thereof shall not be affected, with interpretation and enforcement to occur as if such invalid or unenforceable term, provision or part was never written. 26. The failure of Contractor to enforce at any time any provision of this Purchase Order shall in no way affect the validity of this Purchase Order or any part hereof or the right of Contractor thereafter to enforce each and every such provision. No waiver of any breach of this Purchase Order shall be held to be a waiver of any other or subsequent breach. 27. The Purchase Order Documents, including this Purchase Order, represent the entire integrated agreement between Supplier and Contractor, and supersede all prior negotiations, representations or agreements relating to Supplier’s Work. FPR0021 Rev 1, 07.01.22
Date: SCHEDULE “A” for PO#____ FAW JOB # “ Project “ 1 of 8 FPR0027 Rev 6, 07/01/22 SCHEDULE “A” to Purchase Order No. XXXXX-XX dated June 6, 2024, between F.A. Wilhelm Construction Company, Inc. (“Contractor”) and ACME (“Supplier”). This Schedule “A” is hereby made a part of and incorporated into the Purchase Order. 1. Supplier’s Work. In addition to the Work described on the face of the Purchase Order, Supplier’s Work includes the following specific items: A. Supplier has agreed to a total Purchase Order Sum for its Work based on the following breakdown, which is provided for accounting purposes only: Bid Package XXX: XXX $XXX Total Purchase Order Sum $XXX Alternates: Payment & Performance Bond Add $0 B. Specification Sections: Division 00 – Procurement and Contracting Requirements Division 01 – General Requirements Section XXXXXX – XXXXXXX Section XXXXXX - XXXXXX C. General Scope of Work Includes: 1. All equipment required for the work. 2. All deliveries F.O.B. to jobsite required for the work. 3. Unless specifically excluded or limited below, this Supplier is responsible for the complete specification sections listed above for their respective scope. The Supplier is also responsible for specifications not specifically listed but are required by reference in the listed specifications or as required to perform the scope of work described herein. 4. All fees, permits, inspection costs and coordination required for this scope of work. 5. Acknowledgement and representation that the Supplier has examined and fully understands the Plans, Specifications, and Reports listed in the Contract Documents. 6. Acknowledgement and representation that the Supplier has had sufficient opportunity to request changes, clarifications and interpretations of errors, ambiguities, omissions and other issues contained in the Contract Documents prior to Bid. 7. Include all coordination with drawings and equipment sizing and movability within the existing spaces. Supplier to coordinate and confirm opening sizes and weights of equipment/materials with Contractor. 8. Acknowledgement and representation that where conflicts arise between the General Notes, Project Plans, Specifications and provisions in the individual bid packages, the provision imposing the greater duty or obligation on the Supplier shall govern. 9. Review of the contract documents for ALL trades’ work to determine the scope of work and necessary coordination for their package. 10. Coordination of all design details of this work with all design details of interfacing trade work. 11. Minor items and accessories or devices reasonably inferable or necessary to provide a complete and proper installation of the system, whether or not they are specifically call for by the specifications. Sample Purchase Order
Date: SCHEDULE “A” for PO#____ FAW JOB # “ Project “ 2 of 8 FPR0027 Rev 6, 07/01/22 12. Maintenance of a record set of approved shop drawings, which shall be continuously marked up to clearly reflect final equipment furnished. 13. Coordination of field sequencing with other trades as required. This Supplier may be required to attend and participate in preparation of “Contractors Coordination drawings” and weekly coordination meetings with other trades where requirements, conflicts and coordination issues will be discussed and resolved. Attendance when requested is mandatory. This includes providing 3D models (Revit) of material/equipment supplied for Contractor input into BIM model. 14. Tolerances not to exceed those listed in the drawings or specifications. 15. Supplier shall provide Construction Manager with a minimum of two-week advance notice of any scheduled inspections or site visits. 16. Provide one month and subsequent two week notice of any factory acceptance testing if applicable. 17. Scheduling of all deliveries based on agreed upon job progress dates. Contractor is to be advised of all deliveries for equipment and materials two weeks in advance. 18. The jobsite will be open during normal working hours 7AM to 4:30PM, Monday-Friday. The CM reserves the right to change work hours as necessary. 19. Escalation costs as required for the completion of your work. 20. Compliance with Contractor Corporate Safety Manual and/or a written and approved OSHA compliant Site-Specific Safety Plan. 21. The Construction Manager shall provide temporary, onsite toilet facilities. 22. Supplier shall be prohibited from blocking traffic on any public streets or sidewalks. If blocking of public areas are required, Supplier is to coordinate and comply with all local requirements, permits, traffic controls, etc. 23. The worksite is a tobacco-free site. All employees of Suppliers will be required to comply with this requirement. D. Specific Scope of Work Includes: 1. Scope of Work per Specific Bid Package. 2. Include Scope Review Meeting Notes and Agreements. Meeting held XXXX. E. Specific Scope of Work Excludes: 1. Sales Tax 2. Purchase Order Documents. The Purchase Order Documents also include the following: A. This Schedule “A”. B. The Prime Contract, consisting of the agreement between Construction Manager and Owner which is entitled Standard Form of Agreement Between Owner and Construction Manager as Constructor and dated August 15, 2023 and the other contract documents incorporated therein, including conditions of the contract (general, supplementary and other conditions), drawings, specifications, and any addenda thereto. C. The following addenda to the Prime Contract: Amendment #1 signed TBD if Applicable D. The following attached Exhibits: • Exhibit “A” - Subcontractor/Supplier Affidavit & Waiver of Liens & Claims. Supplier shall submit this document with each application for payment. Sample Purchase Order
Date: SCHEDULE “A” for PO#____ FAW JOB # “ Project “ 3 of 8 FPR0027 Rev 6, 07/01/22 • Exhibit “B” - Sub-subcontractors and Suppliers Disclosure Affidavit. Supplier shall submit this document within 10 days of receiving this Purchase Order and shall update the information on the document with each application for payment. • Exhibit “C” - Sub-Subcontractor/Supplier Affidavit and Waiver of Liens & Claims. With each application for payment, Supplier shall submit this document for each person or entity listed on the Sub-subcontractors and Suppliers Disclosure Affidavit. • Exhibit “D” – Performance and Payment Bond forms that are acceptable to Contractor if Supplier is required to provide bond(s) on the Project. • Exhibit “E” - Documents Log. The documents listed in Exhibit “E” are also incorporated into the Purchase Order by reference as Purchase Order Documents. 3. Schedule. Supplier agrees to the following specific scheduling requirements and milestone dates: 1. Reference the attached Bid Schedule. 2. Initial Submittal Received XXX, 2024. 3. Release into fabrication by XXX, 2024. 4. Delivery by XXX, 2025. A. Supplier shall, within ten (10) days after the date of this Purchase Order, prepare and submit to Contractor for review a detailed schedule, showing the order in which Supplier proposes to carry out all major activities and indicating the dates on which the several activities representing the complete performance of the Purchase Order (including submittals, procurement of materials and equipment) will be started and finished. This schedule shall list the sequence of activities anticipated by Supplier and the anticipated duration of each activity. Supplier acknowledges that Supplier has scheduled and sequenced its Work on the basis of the Contractor’s schedule and any milestone and performance requirements established above and by the Purchase Order Documents. Supplier acknowledges and understands that in development and updating of Contractor’s schedule, Supplier’s proposed activity sequence and durations may need to be amended by the Contractor to allow Contractor’s schedule to meet the performance requirements established by the Purchase Order Documents. Should any aspect of Contractor’s schedule be at variance with the desired sequencing or duration of Supplier’s activities, Supplier shall notify Contractor in writing of such variation within five (5) days of its receipt of Contractor’s schedule. Supplier’s failure to submit its proposed schedule when required or to notify Contractor in writing of any variation or conflict between Supplier’s proposed schedule and Contractor’s schedule shall preclude Supplier from receiving an extension of time to the extent allowed under the Purchase Order. Contractor may require Supplier to prosecute its Work in such sequence as Contractor may reasonably require in order to maintain the progress of other subcontractors and the Contractor’s schedule. 4. Project Requirements. The Supplier’s Work shall be performed in accordance with the following Project Requirements: A. General Requirements: Sample Purchase Order
Date: SCHEDULE “A” for PO#____ FAW JOB # “ Project “ 4 of 8 FPR0027 Rev 6, 07/01/22 1. Supplier warrants that it has visited and examined the Project site, and further warrants that it shall make no claims for additional sums on account of existing site conditions. 2. Supplier shall formalize all questions to Contractor in writing by use of a Request for Information (“RFI”) form that is set up in the web based construction management software that is to be used by Subcontractor on the Project as determined by Contractor. 3. Supplier’s access and deliveries to the site must be coordinated 48 hours in advance of arrival with Contractor’s Superintendent. Failure to do so may result in the access and/or delivery being prohibited by Contractor’s Superintendent, at their discretion. 4. Supplier’s use of lifts, hoists, and other similar equipment (in connection with Work to be performed inside buildings and/or facilities) shall be subject to Contractor's Superintendent’s approval. 5. The use of tobacco and the use of electronic cigarettes a/k/a vape are not permitted in any existing building or building under construction. 6. Supplier is responsible for the timely location and placement of all sleeves, box-outs and embeds associated with its Work. Failure to provide placement information in a timely manner for items supplied by Supplier, but specifically identified as being installed by others, shall result in Supplier being responsible for any corrective measurements required. It is the Supplier’s responsibility to monitor the progress of the work and communicate requirements with the Contractor’s Superintendent and Project Manager. 7. If and when ordered in writing by Contractor, Supplier shall furnish to Contractor a payment and performance bond for 100% of the Purchase Order Sum. The bond shall be in a form consistent with Exhibit “D” and from a surety acceptable to Contractor and shall have a dual-obligee rider naming any parties requested by the Contractor to be a dual-obligee on the bond. The cost of the bond shall be added to the Purchase Order Sum, unless the bond is otherwise required by the Purchase Order Documents B. Submittal Requirements: 1. Within 10 days of receipt of this Purchase Order, Supplier will provide a listing of all material suppliers, vendors and sub-suppliers that are required to furnish submittals on the Project, indicating a scope of work or materials to be supplied and the specification section that submittals will be furnished under. This list must be satisfactory to the Contractor. Supplier must notify the Contractor in writing with any proposed changes once the list has been submitted. 2. All submittals must have an approved submittal stamp signed and dated by the Supplier and will identify the specification section and other specific identification information. 3. Supplier is responsible to confirm and coordinate all dimensions at the job site. If Supplier submittals are returned and require additional work or material beyond what is required by the Purchase Order Documents, Supplier shall submit a quotation to Contractor for these scope revisions in accordance with the Purchase Order Documents. 4. A comprehensive submittal schedule, listing proposed submittal dates, manufacturer lead times, and anticipated critical components, shall be sent to Contractor within 15 days of this Purchase Order or a Notice to Proceed, whichever occurs first. Upon review and acceptance of the submittal schedule, Supplier shall furnish a detailed delivery schedule for all materials used on the Project. 5. Supplier shall use the web based construction management software that is to be used by Supplier for submittals on this Project. Supplier shall provide samples as required by the Purchase Order Documents. 6. Shop drawings and product data that are incomplete or are not in compliance with the Purchase Order Documents shall not be submitted. Sample Purchase Order
Date: SCHEDULE “A” for PO#____ FAW JOB # “ Project “ 5 of 8 FPR0027 Rev 6, 07/01/22 7. Supplier shall not be relieved of responsibility for any deviation from the requirements of the Purchase Order Documents by Architect, Owner or Contractor’s acceptance of shop drawings, product data, samples, and submittals as required by Purchase Order Documents, unless Supplier has specifically informed Contractor in writing of such deviation at the time of submission and the Owner and Contractor have given written approvals to the specific deviation. 8. Any deviations from the Purchase Order Documents must be proposed as a change to the Purchase Order and approved as a change order before procurement. All changes and proposed changes to the Purchase Order Documents are to be noted on the cover letter of the shop drawings and or product data during the submittal process. 9. Data sheets, brochures and/or transmittals being submitted must include the specification section and a reference number. 10. When general catalog or data sheets are submitted, they must be specifically marked with items only relevant to this Project. Details not relevant to the Project shall be deleted or marked out. If these are submitted without clearly indicating which materials or details are applicable, they will be returned without review. C. Billing Requirements: 1. Supplier’s monthly billing shall be submitted on the AIA form G702 by the 20th day of each month, along with its completed Subcontractor/Supplier Affidavit and Waiver of Liens and Claims, its completed Sub-Subcontractors and Suppliers Disclosure Affidavit and a Sub-Subcontractor/Supplier Affidavit and Waiver of Liens & Claims for each person or entity listed on the Sub-subcontractors and Suppliers Disclosure Affidavit. A pencil copy must be submitted five (5) days prior for review by Contractor’s Project Manager. Upon approval of the pencil copy by Contractor’s Project Manager, subcontractor shall submit final copies to apinvoice@fawilhelm.com. 2. All applications for payment must indicate the percentage of Work completed through the billing date, and a percentage of approved change order Work completed through the billing date. 3. All applications for payment MUST reflect retainage of ten percent (5%) to be withheld. 4. All extra work tickets must be signed for by Contractor’s Superintendent and approved by Contractor’s Project Manager, and included in a change order prior to inclusion with any billing. 5. Supplier cannot include off-site storage of materials on pay applications unless approved by Architect and Owner prior to the submission of the applicable pay application. 6. Supplier’s invoices shall not exceed the current Purchase Order Sum. 7. Supplier does hereby sell, transfer, assign and convey to Contractor the goods, materials, parts, supplies, equipment, and accessions required by the Purchase Order Documents (collectively, the “Goods”) and located at the Supplier’s premises or the Supplier’s suppliers’ premises, manufactured or in the process of manufacture for delivery to, or for use on or in connection with the construction of the Project. In the event that any of the Goods are in the process of manufacture, Supplier expressly intends to sell, transfer, assign and convey the same in their completed state, as well as in the form and state the Goods possess at the time of execution of this Purchase Order. It is the express intention of the parties that (i) by their identification in the Purchase Order Documents, Contractor acquires a special property to and insurable interest in the Goods, (ii) title to the Goods passes to Contractor upon execution of this Purchase Order, subject to rejection, refusal to receive or retain the Goods or a justified revocation of acceptance of the Goods by Contractor. Supplier represents, warrants and covenants to Contractor that Supplier (i) is the lawful owner of the Goods, (ii) has good right to sell Sample Purchase Order
