HomeMy WebLinkAbout1. 13546 Brick Road_COA 2025-0805 PACKETHISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY Phone: 574/235.9371 Fax: 574/235.9021 Email: hpcsbsjc@southbendin.gov STAFF REPORT CONCERNING APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS Date: August 8, 2025 Application Number: 2025-0805 Property Location:13546 Brick Road Architectural Style/Date/Architect or Builder: Italianate / c. 1870 Property Owner: Alexander Horvath and Natalie Winters Landmark or District Designation: St. Joseph County Local His- toric Landmark, Ordinance #42-1976 Rating:Outstanding DESCRIPTION OF STRUCTURE/SITE: This is a two story, red brick Italianate farm house with original architectural details such as the wood cornice with brackets and frieze, a bracketed rectangular cupola, and stone windowsill and lintels. The foundation is of dressed coursed stone, and the red brick walls are in English bond. The roof is hipped, and the front porch is open with square posts. The main door has ful side lights and transoml and the windows are 6 over 6 sashes. There is an added brick wing on the back of the house, a block garage (now demolished), and at the back of the site sit a historic brick milkhouse and brick outhouse. In October of 2024, COA 2024-0909 was issued, permitting the deconstruction of the brick outhouse and reuse of its bricks. In mid-2025, the rear of the house and the garage sustained storm damage due to falling tree limbs. DESCRIPTION OF PROPOSED PROJECT: The applicant has requested approval to: 1. Demolish the storm-damaged garage and rebuild a new garage with the same footprint as the pre- vious garage. Siding to be white LP SmartSide, service door to be steel, garage overhead door to be aluminum, and two windows (one on rear and one on side) to be anodized aluminum. - rial (instead of the quarter inch plywood as is currently there), repair and repaint corbels that were damaged in the storm, and repaint areas as needed. 3. Pour a new concrete front sidewalk where existing one was damaged by uprooted trees and repair front fence and gate. STANDARDS AND GUIDELINES: SITE VISIT REPORT: N/A. STAFF RECOMMENDATION: reconstruction with the materials listed above constitute a threat to the integrity of the home’s historic character or value. All repair work is in line with recommendations made in the Standards and Guidelines. Based on the infor- mation provided prior to this public hearing, Staff make a FAVORABLE RECOMMENDATION. Prepared by: Kate Himick, Historic Preservation Specialist HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY Phone: 574/235.9371 Fax: 574/235.9021 Email: hpcsbsjc@southbendin.gov HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY Phone: 574/235.9371 Fax: 574/235.9021 Email: hpcsbsjc@southbendin.gov T. Lee Engineering, Inc. Post Office Box 1260 Greenwood, Indiana 46142-1260 Phone: 317-502-9634 April 22, 2025 Ms. Christina Bracken Erie Insurance Group 7609 West Jefferson Street, Suite 200 Fort Wayne, Indiana 46804 Re: Residential Property Structural Evaluation Claim No: A00006677171 Insured: Mr. Alexander Horvath Subject: Report of Findings File No: L03205 Dear Ms. Bracken: Mr. Alexander Horvath reported that his property was damaged by a tree and tree limbs impacts on March 30, 2025. The residential property was located at 13546 Brick Road in Granger, Indiana. T. Lee Engineering, Inc. was retained by Erie Insurance Group to evaluate the reported damage to the residential structure. We were specifically asked to determine the extent of damage to the building caused by tree and tree limbs impacts. Mr. Timothy A. Lee, P.E. performed our study of the property on April 5, 2025. Mr. and Mrs. Horvath were present during the site study to provide first- hand information. CONCLUSIONS 1. The physical evidence observed at the property indicated the tree and tree limbs impacts resulted in localized damage to the south and west-facing roof slopes, the west-facing roof slope of the first story, the asphalt composition shingles, and the gypsum wallboard ceiling of the master bedroom and kitchen. 2. The physical evidence observed at the attached garage indicated the tree and tree limbs impacts resulted in widespread damage to the east and west-facing roof slopes, the wood framing of the roof structure, asphalt composition shingles, the entry door and overhead garage door, and the south and east concrete masonry unit (CMU) exterior walls, and the upper half of the west CMU exterior wall. Erie Insurance Group April 22, 2025 Page 2 3. The physical evidence observed at the property indicated the tree and tree limbs impacts did not result in damage to the foundation, the floor structures, the turret, the exterior walls of the house, the windows and doors of the house, the east porch, the CMU at the southwest corner in the attached garage, the lower half of the CMU west wall at the attached garage, and the concrete slab of the garage. 