HomeMy WebLinkAbout620 W Washington Street_AA 2025-0618aSarah Andrews, President HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY CERTIFICATE OF APPROPRIATENESS The Historic Preservation Commission of South Bend and St. Joseph County has approved the following work: 1) Replacement of damaged limestone stair tread. Repair to be made in kind with new limestone from Indiana Limestone. 2) Grinding, smoothing, and sealing of all limestone stair treads at main entrance (strategy approved and recommended by Indiana Landmarks to retain what is possible after long-standing issues in the entrance area). 3) Grinding, sanding and tuckpointing of all limestone cracks and locations where treads meet risers with color matched materials. 4) Grinding, repair, and installation of polyurea coating to remedy previously done repairs to concrete slab that were performed incorrectly. 5) Replacement in kind of 5 sections of concrete sidewalks along west side of main entrance. Repairs in kind to include a trowel finish concrete. 6) Various tuckpointing repairs around main entrance and along stairs to lower patio along the north side of building. Repairs to be done in kind including tinting and finishing in accordance with original installation methods. 7) Repairs of various stone caps along north and east sides of building. Grinding, mortar replacement, and sealing to be done as needed. Repairs to be done in kind to preserve original look of exterior as well as prevent further water penetration and damage. 8) Repair of column at southwest corner of exterior (just outside sun room). Repair to be made with color matched epoxy including sand to match color and texture. 9) Cleaning and sealing of damaged limestone walls underneath overhang for carriage drop. Damage was caused by previous roof leak that was repaired in 2024. 10) Repairs as needed stone wall cap along west side of building where railing attaches. Cleaning, crack filling, stone repair, and sealing to be completed to prevent further damages. 11) Stone column restoration at northeast corner of property. Loose stone column to be returned to its originally installed location, secured, and cap reinstalled in kind. 12) Removal, sand blasting, repair, and powder coating of existing, non historic fire escape landing, staircase, and handrail. Temporary replacement to be built of treated lumber while repairs are being made to the metal items. Temporary installation methods will be restricted to no additional building penetrations beyond current penetrations used for metal staircase. 620 WASHINGTON ST South Bend, IN, 46601 Application No. 2025-0618a in the County of St. Joseph; State of Indiana; which is: Located in a Local Historic District A Local Historic Landmark and found this application to be appropriate according to the Standards pertaining to Local Historic Landmarks and/or Local Historic Districts. Regulations pertaining to the Historic Preservation Commission are found in Chapter 21 (Zoning), South Bend Municipal Code and Chapter 26 of the St. Joseph County Code. The issuance of this certificate does NOT in any manner, release the recipient from the responsibility of complying with the requirements of the zoning ordinances, building codes, safety codes, ADA or other requirements of the City of South Bend, the County of St. Joseph, the State of Indiana, or the United States Federal Government. This certificate is good for one year from the date of issuance and is effective from the date entered herein. Plans are on file and open for public inspection at the office of the Historic Preservation Commission of South Bend and St. Joseph County, 227 West Jefferson Blvd., Suite 1400 S, South Bend, Indiana, during normal business hours. THIS CERTIFICATE IS NOT TRANSFERABLE NAME OF APPLICANT:Studebaker Mansion LLC CERTIFICATE ISSUED BY: Kate Himick Historic Preservation Specialist POST IN A CONSPICUOUS PLACE ON THE STREET SIDE OF THE PROJECT UNTIL COMPLETION OF ALL WORK. Phone: (574) 235-9371 E-mail: SBSJCHPC@southbendin.gov ROSS VAN OVERBERGHE Historic Preservation Administrator 6/20/2025DATE CERTIFICATE TAKES FORCE:6/20/2026DATE CERTIFICATE EXPIRES: ADMINISTRATIVE APPROVAL Wednesday, June 18, 2025 Application for Cer tificate of Appropriateness Important Information Regarding this Request REQUIRED DOCUMENTATION AND SITE PLANS