Schedule 2 <br />Exhibit 6 <br />1=EMP or IPMVP <br />® Option B <br />Retrofit Isolation <br />Project Benefits are determined by freid measurement of the energy use of the systems to which the improvement <br />measure was applied, separate from the energy use of the rest of the facility. Short-term, long-term or continuous <br />measurements are taken throughout the pre &post-retrofit period of the contract. <br />Engineering calculations using short term, long-term of continuous pre &post-retrofit measurements will be used to <br />calculate the Project Benefits for the life of the contract. <br />SOUTH BEND: <br />JOHNSON CONTROLS, INC. <br />Initials: Initials: <br />Page 14 of 20 <br />Performance Contract (Rev 14) <br />SB LED Contract_15June 2007_FINAL(ver7) <br />