Date: SCHEDULE “A” for PO#____ FAW JOB # “ Project “ 6 of 8 FPR0027 Rev 6, 07/01/22 the Goods to Contractor, and (iii) warrants and will defend the Contractor’s rights to the Goods as against any and all claims and demands of Supplier’s creditors or other third parties. The foregoing representations, warranties and covenants shall survive the execution of this Purchase Order. For so long as Supplier maintains possession or control of the Goods, Supplier will provide safe and proper storage of the Goods on its own premises or such other premises as the Goods may be located from time to time. Supplier shall not move the Goods or Supplier’s place of business, unless it first provides Contractor thirty (30) days advance written notice. Supplier will physically separate and segregate the Goods by means of ropes or other barriers, or as otherwise may be directed by Contractor, from all other items of inventory and will cause to be placed conspicuously and securely on the Goods a sign or signs in a form satisfactory to Contractor, which identifies the Goods as the property of Contractor and as intended for use on or in connection with the Project. Notwithstanding the foregoing, and in addition to all of Contractor’s other rights in connection with the Goods available to Contractor by law or contract, Supplier hereby grants to Contractor, to the fullest extent it is capable of doing so, a security interest in and to the Goods, now existing or hereinafter acquired, to secure Supplier’s performance of its obligations under this Purchase Order, and any other agreement entered into by the parties. Supplier acknowledges that this Purchase Order shall constitute a Security Agreement for the security interest granted hereby in accordance with the provisions of the Uniform Commercial Code. Supplier hereby irrevocably nominates, constitutes, appoints and designates Contractor as its attorney-in-fact with the rights, but not the obligation, to make, execute, file and deliver any and all other documents or papers, including, without limitation, any financing statements or security agreements deemed necessary and proper by Contractor in order to give full effect not only to the intent and meaning of the sale, transfer, conveyance and assignment contemplated herein, but also to the full protection intended to be herein given to Contractor under all other provisions of this Purchase Order and the other agreements entered into between the parties and applicable law. Supplier hereby ratifies and confirms all acts and actions taken and done by Contractor as attorney-in-fact. This provision is in addition to any other rights and remedies, common and equitable, available to Contractor under this Purchase Order. D. Closeout Requirements: 1. Supplier shall provide manufacturer’s field services, service engineering, written warranties, operation and maintenance manuals, training, orientations and demonstrations, as required in the Purchase Order Documents, and as applicable for all Work contained in this Purchase Order. 2. Prior to Contractor accepting a billing for Work in excess of 25% complete, Supplier must have completed and submitted a list of closeout documents, including the status of those documents. Prior to Contractor accepting a billing in excess of 75% complete, Supplier must have submitted all appropriate closeout documentation. Contractor may withhold progress billings until all closeout documents are received and approved. Prior to Contractor releasing the final retention, Supplier shall provide a record copy of all shop drawings and submittals fully corrected with field modifications and revisions for the Project, along with any attic stock that is required to be provided by the Purchase Order Documents. Supplier shall provide as-built drawings on bluelines and CAD files. Sample Purchase Order
Date: SCHEDULE “A” for PO#____ FAW JOB # “ Project “ 7 of 8 FPR0027 Rev 6, 07/01/22 5. Insurance Requirements. Supplier will provide the following minimum insurance requirements for the Project plus any additional insurance that is required of Contractor under the Prime Contract. A copy of an approved insurance certificate must be on file with the Contractor, at the main office location, prior to the commencement of work on the Project. Submit insurance certificate to inscerts@fawilhelm.com. A. Required Insurance Coverages: 1. Commercial General Liability Occurrence Form Aggregate per Project Endorsement Supplier’s Products / Completed Operations coverage shall be continued for one year after completion of its work or for such period otherwise provided by the Purchase Order Documents, whichever is longer. Contractual Liability No exclusion for Explosion, Collapse, & Underground (XCU) No exclusion for liability assumed in an insured contract. 2. Automobile Liability (Business) Including Hired and Non-Owned Auto liability coverage Contractual Liability No exclusion for liability assumed in an insured contract. 3. Worker’s Compensation/Employer’s Liability Statutory as required by the State where the project is located 4. Excess Liability Umbrella Form – follow form coverage on all liability policies B. Minimum Limits of Insurance Required: 1. Commercial General Liability a. General Aggregate (other than Products / Completed Operations) $2,000,000 b. Products / Completed Operations Aggregate $2,000,000 c. Bodily Injury and Property Damage (each occurrence) $1,000,000 d. Personal & Advertising Injury (any person or organization) $1,000,000 e. Fire Damage (any one fire) $ 50,000 f. Medical Expenses (any one person) $ 5,000 2. Automobile Liability (Business) a. Combined Single Limit Per Accident or Loss – Bodily Injury & Property Damage $1,000,000 3. Worker’s Compensation/Employer’s Liability a. Bodily Injury by Accident – Each Accident $ 500,000 b. Bodily Injury by Disease – Policy Limit $1,000,000 c. Bodily Injury by Disease – Each Employee $ 500,000 4. Excess Liability a. Each Occurrence $5,000,000 C. Additional Insured(s) - applies to all insurance coverage, except Worker’s Compensation and Employer’s Liability. The following shall be named as Additional Insured(s), including coverage for ongoing and completed operations, on Supplier’s policies: Ball State University AND F.A. Wilhelm Construction Co., Inc. AND Wilhelm Construction, Inc. and their respective affiliates, subsidiaries, officers, directors, employees and representatives AND all others required by contract. Sample Purchase Order
Date: SCHEDULE “A” for PO#____ FAW JOB # “ Project “ 8 of 8 FPR0027 Rev 6, 07/01/22 D. In the event the Supplier has or obtains coverage in amounts in excess of those minimum limits outlined above during the period that coverage is required under the Purchase Order, those organizations listed above as Additional Insureds shall also be named as Additional Insureds for such excess amounts. The amounts of insurance (including endorsements thereto) carried in compliance with these insurance requirements are not to be construed as either a limitation or satisfaction of the Supplier’s liability. E. Supplier waives any and all claims against those organizations listed above as Additional Insureds and their respective insurers for damages caused by any occurrence or peril covered by the insurance required by the Purchase Order Documents (waiver of subrogation/waiver of right of recovery). F. Supplier and its insurance carrier shall give Contractor at least thirty (30) days written notice prior to cancellation, non-renewal and/or any material change of any required coverage. G. If any portion of the Supplier’s Work involves project design, architectural services, engineering services or other consulting services, soil boring or reporting of results of same or site surveying or reporting of results of same, professional liability coverage (errors and omissions) with minimum limits of $2,000,000 per claim and $3,000,000 general aggregate and maximum deductible of $25,000 shall be required. It shall also be required that the Excess Liability policy outlined above provide coverage in excess of this professional liability policy. This total coverage shall be continued for Ten (10) years after completion of Supplier’s Work. H. Subcontractors and sub-subcontractors performing work involving asbestos abatement and transportation operations shall provide insurance coverage for liability arising from asbestos, including claims for bodily injury, including wrongful death, property damage and environmental cleanup. Said insurance shall not exclude asbestos abatement, asbestos disease or transportation. The policy or policies shall be written by insurance companies with an A.M. Best rating of not less than A- V. The insurance shall have a per occurrence limit of not less than $5,000,000, and all deductibles shall be borne by Subcontractor and shall not exceed $500,000 without written consent of Contractor. If Subcontractor becomes aware of claims or potential claims that would erode 25% of more of the aggregate limit of the policy, Subcontractor shall notify Contractor immediately and provide such information as Contractor shall request to assess the risk of a future claim being uninsured or underinsured. If the policy is "claims-made", it shall include an Extended Claims Discovery Period of not less than 2 years. Said insurance shall cover the Subcontractor's contractual liability for asbestos claims. I. Subcontractors and sub-subcontractors performing environmental remediation work shall maintain Pollution Liability covering the contractor's liability for bodily injury, property damage, remediation and environmental damage resulting from pollution and related cleanup costs incurred, all arising out of the Subcontractor’s Work or services to be performed under this Agreement. Coverage shall be provided for both Subcontractor’s Work performed on site, as well as during the transport of hazardous materials. Limits of not less than $5,000,000 shall be provided. The policy shall name the Additional Insureds and any parents, subsidiaries, and related entities, but only insofar as the operations under the Agreement are concerned. Sample Purchase Order
Date: SCHEDULE “A” for PO#____ FAW JOB # “ Project “ 9 of 8 FPR0027 Rev 6, 07/01/22 The insurance coverage provided by Supplier under this Purchase Order shall be primary and non-contributory to any other insurance. Sample Purchase Order
EXHIBIT “A” 1 of 1 FPR0027 Rev 6, 07/01/22 SUBCONTRACTOR/SUPPLIER AFFIDAVIT & WAIVER OF LIENS & CLAIMS Partial ( ) Final ( ) We, the undersigned, having been employed by F. A. Wilhelm Construction Co., Inc. (“Contractor”) to furnish labor, services, equipment and/or materials for construction work on the Project known as Ball State University – AC/TH/MU Renovations constructed on real estate located in the County of Delaware in the State of Indiana, hereby warrant that the Contractor, any surety bond instrument or surety, any Project owner(s), any Project funds, and the Project real estate and the improvements thereon cannot be made subject to any valid claim, lien or encumbrance by anyone who furnished labor, services, equipment or materials to the undersigned for use in the Project, and the undersigned hereby waive and release any and all claims, liens and encumbrances of whatsoever kind or nature against the Contractor, any surety bond instrument or surety, any Project owner(s), any Project funds, and the Project real estate and improvements thereon for any labor, services, equipment or materials furnished through _____________________, ______. The above waiver and release are given in order to induce payment in the Amount Due of $______________ and upon receipt by the undersigned of the Amount Due, the above waiver and release become valid, enforceable and of full effect. Upon attachment of the cancelled check and the legal description of the Project, this release may be recorded by the owner(s) or mortgage holder(s) of the Project. Notwithstanding the foregoing, the undersigned does hereby unconditionally waive and release any and all claims, liens and encumbrance of whatsoever kind or nature against the Contractor, any surety bond instrument or surety, any Project owner(s), any Project funds, and the Project real estate and any improvements thereon with respect to monies due the undersigned for previous payment requests in the total sum of $_____________________, the receipt and sufficiency of which is hereby acknowledged by the undersigned. Given under our hand and seal this _____ day of ____________________, ______ ________________________________________ Company By: ________________________________________ Authorized Representative of Company STATE OF: ) COUNTY OF: ) Subscribed and sworn to before me this ______ day of ____________________, 20__. ________________________________________ Notary Public My Commission Expires: County of ResidenceSample Purchase Order
EXHIBIT “B” 1 of 1 FPR0027 Rev 6, 07/01/22 Sample Purchase Order
EXHIBIT “C” 1 of 1 FPR0027 Rev 6, 07/01/22 SUB-SUBCONTRACTOR/SUPPLIER AFFIDAVIT & WAIVER OF LIENS & CLAIMS Partial ( ) Final ( ) We, the undersigned, having been employed by Insert FAW’s 1st tier Sub that owes the money to furnish labor, services, equipment and/or materials for construction work on the Project known as Ball State University – AC/TH/MU Renovations constructed on real estate located in the County of Delaware in the State of Indiana, hereby warrant that F.A. Wilhelm Construction Co., Inc. (“Contractor”), any surety bond instrument or surety, any Project owner(s), any Project funds, and the Project real estate and the improvements thereon cannot be made subject to any valid claim, lien or encumbrance by anyone who furnished labor, services, equipment or materials to the undersigned for use in the Project, and the undersigned hereby waive and release any and all claims, liens and encumbrances of whatsoever kind or nature against the Contractor, any surety bond instrument or surety, any Project owner(s), any Project funds, and the Project real estate and improvements thereon for any labor, services, equipment or materials furnished through ____________, ______. The above waiver and release are given in order to induce payment in the Amount Due of $______________ and upon receipt by the undersigned of the Amount Due, the above waiver and release become valid, enforceable and of full effect. Upon attachment of the cancelled check and the legal description of the Project, this release may be recorded by the owner(s) or mortgage holder(s) of the Project. Notwithstanding the foregoing, the undersigned does hereby unconditionally waive and release any and all claims, liens and encumbrance of whatsoever kind or nature against the Contractor, any surety bond instrument or surety, any Project owner(s), any Project funds, and the Project real estate and any improvements thereon with respect to monies due the undersigned for previous payment requests in the total sum of $_____________________, the receipt and sufficiency of which is hereby acknowledged by the undersigned. Given under our hand and seal this _____ day of ____________________, ______ ________________________________________ Company By: ________________________________________ Authorized Representative of Company STATE OF: ) COUNTY OF: ) Subscribed and sworn to before me this ______ day of ____________________, 20__. ________________________________________ Notary Public My Commission Expires: County of Residence:Sample Purchase Order
