My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tabled - Change Order No 2 - Dylan Dr Lighting Proj No 119-047 - Michiana Contracting (2)
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Change Orders
>
Tabled - Change Order No 2 - Dylan Dr Lighting Proj No 119-047 - Michiana Contracting (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2026 11:10:59 AM
Creation date
8/10/2026 11:10:55 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/28/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CO #DATE <br />119-047-2 07/07/2026 <br />City of South Bend, Public Works Engineering, Phone: (574) 235-9251 <br />215 S. Dr. MLK Jr. Blvd., South Bend, IN 46601 <br />Page 1 <br /> Subject: Change Order 2 <br />BILL TO <br />City of South Bend <br />Public Works Engineering <br />215 S. Dr. MLK Jr. Blvd. Ste. 400 <br />South Bend, IN 46601 <br />PROJECT <br />Dylan Drive Lighting Enhancements <br />PROJECT #: 119-047 <br />215 South Doctor Martin Luther King Junior Boulevard <br />Suite 400 <br />South Bend, IN 46601 <br />DESCRIPTION <br />Wire & fuse replacement for north side of Dylan Dr <br />Item Qty Price/Unit Total <br />5 Conductor #4 6,095 $17.20/LFT $104,834.00 <br />3 Conductor #10 1,585 $5.02/LFT $7,956.70 <br />Lighting Connections 38 $201.14/EA $7,643.32 <br /> <br /> <br />Subtotal $120,434.02 <br />Tax: (0%)$0.00 <br />Total $120,434.02
The URL can be used to link to this page
Your browser does not support the video tag.