Loading...
HomeMy WebLinkAbout605 Edgewater Drive_AA 2025-0730Sarah Andrews, President HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY CERTIFICATE OF APPROPRIATENESS The Historic Preservation Commission of South Bend and St. Joseph County has approved the following work: Replacement of all posts and all railings with new as described in application. Additional railing to be built to the driveway to allow safe access for owners. Style to match what is currently there. The current porch was approved in 2004. Veterans Construction, Contractor for the following location: 605 EDGEWATER DR SOUTH BEND, IN, 46618 Edgewater Place Application No. 2025-0731 in the County of St. Joseph; State of Indiana; which is: Located in a Local Historic District A Local Historic Landmark and found this application to be appropriate according to the Standards pertaining to Local Historic Landmarks and/or Local Historic Districts. Regulations pertaining to the Historic Preservation Commission are found in Chapter 21 (Zoning), South Bend Municipal Code and Chapter 26 of the St. Joseph County Code. The issuance of this certificate does NOT in any manner, release the recipient from the responsibility of complying with the requirements of the zoning ordinances, building codes, safety codes, ADA or other requirements of the City of South Bend, the County of St. Joseph, the State of Indiana, or the United States Federal Government. This certificate is good for one year from the date of issuance and is effective from the date entered herein. Plans are on file and open for public inspection at the office of the Historic Preservation Commission of South Bend and St. Joseph County, 227 West Jefferson Blvd., Suite 1400 S, South Bend, Indiana, during normal business hours. THIS CERTIFICATE IS NOT TRANSFERABLE NAME OF APPLICANT:Penny Krug CERTIFICATE ISSUED BY: Kate Himick Historic Preservation Specialist POST IN A CONSPICUOUS PLACE ON THE STREET SIDE OF THE PROJECT UNTIL COMPLETION OF ALL WORK. Phone: (574) 235-9371 E-mail: SBSJCHPC@southbendin.gov ROSS VAN OVERBERGHE Historic Preservation Administrator 7/31/2025DATE CERTIFICATE TAKES FORCE:7/31/2026DATE CERTIFICATE EXPIRES: Ord No. 6846-80 Edgewater Place Tuesday, July 29, 2025 Application for Certificate of Appropriateness Important Information Regarding this Request REQUIRED DOCUMENTATION AND SITE PLANS The Historic Preservation Commission of South Bend and St. Joseph County cannot process an Application without required documentation. Comprehensive documentation provides a complete understanding of the project. Problems often occur during a project review or during the execution of the project when the property owner, staff or commissioners are unclear as to project specifics. Applications will NOT be processed without required documentation. Photographs may be submitted in digital format or in photographic print. When a project involves blueprints and/or site plans, one (1) set shall be submitted with the Application. Any documentation submitted to this office cannot be returned to the applicant. APPLICATION FEE The application processing fee for any Application for a Certificate Of Appropriateness is $20 Payment must accompany the application at the time of submission. For an electronically submitted application, payment must reach the HPC office within 48 hours following transmission. Payment can be made by credit card by contacting Business License Administrator Michelle Adams at (574) 235-5912; by cash in person in the Department of Community Investment on the 14th floor of the County City Building; or by check made out to City of South Bend. Applications will NOT be processed without the required fee. MEETING ATTENDANCE When an Application has been scheduled for any meeting, the owner, architect or contractor(s) retained for the project shall attend the meeting where their project will be reviewed and a decision rendered. Failure by the owner, architect, or contractor to attend such meetings may result in denial of the Application due to insufficient representation. CERTIFICATE ISSUANCE Certificates of Appropriateness will be filed with the Building Department of South Bend and St. Joseph County. A copy of the Certificate will be emailed directly to the owner and/or contractor(s) listed on the application. INSPECTION AUTHORITY All projects will be inspected during and following execution for compliance with the decision(s) rendered by the Historic Preservation Commission of South Bend and St. Joseph County. Owner acknowledges that while the Historic Preservation Commission only considers Certificates of Appropriateness for exterior features, under certain circumstances it may be necessary for the Commission Staff to have access to the interior of the building in order to accurately assess the condition of the exterior feature and that the lack of access to the interior may prevent the Commission Staff from making a favorable recommendation. Any work performed on a historic landmark or in an historic district which does not conform to the Certificate of Appropriateness certificate shall be immediately halted by the Historic Preservation 1 Commission and the Building Department of South Bend and St. Joseph County. Fines may be levied for projects not in compliance. I read and understand the information above:Yes, Continue Date Tuesday, July 29, 2025 2 Proper ty Information Property Address for Proposed Work:605 edgewater drive Property City south bend Property Zip Code 46601 Property Owner Information:Penny Krug Owner Email Owner Address 605 edgewater drive Proposed Work and Project Information All projects must comply with applicable building and zoning codes. South Bend Zoning Ordinance St. Joseph County Zoning Ordinance Contractor Information Veterans Construction Front porch railing and support columns Marc Shudnow Contractor Phone Number (574) 301-1275 Contractor Email michianahm@gmail.com Description of Proposed Work: Front porch rehabilitation Specification of Material via Manufacture Brochure:PDF Krug.pdf File Upload Site Plans, Aerial Views, and/or Blueprints: One (1) set shall be submitted with the Application. Uploaded documentation must show existing property lines, buildings, structures, and proposed project location(s). Hand Drawn Plans/Elevations are ok Photographs to include: each area affected by project, close up detail of project areas. Windows, Siding, and/or Door projects must include photographs of each window/door/siding affected by the project and detailed close up of condition Applications will not be processed if the required photographs and/or documentation are not included. Any documentation submitted to this office cannot be returned to the applicant. 3 Quote/Evaluation(s) by Repair Professional (Optional): PDF Krug_6986.pdf Photographs: 2.92 MB 2.89 MB 4 2.05 MB 2.91 MB 2.81 MB 2.72 MB 5 Payment Invoice ID # INV-000173 Payment Method Pay via Card or PayPal 6 718 Chapin St, South Bend, IN 46601 (574) 301-1275 Front Porch Rehabilitation – Detailed Work Order Client: Penny Krug Address: 605 Edgewater Dr, South Bend, IN 46601 Date: July 29, 2025 Scope of Work – Detailed Breakdown 1. Demolition & Removal • Carefully remove all existing porch railings (approx. 60 linear feet), preserving surrounding structure • Remove three sets of existing stair railings (approx. 30 linear feet total) • Remove four structural porch posts supporting the overhead roof structure • Dispose of all debris generated from removal work 2. Structural & Carpentry Work • Install four new 4x4 pressure-treated structural posts, anchored securely to the porch deck and overhead framing • Fabricate and install custom 6x6 decorative wood wraps around each 4x4 post using primed select pine or cedar • Apply decorative trim (top and bottom) to each post base and capital for historical character • Construct and install new porch railing (~60 linear feet) using wood balusters and top/bottom rail system in a historically appropriate style • Build and install new railing systems on all three staircases, matching the porch railing style: o Stair 1: 33" wide o Stair 2: 78" wide o Stair 3: 72" wide with extension out 66" • Use corrosion-resistant fasteners, wood glue, and brackets as required for durability and code compliance 3. Fascia & Concrete Repairs • Remove and replace damaged fascia trim on the front-left and left side of the porch (approx. 16 linear feet), using primed pine or PVC • Perform concrete patch repair on one front porch corner with appropriate bonding agent and high-strength patch mix 4. Staining & Painting • Lightly sand, clean, and prepare all new wood surfaces for finishing • Apply high-quality exterior-grade stain (2 coats) to all exposed wood components: o Porch railing o Stair railings o Post wraps and trim • Mask adjacent areas and apply exterior paint to repaired fascia to match existing finish Total Cost of Labor & Materials $7,770