Laserfiche WebLink
Table (No. 22). In the following chart please indicate companies that were used for purchasing <br />materials used in the construction or rehabilitation associated with the project. Include the <br />location of the company, description of the materials, and cost of the materials. Additional <br />information may be requested for verification of this information. (If more space is needed, <br />please photocopy this page). <br />Name and Address of Com an llescri tion of Materials Lost o1 Materials <br />** Please see Response Below** <br />**At this time, Stanz has engaged an Architect to design and provide an estimate of costs to <br />construct the proposed facility. The Architect may also be engaged as the General Contractor to <br />manage the construction project. Stanz intends to procure as much materials (which are <br />available locally) as possible and intends that more than 75% of its materials which are available <br />locally will be purchased locally. Stanz commits to meet with the Department of Community <br />and Economic Development to provide the information requested above after Stanz has more <br />detailed information to provide on its materials and suppliers. <br />.,~ ,.. <br />~~;, <br />Table 22 .~ ;~;;-;~+r:;r r~ <br />