The Historic Preservation Commission of South Bend and St. Joseph County cannot process an Application without required documentation. Comprehensive documentation provides a complete understanding of the project. Problems often occur during a project review or during the execution of the project when the property owner, staff or commissioners are unclear as to project specifics. Applications will NOT be processed without required documentation. Photographs may be submitted in digital format or in photographic print. When a project involves blueprints and/or site plans, one (1) set shall be submitted with the Application. Any documentation submitted to this office cannot be returned to the applicant. APPLICATION FEE The application processing fee for any Application for a Certificate Of Appropriateness is $20 Payment must accompany the application at the time of submission. For an electronically submitted application, payment must reach the HPC office within 48 hours following transmission. Payment can be made by credit card by contacting Business License Administrator Michelle Adams at (574) 235-5912; by cash in person in the Department of Community Investment on the 14th floor of the County City Building; or by check made out to City of South Bend. Applications will NOT be processed without the required fee. MEETING ATTENDANCE When an Application has been scheduled for any meeting, the owner, architect or contractor(s) retained for the project shall attend the meeting where their project will be reviewed and a decision rendered. Failure by the owner, architect, or contractor to attend such meetings may result in denial of the Application due to insufficient representation. CERTIFICATE ISSUANCE Certificates of Appropriateness will be filed with the Building Department of South Bend and St. Joseph County. A copy of the Certificate will be emailed directly to the owner and/or contractor(s) listed on the application. INSPECTION AUTHORITY All projects will be inspected during and following execution for compliance with the decision(s) rendered by the Historic Preservation Commission of South Bend and St. Joseph County. Owner acknowledges that while the Historic Preservation Commission only considers Certificates of Appropriateness for exterior features, under certain circumstances it may be necessary for the Commission Staff to have access to the interior of the building in order to accurately assess the condition of the exterior feature and that the lack of access to the interior may prevent the Commission Staff from making a favorable recommendation. Any work performed on a historic landmark or in an historic district which does not conform to the Certificate of Appropriateness certificate shall be immediately halted by the Historic Preservation 1 Commission and the Building Department of South Bend and St. Joseph County. Fines may be levied for projects not in compliance. I read and understand the information above:Yes, Continue Date Wednesday, June 18, 2025 2 Property Information Property Address for Proposed Work:620 W Washington St Property City South Bend Property Zip Code 46601 Property Owner Information:Studebaker Mansion LLC Owner Email Owner Address 200 N Church St Suite 200, Mishawaka, IN 46544 Proposed Work and Project Information All projects must comply with applicable building and zoning codes. South Bend Zoning Ordinance St. Joseph County Zoning Ordinance Does your project involve any of the following? (Check all that apply):Demolition Contractor Information MGR Masonry Contractors LLC Main entrance to building as well as various locations around building exterior Manny Dosal Contractor Phone Number (574) 931-7554 Contractor Email mgrmasonry1293@yahoo.com Contractor 2 Information Innovative Spaces Main entrance landing Craig Osman Contractor 2 Phone Number (574) 247-1999 Contractor 2 Email craig@innovativespacesinc.com Contractor 3 Information Sautter Construction LLC Fire escape landing & stairs near main entrance Chris Sautter Contractor 3 Phone Number (574) 261-6099 Contractor 3 Email sautter.construction@outlook.com Description of Proposed Work: 1) Replacement of damaged limestone stair tread. Repair to be made in kind with new limestone from Indiana Limestone. 2) Grinding, smoothing, and sealing of all limestone stair treads at main entrance. 3) Grinding, sanding, & tuckpointing all limestone cracks and locations where treads meet risers with color matched materials. 3 6/18/2025 $20.00, PayPal Transaction ID 0L143809JN3902041 4) Grinding, repair, & installation of polyurea coating to remedy previously done repairs that were performed incorrectly. New coating ensures proper traction, UV protection, flexion for expansion & contraction, as well as a significant improvement in color matching to the existing limestone. 5) Replacement in kind of 5 sections of concrete sidewalks along the west side of the main entrance. Repairs in kind include a trowel finish concrete. 6) Various tuckpointing repairs around main entrance and along stairs to lower patio along the north side of the building. Repairs to be done in kind including tinting and finishing in accordance with original installation methods. 7) Repairs of various stone caps along north and east sides of building. Grinding, mortar replacement, and sealing to be done as needed. Repairs to be done in kind to preserve original look of exterior as well as prevent further water penetration and future damage. 8) Repair of column at southwest corner of exterior (just outside sun room). Repair to be made with color matched epoxy including sand to match color and texture. Repair to restore original look of building while preventing further damage caused by water intrusion. 9) Cleaning and sealing of damaged limestone walls underneath overhang for carriage drop. Damage was caused by previous roof leak that was repaired in 2024. Masonry repair to protect existing structure and prevent further damage. 10) Repair as needed stone wall cap along west side of building where railing attaches. Cleaning, crack filling, stone repair, and sealing to be completed to prevent further damage. 11) Stone column restoration at northeast corner of property. Loose stone column to be returned to its originally installed location, secured, and cap reinstalled in kind with original look of proper ty. Includes grinding and tuckpointing in kind as necessary. 12) Removal, sand blasting, repair, & powder coating (matte black finish) of existing, non-historic fire escape landing, staircase, & handrail. Temporary replacement to be built of treated lumber while repairs are being made to metal items. Temporary installation methods will be restricted to no additional building penetrations beyond current penetrations utilized for metal staircase. Specification of Material via Manufacture Brochure:PDF Indiana Geologica….pdf PDF Innovative Space….pdf PDF Indiana Limeston….pdf PDF Innovative Space….pdf PDF Innovative Space….pdf 4 File Upload Site Plans, Aerial Views, and/or Blueprints: One (1) set shall be submitted with the Application. Uploaded documentation must show existing property lines, buildings, structures, and proposed project location(s). Hand Drawn Plans/Elevations are ok Photographs to include: each area affected by project, close up detail of project areas. Windows, Siding, and/or Door projects must include photographs of each window/door/siding affected by the project and detailed close up of condition Applications will not be processed if the required photographs and/or documentation are not included. Any documentation submitted to this office cannot be returned to the applicant. Project Type - List:Demolition Site Plan or Aerial View of Proposed Project Location(s):PDF Studebaker Mansion Exterior Items.pdf Structural Drawings/Architectural Drawings: 2.99 MB Quote/Evaluation(s) by Repair Professional (Optional): PDF MGR Estimate.pdf PDF Innovative Spaces Contract.pdf 5 Photographs: 2.99 MB 2.9 MB 2.84 MB Payment Invoice ID # INV-000162 Payment Method Pay via Card or PayPal 6 Outlook Re: 620 W Washington Full COA App From Todd Zeiger < Date Tue 6/24/2025 3:38 PM To Kate Himick <Khimick@southbendin.gov> Hi, K ate. I have met with the owner's rep and we approved the work per our Easement on the building. If I can answer any questions or provide any further details about our approval let me know. Todd …………………………………. Todd Zeiger Director, Northern Regional Office ……………………………… Indiana Landmarks 801 W. Washington South Bend, Indiana 46601 indianalandmarks.org Indiana Landmarks revitalizes communities, strengthens connections to our diverse heritage, and saves meaningful places. Become