EXHIBIT “F” 1 of 1 FPR0027 Rev 6, 07/01/22 SUBCONTRACT PERFORMANCE BOND Bond No.: KNOW ALL BY THESE PRESENTS: That [name of subcontractor], a [state] corporation, as Principal, hereinafter called Principal, and [name of surety], a [state] corporation, as Surety, hereinafter called Surety, are held and firmly bound unto F.A. Wilhelm Construction Company, Inc. with its address at 3914 Prospect Street, Indianapolis, IN 46203, as Obligee, hereinafter called Obligee, in the amount of U.S. Dollars ($ ) (the “Penal Sum”), for the payment whereof Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Principal has by written agreement dated entered into a subcontract number with Obligee for the performance of subcontract work , including warranty obligations, in accordance with drawings and specifications for the construction of the project (hereinafter "the Project"), which subcontract is by reference made a part hereof, and is hereinafter referred to as the “Subcontract”. A. NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION are such that, if Principal shall promptly and faithfully perform said Subcontract, then this obligation shall be null and void; otherwise it shall remain in full force and effect, subject to the following conditions: (i) Principal is in default under the Subcontract; and (ii) Principal has been declared by Obligee to be in default under the Subcontract; and (iii) the Obligee has performed its obligations under the Subcontract. Upon the occurrence of each of the above conditions, Surety shall have 30 days (“Investigatory Period”) from the last event to occur of the following: (a) receipt of the written notice of default; (b) the date access to the Project site is provided to Surety; or (c) the date the information and documentation in Obligee’s or its agent’s possession and requested by Surety is received by the Surety, which information and documentation must be requested by Surety within 10 days of its receipt of Obligee’s written notice of default, to: (1) Notify Obligee that it has elected to complete the Subcontract through independent contractor(s) retained by Surety and thereafter commence such performance with reasonable promptness. In such event, that portion of the Balance of the Subcontract Price as may be required to complete the Subcontract or remedy the default and to reimburse the Surety for its expenditures shall be paid to the Surety at the times and in the manner as said sums would have been payable to Principal had there been no default under the Subcontract; or (2) Notify the Obligee that it has elected to arrange for a subcontract between Obligee and a replacement subcontractor reasonably acceptable to Obligee guaranteed by subcontract performance and payment bonds provided by the replacement subcontractor in the amount of the replacement subcontract. In such event, Surety shall pay Obligee the difference between the cost of the replacement subcontractor and the amount that would have been payable to the Principal had there been no default under the Subcontract. Such payments may be in a lump sum (in the case of a lump sum subcontract) or periodically as incurred by Obligee; or (3) Request that Obligee complete the Subcontract. In such event, Surety shall pay Obligee the difference between the reasonable cost of a replacement subcontractor and the amount that would have been payable to the Principal had there been no default under the Subcontract; or Sample Purchase Order
EXHIBIT “F” 1 of 1 FPR0027 Rev 6, 07/01/22 (4) Arrange to provide financial and/or other assistance to the Principal (“Financing”) to assist the Principal with completion of the Subcontract. In the event Obligee has formally terminated Principal’s right to proceed under the Subcontract, this option shall be subject to Obligee’s concurrence, which shall not be unreasonably withheld. The Obligee shall pay the Balance of the Subcontract Price as directed by the Surety. In the event Surety provides Financing, Surety, in its sole discretion, may upon written notice to Obligee cease providing such Financing at any time, in which event Surety shall immediately make a further election without a further Investigatory Period under this paragraph A; or (5) Deny liability and notify the Obligee, citing the reasons therefor; or (6) After investigation, determine the amount for which it may be liable to the Obligee and, as soon as practicable after the amount is determined, make payment to the Obligee. B. After Obligee has provided Surety with written notice of the Principal’s default, and during the Investigatory Period and any subsequent period before the commencement of work under paragraph A, subparagraphs 1 or 2, Obligee may take action pursuant to its Subcontract rights to mitigate the damages caused by the Principal’s default. To the extent that Obligee performs obligations under the Subcontract during this period (the “Mitigation Work”) Obligee shall be entitled to deduct the Cost of the Mitigation Work from the Balance of the Subcontract Price. To the extent the Balance of the Subcontract Price is exhausted, and Surety elects to proceed under paragraph A, subparagraphs 1, 2, 3 or 4, Surety shall reimburse Obligee for the difference between the Balance of the Subcontract Price and the Cost of the Mitigation Work incurred and paid by Obligee. C. If Surety proceeds under paragraph A, subparagraphs 1, 2, 3, 4 or 6, Surety may additionally advise in its notice of its election to Obligee that the Obligee’s claim is disputed as to liability and/or amount and Surety is proceeding under a reservation of all rights and defenses. In that event, Surety shall make all payments otherwise called for under this Bond. However, in the event it is determined that Surety is not liable, in whole or in part, under this Bond and Surety expended monies in excess of the funds paid by Obligee to Surety, then Surety shall be entitled to recover the excess from Obligee. D. The Surety’s aggregate liability is limited to the Penal Sum of this Bond, regardless of whether the liability arises from the actions or failure to act of Principal or Surety. All amounts expended by the Surety under paragraphs A and/or B and/or C of this Bond, in excess of funds paid by Obligee to Surety, shall be credited against the Penal Sum. However, in the event it is determined that Surety expended monies in excess of the Penal Sum of this Bond, then Surety shall be entitled to recover the excess from Obligee. The Penal Sum of this Bond shall automatically be increased or decreased by the amount of any change order, provided the change order(s) do not, either singly or in the aggregate, exceed 10% of the original Subcontract amount. Should any change order singly or in the aggregate exceed 10% of the original Subcontract amount, Surety’s written consent must be obtained by Obligee in order to increase the penal sum. E. Definitions: (1) The term “Balance of the Subcontract Price,” as used in this Bond, shall mean the total amount payable by Obligee to Principal under the Subcontract and any amendments thereto, less the amounts heretofore properly paid by Obligee under the Subcontract. (2) The term “Cost of the Mitigation Work” means the cost actually incurred by Obligee in proper performance of work under the Subcontract, including remedying defects in the work of the Principal. Such costs shall be at rates and hours not higher than the standard customarily incurred at the place of the Project except with the prior written consent of the Surety. Obligee’s overhead (both field and home office) as well as profit shall be included Sample Purchase Order
EXHIBIT “F” 1 of 1 FPR0027 Rev 6, 07/01/22 in the Cost of the Mitigation Work at a markup of 15% to the actual labor, material, equipment, and subcontractor costs incurred and paid for by Obligee. Obligee shall not apply markup to the cost of any subcontractor that is affiliated with Obligee. F. Notwithstanding any provision in this Bond and any document incorporated herein to the contrary, any proceeding, legal or equitable, under this Bond must be instituted in a court of competent jurisdiction in the location in which the work or part of the work is located and shall be instituted within two years after a declaration of default or within two years after the Principal ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. G. No right of action shall accrue on this Bond to or for the use of any person or corporation other than the Obligee named herein or the heirs, executors, administrators or successors of the Obligee. H. Any notice given or any demand made under this Bond shall be given in writing and may be provided to the following email address or given by any method of delivery that provides evidence or confirmation of receipt, including personal delivery, express courier (such as Federal Express), and prepaid certified or registered mail with return receipt requested. The Surety’s address for notice is . I. The Surety shall not be liable to the Obligee or others for obligations of the Principal that are unrelated to the Subcontract work, and the Balance of the Subcontract Price shall not be reduced or set off on account of any such unrelated obligations. J. The Surety hereby waives notice of change, including changes of time, to the Subcontract, purchase orders or other obligations. Signed this day of , . (Principal) By: (Surety) By: , Attorney-in-Fact Sample Purchase Order
EXHIBIT “F” 1 of 1 FPR0027 Rev 6, 07/01/22 SUBCONTRACTOR PAYMENT BOND Bond No.: KNOW ALL BY THESE PRESENTS, That we, (subcontractor's name), called the Principal, and (surety's name), a (state) corporation, called the Surety, are held and firmly bound unto F.A. Wilhelm Construction Company, Inc. with its address at 3914 Prospect Street, Indianapolis, IN 46203, hereinafter called the Obligee, in the sum of U.S. Dollars ($ ) (the “Penal Sum”), for the payment whereof said Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. WHEREAS, the Principal has entered into a subcontract numbered with the Obligee, dated , for project ("Subcontract"). NOW, THEREFORE, the conditions of this obligation are such that if the Principal shall promptly make payment to all Claimants as hereinafter defined for all labor and material used, consumed or incorporated in the performance of the construction work to be performed under the Subcontract, then this obligation shall be void; otherwise to remain in full force and effect, subject, however, to the following conditions: 1. A Claimant is defined as one other than the Obligee having a contract with the Principal or with a direct subcontractor of the Principal to supply labor and/or materials and such labor and/or materials are actually used, consumed or incorporated in the performance of the construction work under the Subcontract. 2. The above-named Principal and Surety hereby jointly and severally agree with the Obligee that every Claimant as herein defined who has not been paid in full before the expiration of a period of ninety (90) days after the date on which the last of such Claimant’s work or labor was done or performed or materials were furnished by such Claimant, may bring suit on this bond, prosecute the suit to final judgment for the amount due under Claimant’s contract for the labor and/or materials supplied by the Claimant which were used, consumed or incorporated in the performance of the work, and have execution thereon; provided, however, that a Claimant having a direct contractual relationship with a direct subcontractor of the Principal shall have a right of action on this bond only if said Claimant notifies the Principal and Surety in writing of its claim within ninety (90) days from the date on which said Claimant did or performed the last labor and/or materials for which the claim is made. Such notice shall be served by mailing the same by registered mail or certified mail, postage prepaid, in and envelope addressed to the Principal and Surety, at any place where an office is regularly maintained for the transaction of business, or served in any manner in which legal process may be served in the state in which the project is located, save that such service need not be made by a public officer. 3. No suit or action or arbitration shall be commenced hereunder by any Claimant: a. After the expiration of the earlier of: (1) one year after the day on which the Claimant last supplied the labor and/or materials for which the claim is made; or (2) the limitation period set forth in the public works bond statutes, if any, in the location where the construction work is being performed. Any limitation contained in this bond which is prohibited by any law controlling in the state where the suit is filed shall be deemed to be amended so as to be equal to the minimum period of limitation permitted by the Sample Purchase Order
EXHIBIT “F” 1 of 1 FPR0027 Rev 6, 07/01/22 law of that state, and said period of limitation shall be deemed to have accrued and shall commence to run on the day the Claimant last supplied the labor and/or materials for which the claim is made; and b. Other than in a state court of competent jurisdiction in the county or other political subdivision of the state in which the project, or any part thereof, is situated, or in the United States District Court for the district in which the project, or any part thereof, is situated, and not elsewhere. The Obligee shall not be liable for the payment of any costs or expenses of any such suit action or arbitration. 4. The Penal Sum of this bond shall be reduced by and to the extent of any payment or payments made in good faith hereunder. The Surety's liability hereunder is limited, singly, or in the aggregate, to the Penal Sum of the bond set forth herein. Signed this day of , 20 . (Principal) By: (Surety) By: , Attorney-in-Fact Sample Purchase Order
EXHIBIT “F” 1 of 1 FPR0027 Rev 6, 07/01/22 DUAL OBLIGEE RIDER To be attached to and form a part of Performance/Payment Bond No. , executed concurrently with this rider, it is agreed that: Surety, and , Principal, for valuable consideration, hereby agree that the Bond executed in favor of , Obligee, in connection with a contract for: which bond and contract are made a part of hereof by reference, shall now include as an additional Obligee: in its capacity as for the aforementioned project. The Surety shall not be liable under this bond to the Obligees, or either of them, unless the said Obligees, or either of them, shall make payments to the Principal or to the Surety, in case the Surety arranges for the completion of the contract upon default of the Principal, strictly in accordance with the terms of said contract as to payments, and shall perform all the other obligations to be performed under said contract at the time and in the manner therein set forth. In no event shall the Surety be liable in the aggregate to both Obligees for more than the penal sum of its Performance Bond, nor shall it be liable except for a single payment for each single breach or default. At the Surety’s election, any payment due to either Obligee may be made by its check issued jointly to both. WITNESS the following signatures and seals thisday of , . By: , Attorney-in-Fact Attest: (Principal) By: Sample Purchase Order
DocuSign 07.01.22 (Printed name and title) (Printed name and title) 1. Supplier’s written acceptance or commencement of any performance or service under this Purchase Order shall constitute Supplier’s acceptance of the terms and conditions set forth in the Purchase Order Documents. Contractor objects to and rejects all terms and conditions proposed by Supplier which are different from or in addition to the terms and conditions contained in the Purchase Order Documents and such terms shall not become a part of this Purchase Order. If this Purchase Order is deemed to be an acceptance of a prior offer by Supplier, such acceptance is conditional on Supplier’s assent to all additional or different terms and conditions contained in the Purchase Order Documents. The terms and conditions contained in the Purchase Order Documents cannot be changed in any manner except by a Contractor initiated change order pursuant to Paragraph No. 15 below. 2. Unless otherwise noted on the face of this Purchase Order or in Schedule ‘A’, payment shall be made to Supplier monthly from funds received by Contractor from Owner or Prime Contractor for Supplier’s Work on the following schedule: progress payments in the amount of ninety percent (90%) of the value of goods, materials and services delivered to the job site as determined by Contractor and approved by Owner and Prime Contractor. Final payment of the balance due on the Purchase Order Sum shall be made to Supplier within ten (10) working days after receipt by Contractor of final payment from Owner or Prime Contractor for Supplier’s Work. These payments are subject to receipt of such backup, delivery tickets signed by Contractor’s Project Superintendent, waivers of liens and claims, affidavits, warranties and guarantees as required by the Purchase Order Documents or by Contractor. The Purchase Order Sum includes the cost of all goods, materials, labor, tools, equipment, services, insurance, freight and all other costs of any kind, and Supplier shall be solely responsible for all federal, state and local excise, sales or use taxes applicable to this Purchase Order, and for any license, privilege, income or receipts tax imposed on Supplier. Supplier shall accept any valid sales or use tax exemption certificates. At Contractor’s sole discretion, Contractor may make payments to Supplier by joint check payable jointly to Supplier and its suppliers, subcontractors and/or creditors on the Project. 3. The risk of loss, damage, spoilage and deterioration, and all other risks, shall not pass to Contractor until on or after the scheduled delivery date and after Contractor, Owner, Prime Contractor, Construction Manager and Architect have actually inspected and accepted the goods and materials at the location designated for delivery by Contractor. Any rejected goods or materials may be returned at Supplier’s expense, including any transportation and other charges and expenses paid by Contractor in connection therewith; no replacement of rejected goods and materials may be made without Contractor’s prior written consent. 4. To the extent that the terms and conditions of the Prime Contract apply or relate to Supplier’s Work, Supplier agrees to be bound to Contractor by the same terms and conditions which apply to Contractor and assumes toward Contractor all obligations and responsibilities which Contractor assumes toward Owner, Prime Contractor, Construction Manager and/or Architect under the Prime Contract, and agrees to ensure that all of its material suppliers and subcontractors are likewise bound. Where a provision, term or condition of the Prime Contract, this Purchase Order and/or the Purchase Order Documents are in conflict with one another, the provision, term or condition that imposes the greater obligation or responsibility on Supplier shall govern. 5. Supplier may not assign, delegate or subcontract any of its rights, interests or obligations in or under this Purchase Order without Contractor’s prior written consent. Notwithstanding Contractor’s consent to any such assignment, delegation or subcontracting, Supplier shall not be relieved of any of its obligations pursuant to this Purchase Order, except as otherwise expressly and specifically agreed to in writing by a Contractor initiated changed order pursuant to Paragraph No. 15 below. Sample Purchase Order
