HomeMy WebLinkAbout620 W Washington Street_AA 2025-0618aSarah Andrews,
President
HISTORIC
PRESERVATION
COMMISSION
OF
SOUTH BEND
AND
ST. JOSEPH
COUNTY
CERTIFICATE
OF
APPROPRIATENESS
The Historic Preservation Commission of South Bend and St.
Joseph County has approved the following work:
1) Replacement of damaged limestone stair tread. Repair to be made in kind with new limestone from
Indiana Limestone.
2) Grinding, smoothing, and sealing of all limestone stair treads at main entrance (strategy approved and
recommended by Indiana Landmarks to retain what is possible after long-standing issues in the entrance
area).
3) Grinding, sanding and tuckpointing of all limestone cracks and locations where treads meet risers with
color matched materials.
4) Grinding, repair, and installation of polyurea coating to remedy previously done repairs to concrete slab
that were performed incorrectly.
5) Replacement in kind of 5 sections of concrete sidewalks along west side of main entrance. Repairs in kind
to include a trowel finish concrete.
6) Various tuckpointing repairs around main entrance and along stairs to lower patio along the north side of
building. Repairs to be done in kind including tinting and finishing in accordance with original installation
methods.
7) Repairs of various stone caps along north and east sides of building. Grinding, mortar replacement, and
sealing to be done as needed. Repairs to be done in kind to preserve original look of exterior as well as
prevent further water penetration and damage.
8) Repair of column at southwest corner of exterior (just outside sun room). Repair to be made with color
matched epoxy including sand to match color and texture.
9) Cleaning and sealing of damaged limestone walls underneath overhang for carriage drop. Damage was
caused by previous roof leak that was repaired in 2024.
10) Repairs as needed stone wall cap along west side of building where railing attaches. Cleaning, crack
filling, stone repair, and sealing to be completed to prevent further damages.
11) Stone column restoration at northeast corner of property. Loose stone column to be returned to its
originally installed location, secured, and cap reinstalled in kind.
12) Removal, sand blasting, repair, and powder coating of existing, non historic fire escape landing, staircase,
and handrail. Temporary replacement to be built of treated lumber while repairs are being made to the metal
items. Temporary installation methods will be restricted to no additional building penetrations beyond
current penetrations used for metal staircase.
620 WASHINGTON ST
South Bend, IN, 46601
Application No. 2025-0618a
in the County of St. Joseph; State of Indiana; which is:
Located in a Local Historic District
A Local Historic Landmark
and found this application to be appropriate according to the Standards pertaining to Local
Historic Landmarks and/or Local Historic Districts. Regulations pertaining to the Historic
Preservation Commission are found in Chapter 21 (Zoning), South Bend Municipal Code
and Chapter 26 of the St. Joseph County Code.
The issuance of this certificate does NOT in any manner, release the recipient from
the responsibility of complying with the requirements of the zoning ordinances, building
codes, safety codes, ADA or other requirements of the City of South Bend, the County of
St. Joseph, the State of Indiana, or the United States Federal Government.
This certificate is good for one year from the date of issuance and is effective from
the date entered herein. Plans are on file and open for public inspection at the office of the
Historic Preservation Commission of South Bend and St. Joseph County, 227 West
Jefferson Blvd., Suite 1400 S, South Bend, Indiana, during normal business hours.
THIS CERTIFICATE IS NOT TRANSFERABLE
NAME OF APPLICANT:Studebaker Mansion LLC
CERTIFICATE ISSUED BY:
Kate Himick
Historic Preservation Specialist
POST IN A CONSPICUOUS PLACE ON THE STREET SIDE
OF THE PROJECT UNTIL COMPLETION OF ALL WORK.
Phone: (574) 235-9371
E-mail: SBSJCHPC@southbendin.gov
ROSS VAN OVERBERGHE
Historic Preservation
Administrator
6/20/2025DATE CERTIFICATE
TAKES FORCE:6/20/2026DATE CERTIFICATE
EXPIRES:
ADMINISTRATIVE APPROVAL
Wednesday, June 18, 2025
Application for Cer tificate of
Appropriateness
Important Information Regarding this Request
REQUIRED DOCUMENTATION AND SITE PLANS
The Historic Preservation Commission of South Bend and St. Joseph County cannot process an Application
without required documentation. Comprehensive documentation provides a complete understanding of the
project. Problems often occur during a project review or during the execution of the project when the
property owner, staff or commissioners are unclear as to project specifics. Applications will NOT be
processed without required documentation.
Photographs may be submitted in digital format or in photographic print. When a project involves
blueprints and/or site plans, one (1) set shall be submitted with the Application. Any documentation
submitted to this office cannot be returned to the applicant.
APPLICATION FEE
The application processing fee for any Application for a Certificate Of Appropriateness is $20
Payment must accompany the application at the time of submission. For an electronically submitted
application, payment must reach the HPC office within 48 hours following transmission. Payment can be
made by credit card by contacting
Business License Administrator Michelle Adams at (574) 235-5912; by cash in person in the Department of
Community Investment on the 14th floor of the County City Building; or by check made out to City of
South Bend. Applications will NOT be processed without the required fee.
MEETING ATTENDANCE
When an Application has been scheduled for any meeting, the owner, architect or contractor(s) retained for
the project shall attend the meeting where their project will be reviewed and a decision rendered. Failure by
the owner, architect, or contractor to attend such meetings may result in denial of the Application due to
insufficient representation.
CERTIFICATE ISSUANCE
Certificates of Appropriateness will be filed with the Building Department of South Bend and St. Joseph
County. A copy of the Certificate will be emailed directly to the owner and/or contractor(s) listed on the
application.
INSPECTION AUTHORITY
All projects will be inspected during and following execution for compliance with the decision(s) rendered
by the Historic Preservation Commission of South Bend and St. Joseph County.
Owner acknowledges that while the Historic Preservation Commission only considers Certificates of
Appropriateness for exterior features, under certain circumstances it may be necessary for the Commission
Staff to have access to the interior of the building in order to accurately assess the condition of the exterior
feature and that the lack of access to the interior may prevent the Commission Staff from making a
favorable recommendation.
Any work performed on a historic landmark or in an historic district which does not conform to the
Certificate of Appropriateness certificate shall be immediately halted by the Historic Preservation
1
Commission and the Building Department of South Bend and St. Joseph County. Fines may be levied for
projects not in compliance.
I read and understand the information
above:Yes, Continue
Date Wednesday, June 18, 2025
2
Property Information
Property Address for Proposed Work:620 W Washington St
Property City South Bend
Property Zip Code 46601
Property Owner Information:Studebaker Mansion LLC
Owner Email
Owner Address 200 N Church St Suite 200, Mishawaka, IN 46544
Proposed Work and Project Information
All projects must comply with applicable building and zoning codes.
South Bend Zoning Ordinance St. Joseph County Zoning Ordinance
Does your project involve any of the
following? (Check all that apply):Demolition
Contractor Information MGR Masonry Contractors LLC Main entrance to building as
well as various locations around building exterior Manny
Dosal
Contractor Phone Number (574) 931-7554
Contractor Email mgrmasonry1293@yahoo.com
Contractor 2 Information Innovative Spaces Main entrance landing Craig Osman
Contractor 2 Phone Number (574) 247-1999
Contractor 2 Email craig@innovativespacesinc.com
Contractor 3 Information Sautter Construction LLC Fire escape landing & stairs near
main entrance Chris Sautter
Contractor 3 Phone Number (574) 261-6099
Contractor 3 Email sautter.construction@outlook.com
Description of Proposed Work:
1) Replacement of damaged limestone stair tread. Repair to be made in kind with new limestone from
Indiana Limestone.
2) Grinding, smoothing, and sealing of all limestone stair treads at main entrance.
3) Grinding, sanding, & tuckpointing all limestone cracks and locations where treads meet risers with color
matched materials.
3
6/18/2025 $20.00, PayPal Transaction ID 0L143809JN3902041
4) Grinding, repair, & installation of polyurea coating to remedy previously done repairs that were
performed incorrectly. New coating ensures proper traction, UV protection, flexion for expansion &
contraction, as well as a significant improvement in color matching to the existing limestone.
5) Replacement in kind of 5 sections of concrete sidewalks along the west side of the main entrance.
Repairs in kind include a trowel finish concrete.
6) Various tuckpointing repairs around main entrance and along stairs to lower patio along the north side
of the building. Repairs to be done in kind including tinting and finishing in accordance with original
installation methods.
7) Repairs of various stone caps along north and east sides of building. Grinding, mortar replacement, and
sealing to be done as needed. Repairs to be done in kind to preserve original look of exterior as well as
prevent further water penetration and future damage.
8) Repair of column at southwest corner of exterior (just outside sun room). Repair to be made with color
matched epoxy including sand to match color and texture. Repair to restore original look of building while
preventing further damage caused by water intrusion.
9) Cleaning and sealing of damaged limestone walls underneath overhang for carriage drop. Damage was
caused by previous roof leak that was repaired in 2024. Masonry repair to protect existing structure and
prevent further damage.
10) Repair as needed stone wall cap along west side of building where railing attaches. Cleaning, crack
filling, stone repair, and sealing to be completed to prevent further damage.
11) Stone column restoration at northeast corner of property. Loose stone column to be returned to its
originally installed location, secured, and cap reinstalled in kind with original look of proper ty. Includes
grinding and tuckpointing in kind as necessary.
12) Removal, sand blasting, repair, & powder coating (matte black finish) of existing, non-historic fire
escape landing, staircase, & handrail. Temporary replacement to be built of treated lumber while repairs
are being made to metal items. Temporary installation methods will be restricted to no additional building
penetrations beyond current penetrations utilized for metal staircase.
Specification of Material via
Manufacture Brochure:PDF Indiana Geologica….pdf
PDF Innovative Space….pdf
PDF Indiana Limeston….pdf
PDF Innovative Space….pdf
PDF Innovative Space….pdf
4
File Upload
Site Plans, Aerial Views, and/or Blueprints: One (1) set shall be submitted with the Application.
Uploaded documentation must show existing property lines, buildings, structures, and proposed project
location(s). Hand Drawn Plans/Elevations are ok
Photographs to include: each area affected by project, close up detail of project areas.
Windows, Siding, and/or Door projects must include photographs of each window/door/siding affected
by the project and detailed close up of condition
Applications will not be processed if the required photographs and/or documentation are not
included.
Any documentation submitted to this office cannot be returned to the applicant.
Project Type - List:Demolition
Site Plan or Aerial View of Proposed
Project Location(s):PDF Studebaker Mansion Exterior Items.pdf
Structural Drawings/Architectural
Drawings:
2.99 MB
Quote/Evaluation(s) by Repair Professional (Optional):
PDF MGR Estimate.pdf PDF Innovative Spaces Contract.pdf
5
Photographs:
2.99 MB
2.9 MB
2.84 MB
Payment
Invoice ID # INV-000162
Payment Method Pay via Card or PayPal
6
Outlook
Re: 620 W Washington Full COA App
From Todd Zeiger <
Date Tue 6/24/2025 3:38 PM
To Kate Himick <Khimick@southbendin.gov>
Hi, K ate. I have met with the owner's rep and we approved the work per our Easement on the building. If I
can answer any questions or provide any further details about our approval let me know.
Todd
………………………………….
Todd Zeiger
Director, Northern Regional Office
………………………………
Indiana Landmarks
801 W. Washington
South Bend, Indiana 46601
indianalandmarks.org
Indiana Landmarks revitalizes communities, strengthens connections to our diverse heritage, and saves meaningful
places.
Become a member I Subscribe to our e-letter I Find us on Facebook I Follow us on Instagram
From: Kate Himick <Khimick@southbendin.gov>
Sent: Friday, June 20, 2025 10:10 AM
To: Todd Zeiger <
Subject: 620 W Washington Full COA App
Todd,
Thanks for cha ng with me earlier. Just in case you wanted to review it, I've a ached the full COA
applica on that I received for 620 W Washington.
Best,
Kate
________________
CAUTION: This email originated from outside of the City of South Bend’s network . Do not click
links or open attachments unless you validate the sender and know the content is safe. Please
report any suspicious emails to the CyberSecurity team by clicking the Phish Aler t Button in
Outlook .
PRODUCT DESCRIPTIONMENDER X2 AND MENDER X2NC ARE TWO COMPONENT, EASY TO MIX, FAST CURING CRACK AND SPALL REPAIR MATERIALS. MENDER X2 GOES FROM BLACK TO GREY AS IT CURES TO INDICATE COMPLETION. MENDER X2NC IS A NONCOLORED VERSION SPECIFICALLY FOR GRIND AND CLEAR APPLICATIONS.
TYPICAL USES/APPLICATIONS CRACK AND SPALL REPAIR MIXED WITH SAND TO FILL LARGE HOLES AND VOIDS
PRODUCT ADVANTAGES RAPID CURE LOW VISCOSITY EASY TO MIX
PACKAGINGMENDER X210GALLON KITPART A: 5GALLON PAIL PART B: 5GALLON PAIL
MENDER X2NC2GALLON KITPART A: 1GALLON JUGPART B: 1GALLON JUG
STORAGEPRODUCT SHOULD BE STORED INDOORS BETWEEN 60˚F TO 85˚F AWAY FROM DIRECT SUNLIGHT AND MOISTURE.
MAKE SURE CONTAINERS ARE COMPLETELY SEALED TO PREVENT MOISTURE CONTAMINATION AND ENSURE BEST PERFORMANCE.
SHELF LIFE IS 12 MONTHS.
RECOMMENDED APPLICATION TEMPERATURE
SUMMER: 60˚ 80˚ FWINTER: 30˚ 60˚ F
APPLYING MATERIAL OUTSIDE OF THE RECOMMENED TEMPERATURE RANGE MAY DRAMATICALLY INCREASE OR DECREASE CURE SPEED.
TEST DATA
SOLIDS CONTENT:
A+B CURED >98%
WEIGHT PER GALLON ASTM D1475: PART A: 8.52 LB/GAL PART B: 9.00 LB/GAL
VISCOSITY ASTM D7867: PART A: 240 CPS PART B: 60 CPS
GEL TIME:
100 ML RESIN ONLY SUMMER: 5 MIN WINTER: 1.5 MIN
TACK FREE TIME ASTM D5895:
57 MILS, 50% RH SUMMER: 20 MIN WINTER: 5 MIN
SHORE D HARDNESS ASTM D2240: 10 DAY RESIN ONLY: 68 UNITS 10 DAY WITH SAND*: 82 UNITS
ADHESION ASTM D4541: 10 DAY: >500 PSI CONCRETE FAILED
*USING THE RECOMMENDED MIX RATIO OF SAND
ALL TEST DATA COLLECTED AT 70˚F.
Tech Support 952-491-0616 (Call/Text)
techsupport@penntekcoating.com
7850 Lakeville BLVD, Lakeville, MN 55044
Penntek.com
MENDER X2 AND X2-NC
T E CHN I C AL D ATA SHEE T
Page 1
SURFACE PREPARATION
MAKE SURE SURFACE IS PROPERLY ABRADED,
CLEAN, AND DRY BEFORE APPLICATION. SURFACE
MUST BE FREE OF DIRT, GREASE, OIL, AND OTHER
CONTAMINANTS. CONTAMINANTS COULD LEAD TO
SURFACE DEFECTS SUCH AS CRAWLING AND POOR
ADHESION.
ALL CRACKS SHOULD BE GROUND OUT WITH A
VBLADE AND ALL DUST AND DEBRIS REMOVED. IT
MAY BE NECESSARY TO USE A WIRE BRUSH TO
ENSURE CRACKS AND VOIDS ARE PROPERLY
PREPARED.
ENSURE THAT THE FLOOR TEMPERATURE IS MORE
THAN 5 DEGREES OVER THE LOCAL DEW POINT TO
AVOID WATER CONDENSATION.
FLOOR MOISTURE SHOULD BE MONITORED WITH A
NONDESTRUCTIVE ELECTRONIC MOISTURE METER
AS PER ASTM F2659. READING SHOULD BE LOWER
THAN 5.5% BY THIS METHOD.
PREMIX REQUIREMENTS
MENDER X2:
PART A: REMOVE LID AND MIX WITH DRILL MIXER
FOR 2 MINUTES. BE SURE TO SCRAPE THE BOTTOM
OF THE BUCKET TO MIX IN ANYTHING THAT HAS
SETTLED OUT.
PART B: NOT REQUIRED.
MENDER X2NC:
PART A: INVERT AND SHAKE VIGOROUSLY FOR
ABOUT 1 MINUTE. CHECK THAT THERE ARE NOT
SOLIDS ON THE BOTTOM OF THE JUG, CONTINUE
SHAKING AND INVERTING UNTIL UNIFORM.
PART B: NOT REQUIRED.
MIX RATIO:
1:1 MIX RATIO BY VOLUME A:B
+1 PART SAND BY VOLUME OR MORE IF DESIRED
MIX INSTRUCTIONS:
CAREFULLY MEASURE 1 PART A AND 1 PART B BY
VOLUME AND BLEND TOGETHER FOR 2 MINUTES
WITH A DRILL MIXER. MIX IN THE DESIRED AMOUNT
OF SAND. EITHER 4030 OR 5030 GRADE SAND WILL
WORK. PROCEED TO APPLICATION IMMEDIATELY
AFTER MIXING.
NOTE THAT LARGER VOLUME MIXES WILL HAVE A
SHORTER POT LIFE DUE TO THE HEAT GENERATION
OF THE MATERIAL.
MIX IN SMALL BATCHES AS NEEDED. DO NOT MIX
MORE MATERIAL THAN CAN BE USED IN 510
MINUTES.
APPLICATION
1. POUR MIXTURE INTO PRE PREPARED
CRACKS, PITS, AND SPALLS IN THE CONCRETE.
2. AFTER 20 MINUTES, CHECK THAT THE MENDER X2
IS HARD ENOUGH TO GRIND. IF NOT, CHECK IN 10
MORE MINUTES. TEMPERATURE AND HUMIDITY
CONDITIONS WILL AFFECT THE HARDNESS
DEVELOPMENT.
3. GRIND MATERIAL FLUSH WITH THE SURFACE OF
THE CONCRETE. SWEEP AND VACUUM AWAY ANY
LEFTOVER DUST AND DEBRIS. INSPECT REPAIRS
AND PERFORM TOUCH UPS AS NEEDED.
4. FOR A GRIND AND CLEAR FLOOR, USE MENDER
X2NC WITH CLEAN CONCRETE DUST
EXAMPLE: FROM FLOOR GRINDER TO MATCH
CONCRETE APPEARANCE.
PRODUCT AND APPLICATION SUPPORT
REFER TO THE PENNTEK TRAINING MANUAL OR
CONTACT TECHNICAL SUPPORT LINE
9524910616 FOR FURTHER INFORMATION.
Tech Support 952-491-0616 (Call/Text)
techsupport@penntekcoating.com
7850 Lakeville BLVD, Lakeville, MN 55044
Penntek.com
MENDER X2 AND X2-NC
T E CHN I C AL D ATA SHEE T
Page 2
HELPFUL TIPS
KEEP MATERIAL COOL BEFORE USING TO ENSURE MAXIMUM WORK TIME. MINIMIZE HOW LONG CONTAINERS ARE OPEN TO LIMIT MOISTURE EXPOSURE. THIS WILL KEEP OPENED CONTAINERS FRESH FOR LONGER. THE USE OF SAND WILL EXTEND THE WORK TIME. KEEP SAND AS DRY AS POSSIBLE BEFORE USE TO AVOID FOAMING. USE MORE SAND FOR DEEPER AND WIDER CRACKS. THIS WILL HELP REDUCE MATERIAL SOAKING AWAY. START WITH THIN CRACKS AND SMALLER PITS AS THESE WILL TAKE LONGER TO CURE. ALLOWING THE MIX TO THICKEN SLIGHTLY BEFORE APPLYING WILL HELP IT CURE FASTER. WINTER AND SUMMER PART A CAN BE MIXED TO MAKE A “FALL BLEND”. CHOOSE SPEED BASED ON THE SLAB TEMPERATURE OF THE CONCRETE, NOT THE AIR TEMPERATURE.
Tech Support 952-491-0616 (Call/Text)
techsupport@penntekcoating.com
7850 Lakeville BLVD, Lakeville, MN 55044
Penntek.com
MENDER X2 AND X2-NC
T E CHN I C AL D ATA SHEE T
Page 3
TEST DATA
SOLIDS CONTENT (ASTM 2369):
>99.1%
VOC (ASTM 2369):
<10 g/L
WEIGHT PER GALLON (ASTM D1475):
Part A: 9.37 LB/GAL
Part B: 10.22 LB/GAL
VISCOSITY (ASTM D2196):
Part A: 1400 CPS
Part B: 500 CPS
GEL TIME:
Extreme Heat: 1 Hour
Summer: 50 Minutes
Winter: 14 Minutes
TACK FREE TIME (ASTM D5895) 5-6 MILS, 50% RH:
Extreme Heat: 4.0 Hours
Summer: 3.8 Hours
Winter: 2.5 Hours
KÖNIG HARDNESS 30° (ASTM D4366):
15 Day: 31 S
SHORE D HARDNESS (ASTM D2240):
10 Day: 55
ADHESION (ASTM D4541):
10 Day: >500 PSI (Concrete Failed)
TENSILE STRENGTH AND ELONGATION (ASTM D638):
5 MILS Tensile Strength: 4000 PSI
Elongation: 95%
WATER VAPOR TRANSMISSION (ASTM E96/E96M):
4 MILS
Permeability: 0.78 Perms
All test data collected at 70˚F.
Tech Support 952-491-0616 (Call/Text)
techsupport@penntekcoating.com
7850 Lakeville BLVD, Lakeville, MN 55044
Penntek.com
XP 275 POLYUREA/POLYURETHANE PRIMER/BASECOAT
T E CHN I C AL D ATA SHEE T
Page 1
PRODUCT DESCRIPTION
XP 275 is a high solids, low VOC two component
Polyurea/polyurethane primer/basecoat. XP 275
Basecoat provides rapid cure and excellent adhesion
to concrete. Summer, Winter and Extreme Heat
versions allow for ease of application in various
climates and is pre-pigmented for outstanding hide.
TYPICAL USES/APPLICATIONS
• Basecoat for full broadcast floors
• Primer for pigmented topcoat
PRODUCT ADVANTAGES
• Rapid cure
• Excellent adhesion
• Fast return to service
• High solids
• Simple mix ratio
• Easy roller application
PACKAGING
15-Gallon kit
Part A - 5-Gallon Pail (X2)
Part B - 5-Gallon Pail
STORAGE
Product should be stored indoors between 60˚F to
85˚F away from direct sunlight and moisture.
Make sure containers are completely sealed to
prevent moisture contamination and ensure best
performance.
Shelf life is 12 months.
RECOMMENDED APPLICATION TEMPERATURE
XP 275 Extreme Heat: 80˚F - 100˚F
XP 275 Summer: 60˚F - 80˚F
XP 275 Winter: 30˚F - 60˚ F
COVERAGE
270 – 300 SQ.FT./Gal. (5 – 6 mils)
SURFACE PREPARATION
Make sure surface is properly abraded, clean, and dry
before application. Surface must be free of dirt, grease,
oil, and other contaminants. Contaminants could lead to
surface defects and/or poor adhesion.
Ensure that the floor temperature is more than 5
degrees over the local dew point to avoid water
condensation.
Floor moisture should be monitored with a
nondestructive electronic moisture meter as per ASTM
F2659. Reading should be lower than 5.0% by this
method.
PRE-MIX REQUIREMENTS
Part A: Remove lid and mix with drill mixer for 2 minutes
to ensure uniformity.
Part B: Not required.
MIX RATIO:
2:1 mix ratio by volume (A:B)
MIX INSTRUCTIONS:
Carefully measure 2 Parts A and 1 Part B by volume and
blend together for 2 minutes with a drill mixer. Proceed
to application immediately after mixing. Never mix more
material than can be installed within 15 minutes.
APPLICATION
1.Using the appropriate coverage rate, mix only the
amount of material that can be installed within 15
minutes.
2.To extend the working time, pour mixed material onto
floor in a ribbon like pattern.
3.Spread material evenly with a pre-wetted roller. Use a
chip brush to apply around the edges of the floor. 3/8”
nap shed resistant 18” roller and 3-4” chip brush are
recommended.
4.For Broadcast Systems: broadcast within 15 minutes
of the mix time.
5.Work time of the coating is reduced under high
temperature and/or humid conditions.
6.For detailed application instructions, refer to Penntek
Training Manual or contact the technical support line.
PRODUCT AND APPLICATION SUPPORT
Refer to the Penntek Training Manual or contact technical
support line (952-491-0616) for further information.
Tech Support 952-491-0616 (Call/Text)
techsupport@penntekcoating.com
7850 Lakeville BLVD, Lakeville, MN 55044
Penntek.com
XP 275 POLYUREA/POLYURETHANE PRIMER/BASECOAT
T E CHN I C AL D ATA SHEE T
Page 2
CHEMICAL RESISTANCE | 24 HOUR SPOT TESTING
CHEMICAL RESULT
Acetic Acid 30% 2.5
Acetic Acid 5% 4.5
Acetone 1
Ammonia 10% 5
Battery Acid (Sulfuric Acid 37-40%) 4.5*
Brake Fluid 1
Cleaner (Formula 409®) 5
Cleaner (Pine-Sol®) 2*
Cleaner 3% (Pine-Sol®) 4
Coffee 5
Cola 5
Dish Soap (Dawn®) 2*
Dish Soap 1% (Dawn®) 5
Ethylene Glycol / Antifreeze 5
Gasoline 1
Glass Cleaner (Windex®) 4
Hand Sanitizer (Ethanol Based) 1
Household Bleach (10% in water) 3*
Household Bleach 2*
Hydrochloric Acid 20% 4*
Hydrochloric Acid 5% 4.5*
Ice Melt 20% 5
Isopropyl alcohol 99% 1
Ketchup 5
Mineral Spirits 3
Motor Oil (Conventional) 5
Motor Oil (Synthetic) 5
Mustard 4
Sodium Hydroxide 50% 4
Sodium Hydroxide 25% 4
Sodium Hydroxide 5% 4
Sugar Solution 20% 5
Phosphoric Acid 50% 4.5*
Phosphoric Acid 10% 5
Water 5
Windshield Washer Fluid 4
Xylene 1
KEY:
1 = Moderate/severe damage, does not recover 4 = Light damage, fully recovers
2 = Mild damage, does not recover 5 = No damage
3 = Light damage, partially recovers * = Staining
Tech Support 952-491-0616 (Call/Text)
techsupport@penntekcoating.com
7850 Lakeville BLVD, Lakeville, MN 55044
Penntek.com
XP 275 POLYUREA/POLYURETHANE PRIMER/BASECOAT
T E CHN I C AL D ATA SHEE T
Page 3
Tech Support 952-491-0616 (Call/Text)
techsupport@penntekcoating.com
7850 Lakeville BLVD, Lakeville, MN 55044
Penntek.com
Page 1
T E CHN I C AL D ATA SHEE T
PRODUCT DESCRIPTION
NX 300 is a two component polyaspartic topcoat with
high gloss and excellent UV stability. Summer, winter
and extreme heat versions allow for ease of application
in various climates.
TYPICAL USES/APPLICATIONS
Topcoat for full broadcast floors.
PRODUCT ADVANTAGES
• Rapid cure
• Fast return to service
• Simple mix ration
• Easy roller application
PACKAGING
10-Gallon kit
Part A - 5-Gallon Pail
Part B - 5-Gallon Pail
STORAGE
Product should be stored indoors between 60˚F to
85˚F away from direct sunlight and moisture.
Make sure containers are completely sealed to
prevent moisture contamination and ensure best
performance.
Shelf life is 12 months.
RECOMMENDED APPLICATION TEMPERATURE
NX 300 Extreme Heat: 80˚F - 100˚F
NX 300 Summer: 60˚F - 80˚F
NX 300 Winter: 30˚F - 60˚F
COVERAGE
Over broadcast flake: 150 SQ.FT./Gal
Over smooth surface: 200-230 SQ.FT./Gal
(7-8 MILS)
TEST DATA
VOC (FULL KIT):
Extreme Heat: 92 g/L
Summer: 91 g/L
Winter: 65 g/L
WEIGHT PER GALLON (ASTM D1475):
Extreme Heat Part A: 8.78 LB/GAL
Summer Part A: 8.78 LB/GAL
Winter Part A: 9.05 LB/GAL
Part B: 9.96 LB/GAL
VISCOSITY (ASTM D2196):
Extreme Heat Part A: 970 CPS
Summer Part A: 970 CPS
Winter Part A: 340 CPS
Part B: 150 CPS
TACK FREE TIME (ASTM D5895) 8 MILS, 70˚F/50%RH:
Extreme Heat: 10.5 Hours
Summer: 8 Hours
Winter: 1.5 Hours
KÖNIG HARDNESS (ASTM D4366):
Full Hardness: 145 S
TABER ABRASION (ASTM D4060):
CS-17 Wheels, 1000G Load
LOSS/1000 CYCLES: 65 MG
GLOSS (ASTM D523):
60˚: 90 Units
TENSILE STRENGTH AND ELONGATION (ASTM D638):
Tensile Strength: 5000 PSI
Elongation: 5%
WATER VAPOR TRANSMISSION (ASTM E96/E96M):
4MILS
Permeability: 3.2 Perms
ALL TEST DATA COLLECTION AT 70˚F
NX 300 | POLYASPARTIC TOPCOAT
Tech Support 952-491-0616 (Call/Text)
techsupport@penntekcoating.com
7850 Lakeville BLVD, Lakeville, MN 55044
Penntek.com
Page 2
T E CHN I C AL D ATA SHEE T
SURFACE PREPARATION
Product is intended for use as a topcoat over a
previously primed/coated surface. Not intended for
direct to concrete applications.
Surface must be free of dirt, grease, oil, and other
contaminants. Contaminants could lead to surface
defects such as craters and crawling in the coating.
Make sure surface is properly prepared before
application.
Ensure that the floor temperature is more than 5
degrees over the local dew point to avoid water
condensation.
NX 300 can be re-coated after it cures tack-free and
is hard enough to walk on. If re-coating after 24 hours,
the surface needs to be abraded to ensure adequate
adhesion of the next coating layer.
PRE-MIX REQUIREMENTS
Part A: Invert containers 3 times prior to each use to
ensure uniformity.
Part B: Not required.
MIX RATIO:
1:1 mix ratio by volume (A:B)
MIX INSTRUCTIONS:
Carefully measure 1 Part A and 1 Part B by volume
and blend together for 2 minutes with a drill mixer.
Proceed to application immediately after mixing. Never
mix more material than can be installed within 15
minutes.
APPLICATION
1.Using the appropriate coverage rate, mix only the
amount of material that can be installed within 15
minutes.
2.Spread material evenly with a squeegee and back
roll with a pre-wetted roller. Use a chip brush to
apply around the edges of the floor. 3/8” nap shed
resistant 18” roller and 3” chip brush are
recommended.
3.Work time of the coating is reduced under high
temperature and/or humid conditions.
4.For detailed application instructions, refer to
Penntek training manual or contact the technical
support line.
PRODUCT AND APPLICATION SUPPORT
Refer to the Penntek training manual or contact
technical support line (952-491-0616) for further
information.
NX 300 | POLYASPARTIC TOPCOAT
CHEMICAL RESISTANCE 24 HOUR AND 30 MINUTE SPOT TESTING
CHEMICAL 24 HR RESULT 30 MIN RESULT
Acetic Acid 30% 1 2
Acetic Acid 5% 2 5
Acetone 1 2
Ammonia 10% 5
Battery Acid (Sulfuric Acid 37-40%) 4
Betadine Solution 4* 4*
Brake Fluid 2 5
Citric Acid 20% 5
Cleaner (Formula 409®) 4
Cleaner (Pine-Sol®) 4
Cleaner (Pine-Sol® 3%) 5
Coffee 5
Cola 5
Dish Soap (Dawn®) 4
Dish Soap (Dawn® 1%) 5
Ethylene Glycol / Antifreeze 5
Gasoline 2 3
Glass Cleaner (Windex®) 4
Glycerin 5
Hand Sanitizer (Ethanol Based) 2 3
Household Bleach 4
Hydrochloric Acid 20% 1* 3
Hydrochloric Acid 5% 3 5
Ice Melt 20% in water 5
Isopropyl alcohol 99% 1 3
Ketchup 5
Mineral Spirits 5
Motor Oil (Conventional) 5
Motor Oil (Synthetic) 5
Mustard 3* 3*
Phosphoric Acid 50% 2 5
Phosphoric Acid 10% 3 5
Sodium Hydroxide 50% 5
Skydrol® LD-4 3 4
Sugar Solution 20% 5
Water 5
Wind Shield Washer Fluid 4
Xylene 4
KEY:
1 = Moderate/severe damage, does not recover 4 = Light damage, fully recovers
2 = Mild damage, does not recover 5 = No damage
3 = Light damage, partially recovers * = Staining
Tech Support 952-491-0616 (Call/Text)
techsupport@penntekcoating.com
7850 Lakeville BLVD, Lakeville, MN 55044
Penntek.com
Page 3
T E CHN I C AL D ATA SHEE T
NX 300 | POLYASPARTIC TOPCOAT
Welcome To Innovative Where We've
Been Weaving Magic Into Spaces
Since 2007.
Visit Us At Our Office And Showroom
51401 Bittersweet Rd. Granger, In 46530
As A Local Family Owned
Business, We're Passionate
About Transforming Spaces
That Inspire And Elevate
Everyday Living.
Get Ready To Experience The Transformative Power Of
Our Craftsmanship And Dedication To Excellence.
With Risk-Free, High Quality, And Long-Term Solutions We
Guarantee Not Just A Change But A Lasting Impact. From
Turning Concrete Into Works Of Art, Making Garages Epic,
And Closets Downright Sexy, We Redefine Spaces.
No. 4781May 12, 2025
Chris Sautter
620 W Washington St
South Bend, IN 46601
sautter.construction@outlook.com
(574) 261-6099
Prepared for:
Innovative Spaces | Innovative Concrete Coatings | Craig
Osman
51401 Bittersweet Rd, Granger, IN 46530
P: (574) 247-1999 | craig@innovativespacesinc.com
www.ReclaimMySpace.com www.ReclaimMyConcrete.com
CONTRACT
Chris Sautter
Patio and Sidewalks
Quantity
1
Measurement
96.3 (sq. ft.)
Notes
Install Penntek Evolution Flooring System:
An aesthetic, easy to clean, seamless floor consisting of a pigmented primer binder,
broadcast with multi-color acrylic polymer chips and sealed with a transparent UV Stable
topcoat.
• Diamond Profile Concrete per ICRI guidelines for permanent adhesion.
• Diamond Profile Cracks and Imperfections.
• Patch all Cracks and Pitting as indicated with Mender X2 & Diamond Profile.
• Saw Cut, Expansion, and Tool Joints to be honored when present unless specified.
• Base Coat: Install 100% Solids Polyurea of XP 275 primer/binder.
• Decorative Media Layer: Multicolor Acrylic Polymer Chips Broadcast to Rejection.
• Scrape Floor to remove excess broadcast media.
• Install Clear UV Resistant Polyaspartic Top Coat of NX 300 at 11-12 mils thick.
• Traction Additive Included at No Charge
Fair
Concrete Condition
9
Mohs Testing
3.5
Tramex Reading
22" 220V Electric Machine- Hard Surface
Access
Access
Level 3- 4 oz Gator Grip Traction
Additive per gallon
Traction Level
Hybrid Series- Specify Below
Flake Color
Patio and Sidewalks
Upgrade Flake- Hybrid & Custom
Armadillo
Flake Color
Selected Option
Hybrid Flake Series
Quantity
1
Price:$2,896.30
Pricing
$2,896.30Grand Total:
Deposit Amount:$1,737.78
Balance Due:$1,158.52
The purchaser agrees to pay by cash or check upon completion of work specified on invoice and agrees to these
terms and conditions of purchase agreement. Work completed in stages will be invoiced in stages, based upon
work completed.
Please make checks out to: Innovative Spaces, Inc.
• Payment in full is due upon completion of work.
• Nonpayment of invoice will result in a lien against the installation property.
• Lien will be filed 30 days after completion of project, in accordance with applicable laws.
• Cancellations will be subject to a 10% cancellation fee, with the exception of special ordered products, which may not be restocked.
• Innovative Spaces, Inc will only perform work agreed upon invoice.
• Weather conditions may effect schedule change.
• All changes to this contract must be recorded on a separate change order signed by both parties.
• Local permits are responsibility of property owner. Innovative Spaces, Inc is not responsible for the original condition of the concrete.
• We make no warranty against substrate cracks, joints that are filled, or the return of repaired cracks.
• We make no warranty for damage caused by hydrostatic pressure, or moisture vapor permeating the concrete.
• We are not responsible for bugs or animals that may become entrapped while project is curing.
• We are not responsible for water damage from leaking pipes, receptacles, or any faulty seals such as but not limited to doors and windows.
• We are not responsible for unauthorized entry from someone not respecting non-entry signs such as caution tape, cones, signs.
• We are not responsible for paint lift caused by masking materials on painted surfaces.
• Touch up of painted areas may be required after installation of coating.
X X
Chris Sautter
[sig|req|signer1||||240|35][sig|req|signer2||||240|35]
Company Authorized Signature
DISCOVER THE DIFFERENCE OF OUR FLOORS!
See What Sets Our Concrete Coatings Apart.
Hammer Test Stain Test
Stretch Test UV Sunlight Test
What Do Our Clients Say About Their Floors?
This is due to polyureas
extreme flexibility,
elongation, dense cross-
linking and mar resistance.
Polyureas can take a
tremendous amount of
abuse because they are
malleable and can take the
physical impacts and
disperse them, much like
the rubber on a car tire.
4X STRONGER
THAN EPOXY
Polyureas are 98% more
flexible than typical
Epoxy/Hybrid floor
coatings. This flexibility is
key during large
temperature fluctuations.
Polyureas, being as flexible
as they are, expand and
contract with the concrete
leaving the surface strong
and intact.
WILL NOT CHIP, PEEL
OR DELAMINATE
Polyureas are more
chemically resistant to a
much wider range of
chemicals than epoxy
surfaces. This is due to their
densely cross-linked
chemistry. From Stains, Oil,
Gas, and Grease, to Acids,
Skydrol, Hydroxides,
Polyureas will stand the test
of time. Polyureas are also
100% UV stable.
RESISTS STAINS, OIL,
GASOLINE AND UV RAYS
NO POLYASPARTIC OR
EPOXY BASECOAT
10X MORE
FLEXIBLE
100%
PURE POLYUREA
WHY CHOOSE INNOVATIVE CONCRETE COATINGS?
Our quality surface coatings are installed by factory trained technicians
and backed by our exclusive No Subcontractor Guarantee.
You’ll work with trained and
certified technicians who
share our company
commitment to exceptional
floor coatings and on-time,
hassle-free service.
PROFESSIONAL
TECHNICIANS
Designed by a team of
experienced flooring
chemists our floor finishes
are made for maximum
durability, resilience and
weather and heat
resistance.