Laserfiche WebLink
11 /23/2015 <br /> 68-15 Sec VI : Proposal <br /> •Proposed Fee Structure: <br /> •Filing Fee $25 <br /> •Excavation of 100 linear feet or less, and for each tunnel opening greater: <br /> • In Roadway Pavement $200 <br /> • Outside of Roadway Pavement $25 <br /> •An additional charge of$25 required for each additional 100 linear feet of <br /> continuous excavation.). <br /> 1112312015 5.1566-15 13 <br /> 68-15 Sec VI : Justification <br /> -The long-term integrity and durability of pavement is lessened with each patch. It is <br /> important that it be properly inspected to prevent degradation. <br /> -Proper Inspection of an excavation in a roadway requires multiple site-visits. <br /> 1. Prior to Excavation—Authorization of location <br /> 2. Final Excavation <br /> 3. Placement and Compaction of Backfill <br /> 4. Pavement <br /> Concrete-Authorization to pour based on reinforcing,dowels,etc. <br /> Asphalt—Material,Layers <br /> 5. Final <br /> •Costs <br /> • 5 visits by a Project Inspector would cost$190 <br /> • Review and Scheduling by Manager of Public Construction would cost at minimum$24 <br /> • <br /> 7 <br />