Page 1 of 5 DocuSign 07.01.22 6. Supplier shall provide all goods, materials and services required by this Purchase Order on the delivery date set forth on the face of this Purchase Order, unless a separate delivery and/or work schedule is attached to this Purchase Order. Time is of the essence. The delivery and/or work schedule may be revised by Contractor as the Project progresses. Supplier shall provide Contractor with any requested scheduling information of Supplier’s Work. Any goods or materials delivered in advance of the scheduled delivery date shall, at Contractor’s option, be returned to Supplier or stored by Contractor, at Supplier’s cost and risk. 7. To the extent Supplier has been properly paid amounts due under this Purchase Order, Supplier agrees to keep Owner’s funds and property free and clear of all liens, claims or encumbrances of any kind of Supplier, its subcontractors or suppliers, or from any others claiming through Supplier. 8. Supplier shall comply with all applicable federal, state and local laws, orders, rules and regulations, and shall obtain and provide all notices to authorities, permits, fees, licenses, assessments, inspections and taxes necessary to complete its Work. 9. Supplier shall take the proper precautions in the performance of its Work to protect all persons and property from being injured by the Work or by the condition of the site, shall comply with any safety measures initiated by Contractor or set forth in the Purchase Order Documents, and shall comply with OSHA and any other applicable federal, state or local safety laws, rules, orders or regulations. 10. Supplier shall be responsible for all field measurements and layout necessary to perform its Work, and shall be responsible for the accuracy of its Work. Supplier shall submit to Contractor shop drawings and samples required by the Purchase Order Documents sufficiently in advance of the time any fabrication or shipment of materials, goods or other item for Supplier’s Work is to occur. Review and/or approval by Contractor, Architect, Prime Contractor, Construction Manager or Owner of Supplier’s submittals shall in no way relieve Supplier from conforming with the Purchase Order Documents. 11. Supplier warrants that neither the manufacture nor the sale nor use of the goods and materials to be sold will infringe on any United States or foreign patent, trademark, service mark, copyright, trade secret, trade name or other intellectual property right of any third party. 12. Supplier warrants that all goods and materials provided pursuant to this Purchase Order will be new, unless otherwise specified in the Purchase Order Documents, and will be of merchantable quality and fit for the purposes intended by Contractor, Architect, Prime Contractor, Construction Manager and/or Owner. Supplier also warrants the goods, materials and services provided pursuant to this Purchase Order against all deficiencies and defects in design, manufacturing, materials and/or workmanship for a period of one (1) year from the date of substantial completion of the Project or for such period otherwise provided by the Purchase Order Documents, whichever is longer, and agrees to satisfy the same without cost to Owner, Prime Contractor, Construction Manager or Contractor. These warranties shall survive inspection, acceptance and payment, shall run to Contractor, Owner, Prime Contractor and their respective successors and assigns, and shall be in addition to and not in limitation of any other warranty (including manufacturer warranties), right or remedy provided by law, the Purchase Order Documents or any other means. All manufacturer warranties shall be assigned to Owner and Contractor. 13. Prior to the start of its Work, Supplier shall procure and maintain in force, for at least the duration of its Work, insurance as is called for by the attached “Insurance Requirements,” plus any additional insurance that is required of Contractor under the Prime Contract. Contractor, Owner, Prime Contractor, Construction Manager and Architect shall be named as additional insureds on each of the required policies, except for workers compensation. Supplier shall furnish insurance certificates to Contractor verifying the required insurance prior to beginning its Work, but no later than ten (10) calendar days from the date of this Purchase Order. If any of the foregoing insurance coverages are required Sample Purchase Order
Page 2 of 5 DocuSign 07.01.22 to remain in force after final payment, an additional certificate evidencing continuation of such coverage shall be submitted with Supplier’s final application for payment. 14. To the fullest extent permitted by law, Supplier shall indemnify, hold harmless, and defend at its own expense Contractor, Owner, Prime Contractor, Construction Manager, Architect, and their respective agents, employees and assigns (herein collectively referred to as “indemnities”) from and against any claims, causes of action, damages, losses and expenses (including litigation costs and attorney’s fees) of any nature whatsoever, including but not limited to claims for or relating to injury, sickness or disease to any persons (including death), damages to property (including the lost use thereof and consequential damages therefrom), economic loss, liens, Project delays or intellectual property rights, which arise out of or are alleged to arise out of: a) the performance of Supplier’s Work; b) the condition of the goods and/or materials provided pursuant to this Purchase Order; c) the Supplier’s breach of this Purchase Order; and/or d) any act or omission of Supplier, its subcontractors or material suppliers, anyone directly or indirectly employed by them or anyone for whose acts they may be liable; regardless of whether or not such claim, cause of action, damage, loss or expense is contributed to or caused by the negligence, breach of contract or warranty, strict liability, or any other breach of duty of any indemnitee; provided, however, that Supplier shall not be obligated to indemnify an indemnitee for its sole negligence or willful misconduct where such indemnification is contrary to law, but otherwise it is the intent of the parties that Supplier shall indemnify the indemnities to the fullest extent permitted by law. 15. Supplier may be ordered in writing by Contractor, without invalidating this Purchase Order, to make changes in Supplier’s Work consisting of additions, deletions or other revisions, the Purchase Order Sum and Contractor’s schedule being adjusted accordingly. Within seven (7) working days of receiving notice of such change, Supplier shall submit to Contractor a quotation covering any addition or deduction to the Purchase Order Sum and any impact to Contractor’s schedule, along with all details and backup necessary to support the quotation. Unless otherwise directed in writing by Contractor, Supplier shall not commence such changed or revised work until after Contractor has reviewed and approved Supplier’s quotation, and Contractor and Supplier have signed a written change order setting forth any adjustments to the Purchase Order Sum or Contractor’s schedule. 16. Supplier agrees that in order for it to make a claim against Contractor for extensions of time or allowable damages which arise out of any event or occurrence not covered by Paragraph No. 15 above, Supplier, as a condition precedent, must give Contractor written notice of such claim within seven (7) working days of the event or occurrence giving rise to the claim or within the time which Contractor has to make such a claim against the Owner or Prime Contractor, whichever is shorter, or the claim will be waived. In no event shall Contractor be liable to Supplier for anticipated profits, business interruption or incidental or consequential damages. Contractor’s liability to Supplier for any claim arising out of or relating to this Purchase Order shall be limited to the price allocable to the goods or services or unit thereof which gives rise to the claim. 17. Supplier acknowledges that the Purchase Order Sum includes any and all material and/or labor cost escalation for the duration of the Project and that Supplier shall not be entitled to a change order or adjustment to the Purchase Order Sum for any such material and/or labor cost escalation. 18. To the extent there are any design services required to be performed by Supplier either incidental to Supplier's construction services or as a primary undertaking by Supplier in respect of the Project, such design services shall be procured from licensed, independent design professionals retained by the Supplier or furnished by licensed employees of the Supplier, or as permitted by the law of the place where the Project is located. Supplier shall be responsible for coordinating its design with the Project Architect, engineers and others providing design services for the Project. Supplier shall prepare, for approval by the Project Architect and engineers, Construction Documents consisting of drawings, specifications, and other appropriate instruments ("Instruments of Service") sufficient to set forth in detail the Sample Purchase Order
Page 3 of 5 DocuSign 07.01.22 requirements for the construction of Supplier’s Work. Supplier shall assist the Owner, Architect, Engineers, or Contractor in connection with the filing of documents required for the approval of government authorities having jurisdiction over the Project. All ownership of or other rights in respect of the Instruments of Service shall be transferred by Supplier to Owner upon request. 19. Should Supplier fail to satisfy deficiencies in its performance of this Purchase Order (including but not limited to failure to maintain Contractor’s schedule) within two (2) working days from receipt of Contractor’s written notice of such deficiency, then Contractor, without prejudice to any other right or remedy, shall have the right to: a. terminate this Purchase Order and reject all further deliveries of goods, materials or services; b. reserve or withhold payment to Supplier and retain or take possession of the goods, materials and services provided, stored, manufactured and/or fabricated until Supplier cures and completes this order; and/or c. take whatever steps Contractor deems necessary to correct said deficiencies and charge the cost thereof (including the cost of removing and repairing other work and improvements as necessary to correct the deficiencies) to Supplier, who shall be liable for payment of the same, including reasonable overhead, profit and attorney’s fees. Said notice is not required for Contractor to exercise the remedies under this paragraph when Supplier’s deficiency in performance threatens safety. 20. Contractor may terminate, without notice, all or any part of this Purchase Order, without liability to Contractor, if Supplier becomes insolvent, makes an assignment for the benefit of creditors, is the subject of a proceeding for the appointment of a receiver or trustee, or files a voluntary petition in bankruptcy or is the subject of an involuntary petition in bankruptcy. 21. Labor disputes, fires, acts of God, public enemy, earthquakes, floods, accidents or other causes beyond Contractor’s control shall constitute grounds for suspension of shipment without penalty or cost to Contractor. 22. Supplier shall abide by all federal, state and local laws and regulations that prohibit discrimination against qualified individuals based on their status as protected veterans or individuals with disabilities and shall prohibit discrimination against all individuals based on their race, color, religion, sex, sexual orientation, gender identity or national origin. Moreover, 41 CFR 60-1.4(a), 60-300.5(a) and 60-741.5(a) require that covered suppliers, contractors and subcontractors take affirmative action to employ and advance in employment individuals without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability or veteran status. 23. This Purchase Order and the rights and duties of all persons arising from or related to this Purchase Order shall be governed by the laws of the State of Indiana. Any dispute arising under or related to this Purchase Order, the performance of Work or provision of any materials or goods pursuant hereto, shall be brought only in state court in Marion County, State of Indiana, or if federal jurisdiction is available, in the U.S. District Court for the Southern District of Indiana. The parties to this Purchase Order agree to: a) participate in mediation; b) accept such venues if mediation is unsuccessful; c) waive trial by jury in all proceedings; and d) waive, as against each other, any claim or entitlement to punitive or exemplary damages. If Contractor is in a dispute with the Owner, Prime Contractor and/or Construction Manager that involves Supplier’s Work, acts or omissions, then Contractor may elect to join Supplier as a party to such dispute and the dispute resolution and litigation provisions in the Prime Contract would govern if Contractor made such election of joinder. 24. Supplier agrees that the subject matter of this Purchase Order is confidential in nature and that Supplier will not provide any third party with any information contained herein without the expressed written consent of Contractor. However, Supplier may disclose confidential information, after seven (7) days’ notice to Contractor, where disclosure is Sample Purchase Order
Page 4 of 5 DocuSign 07.01.22 required by law, including a subpoena or other form of compulsory legal process issued by a court or governmental entity, or by court or arbitrator(s) order. Supplier may also disclose confidential information to its employees, consultants, sureties, sub-subcontractors, and others who need to know the content of such information solely and exclusively for the Project and who agree to maintain the confidentiality of such information. 25. If any term, provision or part of a provision to this Purchase Order should be invalid or unenforceable under the governing law, the validity and enforceability of the remaining terms, provisions and parts thereof shall not be affected, with interpretation and enforcement to occur as if such invalid or unenforceable term, provision or part was never written. 26. The failure of Contractor to enforce at any time any provision of this Purchase Order shall in no way affect the validity of this Purchase Order or any part hereof or the right of Contractor thereafter to enforce each and every such provision. No waiver of any breach of this Purchase Order shall be held to be a waiver of any other or subsequent breach. 27. The Purchase Order Documents, including this Purchase Order, represent the entire integrated agreement between Supplier and Contractor, and supersede all prior negotiations, representations or agreements relating to Supplier’s Work. FPR0021 Rev 1, 07.01.22 Sample Purchase Order
SUBCONTRACT EXHIBIT 3 – INSURANCE REQUIREMENTS
Page 1 of 2 FPR0007 Rev 3 07.01.22
INSURANCE REQUIREMENTS
Subcontract Agreement No.
Purchase Order No.
SUBCONTRACTOR or SUPPLIER: PROJECT: Madison Lifestyle District –
Parking Garage
DATE: JOB NUMBER: 11303
SEND CERTIFICATE TO: INSCERTS@FAWILHELM.COM
REQUIRED COVERAGES MINIMUM LIMITS OF INSURANCE REQUIRED
COMMERCIAL GENERAL LIABILITY
- Occurrence Form
- Aggregate per Project Endorsement
- Subcontractor’s or Supplier’s Products /
Completed Operations coverage shall be
continued for one year after completion of
its Work or for such period otherwise
provided by the Subcontract or Purchase
Order Documents, whichever is longer.
- Contractual Liability
- No exclusion for Explosion, Collapse &
Underground (XCU)
- No exclusion for liability assumed in an
insured contract
$ 2,000,000 General Aggregate (other than
Products /Completed operations)
$ 2,000,000 Products/Completed Operations
Aggregate
$ 1,000,000 Bodily Injury and Property
Damage (each occurrence)
$ 1,000,000 Personal & Advertising Injury
(any one person or organization)
$ 50,000 Fire Damage (any one fire)
$ 5,000 Medical Expenses (any one
person)
AUTOMOBILE LIABILITY (Business)
- Including Hired and Non-Owned Auto
liability coverage
- Contractual Liability
- No exclusion for liability assumed in an
insured contract.
$ 1,000,000 Combined Single Limit per
accident or loss- Bodily Injury &
Property Damage
WORKER’S COMPENSATION
EMPLOYER’S LIABILITY
Statutory as required by the State where the Project is
located.
