Laserfiche WebLink
This is EXHIBIT A, consisting of 8 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated <br />Engineer's Services <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br />Engineer shall provide Basic and Additional Services, as set forth below. <br />PART 1— BASIC SERVICES <br />A1.01 Topographic Survey Activities: <br />A. The project area is located within LaSalle Park and is bound by Washington Street to the South, <br />and Falcon Street to the West. Any areas needing to be surveyed outside of the project limits shall <br />be provided by the City of South Bend. <br />B. JPR will provide the following information as it pertains to the survey tasks: <br />• Establish both horizontal and vertical control throughout the project limits utilizing both GPS <br />survey grade equipment as well as conventional survey equipment. <br />• Request utility locates per the Indiana 811 Call Before You Dig call center. Please note that the <br />utilities that will be marked by this company do not include any private utilities. Should private <br />utilities exist within the project limits it may be necessary to contact a private utility locating <br />company to have these lines marked in the field. Fees associated with a private utility locating <br />company are not a part of this proposal. <br />• Correspondence with utility companies to facilitate the locate process. This may include <br />requesting record utility information so the location of the utilities may be graphically depicted <br />on the drawings. <br />• Collect the topographic information within the project limits, including but not limited to, <br />sanitary and storm structures, edges of pavement and curb lines, building corners, observed <br />utilities, trees and spot elevations <br />• Collect invert information for the sanitary and storm structures within the project limits. <br />• Perform research to acquire subdivision plats, prior surveys, and roadway plans. <br />• Prepare a CAD drawing of the existing site conditions that will include a surface model with <br />contours for design purposes. <br />Limitations <br />• Invert measurements made on storm and sanitary structures will be made from above ground <br />only, utilizing methods that do not require confined space entry apparatus, such as ventilation <br />and extraction equipment. <br />• Utility lines will be shown based upon field evidence located during our field investigation <br />and per plans and markings provided by the owner, utility companies, or their <br />representatives. We cannot certify that all utilities required are available. <br />Page 18 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />