HomeMy WebLinkAbout4. 1414 E Wayne Street_COA 2025-0703 PacketHISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY
Phone: 574/235.9371 Fax: 574/235.9021 Email: hpcsbsjc@southbendin.gov
STAFF REPORT
CONCERNING APPLICATION FOR A
CERTIFICATE OF APPROPRIATENESS
Date: July 15, 2025
Application Number: 2025-0703
Property Location: 1414 East Wayne Street
Architectural Style/Date/Architect or Builder:
Colonial Revival / 1925 / H.R. Stapp, Whitcomb & Keller
Property Owner: Drew and Jennifer Chuppe
Landmark or District Designation: East Wayne Street,
Ordinance #7796-87
Rating: Contributing
DESCRIPTION OF STRUCTURE/SITE: This is a two story frame, irregular plan house featuring a gable
roof and a large shed roof front dormer. The roof is of asphalt shingles and the siding is aluminum. The windows
are Marvin wood, double-hung full frame replacement windows with aluminum exterior cladding. The inset door
features leaded glass sidelights and a paneled transom. The main roof extends over the front porch, which crosses
the entire front of the house and wraps around to a side, gabled-roof patio. The porch is supported by large doric
columns over brick flooring.
DESCRIPTION OF PROPOSED PROJECT: The applicant has requested approval to:
1. Extend the existing back addition by roughly 5’ to gain more kitchen and bath space. Construct a ~9’x9’ mud-
room/laundry room addition to the west of the existing addition.
Related works include the following: upper railing and existing roofing to be removed; rubber roofing to be in-
stalled; back entry doors to be replaced; installation of a Marvin aluminum clad, double hung window in the loca-
tion of an existing second story exit; first story windows to be reused in extended-addition.
STANDARDS AND GUIDELINES:
Additions: 36-37. Windows: 29-32. Doors: 10-11.
SITE VISIT REPORT: N/A
STAFF RECOMMENDATION: The addition and extension to the back of the house would not negatively
impact the visual impression of the home from the street. Additionally, the massing of the proposed works are
compatible with the overall structure and the addition is distinguishable from the historic structure without being
markedly inconsistent in design. Based on the information provided prior to this public hearing, Staff makes a FA -
VORABLE RECOMMENDATION.
Prepared by
Kate Himick, Historic Preservation Specialist
HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY
Phone: 574/235.9371 Fax: 574/235.9021 Email: hpcsbsjc@southbendin.gov
MAP OF THE AREA — Google Maps view of the subject area.
SATELLITE IMAGERY — Imagery from 2025.
HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY
Phone: 574/235.9371 Fax: 574/235.9021 Email: hpcsbsjc@southbendin.gov
IMAGERY — View of existing rear facade.
RENDERINGS — Proposed rear facade.
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-3
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"Exterior Perspective Viewsnew window
2-12 pitch,
rubber roofing
metal railing
HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY
Phone: 574/235.9371 Fax: 574/235.9021 Email: hpcsbsjc@southbendin.gov
IMAGERY — View of existing rear facade.
RENDERINGS — Proposed rear facade.
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-3
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"Exterior Perspective Viewsnew window
2-12 pitch,
rubber roofing
metal railing
HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY
Phone: 574/235.9371 Fax: 574/235.9021 Email: hpcsbsjc@southbendin.gov
IMAGERY — View of existing rear facade.
RENDERINGS — Proposed rear facade.
Thursday, July 3, 2025
Application for Cer tificate of
Appropriateness
Important Information Regarding this Request
REQUIRED DOCUMENTATION AND SITE PLANS
The Historic Preservation Commission of South Bend and St. Joseph County cannot process an Application
without required documentation. Comprehensive documentation provides a complete understanding of the
project. Problems often occur during a project review or during the execution of the project when the
property owner, staff or commissioners are unclear as to project specifics. Applications will NOT be
processed without required documentation.
Photographs may be submitted in digital format or in photographic print. When a project involves
blueprints and/or site plans, one (1) set shall be submitted with the Application. Any documentation
submitted to this office cannot be returned to the applicant.
APPLICATION FEE
The application processing fee for any Application for a Certificate Of Appropriateness is $20
Payment must accompany the application at the time of submission. For an electronically submitted
application, payment must reach the HPC office within 48 hours following transmission. Payment can be
made by credit card by contacting
Business License Administrator Michelle Adams at (574) 235-5912; by cash in person in the Department of
Community Investment on the 14th floor of the County City Building; or by check made out to City of
South Bend. Applications will NOT be processed without the required fee.
MEETING ATTENDANCE
When an Application has been scheduled for any meeting, the owner, architect or contractor(s) retained for
the project shall attend the meeting where their project will be reviewed and a decision rendered. Failure by
the owner, architect, or contractor to attend such meetings may result in denial of the Application due to
insufficient representation.
CERTIFICATE ISSUANCE
Certificates of Appropriateness will be filed with the Building Department of South Bend and St. Joseph
County. A copy of the Certificate will be emailed directly to the owner and/or contractor(s) listed on the
application.
INSPECTION AUTHORITY
All projects will be inspected during and following execution for compliance with the decision(s) rendered
by the Historic Preservation Commission of South Bend and St. Joseph County.
Owner acknowledges that while the Historic Preservation Commission only considers Certificates of
Appropriateness for exterior features, under certain circumstances it may be necessary for the Commission
Staff to have access to the interior of the building in order to accurately assess the condition of the exterior
feature and that the lack of access to the interior may prevent the Commission Staff from making a
favorable recommendation.
Any work performed on a historic landmark or in an historic district which does not conform to the
Certificate of Appropriateness certificate shall be immediately halted by the Historic Preservation
1
Commission and the Building Department of South Bend and St. Joseph County. Fines may be levied for
projects not in compliance.
I read and understand the information
above:Yes, Continue
Date Thursday, July 3, 2025
2
Property Information
Property Address for Proposed Work:1414 Wayne Street
Property City South Bend
Property Zip Code 46614
Property Owner Information:
Owner Phone Number (574) 850-7683
Owner Address same
Proposed Work and Project Information
All projects must comply with applicable building and zoning codes.
South Bend Zoning Ordinance St. Joseph County Zoning Ordinance
Does your project involve any of the
following? (Check all that apply):Roofs Windows, Siding, Doors
New Construction, Additions
Contractor Information Peacock & Company, Inc. rear of home Dan Asleson
Contractor Phone Number (574) 289-4992
Contractor Email dasleson@peacockandco.com
Description of Proposed Work:
Remove of the upper railing and roof above kitchen
Construct a 5’x14'2" expansion/remodel the existing kitchen and a half bath remodel/expansion giving a
full bath with shower. High
Construct a 9’3”x 9’8” mudroom/laundry room addition with access to the backyard.
Structure heights approximately 13' at highest point/ rubber roof with a 2/12 pitch.
Reinstallation of salvaged windows
One new window on second floor
Two new back entry doors
File Upload
Site Plans, Aerial Views, and/or Blueprints: One (1) set shall be submitted with the Application.
Uploaded documentation must show existing property lines, buildings, structures, and proposed project
location(s). Hand Drawn Plans/Elevations are ok
Photographs to include: each area affected by project, close up detail of project areas.
Windows, Siding, and/or Door projects must include photographs of each window/door/siding affected
by the project and detailed close up of condition
3
7/3/2025 $20.00 PayPal Transaction ID 9BR58276CK321484Y
Applications will not be processed if the required photographs and/or documentation are not
included.
Any documentation submitted to this office cannot be returned to the applicant.
Project Type - List:Roofs, Windows, Siding, Doors, New Construction, Additions
Overhead View of Proposed Project
Location(s):PDF Chuppe Property.pdf
Site Plan or Aerial View of Proposed
Project Location(s):PDF Chuppe Property_8312.pdf
PDF Chuppe Property_7635.pdf
Elevations (Existing and Proposed
New): PDF Chuppe Design 5.21.25.pdf
Structural Drawings/Architectural
Drawings: PDF Chuppe Design 5.21.25_4163.pdf
Quote/Evaluation(s) by Repair Professional (Optional):
PDF 1414 E Wayne Proposal.pdf
Photographs:
2.73 MB 2.35 MB
4
3.18 MB 2.78 MB
Payment
Invoice ID # INV-000167
Payment Method Pay via Card or PayPal
5
O w n e r ’ s I n i t i a l s _________
P a g e | 1
June 19, 2025
Jennifer & Drew Chuppe
1414 E. Wayne St. S
South Bend, IN 46615
General Description of Project
Peacock and Company will provide various design and specification work
related to an approximate 5’ expansion/remodel of your kitchen and a half
bath remodel/expansion giving you a full bath with shower. As well as
providing you with an approximate 9’3”x 9’8” mudroom/laundry room
addition with access to the backyard.