$ 500,000 Bodily Injury by Accident - each
accident
$ 1,000,000 Bodily Injury by Disease-policy
Limit
$ 500,000 Bodily Injury by Disease – each
employee
EXCESS LIABILITY
- Umbrella Form (follow form coverage on all
liability policies)
$ 5,000,000 Each occurrence
Page 2 of 2 FPR0007 Rev 3 07.01.22
ADDITIONAL INSURED(S) applies to all insurance coverage except Worker’s Compensation/Employer’s
Liability. The following shall be named Additional Insured(s), including coverage for ongoing and completed
operations, on Subcontractor’s policies:
Indiana University AND [additional entities TBD] AND F.A. Wilhelm Construction Co., Inc. and their
respective affiliates, subsidiaries, officers, directors, employees and representatives.
Subcontractor or Supplier will provide the minimum insurance requirements for the Project, plus any additional
insurance that is required of Contractor under the Prime Contract. A copy of an approved insurance certificate must
be on file with the Contractor, at the main office location, prior to the commencement of work on the Project. Send
certificate to inscerts@fawilhelm.com.
In the event the Subcontractor or Supplier has or obtains coverage in amounts in excess of those minimum limits
outlined above during the period that coverage is required under the Subcontract Agreement or Purchase Order, those
organizations listed above as Additional Insureds shall also be named as Additional Insureds for such excess amounts.
The amount of insurance (including endorsements thereto) carried in compliance with these requirements are not to
be construed as either a limitation or satisfaction of the Subcontractor’s or Supplier’s liability.
Subcontractor or Supplier waives any and all claims against those organizations listed above as Additional Insureds
and their respective insurers for damages caused by any occurrence or peril covered by the insurance required by the
Subcontract Documents (waiver of subrogation/waiver of right of recovery).
The insurance coverage provided by Subcontractor or Supplier under this agreement shall be primary and non-
contributory to any other insurance.
Subcontractor or Supplier and its insurance carrier shall give F.A. Wilhelm Construction Co., Inc. at least thirty (30)
days written notice prior to cancellation, non-renewal and/or any material change of any required coverage.
If any portion of the Subcontractor’s Work involves project design, architectural services, engineering services or other
consulting services, soil boring or reporting of results of same or site surveying or reporting of results of same,
professional liability coverage (errors and omissions) with minimum limits of $1,000,000 per claim and $3,000,000
general aggregate and maximum deductible of $25,000 shall be required. It shall also be required that this professional
liability policy, and any replacement policy, have a retroactive date no later than the date of the contract and that the
coverage be continued for a minimum of five years after final completion.
SUBCONTRACT EXHIBIT 4 – F.A. WILHELM’S EXCAVATION POLICY
CORPORATE
SAFETY MANUAL
SECTION: 23 Page 1 of 14
REVISION NUMBER: 11
REVISION DATE: 01.31.25
SUBJECT:
EXCAVATION & TRENCHING
SAFELY WORKING TODAY…
FOR TOMORROW
Section 23: Excavation & Trenching
POLICY
Each contractor or subcontractor performing trenching or excavating shall employ a
Competent Person to oversee the work. The Competent Person must have specific training
in and be knowledgeable about soil analysis Wilhelm and the use of protective systems and
the requirements of OSHA Subpart P standards. management will verify experience,
knowledge and training of the Competent Person. In addition, the Competent Person must
have the authority to take immediate corrective action if a hazard exists.
1. Surface Encumbrances
A. All surface encumbrances that are located so as to create a hazard to
employees shall be removed or supported, as necessary, to safeguard
employees.
2. Underground Installations
A. The estimated location of utility installations, such as sewer, telephone, fuel,
electric, water lines, or any other underground installations that reasonably
may be expected to be encountered during excavation work, shall be
determined prior to opening an excavation.
B. When excavation operations approach the estimated location of underground
installations, the exact location of the installations shall be determined by
safe and acceptable means.
C. While the excavation is open, underground installations shall be protected,
supported or removed as necessary to safeguard employees.
3. Access and Egress
A. Structural ramps that are used solely by employees as a means of access or
egress from excavations shall be designed by a competent person. Structural
ramps used for access or egress of equipment shall be designed by a
competent person qualified in structural design, and shall be constructed in
accordance with the design.
B. Ramps and runways constructed of two or more structural members shall
have the structural members connected together to prevent displacement.
C. Structural members used for ramps and runways shall be of uniform
thickness.
D. Cleats or other appropriate means used to connect runway structural
members shall be attached to the bottom of the runway or shall be attached
in a manner to prevent tripping.
CORPORATE
SAFETY MANUAL
SECTION: 23 Page 2 of 14
REVISION NUMBER: 11
REVISION DATE: 01.31.25
SUBJECT:
EXCAVATION & TRENCHING
SAFELY WORKING TODAY…
FOR TOMORROW
E. Structural ramps used in lieu of steps shall be provided with cleats or other
surface treatments to the top surface to prevent slipping.
4. Means of Egress from Trench Excavations
A. A stairway, ladder, ramp or other safe means of egress shall be located in
trench excavations that are 4 feet or more in depth so as to require no more
than 25 feet of lateral travel for employees.
5. Exposure to Vehicular Traffic
A. Employees exposed to public vehicular traffic shall be provided with, and
shall wear warning vests or other suitable garments marked with or made of
reflectorized or high-visibility material.
6. Exposure to Falling Loads
A. No employee shall be permitted underneath loads handled by lifting or
digging equipment. Employees shall be required to stand away from any
vehicle being loaded or unloaded to avoid being struck by any spillage or
falling materials. Operators may remain in the cabs of vehicles being loaded
or unloaded when the vehicles are equipped, in accordance with
1926.601(b)(6), to provide adequate protection for the operator during
loading and unloading operations.
7. Warning System for Mobile Equipment
A. When mobile equipment is operated adjacent to an excavation, or when such
equipment is required to approach the edge of an excavation, and the
operator does not have a clear and direct view of the edge of the excavation,
a warning system shall be utilized such as barricades, hand or mechanical
signals, or stop logs. If possible, the grade should be away from the
excavation.
HAZARDOUS ATMOSPHERES
1. Testing and Controls - To prevent exposure to harmful levels of atmospheric
contaminants and to assure acceptable atmospheric conditions, the following
requirements shall apply:
A. Where oxygen deficiency (atmospheres containing less than 19.5 percent
oxygen) or a hazardous atmosphere exists or could reasonably be expected
to exist, such as in excavations in landfill areas or excavations in areas where
hazardous substances are stored nearby, the atmospheres in the excavation
CORPORATE
SAFETY MANUAL
SECTION: 23 Page 3 of 14
REVISION NUMBER: 11
REVISION DATE: 01.31.25
SUBJECT:
EXCAVATION & TRENCHING
SAFELY WORKING TODAY…
FOR TOMORROW
shall be tested before employees enter excavations greater than 4 feet in
depth.
B. Adequate precautions shall be taken to prevent employee exposure to
atmospheres containing less than 19.5 percent oxygen and other hazardous
atmospheres. These precautions include providing proper respiratory
protection or ventilation in accordance with subparts D and E of this part
respectively.
C. Adequate precaution shall be taken such as providing ventilation, to prevent
employee exposure to an atmosphere containing a concentration of a
flammable gas in excess of 20 percent of the lower flammable limit of the
gas.
D. When controls are used that is intended to reduce the level of atmospheric
contaminants to acceptable levels, testing shall be conducted as often as
necessary to ensure that the atmosphere remains safe.
2. Emergency Rescue Equipment
A. Emergency rescue equipment, such as breathing apparatus, a safety harness
and line, or a basket stretcher, shall be readily available where hazardous
atmospheric conditions exist or may reasonably be expected to develop
during work in an excavation. This equipment shall be attended when in use.
B. Employees entering bell-bottom pier holes, or other similar deep and
confined footing excavations, shall wear a harness with a lifeline securely
attached to it. The lifeline shall be separate from any line used to handle
materials, and shall be individually attended at all times while the employee
wearing the lifeline is in the excavation.
3. Protection from Hazards Associated With Water Accumulation
A. Employees shall not work in excavations in which there is accumulated water,
or in excavations in which water is accumulating, unless adequate
precautions have been taken to protect employees against the hazards posed
by water accumulation. The precautions necessary to protect employees
adequately vary with each situation, but could include special support or
shield systems to protect from cave-ins, water removal to control the level of
accumulating water, or use of a safety harness and lifeline.
B. If water is controlled or prevented from accumulating by the use of water
removal equipment, the water removal equipment and operations shall be
monitored by a competent person to ensure proper operation.
C. If excavation work interrupts the natural drainage of surface water (such as
streams), diversion ditches, dikes, or other suitable means shall be used to
prevent surface water from entering the excavation and to provide adequate
drainage of the area adjacent to the excavation. Excavations subject to
runoff from heavy rains will require an inspection by a competent person.
CORPORATE
SAFETY MANUAL
SECTION: 23 Page 4 of 14
REVISION NUMBER: 11
REVISION DATE: 01.31.25
SUBJECT:
EXCAVATION & TRENCHING
SAFELY WORKING TODAY…
FOR TOMORROW
4. Stability of Adjacent Structures
A. Where the stability of adjoining buildings, walls, or other structures is
endangered by excavation operations, support systems such as shoring,
bracing, or underpinning shall be provided to ensure the stability of such
structures for the protection of employees.
B. Excavation below the level of the base or footing of any foundation or
retaining wall that could be reasonably expected to pose a hazard to
employees shall not be permitted except when:
1) A support system, such as underpinning, is provided to ensure the
safety of employees and the stability of the structure; or
2) The excavation is in stable rock; or
3) A registered professional engineer has approved the determination
that the structure is sufficiently removed from the excavation so as to
be unaffected by the excavation activity; or
4) A registered professional engineer has approved the determination
that such excavation work will not pose a hazard to employees.
C. Sidewalks, pavements and appurtenant structures shall not be undermined
unless a support system or another method of protection is provided to
protect employees from the possible collapse of such structures.
5. Protection of Employees from Loose Rock or Soil
A. Adequate protection shall be provided to protect employees from loose rock
or soil that could pose a hazard by falling or rolling from an excavation face.
Such protection shall consist of scaling to remove loose material; installation
of protective barricades at intervals as necessary on the face to stop and
contain falling material; or other means that provide equivalent protection.
B. Employees shall be protected from excavated or other materials or
equipment that could pose a hazard by falling or rolling into excavations.
Protection shall be provided by placing and keeping such materials or
equipment at least two feet from the edge of excavations, or by the use of
retaining devices that are sufficient to prevent materials or equipment from
falling or rolling into excavations, or by a combination of both if necessary.
6. Inspections
A. Daily inspections of excavations, the adjacent areas, and protective systems
shall be made by a competent person for evidence of a situation that could
result in possible cave-ins, indications of failure of protective systems,
hazardous atmospheres, or other hazardous conditions. An inspection shall
be conducted by the competent person prior to the start of work and as
needed throughout the shift. Inspections shall also be made after every
rainstorm or other hazard increasing occurrence.
CORPORATE
SAFETY MANUAL
SECTION: 23 Page 5 of 14
REVISION NUMBER: 11
REVISION DATE: 01.31.25
SUBJECT:
EXCAVATION & TRENCHING
SAFELY WORKING TODAY…
FOR TOMORROW
B. These inspections are only required when employee exposure can be
reasonably anticipated.
C. Where the competent person finds evidence of a situation that could result in
a possible cave-in, indications of failure of protective systems, hazardous
atmospheres, or other hazardous conditions, exposed employees shall be
removed from the hazardous area until the necessary precautions have been
taken to ensure their safety.
7. Fall Protection
A. Walkways shall be provided where employees or equipment are required or
permitted to cross over excavations. Guardrails which comply with
1926.502(b) shall be provided where walkways are 6 feet or more above
lower levels.
8. Barricades
A. Excavations left unattended at the end of the work shift shall have barriers
established surrounding the excavation. The barriers can be created from:
1) Spoil Piles
2) Machinery
3) Caution Tape
4) Fencing or Guardrails
9. Protection of Employees in Excavations
A. Each employee in an excavation shall be protected from cave-ins by an
adequate protective system designed in accordance with this section except
when:
1) Excavations are made entirely in stable rock; or
2) Excavations are less than 5 feet in depth and examination of the
ground by a competent person provides no indication of a potential
cave-in.
3) Protective systems shall have the capacity to resist without failure all
loads that are intended or could reasonably be expected to be applied
or transmitted to the system.
10. Design of Sloping and Benching Systems
A. The slopes and configurations of sloping and benching systems shall be
selected and constructed by the employer or his designee and shall be in
accordance with the requirements of the following paragraph as follows:
1) Allowable configurations and slopes.
CORPORATE
SAFETY MANUAL
SECTION: 23 Page 6 of 14
REVISION NUMBER: 11
REVISION DATE: 01.31.25
SUBJECT:
EXCAVATION & TRENCHING
SAFELY WORKING TODAY…
FOR TOMORROW
2) Excavations shall be sloped at an angle not steeper than one and
one-half horizontal to one vertical (34o measured from the horizontal),
unless the employer uses one of the other options listed below.
3) Maximum allowable slopes and allowable configurations for sloping
and benching systems shall be determined in accordance with the
conditions and requirements set forth in Appendixes A and B of the
OSHA subpart.
4) Designs using other tabulated data.
B. Designs of sloping or benching systems shall be selected from and in
accordance with tabulated data, such as tables and charts.
C. The tabulated data shall be in written form and shall include all of the
following:
1) Identification of the parameters that affect the selection of a sloping
or benching system drawn from such data;
2) Identification of the limits of use of the data to include the magnitude
and configuration of slopes determined to be safe;
3) Explanatory information as may be necessary to aid the user in
making a correct selection of a protective system from the data;
4) At least one copy of the tabulated data which identifies the registered
professional engineer who approved the data shall be maintained at
the jobsite during construction of the protective system. After that
time, the data may be stored off the jobsite, but a copy of the data
shall be made available to the Secretary upon request.
11. Design by a Registered Professional Engineer
A. Sloping and benching systems not utilizing the above options shall be
approved by a registered professional engineer.
B. Designs shall be in written form and shall include at least the following:
1) The magnitude of the slopes that were determined to be safe for
the particular project;
2) The configurations that were determined to be safe for the
particular project;
3) The identity of the registered professional engineer approving the
design.
C. At least one copy of the design shall be maintained at the jobsite while the
slope is being constructed. After that time the design need not be at the
jobsite, but a copy shall be made available to the Secretary upon request.
