My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quote Opening - Olive Rd. Lighting Over Indiana Toll Rd. - Michiana Contracting, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Quotations
>
Quote Opening - Olive Rd. Lighting Over Indiana Toll Rd. - Michiana Contracting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:00:36 PM
Creation date
9/29/2016 10:27:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/27/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date: <br />Address: <br />pil l'!i b <br />tv tr <br />CITY OF SOUTH BEND, INDIANA w <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK <br />PROJECT NAME: Olive Road Lighting over the Indiana Toll Road <br />PROJECT NO. 115-124 <br />QUOTES DUE September 27.2016 at 9:30 a.m. Local Time <br />(Must be completed for all quotes. Please type or print) <br />09/27/2016 <br />Firm: Michiana Contracting, Inc. <br />7843 Lilac Road (shipping) PO Box 929 (mailing) <br />City/State/Zip: Plymouth, IN 46563 Telephone Number: ( 574 ) 936.8613 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />Olive Road Lighting over the Indiana Toll Road Project No. 115-124 <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The Cityof South Bend, Department of Public Works <br />and dated I for the sum of (enter the Total Quote as shown on the Proposal) <br />Twenty eight thousand ninety two dollars and no cents (g 28,092.00 ) <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. /J <br />By /Qa.� <br />(Signature) <br />Donald W. Wendel President <br />(Printed Name of Person Signing) <br />The above quote is accepted this <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />James A. Mueller, Member <br />ACCEPTANCE <br />_ day of <br />David P. Relos, Member <br />Therese J. Dorau, Member <br />Attest: Linda M. Martin, Clerk <br />`rr <br />Addendum #1 9/23/2016 Page - 7 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.