4. In order to repair the damage to the building associated with the tree and tree limbs impacta, we recommend the following repairs as part of a reconstruction project: a) Remove, replace or repair the fractured wood framing of the roof structure at the second story: replace approximately 30 square feet 1-inch in thickness decking, sister repair the hip rafter at the southwest corner, 8 feet both sides, 2 inches by 6 inches, replace 2 each 2 inches by 4 inches rafters approximately 6 feet in length, remove and replace approximately 1 square asphalt composition shingles and underlayment, replace approximately 15 linear feet of 1 inch by 6 inches fascia, replace approximately 20 square feet of wood soffit panels, reset detached decorative wood cornice, and paint affected surfaces of approximately 40 square feet. b) Remove and replace the fractured section of roof decking first story at west-facing roof slope: 20 square feet of 1-inch in thickness deck boards, 300 square feet of underlayment, 3 squares of asphalt composition shingles covering the west-facing roof slope, and install 20 linear feet of 6 inches gutter and 1 downspout. c) Remove and replace the wood framing of the roof structure; 40 each 2 inches by 6 inches rafter with 14 feet in length at 16-inches on-center, 24 linear feet of 2 inches by 8 inches ridge beam, 600 square feet of 1-inch in thickness decking, 600 square feet of underlayment, 6 squares of asphalt composition shingles, replace wood fascias and overhangs, and install 24 linear feet of 6 inches gutter and 1 downspout. d) Reconstruct the west CMU wall of the attached garage; replace 150 square feet of 8 inches in thickness hollow core CMU (upper half of the wall), remove and reset two west-facing windows, and paint the affected surfaces of the west wall 150 square feet. e) Reconstruct the south CMU wall of the attached garage; replace 160 square feet of 8 inches in thickness hollow core CMU, remove and reset south-facing window, replace 60 square feet of Erie Insurance Group April 22, 2025 Page 3 vinyl siding at south-facing gable end, and paint the affected surfaces of the south wall 160 square feet. f) Reconstruct the east CMU wall of the attached garage; replace 16 square feet of 8 inches in thickness hollow core CMU, remove and replace east-facing entry door, replace 16 feet wide overhead garage door, replace the overhead garage door header, replace the overhead garage door trim, and paint the affected surfaces of the east wall 200 square feet. g) Repair the gypsum wallboard cracks in the ceiling and west wall of the master bathroom and the ceiling of the kitchen; approximately 100 linear feet. h) Repaint the ceilings and wall repair areas at the master bathroom and kitchen, approximately 400 square feet. OBSERVATIONS The residence was a two-story wood-framed structure building over a stone and masonry basement foundation. The dwelling s exterior walls were brick, and the south-facing gable ends were covered with vinyl siding. The roof slopes of the building were covered with asphalt composition shingles. A turret was at the second story of the house, and the roof slopes of the turret were covered with EPDM. For the purposes of this report, the residence was assumed to face north. An attached two-car garage was located along the south side of the residential building, the exterior walls of the garage were hollow core CMU, and the roof slopes of the garage were covered with asphalt composition shingles. An overhead garage door and entry door were in the east wall of the garage. According to Mr. Horvath, they have owned the property since 2024, and the residential building was constructed in 1875. Mr. Horvath stated a large, mature tree fell on the property and struck the west side of the building, the southwest corner of the second story, the west-facing roof slope of the first story, and the west-facing roof slope of the attached garage. The impact from the tree limbs did not result in structural damage to the east, west, and north exterior walls, the floor framing, the windows, and doors of the residential