12. Design of Support Systems, Shield Systems, and Other Protective Systems -
Designs of support systems, shield systems, and other protective systems shall
be selected and constructed by the employer or his designee and shall be in
accordance with the following requirements as follows:
CORPORATE
SAFETY MANUAL
SECTION: 23 Page 7 of 14
REVISION NUMBER: 11
REVISION DATE: 01.31.25
SUBJECT:
EXCAVATION & TRENCHING
SAFELY WORKING TODAY…
FOR TOMORROW
A. Option (1) - Designs for timber shoring in trenches shall be determined in
accordance with the conditions and requirements set forth in Appendices A
and C of the OSHA Standards.
B. Option (2) - Designs using manufacturer’s tabulated data:
1) Design of support systems, shield systems, or other protective
systems that are drawn from manufacturer’s tabulated data shall be
in accordance with all specifications, recommendations, and
limitations issued or made by the manufacturer.
2) Deviation from the specifications, recommendations, and limitations
issued or made by the manufacturer shall only be allowed after the
manufacturer issues specific written approval.
3) Manufacturer’s specifications, recommendations, and limitations, and
manufacturer’s approval to deviate from the specifications,
recommendations, and limitations shall be in written form at the
jobsite during construction of the protective system. After that time
this data may be stored off the jobsite, but a copy shall be made
available to the Secretary upon request.
C. Option (3) – Designs using other tabulated data.
1) Designs of support systems, shield systems, or other protective
systems shall be selected from and be in accordance with tabulated
data, such as tables and charts.
2) The tabulated data shall be in written form and include all of the
following:
a) Identification of the parameters that affect the selection of
a protective system drawn from such data.
b) Identification of the limits of use of the data.
c) Explanatory information as may be necessary to aid the
user in making a correct selection of a protective system
from the data.
d) At least one copy of the tabulated data, which identifies
the registered professional engineer who approved the
data, shall be maintained at the jobsite during construction
of the protective system.
e) After that time the data may be stored off the jobsite, but
a copy of the data shall be made available to the Secretary
upon request.
D. Option (4) – Design by a registered professional engineer. Support systems,
shield systems, and other protective systems not utilizing Option 1, Option 2
or Option 3 above shall be approved by a registered professional engineer.
E. Designs shall be in written form and shall include the following:
1) A plan indicating the sizes, types, and configurations of the materials
to be used in the protective system; and
2) The identity of the registered professional engineer approving the
design.
CORPORATE
SAFETY MANUAL
SECTION: 23 Page 8 of 14
REVISION NUMBER: 11
REVISION DATE: 01.31.25
SUBJECT:
EXCAVATION & TRENCHING
SAFELY WORKING TODAY…
FOR TOMORROW
F. At least one copy of the design shall be maintained at the jobsite during
construction of the protective system. After that time, the design may be
stored off the jobsite, but a copy of the design shall be made available to the
Secretary upon request.
13. Materials and Equipment
A. Materials and equipment used for protective systems shall be free from
damage or defects that might impair their proper function.
B. Manufactured materials and equipment used for protective systems shall be
used and maintained in a manner that is consistent with the
recommendations of the manufacturer and in a manner that will prevent
employee exposure to hazards.
C. When material or equipment that is used for protective systems is damaged,
a competent person shall examine the material or equipment and evaluate its
suitability for continued use. If the competent person cannot assure the
material or equipment is able to support the intended loads or is otherwise
suitable for safe use, then such material or equipment shall be removed from
service and shall be evaluated and approved by a registered professional
engineer before being returned to service.
INSTALLATION AND REMOVAL OF SUPPORT
1. General
A. Members of support systems shall be securely connected together to prevent
sliding, falling, kick outs, or other predictable failure.
B. Support systems shall be installed and removed in a manner that protects
employees from cave-ins, structural collapses, or from being struck by
members of the support system.
C. Individual members of support systems shall not be subjected to loads
exceeding those which those members were designed to withstand.
D. Before temporary removal of individual members begins, additional
precautions shall be taken to ensure the safety of employees, such as
installing other structural members to carry the loads imposed on the support
system.
E. Removal shall begin at and progress from the bottom of the excavation.
Members shall be released slowly so as to note any indication of possible
failure of the remaining members of the structure or possible cave-in of the
sides of the excavation.
F. Backfilling shall progress together with the removal of support systems from
excavations.
CORPORATE
SAFETY MANUAL
SECTION: 23 Page 9 of 14
REVISION NUMBER: 11
REVISION DATE: 01.31.25
SUBJECT:
EXCAVATION & TRENCHING
SAFELY WORKING TODAY…
FOR TOMORROW
2. Additional Requirements for Support Systems for Trench Excavations
A. Excavation of material to a level no greater than 2 feet below the bottom of
the members of a support system shall be permitted, but only if the system is
designed to resist the forces calculated for the full depth of the trench, and
there are no indications while the trench is open of a possible loss of soil
from behind or below the bottom of the support system.
B. Installation of a support system shall be closely coordinated with the
excavation of trenches.
3. Sloping and Benching Systems
A. Employees shall not be permitted to work on the faces of sloped or benched
excavations at levels above other employees except when employees at the
lower levels are adequately protected from the hazard of falling, rolling, or
sliding material or equipment.
SHIELD SYSTEMS
1. General
A. Shield Systems shall not be subjected to loads exceeding those which the
system was designed to withstand.
B. Shields shall be installed in a manner to restrict lateral or other hazardous
movement of the shield in the event of the application of sudden lateral
loads.
C. Employees shall be protected from the hazard of cave-ins when entering or
exiting the areas protected by shields.
D. Employees shall not be allowed in shields when shields are being installed,
removed, or moved vertically.
2. Additional requirement for shield systems used in trench excavations: Excavations
of earth material to a level not greater than 2 feet below the bottom of a shield shall
be permitted, but only if the shield is designed to resist the forces calculated for the
full depth of the trench, and there are no indications while the trench is open of a
possible loss of soil from behind or below the bottom of the shield.
BASIS OF CLASSIFICATION
1. Classification of Soil and Rock Deposits
A. Each soil and rock deposit shall be classified by a competent person as Stable
Rock, Type A, Type B, or Type C.
CORPORATE
SAFETY MANUAL
SECTION: 23 Page 10 of 14
REVISION NUMBER: 11
REVISION DATE: 01.31.25
SUBJECT:
EXCAVATION & TRENCHING
SAFELY WORKING TODAY…
FOR TOMORROW
B. The classification of the deposits shall be made based on the results of at
least one visual and at least one manual analysis. Such analyses shall be
conducted by a competent person using tests described or in other
recognized methods of soil classification and testing such as those adopted
by the American Society for Testing Materials or the U.S. Department of
Agriculture textural classification system.
2. Visual and Manual Analysis
A. The Visual and Manual analyses shall be designed and conducted to provide
sufficient quantitative and qualitative information as may be necessary to
identify properly the properties, factors, and conditions affecting the
classification of the deposits.
3. Layered Systems
A. In a layered system, the system shall be classified in accordance with its
weakest layer. However, each layer may be classified individually where a
more stable layer lies under a less stable layer.
4. Reclassification
A. If, after classifying a deposit, the properties, factors, or conditions affecting
its classification change in any way, the changes shall be evaluated by a
competent person. The deposit shall be reclassified as necessary to reflect
the changed circumstances.
ACCEPTABLE VISUAL AND MANUAL TESTS
1. Visual Tests
A. Visual analysis is conducted to determine qualitative information regarding
the excavation site in general, the soil adjacent to the excavation, the soil
forming the sides of the open excavation, and the soil taken as samples from
excavated material.
B. Observe samples of soil that are excavated and soil in the sides of the
excavation. Estimate the range of particle sizes and the relative amounts of
the particle sizes. Soil that is primarily composed of find-grained material is
cohesive material. Soil composed primarily of coarse-grained sand or gravel
is granular material.
C. Observe soil as it is excavated. Soil that remains in clumps when excavated
is cohesive. Soil that breaks up easily and does not stay in clumps is
granular.
D. Observe the side of the opened excavation and the surface area adjacent to
the excavation. Crack-like openings such as tension cracks could indicate
CORPORATE
SAFETY MANUAL
SECTION: 23 Page 11 of 14
REVISION NUMBER: 11
REVISION DATE: 01.31.25
SUBJECT:
EXCAVATION & TRENCHING
SAFELY WORKING TODAY…
FOR TOMORROW
fissured material. If chunks of soil spall off a vertical side, the soil could be
fissured. Small spalls are evidence of moving ground and are indications of
potentially hazardous situations.
E. Observe the area adjacent to the excavation and the excavation itself for
evidence of existing utility and other underground structures and to identify
previously disturbed soil.
F. Observe the opened side of the excavation to identify layered systems.
Examine layered systems to identify if the layers slope toward the
excavation. Estimate the degree of slope of the layers.
G. Observe the area adjacent to the excavation and the sides of the opened
excavation for evidence of surface water, water seeping from the sides of the
excavation, or the location of the level of the water table.
H. Observe the area adjacent to the excavation and the area within the
excavation for sources of vibration that may affect the stability of the
excavation face.
2. Manual Tests
A. Manual analysis of soil samples is conducted to determine quantitative as
well as qualitative properties of soil and to provide more information in order
to classify soil properly.
3. Plasticity
A. Mold a moist or wet sample of soil into a ball and attempt to roll it into
threads as thin as 1/8” in diameter. Cohesive material can be successfully
rolled into threads without crumbling. For example, if at least a 2 inch length
of 1/8” thread can be held on one end without tearing, the soil is cohesive.
4. Dry Strength
A. If the soil is dry and crumbles on its own or with moderate pressure into
individual grains or fine powder, it is granular (any combination of gravel,
sand, or silt). If the soil is dry and falls into clumps which break up into
smaller clumps, but the smaller clumps can only be broken up with difficulty,
it may be clay in any combination with gravel, sand or silt. If the dry soil
breaks into clumps which do not break up into small clumps and which can
only be broken with difficulty, and there is no visual indication the soil is
fissured, the soil may be considered unfissured.
5. Thumb Penetration
CORPORATE
SAFETY MANUAL
SECTION: 23 Page 12 of 14
REVISION NUMBER: 11
REVISION DATE: 01.31.25
SUBJECT:
EXCAVATION & TRENCHING
SAFELY WORKING TODAY…
FOR TOMORROW
A. The thumb penetration test can be used to estimate the unconfined
compressive strength of cohesive soils. (This test is based on the thumb
penetration test described in American Society for Testing and Materials
(ASTM) Standard Designation D2488 – “Standard Recommended Practice for
Description of Soils (Visual – Manual Procedure).”) Type A soils with an
unconfined compressive strength of 1.5 tsf can be readily indented by the
thumb; however, they can be penetrated by the thumb only with very great
effort. Type C soils with an unconfined compressive strength of 0.5 tsf can
be easily penetrated several inches by the thumb and can be molded by light
finger pressure. This test should be conducted on an undisturbed soil
sample, such as a large clump of spoil, as soon as practicable after
excavation to keep to a minimum the effects of exposure to drying
influences. If the excavation is later exposed to setting influences (rain,
flooding), the classification of the soil must be changed accordingly.
6. Other Strength Tests
A. Estimates of unconfined compressive strength of soils can also be obtained
by use of a pocket penetrometer or by using a hand-operated shear vane.
7. Drying Test
A. The basic purpose of the drying test is to differentiate between cohesive
material with fissures, un-fissured cohesive material, and granular material.
The procedure for the drying test involves drying a sample of soil that is
approximately 1” thick and 6” in diameter until it is thoroughly dry.
B. If the sample develops cracks as it dries, significant fissures are indicated.
C. Samples that dry without cracking are to be broken by hand. If considerable
force is necessary to break a sample, the soil has significant cohesive
material content. The soil can be classified as an un-fissured cohesive
material and the unconfined compressive strength should be determined.
D. If a sample breaks easily by hand, it is either a fissured cohesive material or
a granular material. To distinguish between the two, pulverize the dried
clumps of the sample by hand or by stepping on them. If the clumps do not
pulverize easily, the material is cohesive with fissures. If they pulverize easily
into very small fragments, the material is granular.
CORPORATE
SAFETY MANUAL
SECTION: 23 Page 13 of 14
REVISION NUMBER: 11
REVISION DATE: 01.31.25
SUBJECT:
EXCAVATION & TRENCHING
SAFELY WORKING TODAY…
FOR TOMORROW
TRAINING
1. Competent Person(s) Identification
A. Must be trained in and knowledgeable of excavation and trenching standards
and other programs that may apply (Hazard Communication, Confined Space,
and Respiratory Protection).
B. Must be capable of recognizing hazardous conditions and must have
authority to stop work and ensure that hazards are corrected.
C. Performs “Daily Excavation Inspection” and “Daily Excavation Logs” are
available and knows when inspections should be performed.
D. Must be capable in assuring the proper locations of underground installations
or utilities.
E. Can determine adequate protective system and ensure employees have
proper PPE.
2. Hazard Recognition
A. Types of Hazards:
1) Definition of excavation or trench
2) Cave-ins
3) Hazardous atmosphere
4) Undermining, surcharge loads, vibrations
5) Fall hazards
6) Ladders, stairways, ramps
7) Placement of spoil
8) Utility locations
9) Water accumulation
10) Rescue procedures and equipment
B. Project Specific Excavation Hazards
C. Daily Excavation Inspection Process
D. Excavation Procedures
E. Soil Classification Definitions
1) Type A Soil
2) Type B Soil
3) Type C Soil
4) Methods of Testing Soils
F. Types of Protective Systems
1) Sloping
2) Benching
3) Shoring
4) Shields
a) Personal Protective Equipment
b) Employee Roles in Excavation Safety Systems
CORPORATE
SAFETY MANUAL
SECTION: 23 Page 14 of 14
REVISION NUMBER: 11
REVISION DATE: 01.31.25
SUBJECT:
EXCAVATION & TRENCHING
SAFELY WORKING TODAY…
FOR TOMORROW
3. Training Verification
A. Written Training Records
1) Name
2) Date
3) Signature of Trainer
4. Retraining
A. Changes in excavation protective systems
B. Changes in workplace or environment
C. Lack of understanding and skill after initial training
SUBCONTRACT EXHIBIT 5 – F.A. WILHELM’S EEO STATEMENT
F.A. Wilhelm Construction Co., Inc. EQUAL EMPLOYMENT OPPORTUNITY POLICY AND AFFIRMATIVE ACTION PROGRAM Effective June 19, 2025
TABLE OF CONTENTS 1. STATEMENT OF EQUAL EMPLOYMENT OPPORTUNITY POLICY AND AFFIRMATIVE ACTION PROGRAM 2. RESPONSIBILITY FOR IMPLEMENTATION 3. INTERNAL DISSEMINATION OF THE EEO POLICY STATEMENT 4. EXTERNAL DISSEMINATION OF THE EEO POLICY STATEMENT, RECRUITMENT AND OUTREACH 5. REVIEW OF PERSONNEL PROCESSES 6. PHYSICAL AND MENTAL QUALIFICATIONS 7. REASONABLE ACCOMMODATION 8. TRAINING AND PROMOTION 9. HARASSMENT 10. AUDIT AND REPORTING SYSTEM 11. TRAINING 12. DATA COLLECTION ANALYSIS 13. COMPLAINT PROCEDURES
1. STATEMENT OF EQUAL EMPLOYMENT OPPORTUNITÉ POLICY AND AFFIRMATIVE ACTION PROGRAM It is the Equal Employment Opportunity Policy of F.A Wilhelm Construction Co., Inc. (the “Company"} that employment actions taken with respect to qualified employment applicants and Company’s employees will be taken in compliance with all applicable executive orders, federal and state statutes, local governmental ordinances and implementing regulations; based only on valid job requirements; and taken without regard to: race, color, religion, sex, sexual orientation, gender identity, age, disability, genetic information, national origin, ancestry, disabled veteran, recently separated veterans, and other protected veterans ("Protected Classes"). Employment actions shall include employment, upgrading, promotion, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship, pre-apprenticeship and/or on-the-job training. Moreover, the Company is committed to maintaining a work environment free of discrimination, harassment, intimidation, threats and coercion based on any Protected Class applicant or employee exercising his/her rights under the law. Employees are encouraged to report any discrimination, harassment, intimidation or coercion without fear of retaliation. ("EEO Policy") Affirmative Action Program It is the policy of the Company that equal employment opportunity be provided in the employment and advancement for all qualified individuals. To achieve this goal, the Company is committed to taking affirmative action to employ and advance in employment qualified protected veteran employees and individuals with disabilities. All personnel actions, including recruitment, hiring, training, and promotion of persons in all job titles, are administered without regard to disability or protected veteran status, and all employment decisions are based solely on valid job requirements. Employees and applicants shall not be subjected to harassment, intimidation, threats, coercion or discrimination because they have engaged in or may engage in any of the following activities: a. Filing a complaint; b. Assisting or participating in an investigation, compliance evaluation, hearing, or any other activity related to the administration of the affirmative action provisions of the Vietnam Era Veterans’ Readjustment Assistance Act of 1974, as amended (VEVRAA) or any other Federal, state or local law requiring equal opportunity for disabled veterans, recently separated veterans, active wartime or campaign badge veterans, or Armed Forces service medal veterans or Section 503 of the Rehabilitation Act of 1973, as amended (Section 503) or any other federal, state or local law requiring equal opportunity for disabled persons; c. Opposing any act or practice made unlawful by VEVRAA or its implementing regulations or any other federal, state or local law requiring equal opportunity for disabled veterans, recently separated veterans, active wartime or campaign badge veterans, or Armed Forces service medal veterans or section 503 or its implementing regulations or any other federal, state or local law requiring equal opportunity for disabled persons; or d. Exercising any other right protected by VEVRAA or Section 503 or their implementing regulations. The Company's EEO policy statement and affirmative action obligations include the full support of Pat Kenney, President, who has assigned responsibilities for implementation to Jill Vietor, Human Resources Manager. The Company will also continually design and implement audit and reporting systems that will measure the effectiveness and the compliance of the AAP, identify the need for remedial actions, and determine if objectives were attained.
A copy of the EEO statement is posted in a form that is accessible and understandable to an individual with a disability. 2. RESPONSIBILITY FOR IMPLEMENTATION EEO Officer Responsibilities. The Company’s president will appoint an Equal Employment Opportunity Officer (“EEO Officer") who will have full authority to carry out this EEO Policy and Affirmative Action Program and who will have the following responsibilities: a. Develop policy statements, personnel policies and procedures, internal and external communication procedures, necessary updates as to any changes in the law and shall monitor the effectiveness of these actions in fulfilling the Company’s EEO and affirmative action obligations. b. Design, implement and monitor the collection of employment data and internal audit and reporting systems to measure program effectiveness and to determine where progress has been made and where further action may be needed. c. Advise the Company’s President quarterly on the progress or problems the Company is experiencing in relation to its implementation of its EEO Policy and Affirmative Action Program. d. Serve as liaison between the Company and government regulatory agencies, and private organizations that promote equal employment opportunity and training for qualified individuals with disabilities and protected veterans. e. Review, at least annually, the Company’s EEO Policy and Affirmative Action Program with managers and supervisors to ensure that they are aware of the policy and understand their obligation to comply with it in all employment actions. f. Monitor management and supervisors handling of employees’ performance to ensure that non-discrimination and affirmative action are adhered to in employment activities. g. Encourage all employees to participate in the Company-sponsored recreational activities, training and education regardless of protected veteran or disability status. h. Provide training for office and field managers and supervisors to ensure that the Company's facilities and project sites are free from harassment, intimidation and coercion of all employees who exercise their rights under the law and the Company’s EEO Policy and Affirmative Action Program. Work with management to facilitate, when applicable, a reasonable accommodation for a qualified applicant or employee. j. No less than annually, review the Company’s EEO Policy, Affirmative Action Program, internal implementation procedures and policies, including audit and reporting, in order to evaluate the effectiveness of the Company’s efforts and to make appropriate changes warranted as a result of the review. 3. INTERNAL DISSEMINATION OF THE EEO POLICY STATEMENT The Company has developed the following internal procedures to communicate its obligation to engage in affirmative action efforts to employ and advance in employment qualified individuals with disabilities and protected veterans. 3.1. The Company employees who are authorized to hire, supervise, promote or discharge employees or who recommend such action will be made fully cognizant of and will
implement Company’s EEO Policy and Affirmative Action Program. To ensure compliance, the following actions will be taken as a minimum: a. Periodic meetings with management and supervisory employees, whose job description includes a responsibility to implement the EEO Policy and Affirmative Action Program, will be conducted at which time their implementation will be reviewed and explained. The meetings will be conducted by the EEO Officer or other knowledgeable Company official. b. Within 30 day of their hire date, all new management and supervisory employees, whose job description includes a responsibility to implement the EEO Policy and Affirmative Action Program, will be provided appropriate training by the EEO Officer or other knowledgeable Company official with respect to Company’s EEO Policy and Affirmative Action Program. c. The EEO Officer or appropriate Company official will provide all personnel engaged in the direct recruitment of employees relative to the methods followed by the Company in employing and advancing in employment qualified individuals with a disability or protected veterans. 3.2. In order to make Company’s EEO Policy and Affirmative Action Program known to ail employees, prospective employees and potential sources of employees, i.e. schools, employment agencies, labor unions, college placement offices, etc., the following actions will be taken: a. Notices and posters setting forth the EEO Policy and Affirmative Action Program will be placed in areas readily accessible to employees, applicants for employment and potential employees such as office and project site bulletin boards. b. The Company’s procedures to implement said policy will be brought to the attention of employees by means of meetings, employee handbooks or other appropriate means. c. The Company will provide a copy of its EEO Policy and Affirmative Action Program to: each labor union or representative of workers with which it has a collective bargaining agreement or other contract or understanding; to any training programs; and to any recruiting sources and community organizations that promote training and hiring of qualified individuals with a disability or protected veterans. 4. EXTERNAL DISSEMINATION OF THE EEO POLICY STATEMENT, RECRUITMENT AND OUYREACH The Company undertakes appropriate outreach and positive recruitment activities that are reasonably designed to effectively recruit individuals with disabilities and protected veterans such as the following: a. When advertising for employees, the Company will include in all advertisements for employment the notation “An Equal Opportunity Employer Including Protected Veterans and Individuals with Disabilities". The Company will insert all such advertisements in newspapers or other publications believed to have circulation among disabled and protected veteran individuals in the area from which the Company’s work force would normally be derived. b. The Company will conduct recruitment through public and private employee referral sources likely to yield a qualified disabled and/or protected veteran applicants including, but not limited to: local veterans’ employment representative, Department of Veterans Affairs, Regional Office, veterans’ counselors and coordinators on college campuses, service officers of national veterans’ groups and local veterans' groups and veterans’ service centers, state employment agencies, schools, colleges and public and private organizations that train and facilitate employment of these individuals. To meet these requirements, the Company will, through the
EEO Officer, identify and meet with representatives of recruiting sources of potential, qualified disabled and/or protected veteran applicants and establish with such identified sources procedures whereby applicants may be referred to the Company for employment consideration. c. The Company will encourage its present employees to refer qualified disabled and/or protected veteran applicants by posting appropriate notices or bulletins in an area accessible to all such employees. In addition, information and procedures with regard to referring qualified disabled and/or protected veteran applicants will be discussed with employees. d. The Company incorporates the Equal Opportunity Clause regarding individuals with disabilities and protected veterans in its purchase orders, leases, and contracts as required by law, executive order, and regulation. Written notification of the Equal Opportunity Policy is sent to all subcontractors, vendors, and suppliers requesting appropriate action on their part. 5. REVIEW OF PERSONNEL PROCESSES The Company reviews its employment procedures to ensure careful, thorough, and systematic consideration of the job qualifications of protected veterans and applicants with disabilities for job vacancies filled either by hiring or promotion, and for all training opportunities offered or available. This review ensures that personnel procedures do not stereotype protected veterans and individuals with disabilities in a manner that limits their access to all jobs for which they are qualified. Applicants and employees with disabilities have equal access to personnel processes, including those implemented through information and communication technologies. The Company periodically reviews its processes, and makes any necessary modifications to ensure its affirmative action obligations are carried The following are some procedures that may be used to facilitate the review and evaluative process: 5.1. With respect to qualified applicants or employees known to be disabled, a disabled veteran or other protected veteran, the Company will consider the job qualifications of the applicant or employee, and with respect to veterans will rely only on the portion of the individual’s military record, including discharge papers, which are relevant to the requirements of the employment opportunity. 5.2. Wages, working conditions and employee benefits shall be established and administered and employment actions of every type, including, but not limited to, hiring, upgrading, promotion, transfer, demotion, layoff and termination, will be taken without regard to disabled ar protected veteran status. The following procedures will be followed: a. Periodic inspections of project sites will be conducted to ensure that working conditions and employee facilities do not allow discriminatory treatment of project site personnel. b. Except for job classifications covered by a collective bargaining agreement, the spread of wages paid within each classification will be periodically evaluated to identify potential indicators of salary disparities. 6. PHYSICAL AND MENTAL QUALIFICATIONS
a. Physical and mental job qualification requirements and employment standards are examined and reviewed in December each year to ensure that they are consistently applied, and reflect actual job duties and responsibilities; and that, to the extent the requirements and standards tend to screen out a qualified disabled or protected veteran, they are job related and consistent with business necessity and the safe performance of the job. b. Whenever the Company applies physical or mental qualifications standards in the selection of applicants or employees for employment or other change in employment status such as promotion, demotion, or training, to the extent that qualification standards tend to screen out a qualified disabled or protected veteran , the standards will be related to the specific job or jobs for which the individual is being considered and consistent with business necessity and the safe performance of the job. 7. REASONABLE ACCOMMODATION The Company makes reasonable accommodations to the physical and mental limitations of employees or applicants to the extent that such accommodations do not impose an undue hardship on the conduct of its business. When an employee with a known disability or known to be a disabled veteran has significant difficulty performing his or her job, and it is reasonable to conclude that the performance problem may be related to the known disability, the employee is confidentially notified of the performance problem, and asked if the problem is related to the disability. If the employee indicates that the performance problem is related to his or her disability, the employee is asked if reasonable accommodation is needed. 8. TRAINING AND PROMOTION The Company will assist in locating, qualifying and increasing the skills of qualified disabled or protected veteran employees and applicants for employment. a. Consistent with Company’s manpower requirements, and as permitted by federal and state regulations, the Company will make full use of training programs, i.e. pre- apprenticeship, apprenticeship and/or on-the-job training, including hometown plans, e.g. the Indiana Plan, for the geographical area of contract performance. b. The Company will advise employees and applicants for employment of available training programs and entrance requirements for each to the extent that Company is aware of such training programs and entrance requirements. The Company will periodically review the training and promotion potential of protected veterans and individuals with disabilities employees and will encourage eligible employees to apply for such training and promotion. 9. HARASSMENT The Company develops and maintains procedures to ensure that its employees are not harassed because of their status as an individual with a disability or a protected veteran. 10. AUDIT AND REPORTING SYSTEM The Company has designed, implemented, and documented an audit and reporting system that: a. Measures the effectiveness of the affirmative action program.
b. Indicates any need for remedial action. c. Determines the degree to which the objectives have been attained. d. Determines whether protected veterans and individuals with known disabilities have the opportunity to participate in all company sponsored educational, training, recreational, and social activities. e. Measures compliance with the affirmative action program's specific obligations. Where the affirmative action program is found to be deficient, corrective action is taken to bring the program into compliance. 11. TRAINING All personnel involved in recruitment, screening, selection, promotion, discipline, and related processes are trained to ensure the implementation of the Company’s commitments made in this Affirmative Action Program. 12. DATA COLLECTION ANALYSTS The Company documents the following computations or comparisons pertaining to applicants and hires on an annual basis, and maintains them for a period of three (3) years: a. The number of applicants who self-identified as individuals with disabilities pursuant to § 60-741.42(a), or who are otherwise known to be individuals with disabilities; b. The number of applicants who self-identified as protected veterans pursuant to § 60-300.42(a), or who are otherwise known as protected veterans; c. The total number of job openings and total number of jobs filled; d. The total number of applicants for all jobs; e. The number of protected veterans and individuals with disabilities applicants hired; and f. The total number of applicants hired. 13. COMPLAINT PROCEDURES If an employee feels he or she has been discriminated against, harassed, intimidated, or coerced on the basis of their status as an individual with a disability. protected veteran, or any other recognized status under the law, he or she may bring a complaint to his or her immediate supervisor. If the complaint involves the supervisor, the employee has a right to discuss the matter with the department manager or the EEO Officer. The EEO Officer will immediately investigate and take all appropriate corrective actions. Complaints will be treated confidentially as much as possible. Retaliation for use of the complaint procedure will not be tolerated and any retaliation should be reported. This complaint process does not preclude the employee from contacting any local, state or federal civil rights agencies. The Company will not retaliate against an employee or applicant for filing a complaint
with the appropriate governmental office.
