My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6A(1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2014
>
09-25-14 Redevelopment Commission Meeting
>
6A(1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2014 8:52:25 AM
Creation date
9/24/2014 8:52:19 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Delete Section P. of Appendix "A" in its entirety. <br /> P. Not Used. <br /> 3. Section T.3. of Appendix "A" is modified as follows: <br /> T. The ENGINEER shall prepare construction plans for the items described below (Bid <br /> Packages 3 & 4) (see Figures 2, 3, 4 and 5). The Bid Package 3 shall consist of converting <br /> the block bounded by Michigan, St. Joseph, Marion and Navarre Streets into a <br /> consolidated parking lot (Area 1). Also, included in Bid Package 3 is conversion of the <br /> block bounded by Michigan, Main, Marion and Madison Streets into a consolidated <br /> parking lot, Gateway Lot (Area 2). <br /> Bid Package 4 shall comprise of the following items: <br /> _ . - - _ • - - •. . . <br /> • . _ •• • • <br /> . . • . . _ . ! - . <br /> • !, . - - • f • . • . . <br /> • <br /> 5)T <br /> approval, <br /> 3. The Engineer shall design a reconfiguration of the parking lot bounded by west <br /> R/W of Michigan, the east R/W of Main, the north R/W of Bartlett Streets and <br /> south R/W of Park Lane. The design improvements shall take into <br /> consideration the roadway improvements shown as part of City Project No. <br /> 114-032 for Michigan Street, Bartlett Street and Park Lane. <br /> The reconfigured parking lot will be a surface parking lot with no gate system. <br /> Lighting for this reconfigured parking lot should be similar to the Spaulding <br /> Li htin .# 2 @180-D12-A-S25-H3-F-Q-WH-F1 (pole assembly) #SRT20-PW-WH, <br /> 9 9 <br /> that were provided for the previous bid Package #2 parking lot improvement <br /> 2of8 <br /> Supplemental Agreement No. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.