Laserfiche WebLink
RESPONSIBLE OFFICE <br />SJCA, Inc. <br />105 E Jefferson Blvd, Suite 216 <br />South Bend, Indiana 46601 <br />317-566-0629 <br />Authorized Negotiator <br />Sherly George, PE <br />Executive Vice President and COO <br />sgeorge@sjcainc.com <br />Point of Contact <br />Robin Warner, Director of Construction <br />Inspection and Project Manager <br />rwarner@sjcainc.com <br />PROFESSIONAL SERVICESMay 27, 2025 <br />LETTER OF INTEREST <br />CITY OF SOUTH BEND <br />CONSTRUCTION INSPECTION SERVICES FOR SAFE ROUTES <br />TO SCHOOL AT KENNEDY ACADEMY (DES. 2201237) <br />Gemma Stanton, ERC/Project Engineer <br />227 W Jefferson Boulevard <br />South Bend, IN 46601 <br />EXPERIENCED TEAM & PROJECT MANAGER <br />Robin Warner will serve as your Project Manager and primary point of contact. Robin has all the credentials and <br />certifications required by INDOT for Construction Inspection. With extensive experience in federally and locally <br />funded projects, he is well-equipped to ensure the successful delivery of this Safe Routes To School project for the <br />City of South Bend. <br />PRACTICAL & COST-EFFECTIVE APPROACH <br />SJCA Inc. is known for our quick response time and dedication to a project. Our construction inspection approach <br />has been highly rated through evaluations and comments. SJCA has visited the project site and formed a strategic <br />project understanding and approach based on our in-person observations to manage construction services and <br />keep this project on schedule. Our ability to be proactive before a project begins demonstrates that we are eager <br />to work with the City of South Bend. <br />CAPACITY TO DELIVER <br />Over the past few years, SJCA has increased capacity by growing to approximately 100 employees, with the <br />commitment of serving our clients with additional resources and capabilities to handle any project challenges. We <br />have added McCormick Engineering, who we have teamed with on previous construction inspection projects, as <br />a partner. With well-qualified team members and sufficient capacity, the SJCA team can provide added value to the <br />project if the contractor desires to accelerate the schedule. <br />We appreciate the City of South Bend considering SJCA for this project and look forward to a partnership that successfully <br />delivers it! <br />Sincerely, <br />TEAM PREQUALIFICATIONS % <br />SJCA, Inc. <br />13.1 Construction Inspection 95% <br />McCormick Engineering 13.1 Construction Inspection <br />5% (DBE) <br />SJCA 95% <br />McCormick 5%