SUBCONTRACT EXHIBIT 6 – CITY OF SOUTH BEND’S EEO STATEMENT
Version 07/19/2023 General Conditions - 2
CITY OF SOUTH BEND EQUAL EMPLOYMENT OPPORTUNITY CONTRACTING PROVISIONS DIVERSITY UTILIZATION It is the policy of the City of South Bend to provide equal employment and business opportunity for all persons, partnerships, companies, and corporations in accordance with the rules, regulations and guidelines of the applicable federal, state and local laws. This policy of equal employment and business opportunity shall apply to every contractor or subcontractor bidding or holding a public contract with the City of South Bend. In furtherance of this policy, the following Equal Opportunity Clauses are hereby made a part of every construction contract entered into by the City of South Bend and all subcontractors entered into pursuant to any such contract and the bidder hereby certifies that it/he/she will abide by these provisions. The contractor will not discriminate against any applicant or employee because of race, color, religion, sex, national origin, or handicap. The contractor will take affirmative action to ensure that all applicants or employees are treated fairly and equitably. Such action shall include but not be limited to the following: hiring, up-grading, demotion or transfer, recruitment, advertising, lay-offs or termination, rates of pay or other forms of compensation and selection for training including apprenticeship programs. The contractor shall agree to post in conspicuous places available to employees and applicants, notices to be provided setting forth the provisions of the Non-Discrimination Clause. The contractor will, in all solicitations or advertisements for employees placed by or
on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national
origin. The contractor will send to each labor union or representative of workers with
which it/he/she has a bargaining agreement or other contract or understanding, a notice to be provided, advising the labor union or worker's representatives of the
contractor's commitment under this section, and shall post copies of the notices in conspicuous places available to applicants and employees.
The contractor will comply with all provisions of Executive Order 11246 (as amended by 11375) and of the rules, regulations and relevant orders of the Department of Labor. Subpart B -- Contractors' Agreements Sec. 202. Except in contracts exempted in accordance with Section 204 of this Order, all Government contracting agencies shall include in every Government contract hereinafter entered into the following provisions:
"During the performance of this contract, the contractor agrees as follows:" "(1) The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated equally during employment, without regard to their race, color, religion, sex or national origin. Such action will include, but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or
Version 07/19/2023 General Conditions - 3
recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of this nondiscrimination clause." "(2) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex or national origin."
"(3) The contractor will send to each labor union or representative of workers with which it/he/she has a collective bargaining agreement or other contract of
understanding, a notice, to be provided by the agency contracting officer, advising the labor union or workers' representative of the contractor's commitments under
Section 202 of Executive Order No. 11246 of September 24, 1965, and shall post copies of the notice in conspicuous places available to employees and applicants for employment." "(4) The contractor will comply with all provisions of Executive Order No. 11246 of September 24, 1965, and of the rules and regulations, and relevant orders of the Secretary of Labor." "(5) The contractor will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the contracting agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders." "(6) In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or with any of such rules, regulations, or orders, in this contract may be cancelled, terminated or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts in accordance with procedures authorized in Executive Order No. 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked* as provided in Executive Order No 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law." "(7) The contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions including sanctions for noncompliance: Provided, however, that in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency the contractor may request the United States to enter into such litigation to protect the interests of the United States." The applicant further agrees that it will be bound by the above equal opportunity clause with respect to its own employment practices when it participates in federally assisted construction work: Provided, that if the applicant so participating is a State or local government, the above equal opportunity clause is not applicable to any agency, instrumentality or subdivision of such government which does not participate
Version 07/19/2023 General Conditions - 4
in work on or under the contract. The applicant agrees that it will assist and cooperate actively with the administering agency and the Secretary of Labor in obtaining the compliance of contractors and subcontractors with the equal opportunity clause and the rules, regulations, and relevant orders of the Secretary of Labor, that it will furnish the administering agency and the Secretary of Labor such information as they may require for the supervision of such compliance, and that it will otherwise assist the administering agency in the discharge of the agency's primary responsibility for securing compliance.
The applicant further agrees that it will refrain from entering into any contract or contract modification subject to Executive Order 11246 of September 24, 1965, with a contractor debarred from, or who has not demonstrated eligibility for, Government contracts and federally assisted construction contracts pursuant to the Executive
Order and will carry out such sanctions and penalties for violation of the equal opportunity clause as may be imposed upon contractors and subcontractors by the
administering agency or the Secretary of Labor pursuant to Part II, Subpart D of the Executive Order. In addition, the applicant agrees that if it fails or refuses to comply with these undertakings, the administering agency may take any or all of the following actions: Cancel, terminate, or suspend in whole or in part this grant (contract, loan,
insurance, guarantee); refrain from extending any further assistance to the applicant under the program with respect to which the failure or refund occurred until satisfactory
assurance of future compliance has been received from such applicant; and refer the case to the Department of Justice for appropriate legal proceedings. * Corrected to read "invoked". In the original text the word "involved" was printed in error.
SUBCONTRACT EXHIBIT 7 – CITY OF SOUTH BEND’S GUIDELINES FOR GOOD FAITH EFFORTS BY CONTRACTORS IN MEETING MWBE CONTRACT GOALS
Version 07/19/2023 General Conditions - 7
CITY OF SOUTH BEND’S GUIDELINES FOR GOOD FAITH
EFFORTS BY CONTRACTORS IN MEETING MWBE CONTRACT
GOALS
Under the City of South Bend’s Minority and Women’s Business Enterprise (MWBE) Inclusion Program Plan (COSB Inclusion Plan), the City of South Bend (the City) is authorized to set “contract specific” goals
to increase MWBE participation in City contracts and procurements.
MWBE participation goals are set based on availability of MWBE contractors within the City’s geographic market area identified in the City’s Disparity Study.
For contractors bidding on a construction, services, supplies or equipment contract where goals have been
set for all or parts of the project, below is information relevant to “good faith efforts” to meet the contract goal.
When the City sets a contract goal, that means MWBE’s are in fact available to perform work on the
contract. Project bidders must try diligently to meet the goal. Failure to make a good faith effort may result in rejection of your bid as non-responsive to the contract. ______________________________________________________________________________
Good faith efforts means actions undertaken by a contractor to achieve a contract goal which, by their scope, intensity, and appropriateness to the objective, can be reasonably expected to fulfill the Program’s
goals (City’s Inclusion Plan, Section 4.B., No. 21). ___________________________________________________________________ A good faith effort is fully reviewable by the City. Where a contract goal is not met, contractors must provide as much information as possible to help the City assess the contractor’s good faith efforts to achieve the goal. Inadequate proof of good faith efforts may result in a finding that the contractor was non-responsive, causing its bid to be rejected even if it is the lowest. Good faith efforts require active, aggressive efforts by the prime contractor to obtain the contract MWBE participation goal. Mere pro forma efforts are not good faith efforts. To satisfy the good faith efforts test:
• A prime contractor may not reject a MWBE’s bid solely because it is not the lowest bid received
from subcontractors. If the MWBE’s costs are reasonable and not excessive, the MWBE’s
quote or bid presumptively should be accepted on a contract requiring goals even if the
MWBE’s bid is not the lowest one received. However, if an MWBE’s bid or quote is
unreasonable or excessive, the prime contractor may reject the bid on that basis. The
contractor has the burden of demonstrating the excessiveness or unreasonableness of the
MWBE’s bid or quote. Because the City must determine whether a MWBE quote was
unreasonable or excessive, Contractors must provide the City with copies of each MWBE
and non MWBE quote submitted to the bidder when a non-MWBE was selected over an
MWBE.
• A contractor may not reject a MWBE as being unqualified without sound reasons based on a
thorough investigation of the MWBE’s capabilities. If a prime contractor rejects a MWBE as
unqualified, the Contractor must provide the City with good reasons for this. The MWBE’s
industry standing or membership in a specific group, organization, political or social affiliation
(example: union v. non-union) is not a basis to reject the MWBE for lack of qualification.
Version 07/19/2023 General Conditions - 8
• The ability or desire of a prime contractor to perform the work of the contract with its own
organization team does not relieve the prime contractor of the need to make good faith efforts
to use MWBE sub contractors to meet the contract goal.
EXAMPLE: Total Project Estimate is $500,000. An MWBE goal of 10% is set for a specific part of the project, i.e., $50,000. Only one MWBE submits a quote to the prime contractor, and it is $50,000. A non MWBE submits a quote of $45,000. Rejecting the MWBE bid may not meet the requirement of making a good faith effort to meet the contract goal because: 1) the MWBE quote is within the goal percentage and dollar amount set for MWBE participation on the project; 2) selection of the MWBE quote guarantees that the contractor meets the set goal and that its bid will be deemed responsive; and 3) the difference between the MWBE and non MWBE quotes is not significant in terms of the overall contract amount (i.e., 1% of total contract). If the MWBE’s quote is $53,000 and the non-MWBE bid is $50,000, it may yet not be demonstrative of a good faith effort to reject the MWBE solely because the MWBE’s quote is not the lowest. The excess is not greatly significant to the total contract cost, and it could reasonably be expected to be made up elsewhere in the contract while guaranteeing full goal compliance. The above examples are illustrative only. The City will make a fair and reasonable judgment as to good faith efforts based on all information and documentation provided by bidders and taking into account the Quality, Quantity, and Intensity of the efforts made by a contractor to meet the contract goal.
Version 07/19/2023 General Conditions - 9
GOOD FAITH EFFORTS MATERIALS TO BE INCLUDED WITH BID If a contractor’s bid does not meet the goal set for the contract, the contractor must submit evidence of good faith efforts with its bid so the City can determine whether the contractor is a responsive bidder. If the contractor’s bid meets the MWBE goal, evidence of good faith effort is not required, but it would be prudent to include some evidence in case an error was made.
The information required of a contractor who has not achieved the contract goal to show good faith efforts can be found in the South Bend Inclusion Program Plan at Section 8.B.3.d. as follows:
(b) Where the bidder cannot achieve the contract goal, the bidder must provide proof of having made good faith efforts to meet the goal. In making this determination of whether to issue a goal waiver, the City will consider, at a minimum, the bidder’s efforts to:
(1) Solicit through all reasonable and available means (e.g., attendance at pre-bid
meetings, advertising and written notices) the interest of all MWBEs in the scopes of work of the contract. The contractor shall provide interested MWBEs with timely, adequate information about the plans, specifications, and requirements of the contract to allow such firms to respond to the solicitation. The bidder must follow up initial solicitations with
interested MWBEs.
(2) Select portions of the work to be performed by MWBEs in order to increase the
likelihood that the contract goal will be achieved. This includes, where appropriate, breaking out contract work items into economically feasible units to facilitate participation, even when the bidder would otherwise prefer to perform these work items with its own forces. It is the bidder’s responsibility to make a portion of the work available to MWBEs
and to select those portions of the work or material needs consistent with the availability of such firms to facilitate their participation.
(3) Negotiate in good faith with interested MWBEs. Evidence of such negotiation includes the names, addresses, and telephone numbers of firms that were contacted; a description of the information provided regarding the plans and specifications for the work selected for subcontracting; and why agreements could not be reached. The bidder may
not reject MWBEs as being unqualified without sound reasons based on a thorough investigation of their capabilities. That there may be some additional costs involved in
finding and using MWBEs is not in itself sufficient reason for a bidder’s failure to meet the contract goal, as long as such costs are reasonable. The ability or desire of a bidder to
perform the work of a Contract with its own organization does not relieve it of the responsibility to make good faith efforts on all scopes of work within which subcontracting
opportunities are available.
(4) Make efforts to assist interested MWBEs in obtaining bonding, lines of credit, or
insurance as required by the City or the bidder, where appropriate.
(5) Make efforts to assist interested MWBEs in obtaining necessary equipment, supplies,
materials, or related assistance or services, where appropriate.
Materials that should be submitted to support a contractor’s good faith efforts include:
• Copies of advertisements, notices, or solicitations from contractor to MWBE’s-- to include
date and time of issuance;
• A list of all locations where advertisements or notices to MWBE’s were placed or
solicitations sent;
• Copies of communication between contractor and MWBE’s in response to contractor’s
advertisements, notices, or solicitations;
• Proof of contractor’s break-out of contract items into units feasible for performance by
WMBE’s;
Version 07/19/2023 General Conditions - 10
• Proof of communications between the contractor and MWBE regarding negotiations for
agreements, and why agreement could not be reached, as stated more specifically in
above Subsection (b) (3);
• Proof of bids or quotes from MWBE’s and those from non MWBE’s when non MWBE’s bid
or quote is used;
• Proof of efforts made by contractor to assist MWBE to participate in contract, where
appropriate; and
• Any other information tending to show that Contractor made active, aggressive efforts to
meet the MWBE participation goal but despite good faith efforts was unable to do so.
BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM
Date 03/17/2026
Name Zach Hurst Department DPW
BPW Date 03/24/2026 Phone Extension 3057
Review and Approval Required Prior to Submittal to Board Diversity Compliance
and Inclusion Officer Officer Name BPW Attorney Attorney Name Michael Schmidt
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach
Required Information
Company or Vendor Name F. A. Wilhelm
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Madison Lifestyle District – New Parking Garage CMc
Project Number 123-074
Funding Source River West DA Bond
Account No. PO-0037917
Amount TBD
Terms of Contract Amendment No. 1
Purpose/Description This first amendment covers nine (9) bid packages for early release work
related to the new parking garage.
For Change Orders Only
Amount of Increase Decrease
$
($ ) Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount: New Completion Date: