My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 (Final) PCA - Colfax Avenue and Hill Street Improvements Div A - TGB Unlimited
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Order and Project Completion Affidavits
>
Change Order No 1 (Final) PCA - Colfax Avenue and Hill Street Improvements Div A - TGB Unlimited
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:39:00 PM
Creation date
7/12/2016 3:38:55 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/12/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend Project No. 114-118A <br />OWNER: <br />City of South Bend <br />ENGINEER: <br />Abonmarche Consultants, Inc. <br />Daryl S. Knip, P.E. <br />Professional Engineer No. 19900163 <br />CONTRACTOR: <br />TGB Unlimited d/b/a S/T Bancroft. <br />PROJECT: <br />Colfax Avenue and Hill Street Street Improvements <br />Project No. 114-018 <br />SUBJECT: <br />Clarifications and Revisions to Contract Documents <br />ISSUE DATE: <br />May 14, 2016 <br />Change Order No. 1 - 06/28/16 <br />This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be <br />incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change Order: <br />1. Reduction in final project cost. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />SPECIFICATIONS: <br />XXXV. Light Pole and Luminaire, Light Pole Foundation <br />B. Additions.: <br />"Eliminated two light poles and one single light luminaire and one double light luminaire and <br />including the two concrete bases. <br />Ver. 3/16/2015 Contractor's Quote For Public Works-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.