We also propose to remodel your upstairs hall bathroom.
Removals
Exterior
Remove upper railing and roof above kitchen as needed
Remove siding as needed
Remove soffit, gutters, downspouts and roofing as needed
Remove entire little roof overhang at back entry door leading to
basement stairs
Remove portions of exterior walls to create a larger bathroom area
with shower and larger kitchen space.
Remove back exterior door leading into kitchen as well as back door
leading to basement
Remove window and trims in half bath
Remove hallway window and trims by back entry
Remove portion of fencing as needed; preserve for homeowner to
reuse if desired
Remove door and trims at upper level
Note: Existing upper level stairwell window to remain as is
O w n e r ’ s I n i t i a l s _________
P a g e | 2
Main Level Interior
Remove door and casing to half bathroom
Remove wall section to make a wider bathroom door opening
Remove flooring and base trims in half bathroom, kitchen and down
hallway; stopping at transitions to original ¾” flooring
Remove subfloor to joists in half bath for access to plumbing and
HVAC crawlspace
Remove toilet and pedestal sink in half bath
Remove all wallpaper in project area only (kitchen, half bath, hallway)
Remove all accessories in half bath
Remove lighting throughout kitchen, hallway and half bath
Remove portions of plaster ceiling for new lighting layout in kitchen
Remove windows and trims at existing breakfast nook; preserve
windows for reinstallation at new breakfast nook location
Remove built-in seating and table in kitchen
Remove all kitchen cabinets and countertops
Remove (4) cabinet doors in hallway; leaving cabinet box in place
Remove kitchen sink and faucet
Remove backsplash tile in kitchen
Remove appliances; preserve all appliances for reinstallation
2nd Floor Hall Bathroom
Remove toilet
Remove sink and faucet
Remove vanity cabinets and countertop
Remove shower/tub wall surround, plumbing fixtures, bathtub and
curtain rod
Remove floor tile to the subfloor and base trims
Remove mirror and all other accessories
Remove vanity light and soffit
o Soffit above bathtub and toilet to remain
Remove flushmount light and vent
Remove wall cabinet above toilet
Remove all wallpaper
Remove any damaged piping if needed at vanity as well as bathtub
See excavation list for additional items.
O w n e r ’ s I n i t i a l s _________
P a g e | 3
Preserve Items
All breakfast nook windows
All appliances
Fencing as needed
Excavation/ Concrete
Demo wood ramp, concrete steps, sidewalk and drive as needed for
new crawl space foundations.
Load and haul away debris.
Layout and excavate for two crawlspace foundation additions.
Load and haul away excess dirt.
Form and pour foundations for two crawlspaces.
Drill and pin new walls to existing using #4 rebar pins.
Install l/2" x 8" galvanized anchor bolts every 6 linear feet.
Backfill foundations using existing soils.
Saw cut for two crawlspace accesses; demo and haul away debris.
Pour and float finish two crawlspace floors at 2" thick with 6 mil
visqueen vapor barrier under slab.
Bobcat/pump concrete into footings, foundations and floors as needed
Form and pour approx. 25 linear feet of sidewalk.
Form and pour two sets of steps at both back doors.
Please note that this proposal does not cover unforeseen obstacles below the soil in
your backyard. This could include utilities, underground lines, invisible fence systems,
sprinklers, etc. We can offer an additional utility locate service (at an additional cost)
which may be able to pick up some of these (additional to the standard and free 811
service).
Framing – Subfloor
2x6 Treated sill plate bolted to foundation wall with foam sill seal between
surfaces. 2x floor joists to match existing of house, 16” on center attached to
sill. ¾” Tongue and groove OSB glued and power nailed to floor joists.
Floor heights of existing to new to be at same height.
O w n e r ’ s I n i t i a l s _________
P a g e | 4
Framing – Exterior Walls
Exterior Walls conventionally framed with 2” x 6”, 16” on center, single top
and bottom plate. Headers over door and window openings.