a member I Subscribe to our e-letter I Find us on Facebook I Follow us on Instagram From: Kate Himick <Khimick@southbendin.gov> Sent: Friday, June 20, 2025 10:10 AM To: Todd Zeiger < Subject: 620 W Washington Full COA App   Todd, Thanks for chang with me earlier. Just in case you wanted to review it, I've aached the full COA applicaon that I received for 620 W Washington. Best, Kate ________________ CAUTION: This email originated from outside of the City of South Bend’s network . Do not click links or open attachments unless you validate the sender and know the content is safe. Please report any suspicious emails to the CyberSecurity team by clicking the Phish Aler t Button in Outlook . PRODUCT DESCRIPTIONMENDER X2 AND MENDER X2NC ARE TWO COMPONENT, EASY TO MIX, FAST CURING CRACK AND SPALL REPAIR MATERIALS. MENDER X2 GOES FROM BLACK TO GREY AS IT CURES TO INDICATE COMPLETION. MENDER X2NC IS A NONCOLORED VERSION SPECIFICALLY FOR GRIND AND CLEAR APPLICATIONS. TYPICAL USES/APPLICATIONS CRACK AND SPALL REPAIR MIXED WITH SAND TO FILL LARGE HOLES AND VOIDS PRODUCT ADVANTAGES RAPID CURE LOW VISCOSITY EASY TO MIX PACKAGINGMENDER X210GALLON KITPART A: 5GALLON PAIL PART B: 5GALLON PAIL MENDER X2NC2GALLON KITPART A: 1GALLON JUGPART B: 1GALLON JUG STORAGEPRODUCT SHOULD BE STORED INDOORS BETWEEN 60˚F TO 85˚F AWAY FROM DIRECT SUNLIGHT AND MOISTURE. MAKE SURE CONTAINERS ARE COMPLETELY SEALED TO PREVENT MOISTURE CONTAMINATION AND ENSURE BEST PERFORMANCE. SHELF LIFE IS 12 MONTHS. RECOMMENDED APPLICATION TEMPERATURE SUMMER: 60˚ 80˚ FWINTER: 30˚ 60˚ F APPLYING MATERIAL OUTSIDE OF THE RECOMMENED TEMPERATURE RANGE MAY DRAMATICALLY INCREASE OR DECREASE CURE SPEED. TEST DATA SOLIDS CONTENT: A+B CURED >98% WEIGHT PER GALLON ASTM D1475: PART A: 8.52 LB/GAL PART B: 9.00 LB/GAL VISCOSITY ASTM D7867: PART A: 240 CPS PART B: 60 CPS GEL TIME: 100 ML RESIN ONLY SUMMER: 5 MIN WINTER: 1.5 MIN TACK FREE TIME ASTM D5895: 57 MILS, 50% RH SUMMER: 20 MIN WINTER: 5 MIN SHORE D HARDNESS ASTM D2240: 10 DAY RESIN ONLY: 68 UNITS 10 DAY WITH SAND*: 82 UNITS ADHESION ASTM D4541: 10 DAY: >500 PSI CONCRETE FAILED *USING THE RECOMMENDED MIX RATIO OF SAND ALL TEST DATA COLLECTED AT 70˚F. Tech Support 952-491-0616 (Call/Text) techsupport@penntekcoating.com 7850 Lakeville BLVD, Lakeville, MN 55044 Penntek.com MENDER X2 AND X2-NC T E CHN I C AL D ATA SHEE T Page 1 SURFACE PREPARATION MAKE SURE SURFACE IS PROPERLY ABRADED, CLEAN, AND DRY BEFORE APPLICATION. SURFACE MUST BE FREE OF DIRT, GREASE, OIL, AND OTHER CONTAMINANTS. CONTAMINANTS COULD LEAD TO SURFACE DEFECTS SUCH AS CRAWLING AND POOR ADHESION. ALL CRACKS SHOULD BE GROUND OUT WITH A VBLADE AND ALL DUST AND DEBRIS REMOVED. IT MAY BE NECESSARY TO USE A WIRE BRUSH TO ENSURE CRACKS AND VOIDS ARE PROPERLY PREPARED. ENSURE THAT THE FLOOR TEMPERATURE IS MORE THAN 5 DEGREES OVER THE LOCAL DEW POINT TO AVOID WATER CONDENSATION. FLOOR MOISTURE SHOULD BE MONITORED WITH A NONDESTRUCTIVE ELECTRONIC MOISTURE METER AS PER ASTM F2659. READING SHOULD BE LOWER THAN 5.5% BY THIS METHOD. PREMIX REQUIREMENTS MENDER X2: PART A: REMOVE LID AND MIX WITH DRILL MIXER FOR 2 MINUTES. BE SURE TO SCRAPE THE BOTTOM OF THE BUCKET TO MIX IN ANYTHING THAT HAS SETTLED OUT. PART B: NOT REQUIRED. MENDER X2NC: PART A: INVERT AND SHAKE VIGOROUSLY FOR ABOUT 1 MINUTE. CHECK THAT THERE ARE NOT SOLIDS ON THE BOTTOM OF THE JUG, CONTINUE SHAKING AND INVERTING UNTIL UNIFORM. PART B: NOT REQUIRED. MIX RATIO: 1:1 MIX RATIO BY VOLUME A:B +1 PART SAND BY VOLUME OR MORE IF DESIRED MIX INSTRUCTIONS: CAREFULLY MEASURE 1 PART A AND 1 PART B BY VOLUME AND BLEND TOGETHER FOR 2 MINUTES WITH A DRILL MIXER. MIX IN THE DESIRED AMOUNT OF SAND. EITHER 4030 OR 5030 GRADE SAND WILL WORK. PROCEED TO APPLICATION IMMEDIATELY AFTER MIXING. NOTE THAT LARGER VOLUME MIXES WILL HAVE A SHORTER POT LIFE DUE TO THE HEAT GENERATION OF THE MATERIAL. MIX IN SMALL BATCHES AS NEEDED. DO NOT MIX MORE MATERIAL THAN CAN BE USED IN 510 MINUTES. APPLICATION 1. POUR MIXTURE INTO PRE PREPARED CRACKS, PITS, AND SPALLS IN THE CONCRETE. 2. AFTER 20 MINUTES, CHECK THAT THE MENDER X2 IS HARD ENOUGH TO GRIND. IF NOT, CHECK IN 10 MORE MINUTES. TEMPERATURE AND HUMIDITY CONDITIONS WILL AFFECT THE HARDNESS DEVELOPMENT. 3. GRIND MATERIAL FLUSH WITH THE SURFACE OF THE CONCRETE. SWEEP AND VACUUM AWAY ANY LEFTOVER DUST AND DEBRIS. INSPECT REPAIRS AND PERFORM TOUCH UPS AS NEEDED. 4. FOR A GRIND AND CLEAR FLOOR, USE MENDER X2NC WITH CLEAN CONCRETE DUST EXAMPLE: FROM FLOOR GRINDER TO MATCH CONCRETE APPEARANCE. PRODUCT AND APPLICATION SUPPORT REFER TO THE PENNTEK TRAINING MANUAL OR CONTACT TECHNICAL SUPPORT LINE 9524910616 FOR FURTHER INFORMATION. Tech Support 952-491-0616 (Call/Text) techsupport@penntekcoating.com 7850 Lakeville BLVD, Lakeville, MN 55044 Penntek.com MENDER X2 AND X2-NC T E CHN I C AL D ATA SHEE T Page 2 HELPFUL TIPS KEEP MATERIAL COOL BEFORE USING TO ENSURE MAXIMUM WORK TIME. MINIMIZE HOW LONG CONTAINERS ARE OPEN TO LIMIT MOISTURE EXPOSURE. THIS WILL KEEP OPENED CONTAINERS FRESH FOR LONGER. THE USE OF SAND WILL EXTEND THE WORK TIME. KEEP SAND AS DRY AS POSSIBLE BEFORE USE TO AVOID FOAMING. USE MORE SAND FOR DEEPER AND WIDER CRACKS. THIS WILL HELP REDUCE MATERIAL SOAKING AWAY. START WITH THIN CRACKS AND SMALLER PITS AS THESE WILL TAKE LONGER TO CURE. ALLOWING THE MIX TO THICKEN SLIGHTLY BEFORE APPLYING WILL HELP IT CURE FASTER. WINTER AND SUMMER PART A CAN BE MIXED TO MAKE A “FALL BLEND”. CHOOSE SPEED BASED ON THE SLAB TEMPERATURE OF THE CONCRETE, NOT THE AIR TEMPERATURE. Tech Support 952-491-0616 (Call/Text) techsupport@penntekcoating.com 7850 Lakeville BLVD, Lakeville, MN 55044 Penntek.com MENDER X2 AND X2-NC T E CHN I C AL D ATA SHEE T Page 3 TEST DATA SOLIDS CONTENT (ASTM 2369): >99.1% VOC (ASTM 2369): <10 g/L WEIGHT PER GALLON (ASTM D1475): Part A: 9.37 LB/GAL Part B: 10.22 LB/GAL VISCOSITY (ASTM D2196): Part A: 1400 CPS Part B: 500 CPS GEL TIME: Extreme Heat: 1 Hour Summer: 50 Minutes Winter: 14 Minutes TACK FREE TIME (ASTM D5895) 5-6 MILS, 50% RH: Extreme Heat: 4.0 Hours Summer: 3.8 Hours Winter: 2.5 Hours KÖNIG HARDNESS 30° (ASTM D4366): 15 Day: 31 S SHORE D HARDNESS (ASTM D2240): 10 Day: 55 ADHESION (ASTM D4541): 10 Day: >500 PSI (Concrete Failed) TENSILE STRENGTH AND ELONGATION (ASTM D638): 5 MILS Tensile Strength: 4000 PSI Elongation: 95% WATER VAPOR TRANSMISSION (ASTM E96/E96M): 4 MILS Permeability: 0.78 Perms All test data collected at 70˚F. Tech Support 952-491-0616 (Call/Text) techsupport@penntekcoating.com 7850 Lakeville BLVD, Lakeville, MN 55044 Penntek.com XP 275 POLYUREA/POLYURETHANE PRIMER/BASECOAT T E CHN I C AL D ATA SHEE T Page 1 PRODUCT DESCRIPTION XP 275 is a high solids, low VOC two component Polyurea/polyurethane primer/basecoat. XP 275 Basecoat provides rapid cure and excellent adhesion to concrete. Summer, Winter and Extreme Heat versions allow for ease of application in various climates and is pre-pigmented for outstanding hide. TYPICAL USES/APPLICATIONS • Basecoat for full broadcast floors • Primer for pigmented topcoat PRODUCT ADVANTAGES • Rapid cure • Excellent adhesion • Fast return to service • High solids • Simple mix ratio • Easy roller application PACKAGING 15-Gallon kit Part A - 5-Gallon Pail (X2) Part B - 5-Gallon Pail STORAGE Product should be stored indoors between 60˚F to 85˚F away from direct sunlight and moisture. Make sure containers are completely sealed to prevent moisture contamination and ensure best performance. Shelf life is 12 months. RECOMMENDED APPLICATION TEMPERATURE XP 275 Extreme Heat: 80˚F - 100˚F XP 275 Summer: 60˚F - 80˚F XP 275 Winter: 30˚F - 60˚ F COVERAGE 270 – 300 SQ.FT./Gal. (5 – 6 mils) SURFACE PREPARATION Make sure surface is properly abraded, clean, and dry before application. Surface must be free of dirt, grease, oil, and other contaminants. Contaminants could lead to surface defects and/or poor adhesion. Ensure that the floor temperature is more than 5 degrees over the local dew point to avoid water condensation. Floor moisture should be monitored with a nondestructive electronic moisture meter as per ASTM F2659. Reading should be lower than 5.0% by this method. PRE-MIX REQUIREMENTS Part A: Remove lid and mix with drill mixer for 2 minutes to ensure uniformity. Part B: Not required. MIX RATIO: 2:1 mix ratio by volume (A:B) MIX INSTRUCTIONS: Carefully measure 2 Parts A and 1 Part B by volume and blend together for 2 minutes with a drill mixer. Proceed to application immediately after mixing. Never mix more material than can be installed within 15 minutes. APPLICATION 1.Using the appropriate coverage rate, mix only the amount of material that can be installed within 15 minutes. 2.To extend the working time, pour mixed material onto floor in a ribbon like pattern. 3.Spread material evenly with a pre-wetted roller. Use a chip brush to apply around the edges of the floor. 3/8” nap shed resistant 18” roller and 3-4” chip brush are recommended. 4.For Broadcast Systems: broadcast within 15 minutes of the mix time. 5.Work time of the coating is reduced under high temperature and/or humid conditions. 6.For detailed application instructions, refer to Penntek Training Manual or contact the technical support line. PRODUCT AND APPLICATION SUPPORT Refer to the Penntek Training Manual or contact technical support line (952-491-0616) for further information. Tech Support 952-491-0616 (Call/Text) techsupport@penntekcoating.com 7850 Lakeville BLVD, Lakeville, MN 55044 Penntek.com XP 275 POLYUREA/POLYURETHANE PRIMER/BASECOAT T E CHN I C AL D ATA SHEE T Page 2 CHEMICAL RESISTANCE | 24 HOUR SPOT TESTING CHEMICAL RESULT Acetic Acid 30% 2.5 Acetic Acid 5% 4.5 Acetone 1 Ammonia 10% 5 Battery Acid (Sulfuric Acid 37-40%) 4.5* Brake Fluid 1 Cleaner (Formula 409®) 5 Cleaner (Pine-Sol®) 2* Cleaner 3% (Pine-Sol®) 4 Coffee 5 Cola 5 Dish Soap (Dawn®) 2* Dish Soap 1% (Dawn®) 5 Ethylene Glycol / Antifreeze 5 Gasoline 1 Glass Cleaner (Windex®) 4 Hand Sanitizer (Ethanol Based) 1 Household Bleach (10% in water) 3* Household Bleach 2* Hydrochloric Acid 20% 4* Hydrochloric Acid 5% 4.5* Ice Melt 20% 5 Isopropyl alcohol 99% 1 Ketchup 5 Mineral Spirits 3 Motor Oil (Conventional) 5 Motor Oil (Synthetic) 5 Mustard 4 Sodium Hydroxide 50% 4 Sodium Hydroxide 25% 4 Sodium Hydroxide 5% 4 Sugar Solution 20% 5 Phosphoric Acid 50% 4.5* Phosphoric Acid 10% 5 Water 5 Windshield Washer Fluid 4 Xylene 1 KEY: 1 = Moderate/severe damage, does not recover 4 = Light damage, fully recovers 2 = Mild damage, does not recover 5 = No damage 3 = Light damage, partially recovers * = Staining Tech Support 952-491-0616 (Call/Text) techsupport@penntekcoating.com 7850 Lakeville BLVD, Lakeville, MN 55044 Penntek.com XP 275 POLYUREA/POLYURETHANE PRIMER/BASECOAT T E CHN I C AL D ATA SHEE T Page 3 Tech Support 952-491-0616 (Call/Text) techsupport@penntekcoating.com 7850 Lakeville BLVD, Lakeville, MN 55044 Penntek.com Page 1 T E CHN I C AL D ATA SHEE T PRODUCT DESCRIPTION NX 300 is a two component polyaspartic topcoat with high gloss and excellent UV stability. Summer, winter and extreme heat versions allow for ease of application in various climates. TYPICAL USES/APPLICATIONS Topcoat for full broadcast floors. PRODUCT ADVANTAGES • Rapid cure • Fast return to service • Simple mix ration • Easy roller application PACKAGING 10-Gallon kit Part A - 5-Gallon Pail Part B - 5-Gallon Pail STORAGE Product should be stored indoors between 60˚F to 85˚F away from direct sunlight and moisture. Make sure containers are completely sealed to prevent moisture contamination and ensure best performance. Shelf life is 12 months. RECOMMENDED APPLICATION TEMPERATURE NX 300 Extreme Heat: 80˚F - 100˚F NX 300 Summer: 60˚F - 80˚F NX 300 Winter: 30˚F - 60˚F COVERAGE Over broadcast flake: 150 SQ.FT./Gal Over smooth surface: 200-230 SQ.FT./Gal (7-8 MILS) TEST DATA VOC (FULL KIT): Extreme Heat: 92 g/L Summer: 91 g/L Winter: 65 g/L WEIGHT PER GALLON (ASTM D1475): Extreme Heat Part A: 8.78 LB/GAL Summer Part A: 8.78 LB/GAL Winter Part A: 9.05 LB/GAL Part B: 9.96 LB/GAL VISCOSITY (ASTM D2196): Extreme Heat Part A: 970 CPS Summer Part A: 970 CPS Winter Part A: 340 CPS Part B: 150 CPS TACK FREE TIME (ASTM D5895) 8 MILS, 70˚F/50%RH: Extreme Heat: 10.5 Hours Summer: 8 Hours Winter: 1.5 Hours KÖNIG HARDNESS (ASTM D4366): Full Hardness: 145 S TABER ABRASION (ASTM D4060): CS-17 Wheels, 1000G Load LOSS/1000 CYCLES: 65 MG GLOSS (ASTM D523): 60˚: 90 Units TENSILE STRENGTH AND ELONGATION (ASTM D638): Tensile Strength: 5000 PSI Elongation: 5% WATER VAPOR TRANSMISSION (ASTM E96/E96M): 4MILS Permeability: 3.2 Perms ALL TEST DATA COLLECTION AT 70˚F NX 300 | POLYASPARTIC TOPCOAT Tech Support 952-491-0616 (Call/Text) techsupport@penntekcoating.com 7850 Lakeville BLVD, Lakeville, MN 55044 Penntek.com Page 2 T E CHN I C AL D ATA SHEE T SURFACE PREPARATION Product is intended for use as a topcoat over a previously primed/coated surface. Not intended for direct to concrete applications. Surface must be free of dirt, grease, oil, and other contaminants. Contaminants could lead to surface defects such as craters and crawling in the coating. Make sure surface is properly prepared before application. Ensure that the floor temperature is more than 5 degrees over the local dew point to avoid water condensation. NX 300 can be re-coated after it cures tack-free and is hard enough to walk on. If re-coating after 24 hours, the surface needs to be abraded to ensure adequate adhesion of the next coating layer. PRE-MIX REQUIREMENTS Part A: Invert containers 3 times prior to each use to ensure uniformity. Part B: Not required. MIX RATIO: 1:1 mix ratio by volume (A:B) MIX INSTRUCTIONS: Carefully measure 1 Part A and 1 Part B by volume and blend together for 2 minutes with a drill mixer. Proceed to application immediately after mixing. Never mix more material than can be installed within 15 minutes. APPLICATION 1.Using the appropriate coverage rate, mix only the amount of material that can be installed within 15 minutes. 2.Spread material evenly with a squeegee and back roll with a pre-wetted roller. Use a chip brush to apply around the edges of the floor. 3/8” nap shed resistant 18” roller and 3” chip brush are recommended. 3.Work time of the coating is reduced under high temperature and/or humid conditions. 4.For detailed application instructions, refer to Penntek training manual or contact the technical support line. PRODUCT AND APPLICATION SUPPORT Refer to the Penntek training manual or contact technical support line (952-491-0616) for further information. NX 300 | POLYASPARTIC TOPCOAT CHEMICAL RESISTANCE 24 HOUR AND 30 MINUTE SPOT TESTING CHEMICAL 24 HR RESULT 30 MIN RESULT Acetic Acid 30% 1 2 Acetic Acid 5% 2 5 Acetone 1 2 Ammonia 10% 5 Battery Acid (Sulfuric Acid 37-40%) 4 Betadine Solution 4* 4* Brake Fluid 2 5 Citric Acid 20% 5 Cleaner (Formula 409®) 4 Cleaner (Pine-Sol®) 4 Cleaner (Pine-Sol® 3%) 5 Coffee 5 Cola 5 Dish Soap (Dawn®) 4 Dish Soap (Dawn® 1%) 5 Ethylene Glycol / Antifreeze 5 Gasoline 2 3 Glass Cleaner (Windex®) 4 Glycerin 5 Hand Sanitizer (Ethanol Based) 2 3 Household Bleach 4 Hydrochloric Acid 20% 1* 3 Hydrochloric Acid 5% 3 5 Ice Melt 20% in water 5 Isopropyl alcohol 99% 1 3 Ketchup 5 Mineral Spirits 5 Motor Oil (Conventional) 5 Motor Oil (Synthetic) 5 Mustard 3* 3* Phosphoric Acid 50% 2 5 Phosphoric Acid 10% 3 5 Sodium Hydroxide 50% 5 Skydrol® LD-4 3 4 Sugar Solution 20% 5 Water 5 Wind Shield Washer Fluid 4 Xylene 4 KEY: 1 = Moderate/severe damage, does not recover 4 = Light damage, fully recovers 2 = Mild damage, does not recover 5 = No damage 3 = Light damage, partially recovers * = Staining Tech Support 952-491-0616 (Call/Text) techsupport@penntekcoating.com 7850 Lakeville BLVD, Lakeville, MN 55044 Penntek.com Page 3 T E CHN I C AL D ATA SHEE T NX 300 | POLYASPARTIC TOPCOAT Welcome To Innovative Where We've Been Weaving Magic Into Spaces Since 2007. Visit Us At Our Office And Showroom 51401 Bittersweet Rd. Granger, In 46530 As A Local Family Owned Business, We're Passionate About Transforming Spaces That Inspire And Elevate Everyday Living. Get Ready To Experience The Transformative Power Of Our Craftsmanship And Dedication To Excellence. With Risk-Free, High Quality, And Long-Term Solutions We Guarantee Not Just A Change But A Lasting Impact. From Turning Concrete Into Works Of Art, Making Garages Epic, And Closets Downright Sexy, We Redefine Spaces. No. 4781May 12, 2025 Chris Sautter 620 W Washington St South Bend, IN 46601 sautter.construction@outlook.com (574) 261-6099 Prepared for: Innovative Spaces | Innovative Concrete Coatings | Craig Osman 51401 Bittersweet Rd, Granger, IN 46530 P: (574) 247-1999 | craig@innovativespacesinc.com www.ReclaimMySpace.com www.ReclaimMyConcrete.com CONTRACT Chris Sautter Patio and Sidewalks Quantity 1 Measurement 96.3 (sq. ft.) Notes Install Penntek Evolution Flooring System: An aesthetic, easy to clean, seamless floor consisting of a pigmented primer binder, broadcast with multi-color acrylic polymer chips and sealed with a transparent UV Stable topcoat. • Diamond Profile Concrete per ICRI guidelines for permanent adhesion. • Diamond Profile Cracks and Imperfections. • Patch all Cracks and Pitting as indicated with Mender X2 & Diamond Profile. • Saw Cut, Expansion, and Tool Joints to be honored when present unless specified. • Base Coat: Install 100% Solids Polyurea of XP 275 primer/binder. • Decorative Media Layer: Multicolor Acrylic Polymer Chips Broadcast to Rejection. • Scrape Floor to remove excess broadcast media. • Install Clear UV Resistant Polyaspartic Top Coat of NX 300 at 11-12 mils thick. • Traction Additive Included at No Charge Fair Concrete Condition 9 Mohs Testing 3.5 Tramex Reading 22" 220V Electric Machine- Hard Surface Access Access Level 3- 4 oz Gator Grip Traction Additive per gallon Traction Level Hybrid Series- Specify Below Flake Color Patio and Sidewalks Upgrade Flake- Hybrid & Custom Armadillo Flake Color Selected Option Hybrid Flake Series Quantity 1 Price:$2,896.30 Pricing $2,896.30Grand Total: Deposit Amount:$1,737.78 Balance Due:$1,158.52 The purchaser agrees to pay by cash or check upon completion of work specified on invoice and agrees to these terms and conditions of purchase agreement. Work completed in stages will be invoiced in stages, based upon work completed. Please make checks out to: Innovative Spaces, Inc. • Payment in full is due upon completion of work. • Nonpayment of invoice will result in a lien against the installation property. • Lien will be filed 30 days after completion of project, in accordance with applicable laws. • Cancellations will be subject to a 10% cancellation fee, with the exception of special ordered products, which may not be restocked. • Innovative Spaces, Inc will only perform work agreed upon invoice. • Weather conditions may effect schedule change. • All changes to this contract must be recorded on a separate change order signed by both parties. • Local permits are responsibility of property owner. Innovative Spaces, Inc is not responsible for the original condition of the concrete. • We make no warranty against substrate cracks, joints that are filled, or the return of repaired cracks. • We make no warranty for damage caused by hydrostatic pressure, or moisture vapor permeating the concrete. • We are not responsible for bugs or animals that may become entrapped while project is curing. • We are not responsible for water damage from leaking pipes, receptacles, or any faulty seals such as but not limited to doors and windows. • We are not responsible for unauthorized entry from someone not respecting non-entry signs such as caution tape, cones, signs. • We are not responsible for paint lift caused by masking materials on painted surfaces. • Touch up of painted areas may be required after installation of coating. X X Chris Sautter [sig|req|signer1||||240|35][sig|req|signer2||||240|35] Company Authorized Signature DISCOVER THE DIFFERENCE OF OUR FLOORS! See What Sets Our Concrete Coatings Apart. Hammer Test Stain Test Stretch Test UV Sunlight Test What Do Our Clients Say About Their Floors? This is due to polyureas extreme flexibility, elongation, dense cross- linking and mar resistance. Polyureas can take a tremendous amount of abuse because they are malleable and can take the physical impacts and disperse them, much like the rubber on a car tire. 4X STRONGER THAN EPOXY Polyureas are 98% more flexible than typical Epoxy/Hybrid floor coatings. This flexibility is key during large temperature fluctuations. Polyureas, being as flexible as they are, expand and contract with the concrete leaving the surface strong and intact. WILL NOT CHIP, PEEL OR DELAMINATE Polyureas are more chemically resistant to a much wider range of chemicals than epoxy surfaces. This is due to their densely cross-linked chemistry. From Stains, Oil, Gas, and Grease, to Acids, Skydrol, Hydroxides, Polyureas will stand the test of time. Polyureas are also 100% UV stable. RESISTS STAINS, OIL, GASOLINE AND UV RAYS NO POLYASPARTIC OR EPOXY BASECOAT 10X MORE FLEXIBLE 100% PURE POLYUREA WHY CHOOSE INNOVATIVE CONCRETE COATINGS? Our quality surface coatings are installed by factory trained technicians and backed by our exclusive No Subcontractor Guarantee. You’ll work with trained and certified technicians who share our company commitment to exceptional floor coatings and on-time, hassle-free service. PROFESSIONAL TECHNICIANS Designed by a team of experienced flooring chemists our floor finishes are made for maximum durability, resilience and weather and heat resistance. ADVANCED MATERIALS The days of slow, expensive floor coatings are over. We will never rush your project, but many projects can be finished in as little as 1 day. ONE DAY INSTALLS