building, did not produce shifting walls or result in fractured door and window frames in the house. Mr. Horvath believed the impact from the tree limb resulted in potential damage to the foundation walls, racking of the building in its entirety, fractured the wood framing of the roof structure, shifting of the house, shifting in the attached garage, and cracks in the ceilings and walls throughout the building. Mr. Horvath was concerned about racking of the building, cracks in the window header of the basement, potential damage to the building foundation, and movement in the wood posts of the east Erie Insurance Group April 22, 2025 Page 4 entry porch. At our site inspection, portions of the tree and tree limbs were removed from the house and garage, portions of the large mature tree remained in the west yard, some tree limb debris was at the site and along the roof slopes, and a tarpaulin covered portions of the south- and west-facing roof slopes at the second story. During the course of our site visit, we noted isolated damage to the asphalt composition shingles at the second story, and the first story roof slopes of the house and attached garage, detached soffit boards at the south and west second story overhangs, partially detached gutters at the west eaves, and a detached wood decorative cornice from the south overhang. The tree limbs did not impact the walls, windows, roof slopes, or roof covering at the turret. Cracks and separations were present in the west, south, and east CMU walls of the attached garage. A long horizontal crack was present across the west garage wall at its mid-height, stair-stepped cracks were present at the southeast and southwest corners of the garage, the top of the south garage wall was displaced toward the south approximately 3 inches, and the top of the east wall of the garage was displaced toward the east 2 feet at the northeast corner. The concrete slab foundation of the garage did not contain recent cracks or separations consistent with the tree impact. We noted no cracks or separations in the mortar joints of the stone foundation from the tree impact. The stone basement window lintel at the west side of the building was cracked through its thickness, the exposed crack edges were worn and weathered, and the progressive fractures of the stone was evidence of long-term movement and cracks in the lintel. No pieces of fractured stone from the lintel were noted on the ground and adjacent to the window. We noted the mortar joint at the top of the window lintel was separated, the south side of the window opening contained mortar joint repairs at the west foundation wall, and the movement, cracks, and displacement in the west stone foundation wall and window lintel did not have the appearances of recent damage. We noted no damage to the master bathroom window in the west exterior wall above the basement window lintel, and no cracks in the brick between the windows to indicate vertical forces transferred down the west wall to fracture the stone lintel. We noted no cracks and separations in the bricks of the south, north, east, and west exterior walls for the house, no stair-stepped cracks or separation in the corners of the residential building, and no leaning or displacements in the exterior walls of the house to indicate shifting, racking, or general leaning of the building in its entirety due to the tree impact. The top of the southern patio post at the east side of the house and at the east entry door was leaning toward the east approximately 1 inch. We noted the 4 inches by 4 inches posts were enclosed with 1 inch thick wood members to form a 6 inches by 6 inches posts. The top of the southernmost 4 inches by 4 inches posts was exposed, the wood post was twisted at the top, and the exposed wood at the 4 inches by 4 inches post was covered with white paint. The displacements in the porch posts were unrelated to the tree impact. No recent cracks or separations were noted in the stone foundation walls and mortar joints to indicate recent movement occurred as a result Erie Insurance Group April 22, 2025 Page 5 of the tree impact. The cracks in the stone lintel and mortar joints of the west wall were filled with accumulated dirt and debris, did not have the appearance of being recently formed, and no stone lintel pieces were noted on the ground and at the basement window. We observed no evidence around the building exterior to indicate racking of the residential building, specifically in the corners of the house, or