My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - SB Bike Garage Bathroom Design Proj No 126-041 - Alliance Architecture Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Agreements/Contracts/Proposals/Addenda
>
PSA - SB Bike Garage Bathroom Design Proj No 126-041 - Alliance Architecture Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2026 11:08:53 AM
Creation date
8/10/2026 11:08:50 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/28/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />AGREEMENT <br />BETWEEN OWNER AND ENGINEER <br />FOR <br />PROFESSIONAL SERVICES <br /> <br /> <br />THIS IS AN AGREEMENT effective as of July 28, 2026 (“Effective Date”) between <br />Board of Public Works, City of South Bend, Indiana ("Owner") and Alliance Architects, Inc. <br />(“Engineer”). <br /> <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br /> <br /> Wayne Street Garage Restroom and Ramp (“Project"). <br /> <br />Engineer’s Services under this Agreement are generally identified as follows: <br /> <br /> Architectural and Engineering design services for the addition of a restroom within the tenant <br />space (SB Bike Garage), and the addition of an accessible ramp from the parking area to an elevated <br />skyway, all located at 119 West Wayne Street, South Bend. Work will include conceptual design, <br />construction documents, bidding or quoting, and construction administration. Work will also include <br />locating connection points to sewer and water service for the restroom. <br /> <br />Owner and Engineer further agree as follows: <br /> <br />1.01 Basic Agreement and Period of Service <br />A. Engineer shall provide, or cause to be provided, the services set forth in this Agreement. If <br />authorized by Owner, or if required because of changes in the Project, Engineer shall furnish <br />services in addition to those set forth above. Owner shall pay Engineer for its services as set forth <br />in Paragraphs 7.01 and 7.02. <br />B. Engineer shall complete its services within a reasonable time, or within the following specific time <br />period: October 30, 2026 for completion of design and construction documents. <br />C. If the Project includes construction-related professional services, then Engineer's time for <br />completion of services is conditioned on the time for Owner and its contractors to complete <br />construction not exceeding 12 months. If the actual time to complete construction exceeds the <br />number of months indicated, then Engineer's period of service and its total compensation shall be <br />appropriately adjusted.
The URL can be used to link to this page
Your browser does not support the video tag.