Approx. Rough opening dimensions for doors and windows:
A- Door off of kitchen (RO 38 ¼”W x 82”H)
B- Door off of mudroom/laundry ((RO 38 ¼”W x 82”H)
C- Window upstairs (RO 36 ½”W x 38 ½”H)
D- Preserved windows to be measured onsite for RO
Framing – Ceiling
Flat Ceiling:
2” x8”- 16” on center to create a flat ceiling of approx. 102” height.
Framing – Roof
Roof to be built at a 2-12 pitch sloping away from house on both kitchen and
mudroom/laundry additions.
Framing – Interior Walls
Interior walls conventionally framed with 2” x 4”, 16” on center, single top
and bottom plate.
Roofing
Install new High-density polyisocyanurate cover board over ¾”
plywood decking, approximately 350sf
Over the cover board, fully adhere .060 EPDM membrane,
approximately 350sf
At the sloping edges, install 3”-faced metal edging with 1” gravel
stop, approximately 32lf
At gutter edge, install 2”-faced metal edging, approximately 25lf
o We will match existing metal flashing color as closely as
possible
At 2nd story wall side, flash EPDM 6-9” up wall
Flash all metal edging and seams according to EPDM manufacturer’s
detail drawings and technical specifications
O w n e r ’ s I n i t i a l s _________
P a g e | 5
Soffit/ Fascia/ Gutters/ Downspouts
Supply and install all new aluminum soffit, fascia, gutters and downspouts to
match style/size/color of existing as close as possible.
Siding
Peacock will not be providing any siding labor or materials at this time.
Siding will be done by others and will not be covered by Peacock’s
warranty. Homeowner plans to have the whole house resided and wants that
company to also side the additions.
Windows/ Exterior Doors
Window upstairs (to be site verified by Quality Window & Doors)
Reinstall preserved windows at new location in dining nook area.
O w n e r ’ s I n i t i a l s _________
P a g e | 6
Exterior doors at laundry room & kitchen:
Kitchen door will have a left hand inswing and mudroom/laundry door will
have a right hand inswing.
Hardware is included here but you can choose the style/color you would like.
Exterior Trims
Supply and install new trims to match existing as close as possible for window
and doors.
Heating and Air Conditioning
Supply and install (4) runs to new remodeled space for heating and
cooling
Vent out new bathroom exhaust fans in both downstairs bathroom and
upstairs bathroom
Repair all deteriorated- rusted out ducts in existing basement
O w n e r ’ s I n i t i a l s _________
P a g e | 7
Electrical
Our licensed electrician will do the following electrical work:
1st Floor
Install new exterior coach light at kitchen door as well as laundry room
door.
Install outside GFCI outlets as needed
Insulation
R-value is based on wall thickness. Supply and install the following:
Foam around all openings and jambs
Foam around any cracks in the siding or in box sills
Foam around wire and plumbing holes in top and bottom plates and
exterior wall partitions
Foam full being electrical boxes. If wall is 2x6 foam where wires enter
the electrical box
Caulk plates, narrow headers and all gap areas as needed
Install 6”x16” foam air deflectors at eaves of the addition
Install R-19 kraft faced fiberglass batts in the exterior walls of
addition
Install R-19 fiberglass batts in basement box sills and/or between
floor box sills of addition
Install R-10 4’ MBI on the addition crawlspace walls
Install R-38 kraft faced fiberglass batts in the un-blowable ceiling of
the addition
O w n e r ’ s I n i t i a l s _________
P a g e | 8
Exterior Railing
Supply and install (QTY.1) C10 Westbury railing on concrete steps at
exterior kitchen door to left side only when viewed from the outside.
Aluminum- Powder Coated Black
Landscaping
Unless otherwise specified, our proposal does not include landscaping work
after the job is complete. Depending on the scope of work, your yard may
be disrupted from job access, equipment, etc. We will fill ruts, and rake
level, but we have not provided for any seeding or sod work.