evidence of movement and shifting of the roof structure toward the north and east associated with the tree impacts or high wind forces. We noted the entry doors in the east and south walls of the residential building were not binding in their frames, and the windows of the building opened and closed without dragging and without being forced. The interior doors were noted to open and close without rubbing and were not bound in their frames. The windows around the perimeter of the building did not contain fractured or broken glass panes, the window frames were not damaged, and the windows opened and closed when operated. The exterior walls contained no fractured bricks from tree limb impacts. The tree and tree limbs impacted the second story roof slope, the first story west-facing roof slope above the master bathroom, and the west-facing roof slope and west eave of the attached garage. At the attached garage, widespread evidence of racking, twisting, and leaning of the garage in its entirety was noted at the southwest and southeast corners. , and the measurements taken indicated that the north, west, east, and south exterior walls of the house were plumb in the locations measured. No cracks and separations were noted in the south, east, and north exterior wall finishes to indicate northward and eastward movements in the tops of the exterior walls associated with tree impact. The lathe and plaster, and gypsum wallboard throughout the building interior, specifically the wallboard and plaster on walls parallel to the tree impact or installed in the east-west plane, did not contain cracks or separations above door and window openings to indicate movement of the structure toward the east, except for the west wall and north interior wall at the master bathroom. We observed hairline wallboard cracks in the ceilings of the master bathroom and kitchen associated with elastic deformation in the wood framing of the building resulting from the tree impact. The hairline ceiling cracks were in line with the tree impacting the west eave of the first story, and the cracks were noted in the tape seams of the wallboard. We did not note broken windowpanes in the south- and west-facing windows, or damage to the entry doors. The floor observed to the humped or sloped to indicate displacements in the floor structure, perimeter foundation walls, or interior support posts and beams. The tops of the south, east, and west exterior CMU walls of the attached garage were displaced toward the east from the tree impact at the west eave and west-facing roof slope of the garage. The roof structure revealed indications of distress and movement consistent with Erie Insurance Group April 22, 2025 Page 6 the effects of . Evidence was found during the site inspection that the forces from the impact damaged individual structural framing members of the roof structure at the southwest corner of the second story. The forces from the tree impact damaged the decking and rafter extensions of the southwest hip ridge and the south- and west-facing roof slopes, broke the fascia boards, separated the wood overhangs, and detached a decorative wood cornice piece. The tree impact fractured the decking of the west-facing roof slope above the master bathroom and detached the gutter from the west eave. We noted no fractured wood framing of the first story rafters above the master bathroom, and no indication of fractured ceiling joists were noted across the first and second story ceilings. In the family room, master bedroom, staircase, second story hallway, the living room, second story bedrooms, and the main level hallway, we noted no recent wall and ceiling cracks at locations of openings in the walls, at interior door openings, or at the intersection of walls. Individual plaster cracks were noted on the walls of the master bedroom and first level hallway that were covered with paint and did not have the appearances of being from a recent event. We noted no wallboard cracks at the lower-level staircase or the building corners to indicate racking and twisting of the building in its entirety. The wood framing of the garage s roof structure sustained widespread and significant damage necessitating the removal and replacement of the rafters, ridge beam, decking, and asphalt composition shingles. Mr. Alexander Horvath believes damage occurred to the wood framing of the building, the interior wallboard and plaster finishes, the roof slopes, possibly racking of the entire building, and potential damage to the foundation and attached garage. ANALYSIS When a tree strikes a building, a transfer of energy takes place between the tree and the structure it strikes. The rules of physics are such that the softer the material being struck, the greater amount of the tree's total energy is transferred into the object being struck, and therefore the greater potential damage to that object. In addition, the greater the velocity of the moving object, the greater the energy available to be imparted into the receiving structure. A building and attached components generally have large masses and require being struck by another object of sufficient kinetic energy to break and fracture the individual building components. The tree had sufficient mass to damage the building in localized and specific areas, and the physical evidence observed at the property indicated that the tree was moving at a low speed resulting in damage to hip rafter end at the second story roof slope, the west and east-facing roof slopes at the attached garage, fractured the ridge beam at the garage, gouged the shingles of the west roof slopes, displaced the walls in the attached garage, fractured rafters at the , and to resulted in wallboard cracks in the master bathroom and kitchen ceiling. Erie Insurance Group April 22, 2025 Page 7 There was no evidence of structural damage to the masonry framing for the exterior walls, the floor structures of the residential building, or the fenestrations from a one-time event such as the tree impact. The force of the tree impact did not result in permanent shifting, twisting, or racking of the house or displacement of the entire structure. The lateral forces from the tree impacting the west side of the attached garage resulted in the racking and movements in the tops of the east, west, and south garage walls toward the east. The damage to the structure was readily replaceable and repairable on a spot and individual basis. Repairs of the fractured hip rafters of the second story at the tree impact location should be completed. The repairs should include wallboard ceiling repairs in the master bathroom and kitchen, repairs to the damaged shingles of the west and south-facing roof slopes, replacement of the wood roof structure at the attached garage, and reconstruction of the displaced and fractured CMU exterior walls in the attached garage. The tree stone foundation, the exterior walls, the concrete slab of the garage, the east entry patio and posts, or the floor structures. We observed no recent cracks or displacement in the foundation of the building and no evidence of damage to the foundation walls from a recent event. Scope of Repairs In order to repair the structural damage to the subject building caused by the tree and tree limbs impacts on March 30, 2025, we recommend that the damaged framing of the garage s roof structure be removed and replaced, the fractured decking be replaced, the damaged asphalt composition shingles and gutters be replaced with the same sized members, and the isolated interior wallboard cracks be repaired. All repairs should be performed by qualified contractors and in accordance with all applicable state and local building codes and standards. We recommended the following repairs as part of a reconstruction project to address the recent damage: In order to repair the damage to the building associated with the tree impact we recommend the following repairs as part of a reconstruction project: A. Remove, replace or repair the fractured wood framing of the roof structure at the second story: replace approximately 30 square feet 1-inch in thickness decking, sister repair the hip rafter at the southwest corner, 8 feet both sides, 2 inches by 6 inches, replace 2 each 2 inches by 4 inches rafters approximately 6 feet in length, remove and replace approximately 1 square asphalt composition shingles and underlayment, replace approximately 15 linear feet of 1 inch by 6 inches fascia, replace approximately 20 square Erie Insurance Group April 22, 2025 Page 8 feet of wood soffit panels, reset detached decorative wood cornice, and paint affected surfaces of approximately 40 square feet. B. Remove and replace the fractured section of roof decking first story at west- facing roof slope: 20 square feet of 1-inch in thickness deck boards, 300 square feet of underlayment, 3 squares of asphalt composition shingles covering the west-facing roof slope, and install 20 linear feet of 6 inches gutter and 1 downspout. C. Remove and replace the wood framing of the structure; 40 each 2 inches by 6 inches rafter with 14 feet in length at 16- inches on-center, 24 linear feet of 2 inches by 8 inches ridge beam, 600 square feet of 1-inch in thickness decking, 600 square feet of underlayment, 6 squares of asphalt composition shingles, replace wood fascias and overhangs, and install 24 linear feet of 6 inches gutter and 1 downspout. D. Reconstruct the west CMU wall of the attached garage; replace 150 square feet of 8 inches in thickness hollow core CMU (upper half of the wall), remove and reset two west-facing windows, and paint the affected surfaces of the west wall 150 square feet. E. Reconstruct the south CMU wall of the attached garage; replace 160 square feet of 8 inches in thickness hollow core CMU, remove and reset south- facing window, replace 60 square feet of vinyl siding at south-facing gable end, and paint the affected surfaces of the south wall 160 square feet. F. Reconstruct the east CMU wall of the attached garage; replace 16 square feet of 8 inches in thickness hollow core CMU, remove and replace east- facing entry door, replace 16 feet wide overhead garage door, replace the overhead garage door header, replace the overhead garage door trim, and paint the affected surfaces of the east wall 200 square feet. G. Repair the gypsum wallboard cracks in the ceiling and west wall of the master bathroom and the ceiling of the kitchen; approximately 100 linear feet. H. Repaint the ceilings and wall repair areas at the master bathroom and kitchen, approximately 400 square feet. This report was prepared for the exclusive use of Erie Insurance Group and was not intended for any other purpose. Our report was based on information made available to us at the time. Should additional information become available, we reserve the right to determine the impact, if any, the new information may have on our opinions and conclusions, and to revise our opinions and conclusions if necessary. Erie Insurance Group April 22, 2025 Page 9 Thank you for allowing us to provide this service. If you have any questions or need additional assistance, please call. Sincerely, T. LEE ENGINEERING, INC. Timothy A. Lee, P.E., M.B.A. Civil Engineer Attachments: Photographs Erie Insurance Group April 22, 2025 Page 10 Photograph 1 View of the Horvath property from the north looking toward the south. Photograph 2 View of the east side of the building. Erie Insurance Group April 22, 2025 Page 11 Photograph 3 View of the west side of the building. Photograph 4 View of the west side of the building and the tree impact locations. Erie Insurance Group April 22, 2025 Page 12 Photograph 5 View of the south side of the building. Photograph 6 View of the horizontal crack in the west CMU garage wall. Erie Insurance Group April 22, 2025 Page 13 Photograph 7 View of the horizontal crack in the west CMU garage wall. Photograph 8 View of the horizontal and stair-stepped cracks in the south CMU garage wall. Erie Insurance Group April 22, 2025 Page 14 Photograph 9 View of the displacement in the east garage wall. Photograph 10 View of the fractured wood framing of the roof structure at the garage. Erie Insurance Group April 22, 2025 Page 15 Photograph 11 View of the fractured wood framing of the roof structure at the garage. Photograph 12 View of the fractured wood framing of the roof structure at the garage. Erie Insurance Group April 22, 2025 Page 16 Photograph 13 View of the east-facing roof slope of the second story. Photograph 14 View of the south roof slope of the second story. Erie Insurance Group April 22, 2025 Page 17 Photograph 15 View of the south roof slope of the second story. Photograph 16 View of the west roof slope of the second story. Erie Insurance Group April 22, 2025 Page 18 Photograph 17 View of the tarpaulins at the southwest corner of the second story. Photograph 18 View of the tarpaulins at the southwest corner of the second story. Erie Insurance Group April 22, 2025 Page 19 Photograph 19 View of the tarpaulins covering the south-facing roof slope. Photograph 20 View of the gouges in the hip ridge cap shingles. Erie Insurance Group April 22, 2025 Page 20 Photograph 21 View of the temporary repairs to the second story hip. Photograph 22 View of the west-facing roof slope. Erie Insurance Group April 22, 2025 Page 21 Photograph 23 View of the west-facing roof slope. Photograph 24 View of the rotted fascia with west exposure. Erie Insurance Group April 22, 2025 Page 22 Photograph 25 View of the EPDM roofing at the turret. Photograph 26 View of the EPDM roofing at the turret. Erie Insurance Group April 22, 2025 Page 23 Photograph 27 View of the EPDM roofing at the turret. Photograph 28 View of the deflected hip roof slope at the southwest corner of the second story. Erie Insurance Group April 22, 2025 Page 24 Photograph 29 View of the impact to the west eave of the first story. Photograph 30 View of the southern post at the east entry and patio. Erie Insurance Group April 22, 2025 Page 25 Photograph 31 View of the twisted 4 inches by 4 inches post and the painted wood top. Photograph 32 View of the rotted wood soffit at the south overhang. Erie Insurance Group April 22, 2025 Page 26 Photograph 33 View of the south overhang and the rotted wood boards. Photograph 34 View of the south overhang and fractured fascia and overhang at the tree impact location. Erie Insurance Group April 22, 2025 Page 27 Photograph 35 View of the south overhang and fractured fascia and overhang at the tree impact location. Photograph 36 View of the south overhang and fractured fascia and overhang at the tree impact location. Erie Insurance Group April 22, 2025 Page 28 Photograph 37 View of the tree debris at the first story. Photograph 38 View of the tree debris at the first story. Erie Insurance Group April 22, 2025 Page 29 Photograph 39 View of the south exterior wall for the second story. Photograph 40 View of the improper flashing between the south wall and the first story roof slope. Erie Insurance Group April 22, 2025 Page 30 Photograph 41 View of the improper flashing between the south wall and the first story roof slope. Photograph 42 View of the improper flashing between the south wall and the first story roof slope. Erie Insurance Group April 22, 2025 Page 31 Photograph 43 View of the improper flashing between the south wall and the first story roof slope. Photograph 44 View of the gouges in the shingles of the first story. Erie Insurance Group April 22, 2025 Page 32 Photograph 45 View of the west side of the house and attached garage. Photograph 46 View of the fractured lintel at the basement window. Erie Insurance Group April 22, 2025 Page 33 Photograph 47 View of the progressive fractures of the crack edges in the lintel. Photograph 48 View of the stone lintel cracks and the missing mortar. Erie Insurance Group April 22, 2025 Page 34 Photograph 49 View of the stone lintel cracks and the missing mortar. Photograph 50 View of the deteriorated support for the south end of the lintel. Erie Insurance Group April 22, 2025 Page 35 Photograph 51 View of the stone foundation along the west side of the building. Photograph 52 View of the stone foundation along the west side of the building. Erie Insurance Group April 22, 2025 Page 36 Photograph 53 View of the masonry basement foundation. Photograph 54 View of the masonry basement foundation. Erie Insurance Group April 22, 2025 Page 37 Photograph 55 View of the masonry and stone basement foundation. Photograph 56 View of the masonry and stone basement foundation. Erie Insurance Group April 22, 2025 Page 38 Photograph 57 View of the masonry repairs at the west basement window. Photograph 58 View of the masonry repairs at the west basement window. Erie Insurance Group April 22, 2025 Page 39 Photograph 59 View of the stone foundation. Photograph 60 View of the cathedral ceiling in the first story at the west-facing roof slope. Erie Insurance Group April 22, 2025 Page 40 Photograph 61 View of the cathedral ceiling in the first story at the west-facing roof slope. Photograph 62 View of the cathedral ceiling in the first story at the west-facing roof slope. Note the absence of cracks and separations. Erie Insurance Group April 22, 2025 Page 41 Photograph 63 View of the cathedral ceiling in the first story at the west-facing roof slope. Photograph 64 View of the rafters of the west-facing roof slope. Erie Insurance Group April 22, 2025 Page 42 Photograph 65 View of the rafters of the west-facing roof slope. Photograph 66 View of the rafters of the west-facing roof slope. Erie Insurance Group April 22, 2025 Page 43 Photograph 67 View of the rafters of the west-facing roof slope. Photograph 68 View of the rafters of the west-facing roof slope. Erie Insurance Group April 22, 2025 Page 44 Photograph 69 View of the cathedral ceiling in the first story at the west-facing roof slope. Note the absence of cracks and separations. Photograph 70 View of the cathedral ceiling in the first story at the west-facing roof slope. Note the absence of cracks and separations. Erie Insurance Group April 22, 2025 Page 45 Photograph 71 View of the second story bedroom. Photograph 72 View of the interior door of the second story bedroom. Erie Insurance Group April 22, 2025 Page 46 Photograph 73 View of the west wall and the absence of pronounced cracks and separations. Photograph 74 View of the west wall and window. Erie Insurance Group April 22, 2025 Page 47 Photograph 75 View of the west wall and corner, and the absence of pronounced separations. Photograph 76 View of the west wall and the absence of pronounced cracks and separations. Erie Insurance Group April 22, 2025 Page 48 Photograph 77 View of the interior wall and ceiling, and the absence of pronounced cracks and separations. Photograph 78 View of the master bedroom interior north wall. Erie Insurance Group April 22, 2025 Page 49 Photograph 79 View of the plaster crack covered with paint. Photograph 80 View of the plaster crack covered with paint. Erie Insurance Group April 22, 2025 Page 50 Photograph 81 View of the trim at the interior wall and the absence of separations. Photograph 82 View of the trim at the interior wall and the absence of separations. Erie Insurance Group April 22, 2025 Page 51 Photograph 83 View of the hallway at the east side of the building. Photograph 84 View of the plaster crack with accumulated paint above the door opening. Erie Insurance Group April 22, 2025 Page 52 Photograph 85 View of the plaster crack with accumulated paint above the door opening. Photograph 86 View of the plaster crack with accumulated paint above the door opening. Erie Insurance Group April 22, 2025 Page 53 Photograph 87 View of the rafters at the second story and the south-facing roof slope. Note the secondary framing of the rafter extensions. Photograph 88 View of the rafters at the second story and the south-facing roof slope. Note the secondary framing of the rafter extensions. Erie Insurance Group April 22, 2025 Page 54 Photograph 89 View of the hip rafter for the southwest corner at the second story. Photograph 90 View of the rafters at the second story and the west-facing roof slope. Note the secondary framing of the rafter extensions. Erie Insurance Group April 22, 2025 Page 55 Photograph 91 View of the rafters at the second story and the west-facing roof slope. Note the secondary framing of the rafter extensions. Photograph 92 View of the fractured decking and rafter ends. Erie Insurance Group April 22, 2025 Page 56 Photograph 93 View of the fractured decking and rafter ends. Photograph 94 View of the hip rafter. Erie Insurance Group April 22, 2025 Page 57 Photograph 95 View of the decking. Photograph 96 View of the south-facing roof slope and the rafters. Erie Insurance Group April 22, 2025 Page 58 Photograph 97 View of the south-facing roof slope and the rafters. Photograph 98 View of the gypsum wallboard of the kitchen ceiling. Erie Insurance Group April 22, 2025 Page 59 Photograph 99 View of the gypsum wallboard of the kitchen ceiling and the hairline cracks in the seam tape. Photograph 100 View of the gypsum wallboard of the kitchen ceiling and the hairline cracks in the seam tape. Erie Insurance Group April 22, 2025 Page 60 Photograph 101 View of the gypsum wallboard of the kitchen ceiling and the hairline cracks in the seam tape. Photograph 102 View of the gypsum wallboard of the kitchen ceiling and the hairline cracks in the seam tape. Erie Insurance Group April 22, 2025 Page 61 Photograph 103 View of the gypsum wallboard of the kitchen ceiling and the hairline cracks in the seam tape. Photograph 104 View of the west exterior wall of the master bathroom. Erie Insurance Group April 22, 2025 Page 62 Photograph 105 View of the gypsum wallboard of the master bathroom and the hairline cracks in the seam tape. Photograph 106 View of the gypsum wallboard of the master bathroom and the hairline cracks in the seam tape. Erie Insurance Group April 22, 2025 Page 63 Photograph 107 View of the gypsum wallboard of the master bathroom and the hairline cracks in the seam tape. Photograph 108 View of the door operating in the opening. T. Lee Engineering, Inc. Mr. Alexander Horvath 13546 Brick Road Granger, Indiana 46530 Claim No. A00006677171 Project No. L03205 PREPARED FOR: Ms. Christina Bracken Erie Insurance Group 7609 West Jefferson Street, Suite 200 Fort Wayne, Indiana 46804 PREPARED BY: Timothy A. Lee, PE, MBA T. Lee Engineering, Inc. POST OFFICE BOX 1260 GREENWOOD, INDIANA 46142-1260 April 22 , 2025 Timothy A. Lee, PE, MBA Civil Engineer