B33SB36B18RDWB27B24RB6RB33SB36B18RDWB27B24RB6RU362490
2068
1840DH1840DH1840DH21130DH286830681840DH1840DH1840DH 17211DH17211DH17211DH21130DH
21168
21140DH 28682868
2868
2868
3'-8"3'-6"
12'
14'-2"4'-2"4'-5"5'-8 5/8"3'-7"14'-7 1/2"preserve windows
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-1
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"Existing Floor Plan
B30SB364DB18DWB271DB2118181DB2118181DB211818B24LSB24R1DB18B33B331DB18B30B30SB364DB18DWB271DB2118181DB2118181DB211818B24LSB24R1DB18B33B331DB18B30U362484
U641284THW2718W2436LW2436RW2718W3630W3348W3348W3348W3648W3348W3348W302121140DH
1740DH1740DH1740DH30681740DH1740DH1740DH 17211DH17211DH17211DH28683068
286830702868
266821068
DN
DN
R4
R4
R4
R4
R4
R4
3
3
3
3 20'3'-7"9'-8"
7'
4'-5"5'9'-3"14'-2"3'11'7'-8"7'-10"2'-8"PO Trash/Rec.
slide out towel rack
PO tray divider
RO shelves
RO shelves
wider door
RO shelves
lid holder
reinstall
salvaged
paint doors
grab
bar
recessed soap
micro. shelf
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-2
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"New Design
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-3
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"Exterior Perspective Viewsnew window
2-12 pitch,
rubber roofing
metal railing
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-4
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"Interior- Kitchen Perspective Views
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-5
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"Kitchen Elevations
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-6
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"Interior- Laundry & BathroomPerspective Views
B152234RB242234RSB242234RB152234RB152234RB242234RSB242234RB152234RW3036W1536RW1536R21138DH
26683'-2"
7'-9"8'-2"2'-9"2'
remove soffit
keep soffits 4DB1522341DB242234SB2422344DB1522344DB1522341DB242234SB2422344DB152234W3036W1D1562LW1D1562R21138DH
26683'-2"
7'-9"8'-2"2'-9"recessed niche w/
soap bar below
grab bar
hand shower
towel bar
recessed soap
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-7
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"Upstairs BathroomEXISTING PLAN
NEW DESIGN
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-8
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"Upstairs Bathroom-Perspective Views
B33SB36B18RDWB27B24RB6RB33SB36B18RDWB27B24RB6RU362490
2068
1840DH1840DH1840DH21130DH286830681840DH1840DH1840DH 17211DH17211DH17211DH21130DH
21168
21140DH 28682868
2868
2868
3'-8"3'-6"
12'
14'-2"4'-2"4'-5"5'-8 5/8"3'-7"14'-7 1/2"preserve windows
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-1
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"Existing Floor Plan
B30SB364DB18DWB271DB2118181DB2118181DB211818B24LSB24R1DB18B33B331DB18B30B30SB364DB18DWB271DB2118181DB2118181DB211818B24LSB24R1DB18B33B331DB18B30U362484
U641284THW2718W2436LW2436RW2718W3630W3348W3348W3348W3648W3348W3348W302121140DH
1740DH1740DH1740DH30681740DH1740DH1740DH 17211DH17211DH17211DH28683068
286830702868
266821068
DN
DN
R4
R4
R4
R4
R4
R4
3
3
3
3 20'3'-7"9'-8"
7'
4'-5"5'9'-3"14'-2"3'11'7'-8"7'-10"2'-8"PO Trash/Rec.
slide out towel rack
PO tray divider
RO shelves
RO shelves
wider door
RO shelves
lid holder
reinstall
salvaged
paint doors
grab
bar
recessed soap
micro. shelf
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-2
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"New Design
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-3
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"Exterior Perspective Viewsnew window
2-12 pitch,
rubber roofing
metal railing
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-4
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"Interior- Kitchen Perspective Views
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-5
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"Kitchen Elevations
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-6
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"Interior- Laundry & BathroomPerspective Views
B152234RB242234RSB242234RB152234RB152234RB242234RSB242234RB152234RW3036W1536RW1536R21138DH
26683'-2"
7'-9"8'-2"2'-9"2'
remove soffit
keep soffits 4DB1522341DB242234SB2422344DB1522344DB1522341DB242234SB2422344DB152234W3036W1D1562LW1D1562R21138DH
26683'-2"
7'-9"8'-2"2'-9"recessed niche w/
soap bar below
grab bar
hand shower
towel bar
recessed soap
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-7
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"Upstairs BathroomEXISTING PLAN
NEW DESIGN
SHEET:
SCALE:
DATE:DRAWN BY: Crystal Johnson, DESIGNERcjohnson@peacockandco.com574-289-4992PROJECT:SHEET TITLE:A-8
5/21/2025CHUPPE ADDITION &KITCHEN REMODELJenny & Drew Chuppe1414 Wayne St.South Bend, IN 466151/3"=1'0"Upstairs Bathroom-Perspective Views